Site 00003180 - SLESSE CREEK NEAR VEDDER CROSSING

  • Status

    Confirmatory sampling completed. No further action required.
  • Site Status

    Closed
  • Classification

    Medium Priority for Action

Site Details

Site Location

Locate this site on map
  • Latitude, Longitude

    49.071111, -121.69944
  • Municipality

    Fraser Valley E, BC
  • Federal Electoral District

    Chilliwack--Hope

Site Management Strategy

  • Remediation
  • Periodic Monitoring
  • Additional assessment
  • Assessment
  • Risk Management

Contaminant Details

Contamination Estimate

  • Cubic Meters

    2
  • Tons

    2

The following contaminated media was identified on the site:

Contaminant Type Medium Type
PAHs (polycyclic aromatic hydrocarbon) Sediment
PAHs (polycyclic aromatic hydrocarbon) Surface soil
PAHs (polycyclic aromatic hydrocarbon) Soil
PAHs (polycyclic aromatic hydrocarbon) Other medium
Metal, metalloid, and organometallic Sediment
Metal, metalloid, and organometallic Surface soil
Metal, metalloid, and organometallic Soil
Metal, metalloid, and organometallic Other medium
Other Physical/Chemical (pH, temperature, dissolved solids, turbidity, etc.) Sediment
Other Physical/Chemical (pH, temperature, dissolved solids, turbidity, etc.) Surface soil
Other Physical/Chemical (pH, temperature, dissolved solids, turbidity, etc.) Soil

Population

This table contains the population estimates at distances around the site.

Radius Population
1 km4
5 km102
10 km1,032
25 km95,408
50 km284,871

Summary of Annually Reported Data

Total Expenditures

  • Assessment

    $29,452.96
  • Remediation

    $50,512.47

FCSAP Expenditures

  • Assessment

    $29,452.96
  • Remediation

    $50,512.47

Financial/Annual Information

2009-2010

  • Reporting Organization

    Environment and Climate Change Canada
  • Internal Identifier

    00003180
  • Highest Step Completed

    09 Confirmatory Sampling and Final Reporting
  • Total Assessment Expenditure

    $29,452.96
  • Total Remediation Expenditure

    $50,512.47
  • Total Care Maintenance Expenditure

    $0.00
  • Total Monitoring Expenditure

    $0.00
  • FCSAP Assessment Expenditure

    $29,452.96
  • FCSAP Remediation Expenditure

    $50,512.47
  • FCSAP Care Maintenance Expenditure

    $0.00
  • FCSAP Monitoring Expenditure

    $0.00
  • Actual Cubic Meters Remediated

    0 m3
  • Actual Hectares Remediated

    0 ha
  • Actual Tons Remediated

    0 t
  • Closed

    Yes