Site 19536001 - Klemtu

  • Status

    Long term monitoring completed. No further action required.
  • Site Status

    Closed
  • Classification

    Not a Priority for Action

Site Details

  • Reporting Organization

  • Reason for Involvement

    A reserve as defined in the Indian Act
  • Property Type

    Canada Lands

Site Location

Locate this site on map
  • Latitude, Longitude

    52.59339, -128.53409
  • Municipality

    Kitasoo 1, BC
  • Federal Electoral District

    Skeena--Bulkley Valley

Site Management Strategy

  • Remediation

Contaminant Details

Contamination Estimate

  • Cubic Meters

    2

The following contaminated media was identified on the site:

Contaminant Type Medium Type
PHCs (petroleum hydrocarbons) Soil

Action Plan

In 2000, petroleum hydrocarbon contaminated soil was identified at the health centre: the aboveground storage tank at the health clinic, and the aboveground storage tank at the nurse's residence. Soil remediation was carried out in 2003. Follow-up sampling in 2005 indicate that less than 5 cubic metres of contaminated oil remained at the nurse's residence. An environmental site assessment conducted in February 2007 confirmed four areas of petroleum hydrocarbon soil contamination: at the aboveground storage tank at the health clinic, at the aboveground storage tank at the generator shed, at the trailer residence, and to the east of the trailer residence. Remediation was completed in the four areas that were impacted and a total of 2 cubic metres of soil was removed and placed in a biocell in the community. Site remediated.

Population

This table contains the population estimates at distances around the site.

Radius Population
1 km199
5 km349
10 km349
25 km349
50 km349

Summary of Annually Reported Data

Total Expenditures

  • Assessment

    $41,500.00
  • Remediation

    $60,610.64

FCSAP Expenditures

  • Assessment

    $41,500.00

Financial/Annual Information

2008-2009

  • Reporting Organization

    Health Canada
  • Internal Identifier

    540-KL-02
  • Highest Step Completed

    10 Long-Term Monitoring (Optional)
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $0.00
  • Total Care Maintenance Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Care Maintenance Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    2 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    Yes

2007-2008

  • Reporting Organization

    Health Canada
  • Internal Identifier

    540-KL-02
  • Highest Step Completed

    09 Confirmatory Sampling and Final Reporting
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $60,610.64
  • Total Care Maintenance Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Care Maintenance Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    0 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    No

2006-2007

  • Reporting Organization

    Health Canada
  • Internal Identifier

    540-KL-02
  • Highest Step Completed

    07 Develop Remediation/Risk Management Strategy
  • Total Assessment Expenditure

    $41,500.00
  • Total Remediation Expenditure

    $0.00
  • Total Care Maintenance Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $41,500.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Care Maintenance Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    2.75 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    5.5 t
  • Closed

    No

2005-2006

  • Reporting Organization

    Health Canada
  • Internal Identifier

    540-KL-02
  • Highest Step Completed

    03 Initial Testing Program
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $0.00
  • Total Care Maintenance Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Care Maintenance Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    2.75 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    5.5 t
  • Closed

    No