Results by Site Impact
Change results view to: Name and Location Contaminants and Media
FCSI Identifier Site Name |
Status | Fiscal Year | Classification | Highest Step Completed |
---|---|---|---|---|
00000911
Residential Housing Units Fort Henry Heights |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00000958
Various around Base, screening point for Phase 2&3 |
Historical review completed. No further action required. | 2006-2007 | 02 Historical Review | |
00012676
KINGSTON (CONFEDERATION BASIN)(Waterlot) |
Detailed testing completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00012809
KINGSTON-PORTSMOUTH HARBOUR (Waterlot near gas pumps and near current waste oil AST) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00012810
KINGSTON-PORTSMOUTH HARBOUR (Northeast portion of |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00012983
441-C07 Frontenac Institution - Regional Garage Fuel Storage Tank System |
Remediation / risk management completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00012984
441-C02 Frontenac Institution - Barnyards |
Initial testing completed. No further action required. | 2011-2012 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012990
441-L03 Frontenac Institution - Landfill #3 at Quarry Road and Little Cataraqui Creek Tributary |
Confirmatory sampling completed. No further action required. | 2020-2021 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00012997
423-C01-A Active Firing Range #1 |
Detailed testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00012998
423-C01-B Active Firing Range #2 |
Detailed testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00012999
423-L01 Bath Institution - Landfill at Firing Range |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013000
423-L03 Bath Institution - Landfill Near Parking Lot |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
00013013
450-C01-A Older active firing range |
Initial testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013014
450-C01-B Newer Active Firing Range |
Historical review completed. No further action required. | 2014-2015 | 02 Historical Review | |
00013160
KINGSTON-PORTSMOUTH HARBOUR (Northwest corner of p |
Detailed testing completed. No further action required. | 2021-2022 | I Insufficient Information | 06 Classify the site using the CCME National Classification System |
00013727
Banford Point - Soil on the centre and all four corners of the site |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00013733
Bateau Channel, 2 minor shore light - No Contamination Identified |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00013734
Bateau Channel # 3 - No Contamination Identified |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00013735
Bayfield Island (Area surrounding structure) |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00013751
Brothers Island West - No Contamination Identified |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00013768
Carruthers Point minor shore light - No Contamination Identified |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00013774
Cassidy Shoal Minor Shore Light - in the area of t |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013777
Cedar Island - Close to the navigational aid |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013791
Confederation Marina - No Contamination Identified |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00013829
Grog Island - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00013834
Howe Island - No Contamination Identified |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00013835
Howe Island Ferry -No Contamination Identified |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00013846
Kerr Point - Unassessed |
Historical review completed. No further action required. | 2023-2024 | 02 Historical Review | |
00013849
Kingston Ferry Terminal (Unassessed) |
Historical review completed. No further action required. | 2022-2023 | 02 Historical Review | |
00013850
Kingston Harbour Breakwall (No Contamination Identified) |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00013851
Kingston SAR (No Contamination Identified) |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00013934
Nicholson's Point - No Contamination Identified |
Historical review completed. No further action required. | 2013-2014 | 02 Historical Review | |
00013954
Pigeon Island - Soils in the central-eastern portion of the site |
Detailed testing completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013956
Point Alexandria - No Contamination Found |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00013998
Portsmouth Wharf (No Contamination Identified) |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00014076
Wolfe Island (Quebec Head) - Northeast portion of the site |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00014077
Wolfe Island South Side - Former tower |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00015114
Kingston MCTS (Odessa) (Around communication tower |
Detailed testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00015216
Kingston Gauging Station (No Contamination Identified) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00016546
BATH (Waterlot) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00016569
GRASS CREEK - Waterlot Sediment |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00016574
KINGSTON (CONFEDERATION BASIN)(No Contamination Identified) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00016577
LONG POINT (AMHERST ISLAND) (Water lot) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00023379
451-C08 Pittsburgh Institution - Former Silica Mine |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | I Insufficient Information | 06 Classify the site using the CCME National Classification System |
