Results by Site Impact
Change results view to: Name and Location Contaminants and Media
FCSI Identifier Site Name |
Status | Fiscal Year | Classification | Highest Step Completed |
---|---|---|---|---|
00000430
682 - Tahltan - 07655 - TELEGRAPH CREEK 6 - 7000023894 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00000540
534 - Hagwilget Village Council - 06786 - HAGWILGET 1 - 0902234405 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00000541
683 - Iskut - 08363 - ISKUT 6 - 0902234505 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00000543
681 - Kitsumkalum - 07646 - KITSUMKAYLUM 1 - 0902236405 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
00000545
530 - Witset First Nation - 06748 - MORICETOWN 1 - 0902240305 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00000546
530 - Witset First Nation - 06751 - BABINE 17 - 0902240405 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00000547
530 - Witset First Nation - 06749 - CORYATSAQUA (MORICETOWN) 2 - 0902240505 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00000548
530 - Witset First Nation - 06749 - CORYATSAQUA (MORICETOWN) 2 - 0902240605 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00000557
530 - Witset First Nation - 06749 - CORYATSAQUA (MORICETOWN) 2 - 0902244805 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00000577
540 - Kitasoo - 07886 - KITASOO NO. 1 - 0902281305 |
Initial testing completed. No further action required. | 2011-2012 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000578
540 - Kitasoo - 07886 - KITASOO NO. 1 - 0902281405 |
Initial testing completed. No further action required. | 2011-2012 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000579
540 - Kitasoo Xai'xais Nation - 07886 - KITASOO 1 - 0902281505 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00000580
540 - Kitasoo - 07886 - KITASOO 1 / 0902281605 |
Detailed testing completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00000885
New Aiyansh Offices & Residences/ Nass Camp |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00001265
Moose River near Red Pass |
Confirmatory sampling completed. No further action required. | 2019-2020 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00002449
Operation's Building |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00002450
Dease Lake Weather Station (Consolidated) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00002452
Former Storage Tank |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00002909
TUYA RIVER NEAR TELEGRAPH CREEK |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00002910
Stikine river at Telegraph creek |
Confirmatory sampling completed. No further action required. | 2008-2009 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00002913
SURPRISE CREEK NEAR THE MOUTH |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00002915
Nass river above Shumal creek |
Confirmatory sampling completed. No further action required. | 2010-2011 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00002934
TWO MILE CREEK IN DISTRICT LOT 4834 |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00002935
SKEENA RIVER AT USK |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00002938
EXCHAMSIKS RIVER NEAR TERRACE |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00002940
Deep creek above reservoir |
Historical review completed. No further action required. | 2008-2009 | 02 Historical Review | |
00002950
Kemano river above powerhouse tailrace |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
00002951
Kitimat river below Hirsch creek |
Confirmatory sampling completed. No further action required. | 2008-2009 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00002952
HIRSCH CREEK NEAR THE MOUTH |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00002953
Little Wedeene river below Bowbyes creek |
Detailed testing completed. No further action required. | 2008-2009 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00003085
Bowron river below Box Canyon |
Detailed testing completed. No further action required. | 2008-2009 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00003140
Chilko river near Redstone |
Confirmatory sampling completed. No further action required. | 2010-2011 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00004458
671 - Nisga'a Village of Gingolx - 07705 - KINCOLITH 14 - 0902466605 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00004461
671 - Nisga'a Village of Gingolx - 07705 - KINCOLITH 14 - 0902466905 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00004492
532 - Kispiox - 06761 - KISPIOX 1 - 0902470005 |
Historical review completed. No further action required. | 2017-2018 | 02 Historical Review | |
00004675
677 - Nisga'a Village of New Aiyansh - 07579 - NEW AIYANSH 1 - 0902488305 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00004774
534 - Hagwilget First Nation Government - 06786 - HAGWILGET 1 - 0902498205 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00004780
531 - Gitanmaax - 06755 - GITANMAAX 1 - 0902498805 |
Historical review completed. No further action required. | 2017-2018 | 02 Historical Review | |
00004781
532 - Kispiox - 06761 - KISPIOX 1 - 0902498905 |
Historical review completed. No further action required. | 2017-2018 | 02 Historical Review | |
00005192
683 - Iskut - 08363 - ISKUT 6 - 0902540005 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00006217
678 - Nisga'a Village of Laxgalt'sap - 07611 - LACHKALTSAP 9 - 7000023494 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00006218
