Search Results
Search Results Summary | |
---|---|
Criteria: |
|
Sort Key: | FCSI Identifier (ascending) |
Sites Found: | 97 |
Results by Site Impact
Change results view to: Name and Location Contaminants and Media
FCSI Identifier Site Name |
Status | Fiscal Year | Classification | Highest Step Completed |
---|---|---|---|---|
00000851
Spruce Point - Metals Impacted Soil |
Detailed testing completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00002331
Maintenance Garage Compound |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00002697
APEC 2 - Former Reed Homestead |
Initial testing completed. No further action required. | 2010-2011 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00002699
APEC 3 - Former Townsend Homestead |
Initial testing completed. No further action required. | 2010-2011 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00002700
APEC 4 - Former Watters Homestead |
Initial testing completed. No further action required. | 2010-2011 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00006184
5 - Esgenoopetitj First Nation - 06006 - ESGENOÔPETITJ INDIAN RESERVE NO. 14 / 1000012093 |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00006247
12 - Oromocto - 06017 - OROMOCTO 26 / 1000044296 |
Detailed testing completed. No further action required. | 2012-2013 | 1 High Priority for Action | 05 Detailed Testing Program |
00006370
16 - Tobique - 06025 - TOBIQUE 20 - 1000017493 |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00006455
7 - Eel Ground - 06011 - EEL GROUND 2 - 1000000793 |
Historical review completed. No further action required. | 2015-2016 | 02 Historical Review | |
00006841
5 - Esgenoopetitj First Nation - 06006 - ESGENOÔPETITJ INDIAN RESERVE NO. 14 - 0203131306 |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00011596
Portobello Creek (former container dumpsite) |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00012452
Lower Neguac Wharf Former Rear Range (No Issues) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 05 Detailed Testing Program |
00012601
POINTE-SAPIN (No Impacted Soil/GW- Petroleum Storage on Adjacent CO-OP Property) |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00012633
MISCOU - No Soil Impacts- Barrel Storage Area |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00012634
LE GOULET (No Soil Impacts in Dredge Spoil Disposal Area) |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00016912
Big Shippegan (No Impacts at Burn Pit) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00016926
Cape Jourimain (Former) Range Front - No Impacts |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00016947
Cocagne Range Front - No Impacts |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00016953
Dixon Point Former Range Rear - No Petroleum Hydrocarbon Impacts |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00016971
Shippagan SAR (PAHs in Soil and Sediment) |
Initial testing completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00016981
Lameque Range Front (Contamination is Unlikely) |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
00016982
Lameque Range Rear (No Concerns Identified) |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
00016995
Lower Neguac Wharf Range Rear (Soil Impacts- Metals and PAHs) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017011
Miscou Harbour Range Front - No Impacts Identified |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017028
Oak Channel Range Front - Arsenic in Soil |
Initial testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017029
Oak Channel Range Rear - No Impacts |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00017053
Pointe du Chene Range Rear (No Hydrocarbon/PAH impacts to soil) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00017057
Pointe Sapin Range Front - No Issues |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00017095
St. Andrews Bank Ranges - No Impacts - Front Light |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017096
St. Andrews Bank Ranges - No Impacts - Rear Light |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017612
Cherry Islet - Former Light Area Assessed No Action Required |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017619
Deer Point - No Issues |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017630
Greys Point - No Further Work Required |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017656
Oak Point - No Issues |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00017683
Birch Cove - No Impacts Identified |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018021
ALMA (Metals in Soil/GW) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018022
ANSE-BLEUE (No Land Based Impacts Identified) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018023
BACK BAY (No Land Based Impacts Identified) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00018025
BARRE-DE-COCAGNE (CORMIERVILLE) (Dredge Spoil contamination) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018026
BEAVER HARBOUR (no land based impacts) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018031
BOTSFORD (MURRAY CORNER) (PAHs in Soil, Potential Groundwater Impacts) |
Detailed testing completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00018035
CAP-PELÉ (PAHs in Soil, Zinc in Soil) |
Detailed testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00018038
CARAQUET (No Land Based Impacts Identified) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018039
CHANCE HARBOUR (no land based impacts) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018045
GRANDE-ANSE (lead in soil) |
Initial testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018052
INGALLS HEAD - Soil/GW Impacts- Former Spill Area and Waste Oil Tank Area |
Detailed testing completed. No further action required. | 2015-2016 | 1 High Priority for Action | 05 Detailed Testing Program |
00018058
LEONARDVILLE (No Soil/GW Impacts-Adj. Waste Oil Tank) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018059
PETIT-CAP (PAH in Sediment) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018061
LITTLE SHEMOGUE (EMILY'S POINT) - PAH in soil |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00018067