00023391
Kingston Inner Harbour Marsh |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024628
441-F01 Frontenac - Farmland |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
00024629
451-F01 Pittsburgh - Farmland |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
00024631
416-C02 Kingston Institution - Burried Barrels Near Building A7 |
Detailed testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00024632
423-C02 Dangerous Goods Storage Area |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
00024633
401-C01 Regional Headquarters Ontario - Parking Lot |
Confirmatory sampling completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024636
440-C04 Collins Bay - Building C-29 Storage tank system |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024637
440-C05 Collins Bay - Building C-8 Storage tank system |
Initial testing completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024638
450-L01 Joyceville Institution - Landfill NW of Perimeter Road |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024662
441-L02 Collins Bay - Southern Landfill (near Front Road) |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024663
441-L01 Collins Bay - Former Landfill at Northwest Corner of Property |
Remediation / risk management completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024738
441-C09 Frontenac Institution - Manure Composting at Sewage Lagoon |
Detailed testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00024739
441-C16 Former AST at Building FF23 |
Detailed testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00024740
441-C19 Collins Bay - Equipment Shed FF19 Staining |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00024741
441-C20 Collins Bay - Equipment Shed FF33 Staining |
Remediation / risk management completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024742
441-C21-A Collins Bay - Property Line Sampling |
Initial testing completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024743
441-C25 Frontenac Institution - Debris Landfill |
Remediation / risk management completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024744
451-C10 Pittsburgh Cattle Feed Lots |
Initial testing completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024745
451-C11 Joyceville - Debris, Waste and Rubble at PP64 |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024746
451-C12-A Pittsburgh Former Underground storage tank |
Confirmatory sampling completed. No further action required. | 2018-2019 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024747
451-C12-B Joyceville - Debris at PP55 |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024748
451-C20 Pittsburgh Perimeter of the Farm |
Detailed testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00024837
Anglin's Bay |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025017
Mech Eng Fuel Spill R75/R69 |
Long term monitoring completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
00025348
KINGSTON-PORTSMOUTH HARBOUR (northwest corner of s |
Detailed testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00026073
416-C03 Kingston Penitentiary - Western exterior areas, Portsmouth Harbour side |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00026074
416-C04 Kingston Penitentiary - Exterior areas southern side |
Remediation / risk management completed. No further action required. | 2016-2017 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00026095
Kingston Coal Dock |
Initial testing completed. No further action required. | 2019-2020 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00026386
451-C22 Pittsburgh Greenhouse (PP56 and PP63) |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00026431
416-C05 Kingston Penitentiary - Fuel Storage Tanks Southeast of the stores building |
Detailed testing completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00026432
431-C01 Isabel MacNeil House Historical Use of Lead Base Paint |
Remediation / risk management completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00027596
450-C06 - Joyceville former heating oil AST |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
07118001
Knapp Point (CCG Property) |
Confirmatory sampling completed. No further action required. | 2018-2019 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09406001
Soil remediation Site/Abandoned Landfill, Gore Training Area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09406002
600 Yard Rifle Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09406003
25 Yard Range North |
Remediation / risk management completed. No further action required. | 1998-1999 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09406004
25 Yard Range Central |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09406005
Correctional Services Canada Small Arms Range |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09406006
75 Yard Small Arms Classification Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09406007
Gore Training Area - Low Growth Region |
Initial testing completed. No further action required. | 2006-2007 | 03 Initial Testing Program | |
09406008
Abandoned Landfill - McNaughton Barracks |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09406012
Sand and Salt Storage bldg E32 McN |
Initial testing completed. No further action required. | 2003-2004 | 03 Initial Testing Program | |
09406013
Sand and Salt Storage Bldg C40 McN |
Initial testing completed. No further action required. | 2002-2003 | 03 Initial Testing Program | |
09406014
POL Storage Bldg A18 McN |
Initial testing completed. No further action required. | 2003-2004 | 03 Initial Testing Program | |
09406015
Auto Hobby Club Bldg C35 McN |
Initial testing completed. No further action required. | 1998-1999 | 03 Initial Testing Program | |
09406017
