Site 00000843 - Takla Landing

  • Status

    Long term monitoring completed. No further action required.
  • Site Status

    Closed
  • Classification

    Not a Priority for Action

Site Details

  • Reporting Organization

  • Reason for Involvement

    A reserve as defined in the Indian Act
  • Property Type

    Canada Lands

Site Location

Locate this site on map
  • Latitude, Longitude

    55.48242, -125.97376
  • Municipality

    North Tacla Lake, BC
  • Federal Electoral District

    Skeena--Bulkley Valley

Site Management Strategy

  • Remediation

Contaminant Details

Contamination Estimate

  • Cubic Meters

    5

The following contaminated media was identified on the site:

Contaminant Type Medium Type
PHCs (petroleum hydrocarbons) Soil

Action Plan

In 2004, significant soil contamination was observed inside the generator building and beneath an adjacent fuel barrel dock. An environmental site assessment conducted in February 2007 confirmed soil contamination in the vicinity of the generator building. Fuel drums at both locations were determined to be in poor condition and were removed in June 2007. In 2007/08, the remediation was completed at the site. Approximately 5 cubic metres of contaminated soil was removed from the site and moved to a temporary biocell in the community landfill. Site is remediated.

Population

This table contains the population estimates at distances around the site.

Radius Population
1 km200
5 km280
10 km280
25 km280
50 km376

Summary of Annually Reported Data

Total Expenditures

  • Assessment

    $44,000.00
  • Remediation

    $91,460.48

FCSAP Expenditures

  • Assessment

    $44,000.00

Financial/Annual Information

2008-2009

  • Reporting Organization

    Health Canada
  • Internal Identifier

    608-TL-04
  • Highest Step Completed

    10 Long-Term Monitoring (Optional)
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $0.00
  • Total Care Maintenance Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Care Maintenance Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    5 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    Yes

2007-2008

  • Reporting Organization

    Health Canada
  • Internal Identifier

    608-TL-04
  • Highest Step Completed

    09 Confirmatory Sampling and Final Reporting
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $91,460.48
  • Total Care Maintenance Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Care Maintenance Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    5 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    No

2006-2007

  • Reporting Organization

    Health Canada
  • Internal Identifier

    608-TL-04
  • Highest Step Completed

    07 Develop Remediation/Risk Management Strategy
  • Total Assessment Expenditure

    $44,000.00
  • Total Remediation Expenditure

    $0.00
  • Total Care Maintenance Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $44,000.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Care Maintenance Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    0 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    No

2005-2006

  • Reporting Organization

    Health Canada
  • Internal Identifier

    608-TL-04
  • Highest Step Completed

    03 Initial Testing Program
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $0.00
  • Total Care Maintenance Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Care Maintenance Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    0 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    No