682 - Tahltan - 07658 - DEASE LAKE 9 - 7000023794 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00006249
535 - Gitsegukla - 06773 - NEW GITSEGUKLA NO 2 - 7000073796 |
Long term monitoring completed. No further action required. | 2000-2001 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
00006276
531 - Gitanmaax - 06755 - GITANMAAX 1 - 7000099798 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00006277
682 - Tahltan - 09034 - GUHTHE TAH NO. 12 - 7000101598 |
Confirmatory sampling completed. No further action required. | 2008-2009 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00006278
530 - Witset First Nation - 06751 - BABINE 17 - 7000103998 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00006288
680 - Kitselas - 07644 - KULSPAI 6 - 7000120598 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00006323
533 - Glen Vowell - 06760 - SIK-E-DAKH NO. 2 - 7000108798 |
Confirmatory sampling completed. No further action required. | 2009-2010 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00006324
676 - Haisla Nation - 07620 - KITAMAAT 2 - 7000105598 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00006349
530 - Moricetown - 06748 - MORICETOWN NO. 1 - 7000103498 |
Long term monitoring completed. No further action required. | 2000-2001 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
00006359
680 - Kitselas - 07643 - ZAIMOETZ NO. 5 - 7000047195 |
Confirmatory sampling completed. No further action required. | 2002-2003 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00006404
531 - Gitanmaax - 06755 - GITANMAAX 1 - 7000099898 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
00006405
535 - Gitsegukla - 06772 - GITSEGUKLA 1 - 7000100898 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00006406
682 - Tahltan - 07658 - DEASE LAKE 9 - 7000101998 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00006407
530 - Witset First Nation - 06748 - MORICETOWN 1 - 7000103698 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00006408
530 - Witset First Nation - 06751 - BABINE 17 - 7000103898 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00006409
676 - Haisla Nation - 07620 - KITAMAAT 2 - 7000105698 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00006438
537 - Gitanyow - 06782 - GITANYOW 1 - 7000099498 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00006448
682 - Tahltan - 09034 - GUHTHE TAH 12 - 7000101698 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00006459
676 - Haisla Nation - 07620 - KITAMAAT 2 - 7000040194 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00006463
678 - Nisga'a Village of Laxgalt'sap - 07611 - LACHKALTSAP 9 - 7000023594 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00006473
682 - Tahltan - 07658 - DEASE LAKE NO. 9 - 7000102098 |
Confirmatory sampling completed. No further action required. | 2008-2009 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00006475
530 - Witset First Nation - 06748 - MORICETOWN 1 - 7000103798 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00006476
533 - Glen Vowell - 06760 - SIK-E-DAKH 2 - 7000108698 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006489
531 - Gitanmaax - 06755 - GITANMAAX NO. 1 - 7000099698 |
Confirmatory sampling completed. No further action required. | 2009-2010 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00006490
537 - Gitanyow - 06782 - GITANYOW 1 / 7000100498 |
Historical review completed. No further action required. | 2023-2024 | 02 Historical Review | |
00006498
682 - Tahltan - 07655 - TELEGRAPH CREEK NO. 6 - 0902034105 |
Detailed testing completed. No further action required. | 2008-2009 | 1 High Priority for Action | 05 Detailed Testing Program |
00006515
535 - Gitsegukla - 06772 - GITSEGUKLA 1 - 7000100198 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00006530
531 - Gitanmaax - 06755 - GITANMAAX 1 - 7000099998 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00006531
533 - Glen Vowell - 06760 - SIK-E-DAKH 2 - 7000108998 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00006533
682 - Tahitan - 07655 - TELEGRAPH CREEK NO. 6 - 0902034205 |
Historical review completed. No further action required. | 2008-2009 | 02 Historical Review | |
00006540
537 - Gitanyow - 06782 - GITANYOW 1 - 7000099398 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00006541
535 - Gitsegukla - 06772 - GITSEGUKLA 1 - 7000100398 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00006543
530 - Moricetown - 06748 - MORICETOWN NO. 1 - 7000103198 |
Confirmatory sampling completed. No further action required. | 2009-2010 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00006544
678 - Nisga'a Village of Laxgalt'sap - 07611 - LACHKALTSAP NO. 9 - 7000104598 |
Confirmatory sampling completed. No further action required. | 2010-2011 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00006545
676 - Haisla Nation - 07620 - KITAMAAT 2 - 7000105498 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00006572
535 - Gitsegukla - 06772 - GITSEGUKLA 1 - 7000100298 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00006586
535 - Gitsegukla - 06772 - GITSEGUKLA 1 - 7000100698 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00006591
530 - Witset First Nation - 06748 - MORICETOWN 1 - 7000103398 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00006593
530 - Witset First Nation - 06748 - MORICETOWN 1 - 7000103598 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00006594