Building H55 - Defence Research Lab Disposal |
Initial testing completed. No further action required. | 2006-2007 | 03 Initial Testing Program | |
09406018
Fire Fighting Training Area |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
09406019
A12 McNaughton |
Initial testing completed. No further action required. | 2003-2004 | 03 Initial Testing Program | |
09406021
E30 |
Initial testing completed. No further action required. | 2003-2004 | 03 Initial Testing Program | |
09406023
MCN D-36 |
Initial testing completed. No further action required. | 1997-1998 | N Not a Priority for Action | 03 Initial Testing Program |
09406024
E-32 UST |
Initial testing completed. No further action required. | 2003-2004 | 03 Initial Testing Program | |
09406026
MCN A21 Central Heating Plant |
Initial testing completed. No further action required. | 1997-1998 | 03 Initial Testing Program | |
09406027
Two USTs, Pipeline and Valve Pits |
Long term monitoring completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
09407005
25 Yard Range South |
Remediation / risk management completed. No further action required. | 2014-2015 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09407006
R26 Fort Henry Heights Dump site |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
09407007
B24 Vimy Hydraulic Hoist |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | I Insufficient Information | 06 Classify the site using the CCME National Classification System |
09407008
Arrowhead Beach |
Initial testing completed. No further action required. | 1997-1998 | 03 Initial Testing Program | |
09407009
Fort Henry Heights R3, R4 |
Long term monitoring completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
09434001
450-C05 Joyceville - Fuel storage tanks bldg JVJ12B |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
09434002
451-C03 Pittsburgh Institution - Fuel Storage Tank (Upper Farm) |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
09434003
451-C02 Pittsburgh Institution - Marsh |
Detailed testing completed. No further action required. | 2010-2011 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09445001
Fort Frontenac Water Lots |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09445002
Fort Frontenac Courtyard |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09445003
FF6 Normandy Hall |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09451002
Parking lot (Old Post Office) |
Remediation / risk management completed. No further action required. | 2009-2010 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09451003
Parking lot (Old Post Office) |
Remediation / risk management completed. No further action required. | 2009-2010 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09451004
Parking lot (Old Post Office) |
Remediation / risk management completed. No further action required. | 2009-2010 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09461001
Graving Dock |
Remediation / risk management completed. No further action required. | 2015-2016 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09461002
Graving Dock |
Confirmatory sampling completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09461003
Water Lot |
Detailed testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 05 Detailed Testing Program |
09462001
Lasalle Causeway Bridge |
Long term monitoring completed. No further action required. | 2011-2012 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
09462002
Part 1 |
Historical review not required. | 2015-2016 | N Not a Priority for Action | 01 Identify Suspect Sites |
09462003
Part 9/10 |
Historical review not required. | 2015-2016 | N Not a Priority for Action | 01 Identify Suspect Sites |
09477001
416-C01 Kingston Institution - Fuel Storage Tanks |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
09509001
421-C01 Electrical substation |
Historical review completed. No further action required. | 2011-2012 | 02 Historical Review | |
14342001
Kingston Airport Parcel 1 |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
22905001
No PIN 1 |
Confirmatory sampling completed. No further action required. | 2008-2009 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
22905002
PIN 8 |
Confirmatory sampling completed. No further action required. | 2008-2009 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
22905003
PIN 10 |
Confirmatory sampling completed. No further action required. | 2011-2012 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
22905004
PIN 10 - Sediment |
Confirmatory sampling completed. No further action required. | 2008-2009 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
22905005
PIN 13 |
Confirmatory sampling completed. No further action required. | 2008-2009 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
22905006
PIN 24 |
Remediation / risk management completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
22905008
Outer Harbour Bed |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
22905009
Inner Harbour |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
54091001
KINGSTON (TREASURE ISLAND) (located in water lot of small craft harbour) |
Initial testing completed. No further action required. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
56058001
Irvine Point - Front Range (LL 380) |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
56058002
Irvine Point - Rear Range (LL 381) |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
58204001
Nine Mile Point - W, N and E of light station |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
67606001
Brothers Islands - Soils, former lighthouse area |
Detailed testing completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
83493001
Pig Point - Navigational Aid |
Detailed testing completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |