Site 19876001 - Fort Ware

  • Status

    Long term monitoring completed. No further action required.
  • Site Status

    Closed
  • Classification

    Not a Priority for Action

Site Details

  • Reporting Organization

  • Reason for Involvement

    A reserve as defined in the Indian Act
  • Property Type

    Canada Lands

Site Location

Locate this site on map
  • Latitude, Longitude

    57.43071, -125.63835
  • Municipality

    Fort Ware 1, BC
  • Federal Electoral District

    Prince George--Peace River--Northern Rockies

Site Management Strategy

  • Remediation

Contaminant Details

Contamination Estimate

  • Cubic Meters

    10

The following contaminated media was identified on the site:

Contaminant Type Medium Type
PHCs (petroleum hydrocarbons) Soil

Action Plan

In 1998, 3 cubic metres of heavy staining was reported at the site of the former aboveground storage tanks located behind the existing nursing station. An environmental site assessment conducted in October 2006 indicates petroleum hydrocarbon soil contamination in the amount of 29,900 milligrams per kilogram beginning at a soil depth of 0.6 metres. Contamination extends to 6 metres underground (to the water table). Approximately 10 cubic metres of soil was removed from the impacted area and moved to a temporary biocell located in the community landfill for treatment. A risk assessment was conducted to evaluate potential risks to receptors at the Site based on current conditions. Risks were considered acceptable for receptors in the current and construction scenarios. Site is remediated.

Population

This table contains the population estimates at distances around the site.

Radius Population
1 km200
5 km373
10 km373
25 km373
50 km373

Summary of Annually Reported Data

Total Expenditures

  • Assessment

    $115,000.00
  • Remediation

    $47,725.26

FCSAP Expenditures

  • Assessment

    $115,000.00

Financial/Annual Information

2008-2009

  • Reporting Organization

    Health Canada
  • Internal Identifier

    610-FW-01
  • Highest Step Completed

    10 Long-Term Monitoring (Optional)
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $0.00
  • Total Care Maintenance Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Care Maintenance Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    10 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    Yes

2007-2008

  • Reporting Organization

    Health Canada
  • Internal Identifier

    610-FW-01
  • Highest Step Completed

    09 Confirmatory Sampling and Final Reporting
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $47,725.26
  • Total Care Maintenance Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Care Maintenance Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    10 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    No

2006-2007

  • Reporting Organization

    Health Canada
  • Internal Identifier

    610-FW-01
  • Highest Step Completed

    07 Develop Remediation/Risk Management Strategy
  • Total Assessment Expenditure

    $115,000.00
  • Total Remediation Expenditure

    $0.00
  • Total Care Maintenance Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $115,000.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Care Maintenance Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    0 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    No

2005-2006

  • Reporting Organization

    Health Canada
  • Internal Identifier

    610-FW-01
  • Highest Step Completed

    06 Classify the site using the CCME National Classification System
  • Total Assessment Expenditure

    $0.00
  • Total Remediation Expenditure

    $0.00
  • Total Care Maintenance Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $0.00
  • FCSAP Remediation Expenditure

    $0.00
  • FCSAP Care Maintenance Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    0 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    No