535 - Gitsegukla - 06772 - GITSEGUKLA 1 - 7000100998 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00006765
536 - Gitwangak - 06776 - GITWANGAK NO. 2 - 0903020806 |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00006766
536 - Gitwangak - 06776 - GITWANGAK 2 - 0903020906 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00006813
671 - Nisga'a Village of Gingolx - 07705 - KINCOLITH NO. 14 - 7000110298 |
Confirmatory sampling completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00006909
679 - Nisga'a Village of Gitwinksihlkw - 07614 - ZAULZAP 29 - 0903290807 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00006912
671 - Nisga'a Village of Gingolx - 07705 - KINCOLITH NO. 14 - 0903296807 |
Detailed testing completed. No further action required. | 2010-2011 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00006917
682 - Tahltan - 07655 - TELEGRAPH CREEK 6 - 0903328907 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00006918
683 - Iskut - 08363 - ISKUT 6 - 0903329007 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00006933
540 - Kitasoo Xai'xais Nation - 07886 - KITASOO 1 - 0903376808 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00007014
678 - Nisga'a Village of Laxgalt'sap - 07611 - LACHKALTSAP 9 - 0903580908 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00007015
678 - Nisga'a Village of Laxgalt'sap - 07611 - LACHKALTSAP NO. 9 - 0903582808 |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00007016
677 - Nisga'a Village of New Aiyansh - 07579 - NEW AIYANSH 1 - 0903582908 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00007576
531 - Gitanmaax - 06755 - GITANMAAX 1 / 0904113609 |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00007648
680 - Kitselas - 07643 - ZAIMOETZ NO. 5 - 0902116305 |
Confirmatory sampling completed. No further action required. | 2010-2011 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00007674
678 - Nisga'a Village of Laxgalt'sap - 07611 - LACHKALTSAP 9 - 0904385609 |
Long term monitoring completed. No further action required. | 2017-2018 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
00007712
680 - Kitselas - 07644 - KULSPAI NO. 6 - 0904501709 |
Confirmatory sampling completed. No further action required. | 2010-2011 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00007714
680 - Kitselas - 07644 - KULSPAI NO. 6 - 0904503709 |
Confirmatory sampling completed. No further action required. | 2010-2011 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00007718
680 - Kitselas - 07637 - KITSELAS NO. 1 - 0904507709 |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00007719
680 - Kitselas - 07637 - KITSELAS NO. 1 - 0904507809 |
Confirmatory sampling completed. No further action required. | 2010-2011 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00007720
680 - Kitselas - 07637 - KITSELAS NO. 1 - 0904509809 |
Confirmatory sampling completed. No further action required. | 2010-2011 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00007721
680 - Kitselas - 07641 - KSHISH NO. 4 (INCLUDES KSHISH 4A) - 0904509909 |
Confirmatory sampling completed. No further action required. | 2010-2011 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00007761
676 - Haisla Nation - 07619 - KITAMAAT 1 - 0904607609 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00007764
534 - Hagwilget Village - 06786 - HAGWILGET 1 - 0904613609 |
Confirmatory sampling completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00007829
681 - Kitsumkalum - 07646 - KITSUMKAYLUM NO. 1 - 0904739610 |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00007852
682 - Tahltan - 07655 - TELEGRAPH CREEK NO. 6 - 0904771610 |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00007869
534 - Hagwilget Village - 06786 - HAGWILGET 1 - BC04790210 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008197
678 - Nisga'a Village of Laxgalt'sap - 07611 - LACHKALTSAP 9 - BC04824911 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008201
540 - Kitasoo Xai'xais Nation - 07886 - KITASOO 1 - BC04825611 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008204
540 - Kitasoo Xai'xais Nation - 07886 - KITASOO 1 - BC04825911 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008209
540 - Kitasoo Xai'xais Nation - 07886 - KITASOO 1 - BC04826011 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00011140
Iskut river at outlet of Kinaskan lake |
Confirmatory sampling completed. No further action required. | 2008-2009 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00011150
Nazko river above Michelle creek |
Confirmatory sampling completed. No further action required. | 2010-2011 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00011163
Skeena river at Glen Vowell |
Confirmatory sampling completed. No further action required. | 2010-2011 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00011165
Stikine river above Choquette river |
Confirmatory sampling completed. No further action required. | 2008-2009 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00011584
NASS RIVER ABOVE SHUMAL CREEK |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00019443
Allen Point |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00019475
Borde Island |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00019539
Clio Point |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00019551
Cornwall Point |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00019584
Dorothy Island |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00019601
