Results by Site Impact
Change results view to: Name and Location Contaminants and Media
FCSI Identifier Site Name |
Status | Fiscal Year | Classification | Highest Step Completed |
---|---|---|---|---|
00000017
THOMPSON-LUNDMARK MINE (WACO, KIM) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000068
BULLMOOSE LAKE MINE (FORMERLY MANN LAKE) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00000154
CANTUNG MINE (CANADA TUNGSTEN MINE, TUNGSTEN MINE ) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
00000162
CAMLAREN MINE (HUMP VEIN) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00000333
MITCHELL LAKE MINE (RIBB CHICK BENEVENTUM, NO. 1 VEIN) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000351
GOODROCK MINE (Gordon Lake) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00000380
OTTER & MONTGOMERY LAKES |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000381
PELLY LAKE |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00000397
MYRT LAKE (SDC GROUP, DOME #1, WT) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000477
654 - Tsawout First Nation - 06832 - EAST SAANICH 2 - 0902104305 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00000480
654 - Tsawout First Nation - 06832 - EAST SAANICH 2 - 0902108605 |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | I Insufficient Information | 05 Detailed Testing Program |
00000883
Pr Rupert Marine Station, Sourdough Bay - Foreshore Sediments |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00000889
LOGGIECROFT (KOUCHIBOUGUAC) - PAH's and metals in sediments |
Historical review completed. Initial testing underway. | 2022-2023 | 02 Historical Review | |
00000891
NAUFRAGE (Metal Impacts/Potential PAH Impacts in Sediment) |
Historical review completed. Initial testing underway. | 2022-2023 | 02 Historical Review | |
00000894
ANSE-BLEUE (Metals and PAH Impacts in Waterlot Sed) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00000896
Foxtrap (SCH - Waterlot) |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00000898
WILBERFORCE (PUSEY) - LAUNCHING RAMP (Sediment-South and East of Wharf) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00001290
ASH RIVER BELOW MORAN CREEK |
Confirmatory sampling completed. No further action required. | 2010-2011 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00001293
MURRAY CREEK AT 216 STREET, LANGLEY |
Confirmatory sampling completed. No further action required. | 2010-2011 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00001371
Flings Brook - Atlantic Cool Climate Crop Research Centre |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00002337
Rideau Canal, Swale of Lot 2, Concession IV |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00002363
Southwest Brook at Terra Nova National Park (CHS) |
Detailed testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00002421
BEAVER CREEK NEAR BROCKET |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00002426
Long Point National Wildlife Area (Consolidated) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00002462
MOUNTAIN VIEW IRRIGATION DISTRICT CANAL |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00002475
LEE CREEK AT CARDSTON |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00002480
St. Clair National Wildlife Area - St. Clair Unit (Consolidated) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00002493
EXPANSE COULEE NEAR THE MOUTH |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00002539
Elbow River below Glenmore Dam |
Initial testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00002565
Zeballos River Near Zeballos |
Confirmatory sampling completed. No further action required. | 2010-2011 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00002569
NEW WEST COULEE NEAR THE MOUTH |
Detailed testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00002575
Area located down gradient from the air quality monitoring station |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
00002582
Floating boardwalk |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
00002596
Contaminants transported by currents and deposited on the surface |
Historical review completed. No further action required. | 2010-2011 | 02 Historical Review | |
00002604
Ray Creek near Innisfail |
Initial testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00002607
Contaminants transported by currents and deposited on the surface |
Initial testing completed. No further action required. | 2010-2011 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00002658
Sturgeon River near Magnolia Bridge (05EA010) |
Detailed testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00002694
Amisk River at Highway No. 36 (06AA002) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00002702
Magnusson Creek near Wynyard |
Initial testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00002719
Embarras River near Weald (07AF014) |
Detailed testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00002747
Eureka High Arctic Weather Station |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00002805
CROWSNEST RIVER AT FRANK |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00003180
SLESSE CREEK NEAR VEDDER CROSSING |
Confirmatory sampling completed. No further action required. | 2009-2010 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00006221
633 - Quatsino - 07077 - GRASS POINT 13 - 7000012794 |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006223
660 - Tla-o-qui-aht First Nations - 06875 - ESOWISTA 3 - 7000011694 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00006722
555 - Squamish - 07984 - STAWAMUS NO. 24 - 0902843306 |
Confirmatory sampling completed. No further action required. | 2003-2004 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00006748
667 - Uchucklesaht - 06939 - ELHLATEESE 2 - 0902949406 |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 3 Low Priority for Action | 05 Detailed Testing Program |
00006764
538 - Heiltsuk - 07857 - BELLA BELLA 1 - 0903014806 |
Confirmatory sampling completed. No further action required. | 2018-2019 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00007210
648 - Snuneymuxw First Nation - 06817 - NANAIMO RIVER 3 - 0903801608 |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00007211
648 - Snuneymuxw First Nation - 06816 - NANAIMO RIVER 2 - 0903801708 |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00007212
