Search Results
Search Results Summary | |
---|---|
Criteria: |
|
Sort Key: | FCSI Identifier (ascending) |
Sites Found: | 142 |
Results by Site Impact
Change results view to: Name and Location Contaminants and Media
FCSI Identifier Site Name |
Status | Fiscal Year | Classification | Highest Step Completed |
---|---|---|---|---|
00000896
Foxtrap (SCH - Waterlot) |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00000923
Disposed Brit Prop No 4 Site 14 (6301) West Side of Property |
Historical review completed. No further action required. | 1999-2000 | N Not a Priority for Action | 02 Historical Review |
00000924
Disposed - Brit Prop No 4 Site 14 (6302) - Boiler House |
Historical review completed. No further action required. | 1999-2000 | 02 Historical Review | |
00001368
Atlantic Cool Climate Crop Research Centre |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 05 Detailed Testing Program |
00001369
Atlantic Cool Climate Crop Research Centre |
Confirmatory sampling completed. No further action required. | 2011-2012 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00001370
Atlantic Cool Climate Crop Research Centre |
Confirmatory sampling completed. No further action required. | 2011-2012 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00001371
Flings Brook - Atlantic Cool Climate Crop Research Centre |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00001410
Atlantic Cool Climate Crop Research Centre |
Remediation / risk management completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00001451
Atlantic Cool Climate Crop Research Centre |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00001543
Atlantic Cool Climate Crop Research Centre |
Confirmatory sampling completed. No further action required. | 2014-2015 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00012247
Cape Spear - Dwelling/Beacon Building - Area 1 |
Confirmatory sampling completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00012686
St. John's (CCG Helicopter Hanger) |
Initial testing completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017173
St. John's Tide Gauge (Unassessed) |
Historical review not required. | 2013-2014 | 01 Identify Suspect Sites | |
00018167
Bull Head - Minor Aid |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018193
Cape St. Francis - Lightstation |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018205
Chain Rock - Minor Aid |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00018270
Fort Amherst - Lightstation - DFRP# 34885 |
Detailed testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00018291
Foxtrap (Outer Breakwater Light - Unassessed) |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00018411
Long Pond - E Breakwater - Unassessed |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00018412
Long Pond - SAR |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00018459
North Head - Minor Aid |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018502
Portugal Cove (Front Range) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018503
Portugal Cove (Rear Range) |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00018506
Pouch Cove (Decca Site - DFRP# 00330) |
Detailed testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00018532
Robin Hood Bay Transmitter (MF Tx / VHF) - Electrical Substation |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 05 Detailed Testing Program |
00018595
St. John's CGRS Majors Path |
Historical review not required. | 2015-2016 | 01 Identify Suspect Sites | |
00018596
St. John's (Dockyard - Unassessed) |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00018597
St. John's (Harbour - Dockyard - Unassessed) |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00018598
St. John's (Harbour - Range Front) |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00018599
St. John's (Harbour - Range Rear) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00018666
Foxtrap (Inner Breakwater Light - Unassessed) |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00018667
Foxtrap (Inner Breakwater Light - Unassessed) |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00018800
Petty Harbour (S. Breakwater Light - Unassessed) |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00018824
St. John's (Southside Small Boat Basin - Parking - Unassessed) |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
00018866
Bay Bulls (Warehouse) |
Detailed testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 05 Detailed Testing Program |
00018917
Indian Pond Lake - Cages Fish Hatchery |
Historical review not required. | 2015-2016 | 01 Identify Suspect Sites | |
00018943
Petty Harbour Bait Holding Unit 9 |
Historical review not required. | 2015-2016 | 01 Identify Suspect Sites | |
00018944
Pier 27 Wharf - Unassessed |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00019009
Bauline (Uplands - DFRP# 00029) |
Remediation / risk management completed. No further action required. | 2020-2021 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00019103
Foxtrap (SCH - Uplands) |
Detailed testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 05 Detailed Testing Program |
00019278
Portugal Cove (Waterlot) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019281
Pouch Cove (DFRP# 26784 - Upland - North Slipway) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00019282
Pouch Cove (DFRP# 26786 - Upland - South Slipway) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00019283
Pouch Cove (DFRP# 26784/26786 - Waterlot) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00019286
QUIDI VIDI (DFRP# 34830/34970 - UPLANDS) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00019348