Emilia Island |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00019604
Europa Point |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00019632
Freeman Point |
Initial testing completed. No further action required. | 2022-2023 | 03 Initial Testing Program | |
00019643
Gertrude Point |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00019670
Griffin Point |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00019689
Hawkesbury Island |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00019698
Hilton Point |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00019720
Jorkins Point |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00019730
Kersey Point |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00019731
Kingcome Point |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00019746
Legace Point |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00019747
Legge Point |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00019768
Maitland Island Southwest End |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00019776
Mary Point |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00019867
Redcliffe Point |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00019875
Rix Island |
Detailed testing completed. No further action required. | 2023-2024 | 07 Develop Remediation/Risk Management Strategy | |
00019896
Sarah Island |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00020047
Work Island |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00020073
Abrams Island |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020076
Alice Arm |
Initial testing completed. No further action required. | 2022-2023 | 03 Initial Testing Program | |
00020077
Alice Arm Wharf |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020197
Ashdown Island |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020200
Baker Point |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020203
Duckers Island |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020204
Dupont Island and Dupont Island South |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00020207
Haig Rock |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00020208
Jacinto Islands RACON |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020211
Logan Rock |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020212
Levy Point |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020215
Parry Patch |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00020216
Ramsbotham Island |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020217
Split Head (Separation Point) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00020220
Reef Point |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00020224
Walsh Rock |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020225
Wedge Point |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00020226
York Point |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00020228
Lombard Point |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00020230
Blackrock Point |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020235
Money Point |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020236
Fin Rock |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020238
Hiekish Narrows |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00020239
Hewitt Island |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020248
Point Cumming |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020249
Plover Point |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020253
Quarry Point |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020254
Staniforth Point |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020255
Trivett Point |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020256
Tomkinson Point |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020259
Tenas Island |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020296
Brooke Shoal |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00020303
Double Islets |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020305
Fort Point |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020309
Hattie Island |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020313
Lizard Point (Portland Inlet) |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020314
Leading Point |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00020317
Mill Bay |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020319
Otter Passage |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020320
Observatory Inlet - Minor Shore Light |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00020322
Pearse Canal Island |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00020323
Ramsden Point |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020324
Richards Point |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020325
Stewart |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00020326
Stewart Dophin West |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020337
Hyde Rock |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00020343
Liddle Island |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00020348
Pearson Point |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020644
Kincolith Breakwater - Possible creosote compounds from timber batteries |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
00020683
Hiekish Narrows - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00020686