660 - Tla-o-qui-aht First Nations - 06875 - ESOWISTA 3 - 0903801808 |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00007642
549 - Tsleil-Waututh Nation - 07903 - BURRARD INLET 3 - 0904308509 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00007658
673 - Metlakatla First Nation - 07754 - S1/2 TSIMPSEAN 2 - 0904343609 |
Long term monitoring completed. No further action required. | 2017-2018 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
00007677
674 - Lax Kw'alaams - 07770 - LAX KW'ALAAMS 1 - 0904391809 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00007686
555 - Squamish - 07968 - SEYMOUR CREEK 2 / 0904441709 |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008209
540 - Kitasoo Xai'xais Nation - 07886 - KITASOO 1 - BC04826011 |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00008251
564 - Kwantlen First Nation - 08029 - WHONNOCK 1 - BC04791810 |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00008253
549 - Tsleil-Waututh Nation - 07903 - BURRARD INLET 3 - BC04830212 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00008260
545 - West Moberly First Nations - 06955 - WEST MOBERLY LAKE 168A - BC04831612 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00008297
648 - Snuneymuxw First Nation - 06815 - NANAIMO TOWN 1 - BC04836112 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00008298
581 - Seabird Island - 08073 - SEABIRD ISLAND - BC04836212 |
Detailed testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00008318
Bells Corners Complex |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008320
Bells Corners Complex |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008335
CFB Petawawa RTA - Area 8 (Demolition Range) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008337
Former skeet range |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008338
Block 7741 Military Training Area |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008343
OPSEE Training Area |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008347
Cadet Camp Landfill & Firing Range |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008365
VIC-2 Work Point Waterlot |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00008389
9 Wing Heavy Equipment Building Site - Parcel #1 |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008420
CFB Petawawa RTA - Old Grenade Range |
Long term monitoring completed. No further action required. | 2018-2019 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
00008422
Old St-Maurice firing range (17 acres portion) |
Confirmatory sampling completed. No further action required. | 2012-2013 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00008429
South Escarpment Stillwaters (SES 1100 series) |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008435
YA-3 - Yarrows Building 591 |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00008477
Reichwald Sm. Arms Rifle Rng |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008481
Old Vimy Sm. Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008482
Old Amiens Small Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008483
Old Mons Small Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008488
Batoche Sm. Arms Rifle Rng |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008489
Salisbury Sm. Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00008490
Alexandra Sm. Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008499
Cedar Springs Rifle Range & Danger Area |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00008500
Winona Rifle Range |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008530
COL-20 Colwood F-Jetty Intertidal&Prkg Lot |
Confirmatory sampling completed. No further action required. | 2019-2020 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008535
Sussex Small Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00008536
Gloucester Small Arms Rifle Range |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00008627
RP-11 Rocky Point Former Boat Shed & Fuel Storage |
Remediation / risk management completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008630
RP-14 Rocky Point Former Landfill Adjacent to Pedder Bay |
Confirmatory sampling completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008631
RP-15 Rocky Point Whirl Bay |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008632
RP-16 Rocky Point Pedder Bay Boat Jetty at Mason Point |
Remediation / risk management completed. No further action required. | 2021-2022 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008649
COL-30 Colwood Joe’s Creek East of Wilfert Rd |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008659
COL-40 Colwood North Western Bank of Dunn's Nook |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00008691
Burwash CFTA |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008734
Sediments covering an area of 10 feet from the water level around the islands |
Detailed testing completed. No further action required. | 2010-2011 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00008735
Sediments covering an area of 10 feet from the water level around the islands |
Initial testing completed. No further action required. | 2010-2011 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008753
Nisutlin River Delta National Wildlife Area (Consolidated) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00008938
GAINSBOROUGH CREEK NEAR LYLETON |
Confirmatory sampling completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00009075
LAKE WINNIPEG AT VICTORIA BEACH |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00009218
Upper Humber River near Reidville |
Confirmatory sampling completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00009264
Rocky River near Colinet |
Confirmatory sampling completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00010449
Swift Current Creek below Rock Creek (05HD036) |
Detailed testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00010494
SALINE CREEK NEAR NOKOMIS |
Initial testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00010505
EKAPO CREEK NEAR MARIEVAL |
Initial testing completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00010507
CUTARM CREEK NEAR SPY HILL |
Initial testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00010543
Birch Creek near Elfros |
Initial testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00010546
QUILL CREEK NEAR QUILL LAKE |
Initial testing completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012384
Saint-Ours Island, road on - former front range light |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00012436
Dixie - front range light |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00012463
Burgeo (SAR Station - Waterlot) |
Detailed testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00012525
ST-PLACIDE |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 05 Detailed Testing Program |
00012542
EAST DOVER (sediment impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012545
Forest Field (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012562
St. Jones Within SCH |
Initial testing completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012568
Port Albert (Uplands - DFRP# 0131) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00012571
Exploits Island (Waterlot - DFRP# 01415) |
Initial testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012572
Newstead (Waterlot - DFRP# 01431) |
Detailed testing completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00012578
Pond Cove (Waterlot - DFRP# 01672) |
Detailed testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00012581
LONG POND MANUELS (WATERLOT - DFRP# 05864) |
Initial testing completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012590
English Harbour West (Waterlot - DFRP# 34532) |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012592
Flat Islands (Port Elizabeth - Waterlot- DFRP# 345 |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00012593
Oderin (SCH - DFRP# 34589) |
Detailed testing completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 05 Detailed Testing Program |
00012594
Musgravetown (Uplands and Waterlot - DFRP# 34625) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012596
Virgin Arm (Waterlot - DFRP# 34641) |
Detailed testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 05 Detailed Testing Program |
00012630
Cottage Cove-Sed Impacts |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012631
DUBLIN SHORE (Impacted Sediments- PAHs/Metals) |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012632
LUNENBURG - RAILWAY WHARF (Impacted Sediments- PAHs/Cadmium) |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012634
LE GOULET (No Soil Impacts in Dredge Spoil Disposal Area) |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00012640
NEWELLTON (Sediment Impacts: Metals and PAH) |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012642
PIGEON HILL (Sediment Impacts- PAHs and Metals) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00012645
Powell River North - On Site and Adjacent Site act |
Detailed testing completed. No further action required. | 2021-2022 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00012649
HOSPITAL BAY |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 3 Low Priority for Action | 05 Detailed Testing Program |
00012652
DUNROBIN (Waterlot SE portion of the South Basin) |
Initial testing completed. No further action required. | 2005-2006 | 2 Medium Priority for Action | 03 Initial Testing Program |
00012653
PELEE ISLAND (SCUDDER WHARF RECREATIONAL AREA) (Wa |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00012662
MEAFORD (Harbour Waterlot) |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 3 Low Priority for Action | 05 Detailed Testing Program |
00012666
RONDEAU (ERIEAU) (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012670
Wellers Bay - No further assessment required |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012672
BERRY BAY (WEKUSKO LAKE) (Soil around Parking lot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012674
BROCKVILLE (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012676
KINGSTON (CONFEDERATION BASIN)(Waterlot) |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00012677
AMARANTH |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012687
Cormorant Lake - Waterlot |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00012691
DEEP RIVER (Contaminated Sediments in the Waterlot) |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012698
FAUST - Waterlot Sediments |
Detailed testing completed. No further action required. | 2020-2021 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00012711
JOUSSARD (Creek and Lakebed) |
Detailed testing completed. No further action required. | 2020-2021 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00012714
KINOOSAO (Lakebed) |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | I Insufficient Information | 05 Detailed Testing Program |
00012733
PELICAN NARROWS - FISH PLANT (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012740
RABBIT POINT (PRINCESS HARBOUR) - Waterlot |
Initial testing completed. No further action required. | 2020-2021 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012743
Rossville SCH (Soil and Water Lot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012745
NATION WIDE ROSS LAKE/ PEG TANTALUM (TOKE) MINE |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012746
ST. JEAN BAPTISTE (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012750
THUNDER BAY (CURRENT RIVER) (Unassessed) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012756
WADE'S LANDING (Sediment on Site) |
Initial testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012761
WIARTON - MARINA (Waterlot) |
Detailed testing completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 05 Detailed Testing Program |
00012764
LOW ISLAND (LITTLE CURRENT) (Waterlot) |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00012765
SILVER ISLET (Waterlot) |
Detailed testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00012767
KINUSO (SPRUCE POINT PARK) (waterlot) |
Detailed testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00012771
BEAVERTON (Sediment sample near former USTs located off-site) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00012775
GROS CAP (various areas in waterlot) |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 05 Detailed Testing Program |
00012785
PORT BURWELL(Waterlot - E of Talismen ASTs) |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00012791
SILVER ISLET (PAC 2: Submerged drum) |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
00012796
WHEATLEY (Waterlot Throughout Harbour) |
Detailed testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00012808
LITTLE CURRENT - TOWN DOCKS (Waterlot) |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00012809