St. John's (Prosser's Rock - Uplands - DFRP# 55785) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00019349
St. John's (Prosser's Rock - Waterlot - DFRP# 55785) |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019374
Torbay (Waterlot) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00019375
Torbay (Uplands) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00019394
Witless Bay (SCH - DFRP# 10641) |
Detailed testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00019410
BISCAYAN COVE (UPLANDS) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00022336
St. John's RCMP |
Historical review completed. No further action required. | 2008-2009 | 02 Historical Review | |
00022927
Cape Spear - Equipment Building - Area 2 |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00023061
Quidi Vidi (DFRP# 34830/34970 - Water Lot) |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 05 Detailed Testing Program |
00023132
BISCAYAN COVE (WATERLOT) |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 05 Detailed Testing Program |
00024326
Logy Bay (SCH - DFRP# 00353) |
Historical review not required. | 2015-2016 | 01 Identify Suspect Sites | |
00024612
Institute for Ocean Technology (IOT) |
Detailed testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 05 Detailed Testing Program |
00208001
Red Head - MFRx Receiver Site |
Detailed testing completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00306001
Public Harbour and Wharf |
Detailed testing completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00323001
Air Navigation Facility: Receiver |
Confirmatory sampling completed. No further action required. | 2008-2009 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00339001
Hangar 2 Area - Former Storage Tank |
Historical review not required. | 2002-2003 | 01 Identify Suspect Sites | |
00339002
Disposal Site 2 and Fire Training Area |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00339003
Air Navigation Facility: Air Operation Building/Centre |
Confirmatory sampling completed. No further action required. | 2008-2009 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00339011
Former Operations Area |
Detailed testing completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00339015
Marine Fire Training Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00339029
Snow Dump |
Confirmatory sampling completed. No further action required. | 2003-2004 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00342001
Atlantic Cool Climate Crop Research Centre |
Detailed testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00342002
Atlantic Cool Climate Crop Research Centre |
Confirmatory sampling completed. No further action required. | 2011-2012 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00348002
CFS St John's (5110) - Parkers Pond Transmitter Site |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00348003
Parker's Pond Radio Site (5111) - Antenna Site (Herbicides) |
Initial testing completed. No further action required. | 1998-1999 | 03 Initial Testing Program | |
00360001
GOCB - Governement of Canada Building - Mount Pearl, NL |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00371001
Sir Humphrey Gilbert Building - St. John's, NL |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00373001
Pleasantville 310 |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
00373002
Pleasantville 312 |
Detailed testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00373003
Pleasantville 530 |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
00373004
Pleasantville 309 |
Detailed testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00373005
Pleasantville 508 |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
00373006
Pleasantville 509 |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
00373007
Pleasantville 512 |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
00373008
Pleasantville 511 |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
00373009
Pleasantville 404 |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
00373010
Pleasantville 409 |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
00373011
Pleasantville 402 |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
00373012
Pleasantville 401 |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
00373013
Pleasantville 403 |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
00373014
Pleasantville 207 |
Detailed testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00373015
Pleasantville 202 |
Detailed testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00373016
Pleasantville 215 |
Detailed testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00373019
Pleasantville 405 |
Detailed testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00373020
Pleasantville 407 |
Detailed testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00373021
Pleasantville 408 |
Detailed testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00373024
Pleasantville 410 |
Detailed testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00373025
Pleasantville 562 |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
00373026
Pleasantville 102-104 |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
00373027
Pleasantville 301-307 |
Detailed testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00373028
Pleasantville 205 |
Detailed testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00373029
Pleasantville 507 |
Detailed testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00373040
Pleasantville 313 |
Detailed testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00373041
Pleasantville 314 |
Detailed testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00373042
Pleasantville 815 |
Detailed testing completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 05 Detailed Testing Program |
00373043
Pleasantville 806 |
Detailed testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00373045
Land at Former Building 911- Pleasantville |
Confirmatory sampling completed. No further action required. | 2009-2010 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00373046
Building 223 |
Confirmatory sampling completed. No further action required. | 2015-2016 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00418001
Disposed - 20 Amherst Heights (6101) - AST at PMQ |
Historical review completed. No further action required. | 1996-1997 | N Not a Priority for Action | 02 Historical Review |
00418002
CFS St John's (4801) - 200 Compound |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00418003
Disposed - CFS St John's (4802) - 300 Compound. |
Confirmatory sampling completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00418004
Disposed - CFS St John's (4803) - B815 |
Initial testing completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00418005
Disposed - CFS St John's (4804) - 400 & 500 Compounds - PMQs |
Initial testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00418006
Disposed -CFS St John's(4805) Lower Compound -Motor Storage |
Initial testing completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
22403001
Taxation Centre |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
32039001
Disposed-British Prop.No1, Site 5(6201)Garage/waste oil tank |
Initial testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
32039002
Disposed -British Prop.No1,Site5 (6202)Yard/fill area,tanks. |
Initial testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
32039003
Disposed -British Prop. No1,Site 5(6203)-Former Machine Shop |
Initial testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
32041001
Disposed-British Prop.No4,Site15 (6303)E side pop/bulk tanks |
Confirmatory sampling completed. No further action required. | 2019-2020 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
32044001
CFS St Johns (4910) - Southside Road Tank Farm |
Remediation / risk management completed. No further action required. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
32044002
CFS St Johns (5210) - Shea Height's Tank Farm |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
32046002
Pier 26 (5301) - British Property Site 7c (Cabot Boatshed) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
32047002
Pier 27 (5302) - Brit. Prop. Site 7c |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
34104001
Air Navigation Facility: Non Directional Beacon |
Confirmatory sampling completed. No further action required. | 2008-2009 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
55786001
John Cabot Building |
Historical review not required. | 2013-2014 | 01 Identify Suspect Sites | |
55836001
Adjacent to 610 & 614 Janeway Place |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
55870001
White Hills |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
72005001
Robin Hood Bay Transmitter (MF Tx / VHF) - Tank Cradle - TPH in soil |
Detailed testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
72019001
St. John's (Base - Administration Bldg) |
Detailed testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
72019002
St. John's (Base - Berth 28) |
Long term monitoring completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
72019003
St. John's (Base - Waterlot) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
72078001
Area 1 |
Remediation / risk management completed. No further action required. | 2011-2012 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
72078002
Area 2 |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
72078003
Area 3 |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
72078004
Area 4 |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
80195001
St. John's (CN Property Storage Facility) |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
N0090001
Iron Rack |
Remediation / risk management completed. No further action required. | 2015-2016 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0090002
Zone 1 & 2 Area North of Graving Dock |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0090003
Zone 3 - Area West of Graving Dock |
Detailed testing completed. No further action required. | 2015-2016 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
N0090004
Zone 4 - Area South of Graving Dock |
Detailed testing completed. No further action required. | 2008-2009 | 1 High Priority for Action | 05 Detailed Testing Program |
N0090005
Zone 5 - Former CNR Property |
Detailed testing completed. No further action required. | 2008-2009 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
N0090006
Zone 6 - Area South of Waterford River |
Detailed testing completed. No further action required. | 2008-2009 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
N0201001
Former (CN) Valley Car Shop Property |
Remediation / risk management completed. No further action required. | 2011-2012 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
N0202001
Former CN Yard, Corner Brook |
Detailed testing completed. No further action required. | 2012-2013 | I Insufficient Information | 05 Detailed Testing Program |
N0203001
Area 5 |
Long term monitoring completed. No further action required. | 2011-2012 | I Insufficient Information | 10 Long-Term Monitoring (Optional) |
N0203002
Area 6 |
Long term monitoring completed. No further action required. | 2011-2012 | I Insufficient Information | 10 Long-Term Monitoring (Optional) |
N0203003
Area 7 |
Long term monitoring completed. No further action required. | 2011-2012 | I Insufficient Information | 10 Long-Term Monitoring (Optional) |
- Version:
- 40