Moody Point - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00020693
Sager Island - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00020726
Alexander Island |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020741
Kitimat Radio - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00020742
Klemtu Mountain |
Historical review completed. No further action required. | 2015-2016 | 02 Historical Review | |
00020744
Mount Dent |
Historical review completed. No further action required. | 2017-2018 | 02 Historical Review | |
00020745
Mount Gil |
Initial testing completed. Detailed testing underway. | 2023-2024 | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) | |
00020760
Trutch Island |
Historical review not required. | 2016-2017 | 01 Identify Suspect Sites | |
00020791
Thornhill Mountain Antenna Tower, was Copper Mtn. - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00020799
Mount Sarah, Swindle Island Repeater Site - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00020805
Nine Mile Mountain Repeater - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00020814
Mount Jackman - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00020815
Hoeft Mountain Repeater Site - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00020816
Hawkesbury Island |
Historical review completed. No further action required. | 2017-2018 | 02 Historical Review | |
00020817
Flint Repeater - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00020945
Cranberry River Proposed Fishway - No Contamination Identified |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00020948
Deep Creek CEDP Hatchery |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00020964
Gingit Creek Spawning Channel |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
00020983
Kitimat Hatchery |
Initial testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00020988
Kwinamass Guardian Cabin - Unassessed |
Initial testing completed. No further action required. | 2018-2019 | 03 Initial Testing Program | |
00021006
Meziadin Fishway - No Contamination Identified |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00021012
Moricetown Falls Fishway - No Contamination Identified |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00021023
Nass River Test Site - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00021026
New Hazelton Field Office - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00021027
New Hazelton / 4787,13th Avenue - Entire Property |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00021106
Lower Stikine River Cabin |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00021109
Tahltan Lake Field Camp |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00021114
Terrace Warehouse - Unassessed |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
00021165
Terrace Field Office - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00021191
Arnoup Creek Fishway - No Contamination Identified |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00021195
Canoona Fishway - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00021210
North Seaskinnish Creek Fishway - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00021211
Salmon Creek Fishway, Ucluelet - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00021229
Kincolith CEDP Hatchery |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00021230
Klemtu (Kitasoo) CEDP Hatchery |
Initial testing completed. Detailed testing underway. | 2023-2024 | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) | |
00021241
Kitsumkalum Hatchery - Unassessed |
Historical review not required. | 2015-2016 | 01 Identify Suspect Sites | |
00021259
Moricetown, 1989 - Unassessed |
Historical review not required. | 2015-2016 | 01 Identify Suspect Sites | |
00021262
Kildala River Field Camp - Unassessed |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00021330
GREENVILLE-FLOATS |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00021341
KITAMAAT VILLAGE |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00021346
KLEMTU |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00021444
STEWART |
Detailed testing completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00021461
HARTLEY BAY-MOORING BUOYS - Unassessed |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
00021467
KINCOLITH |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00021514
Canyon Island Field Camp - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00022800 | Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
00022802 | Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
00022803 | Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
00022804 | Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
00022805 | Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
00022806 | Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
00022807 | Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
00022808 | Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
00023395 | Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
00025809 | Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00025812
Dease Lake RCMP Detachment Site |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00025853
681 - Kitsumkalum - 07646 - KITSUMKAYLUM 1 - BC04849314 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025854
- BC04850814 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025864
676 - Haisla Nation - 07620 - KITAMAAT 2 - BC04851314 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00025940