CAP-DE-SAINT-LOUIS (No Land Based Impacts Identified) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018069
MACES BAY (PAH in soil near wharf area) |
Remediation / risk management completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00018073
MILLER BROOK (SALMON BEACH) - No Land Based Impacts |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018077
MISCOU - No Soil Impacts- Dredge Spoil Disp. Area |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018078
NEGUAC (No Land Based Impacts) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00018081
NORTH HEAD -FISHERMEN'S WHARF (Hydrocarbon Staining- Fmr. USTs/Waste Oil Tank) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018082
NORTH HEAD -FISHERMEN'S WHARF (No Soil/GW Petroleum Impacts -Adjacent Property) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018085
PIGEON HILL (Pigeon Hill- No Land Based Impacts) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018087
POINTE-SAPIN (No Impacted Soil- Various Sources) |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00018090
CAP-LUMIÈRE (RICHIBUCTO CAPE) - No Land Based Impacts Identified |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018094
SAINT-EDOUARD-DE-KENT (No Impacts Identified) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018096
SEAL COVE-FISHERMEN'S WHARVES (No Soil/GW Impacts- Fmr. USTs/ASTs/Waste Oil Tank) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018100
LE GOULET (No Soil Impacts - Petroleum Hydrocarbons) |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00018101
LE GOULET (No Soil Impacts in Storage Compound) |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00018103
ST. MARTINS (No Petroleum Hydrocarbon Impacts in Soil/GW) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018111
VAL-COMEAU (No Land Based Impacts) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018114
WHITE HEAD - No Environmental Contamination |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00023144
ROBICHAUD (PAH contamination near dredge spoils) |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00024384
GRANDE-ANSE (dredge soil containment area) |
Initial testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024385
MCEACHERNS POINT (WISHART POINT) - Dredge Spoil Containment Area |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024386
POINTE-SAPIN (Dredge Spoil Containment Area) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
00024387
PETIT-CAP (Dredge Spoil Containment Area) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00024388
MILLER BROOK (SALMON BEACH) - Dredge Spoil Containment Area |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00024389
ESCUMINAC (Dredge Spoil Containment Area) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00025159
Military History Museum Gagetown |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025558
Creosote Treated Wood - Bennett Brook |
Initial testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
03920001
Coast Guard Base Saint John (PAH Impacts in Soil/GW, Metal Impacts in Soil) |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
03922001
Partridge Island Light and DGPS Station |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03983001
Southwest Head - Metals Impacts in Soil |
Detailed testing completed. No further action required. | 2012-2013 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
03984001
Machias Seal Island - Limiting access risk management site closed |
Detailed testing completed. No further action required. | 2012-2013 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
03987001
Great Duck Island - Metals in Soil |
Detailed testing completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
04248001
Grindstone Island West End - Soil Metal and TPH impacts |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 05 Detailed Testing Program |
04312002
LES ABOITEAUX (DUPUIS CORNER) - Benzene, Uranium and PAH Impacts in soil |
Remediation / risk management completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
04338002
221-C05 Coal Storage Area |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
04448001
Buctouch Bar (No Impacts) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 05 Detailed Testing Program |
04667013
Potato Research Centre |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
04718001
Additional Phase II Sampling - Government of Canada Building - Woodstock, NB |
Confirmatory sampling completed. No further action required. | 2011-2012 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
04981002
SHIPPAGAN (Hydrocarbon near Fish waste tanks) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
05339001
3 - Elsipogtog First Nation - 06004 - RICHIBUCTO 15 - 1000001193 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
05339002
3 - Elsipogtog First Nation - 06004 - RICHIBUCTO 15 - 1000002993 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
05339003
3 - Elsipogtog First Nation - 06004 - RICHIBUCTO 15 - 1000002493 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
05339004
3 - Elsipogtog First Nation - 06004 - RICHIBUCTO 15 - 1000005093 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
05339005
3 - Elsipogtog First Nation - 06004 - RICHIBUCTO 15 - 1000029095 |
Initial testing completed. No further action required. | 2023-2024 | I Insufficient Information | 03 Initial Testing Program |
05341001
6 - Madawaska Maliseet First Nation - 06009 - ST BASILE 10 - 1000033995 |
Confirmatory sampling completed. No further action required. | 2015-2016 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
24386001
231-C02 Atlantic Fuel Spill Site |
Confirmatory sampling completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
33854001
Letang Salmon Farm (Metals and Hydrocarbons in Soil near storage area) |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
37255001
Saint John Ferry Terminal |
Remediation / risk management completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
81836001
Cape Jourimain (Former) back Range - No Impacts in Soil |
Detailed testing completed. No further action required. | 2012-2013 | 1 High Priority for Action | 05 Detailed Testing Program |
- Version:
- 40