681 - Kitsumkalum - 07646 - KITSUMKAYLUM 1 - BC04868316 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00025972
676 - Haisla Nation - 07620 - KITAMAAT 2 - BC04871716 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00026505
681 - Kitsumkalum - 07646 - KITSUMKAYLUM 1 - BC04881517 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
00028148
New Hazelton RCMP Detachment |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
05037001
534 - Hagwilget First Nation Government - 06786 - HAGWILGET 1 - 7000048895 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05037002
534 - Hagwilget Village Council - 06786 - HAGWILGET 1 - 7000108598 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
05045003
671 - Nisga'a Village of Gingolx - 07705 - KINCOLITH 14 - 7000110398 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05045004
671 - Nisga'a Village of Gingolx - 07705 - KINCOLITH NO. 14 - 7000110498 |
Confirmatory sampling completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05045005
671 - Nisga'a Village of Gingolx - 07705 - KINCOLITH NO. 14 - 7000110598 |
Remediation / risk management completed. No further action required. | 2000-2001 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05045006
671 - Nisga'a Village of Gingolx - 07705 - KINCOLITH NO. 14 - 7000110698 |
Remediation / risk management completed. No further action required. | 2000-2001 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05045007
671 - Nisga'a Village of Gingolx - 07705 - KINCOLITH 14 - 7000110798 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05045008
671 - Nisga'a Village of Gingolx - 07705 - KINCOLITH 14 - 7000110998 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05045009
671 - Nisga'a Village of Gingolx - 07705 - KINCOLITH NO. 14 - 7000110898 |
Long term monitoring completed. No further action required. | 2000-2001 | I Insufficient Information | 10 Long-Term Monitoring (Optional) |
05046001
532 - Kispiox - 06761 - KISPIOX NO. 1 - 7000105898 |
Confirmatory sampling completed. No further action required. | 1998-1999 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05046003
532 - Kispiox - 06761 - KISPIOX NO. 1 - 7000106298 |
Confirmatory sampling completed. No further action required. | 2008-2009 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05046004
532 - Kispiox - 06761 - KISPIOX NO. 1 - 7000123698 |
Confirmatory sampling completed. No further action required. | 2008-2009 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05046005
532 - Kispiox - 06761 - KISPIOX 1 - 7000106098 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05046006
532 - Kispiox - 06761 - KISPIOX NO. 1 - 7000106398 |
Confirmatory sampling completed. No further action required. | 2008-2009 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05046007
532 - Kispiox - 06761 - KISPIOX NO. 1 - 7000106498 |
Confirmatory sampling completed. No further action required. | 2008-2009 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05046008
532 - Kispiox - 06761 - KISPIOX 1 - 7000106598 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
05046009
532 - Kispiox - 06761 - KISPIOX 1 - 7000106698 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05046010
532 - Kispiox - 06761 - KISPIOX NO. 1 - 7000106798 |
Confirmatory sampling completed. No further action required. | 2008-2009 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05046011
532 - Kispiox - 06761 - KISPIOX NO. 1 - 7000047595 |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
05046012
532 - Kispiox - 06761 - KISPIOX NO. 1 - 7000105998 |
Confirmatory sampling completed. No further action required. | 2008-2009 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05046013
532 - Kispiox - 06761 - KISPIOX 1 - 7000106198 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05047001
540 - Kitasoo - 07886 - KITASOO NO. 1 - 7000040594 |
Long term monitoring completed. No further action required. | 2008-2009 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
05047002
540 - Kitasoo - 07886 - KITASOO NO. 1 - 7000040694 |
Confirmatory sampling completed. No further action required. | 2008-2009 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05047003
540 - Kitasoo - 07886 - KITASOO NO. 1 - 7000093697 |
Confirmatory sampling completed. No further action required. | 2000-2001 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05047004
540 - Kitasoo - 07886 - KITASOO NO. 1 - 7000093797 |
Confirmatory sampling completed. No further action required. | 2000-2001 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05047005
540 - Kitasoo - 07886 - KITASOO NO. 1 - 7000093997 |
Confirmatory sampling completed. No further action required. | 1999-2000 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05047006
540 - Kitasoo - 07886 - KITASOO NO. 1 - 7000040494 |
Long term monitoring completed. No further action required. | 2002-2003 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
05047007
540 - Kitasoo - 07886 - KITASOO NO. 1 - 7000040794 |
Historical review not required. | 2010-2011 | 01 Identify Suspect Sites | |
05047008
540 - Kitasoo - 07886 - KITASOO NO. 1 - 7000093897 |
Confirmatory sampling completed. No further action required. | 2000-2001 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05047009
540 - Kitasoo - 07886 - KITASOO NO. 1 - 0902032405 |
Confirmatory sampling completed. No further action required. | 2008-2009 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05048001
681 - Kitsumkalum - 07646 - KITSUMKAYLUM 1 - 7000036494 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05048002
681 - Kitsumkalum - 07646 - KITSUMKAYLUM 1 - 7000105398 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05336001
677 - Nisga'a Village of New Aiyansh - 07579 - NEW AIYANSH 1 - 7000022094 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05336002
677 - Nisga'a Village of New Aiyansh - 07579 - NEW AIYANSH NO. 1 - 7000021994 |
Confirmatory sampling completed. No further action required. | 2010-2011 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05336003
677 - Nisga'a Village of New Aiyansh - 07579 - NEW AIYANSH 1 - 7000029594 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05336005
677 - Nisga'a Village of New Aiyansh - 07579 - NEW AIYANSH NO. 1 - 7000021894 |
Long term monitoring completed. No further action required. | 2000-2001 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
05336007
677 - Nisga'a Village of New Aiyansh - 07579 - NEW AIYANSH 1 - 7000097397 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05336008
677 - Nisga'a Village of New Aiyansh - 07579 - NEW AIYANSH 1 - 7000097497 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05336010
677 - Nisga'a Village of New Aiyansh - 07579 - NEW AIYANSH 1 - 0902036505 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05337002
679 - Nisga'a Village of Gitwinksihlkw - 07613 - GITWINKSIHLKW NO. 7 - 7000023294 |
Long term monitoring completed. No further action required. | 2009-2010 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
05337005
679 - Nisga'a Village of Gitwinksihlkw - 07614 - ZAULZAP NO. 29 - 7000108298 |
Confirmatory sampling completed. No further action required. | 2008-2009 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05337006
679 - Nisga'a Village of Gitwinksihlkw - 07613 - GITWINKSIHLKW NO. 7 - 7000108398 |
Confirmatory sampling completed. No further action required. | 2009-2010 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05337007
679 - Nisga'a Village of Gitwinksihlkw - 07613 - GITWINKSIHLKW 7 - 7000108498 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05362001
536 - Gitwangak - 06775 - GITWANGAK 1 - 7000067896 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05362002
536 - Gitwangak - 06775 - GITWANGAK NO. 1 - 0901232403 |
Historical review not required. | 2005-2006 | 01 Identify Suspect Sites | |
05362003
536 - Gitwangak - 06775 - GITWANGAK NO. 1 - 0901232503 |
Historical review not required. | 2005-2006 | 01 Identify Suspect Sites | |
05362004
536 - Gitwangak - 06775 - GITWANGAK NO. 1 - 7000107898 |
Long term monitoring completed. No further action required. | 2000-2001 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
05362005
536 - Gitwangak - 06775 - GITWANGAK NO. 1 - 7000071296 |
Long term monitoring completed. No further action required. | 2000-2001 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
05362006
536 - Gitwangak - 06775 - GITWANGAK 1 - 7000071396 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
05362010
536 - Gitwangak - 06775 - GITWANGAK 1 - 7000071496 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
05362012
536 - Gitwangak - 06775 - GITWANGAK 1 - 7000107398 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
05362013
536 - Gitwangak - 06775 - GITWANGAK 1 / 7000107498 |
Historical review completed. No further action required. | 2023-2024 | 02 Historical Review | |
05362014
536 - Gitwangak - 06775 - GITWANGAK 1 - 7000107598 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
05362015
536 - Gitwangak - 06775 - GITWANGAK 1 / 7000108098 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
05364001
683 - Iskut - 08363 - ISKUT 6 - 7000046494 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05364002
683 - Iskut - 08363 - ISKUT 6 - 7000046394 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05364005
683 - Iskut - 08363 - ISKUT 6 - 7000107098 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
05378001
677 - Nisga'a Village of New Aiyansh - 07580 - AIYANSH (KITLADAMAS) NO. 1 - 7000101398 |
Confirmatory sampling completed. No further action required. | 2010-2011 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05382008
530 - Witset First Nation - 06748 - MORICETOWN 1 - 7000103298 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
05382009
535 - Gitsegukla - 06772 - GITSEGUKLA 1 - 7000100798 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
19118001
679 - Nisga'a Village of Gitwinksihlkw - 07613 - GITWINKSIHLKW NO. 7 - 7000023094 |
Confirmatory sampling completed. No further action required. | 2009-2010 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
19536001
Klemtu |
Long term monitoring completed. No further action required. | 2008-2009 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
34099001
Air Navigation Facility: Non Directional Beacon |
Historical review not required. | 2001-2002 | 01 Identify Suspect Sites | |
36868019
Klemtu RCMP |
Confirmatory sampling completed. No further action required. | 2007-2008 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
67678001
Boat Bluff |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67683001
McInnes Island |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0074001
Waterlot |
Historical review not required. | 2001-2002 | 01 Identify Suspect Sites | |
N0074002
Uplands |
Detailed testing completed. No further action required. | 2010-2011 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
- Version:
- 40