KINGSTON-PORTSMOUTH HARBOUR (Waterlot near gas pumps and near current waste oil AST) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00012819
MAMAINSE HARBOUR (SCH - Waterlot) |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012856
Anthracite Townsite |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00013051
RED HEAD - Sediment Impacts-Hydrocarbons, DDT, PCBs, Metals |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013057
BEACH POINT (Copper Impacts > ISQGs in Waterlot Sediment) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013059
BACK BAY (Metal & PAH Impacts in Waterlot Sediment) |
Initial testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013060
Long Cove (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013062
FOX POINT (Sediment Impacts from Creosote Timbers) |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013066
LITTLE HARBOUR (L'ARDOISE) (Metals and PAH Impacts in Waterlot Sediment) |
Initial testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013067
Branch (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013069
BAYPORT (sed impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013073
INGONISH (MACLEODS POINT) (PAH and Metal Impacts in Waterlot Sediments) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013078
BUCTOUCHE (PAH & Metals in Waterlot Sediment) |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00013079
Black Duck Cove (Waterlot) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013088
SHIPPAGAN (Metals/PAH impacts in Waterlot Sediment |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013090
SKINNERS POND (Sediment Impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013094
Southern Harbour (South Wharf - Waterlot - DFRP# 34519) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013097
Harbourside Office and Storage Building(Disposed) (PAHs, PCBs and Metals in waterlot sediment) |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00013102
CAP-DES-CAISSIE (Metal & PAH Impacts in Waterlot Sediment) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013104
FREEPORT (SOUTH COVE) (Metal, PAH Impacts in Sediment) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013107
Ochre Pit Cove (Waterlot - DFRP# 00193) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013108
CAP-DE-SAINT-LOUIS (PAH/Metals Impacted Sediments) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013109
LOWER PROSPECT (PAHs/Metals In Waterlot Sediments) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013110
DINGWALL (sediment impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013111
Thunder Bay CCG Base (Waterlot) |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 05 Detailed Testing Program |
00013113
ABRAMS VILLAGE (Waterlot Sediment Impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013114
HOWARDS COVE - Metal Impacts in Sediment |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | I Insufficient Information | 05 Detailed Testing Program |
00013116
CHANCE HARBOUR (metal and PAH impacts in sediment) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013118
CARAQUET (PAH's & metals in sediment) |
Detailed testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00013121
LOWER JORDAN BAY (Metal and PAH impacts in seds) |
Detailed testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00013125
Point Abino - Heavy metal contaminated sed in Foundation |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00013133
Conche (Waterlot - DFRP# 01585) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013135
BIG BRAS D'OR (Metals and PAHs in Waterlot Sedments) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013136
FELTZEN SOUTH (metals and PAH in waterlot sediments) |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013138
FALLS POINT - Metal and PAH Impacts in Waterlot Sediment |
Initial testing completed. Detailed testing underway. | 2022-2023 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013139
DENNIS POINT (LOWER WEST PUBNICO) (As and PAH impacts in sediment) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013142
Harbour Breton Wharf Site Waterlot - DFRP # 00626 |
Detailed testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 05 Detailed Testing Program |
00013146
PARRY SOUND-BAY ST. WHARF (Waterlots) |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013148
PORT ELGIN (Waterlot) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013150
LONGSPUR LAKE (LANG LAKE) (Waterlot) |
Detailed testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013156
HILTON BEACH (North end of launching ramp Sediments) |
Initial testing completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013159
STURGEON CREEK (Waterlot) |
Historical review completed. No further action required. | 2005-2006 | 3 Low Priority for Action | 02 Historical Review |
00013161
Penetanguishene Wharf (Waterlot) |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00013166
QUEENSPORT (Sediment Impacts- PAHs/Metals) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013168
CENTREVILLE (TROUT COVE) (imapcted seds) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013169
MCEACHERNS POINT (WISHART POINT) - Impacted Sedime |
Detailed testing completed. No further action required. | 2021-2022 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00013170
NORTH HEAD -FISHERMEN'S WHARF (Sediment Impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013171
SEAL COVE-FISHERMEN'S WHARVES (Sediment Impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013175
LITTLE RIVER (VICTORIA COUNTY) (Impacted Sediments) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013176
LOUISBOURG (Impacted Sediments- PAHs and Metals) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013179
SANDFORD (impacted sediments-waterlot) |
Initial testing completed. No further action required. | 2022-2023 | 03 Initial Testing Program | |
00013184
JUDIQUE (BAXTERS COVE) (sediment impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013185
CARIBOU FERRY - FISHERMEN'S FACILITIES - Sediment Impacts- PAHs |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00013187
MALAGASH (Copper in Sediments) |
Initial testing completed. No further action required. | 2022-2023 | 03 Initial Testing Program | |
00013192
RICHIBUCTO (Impacted Sediments) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013195
CLARK'S HARBOUR ( Sed impacts) |
Initial testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013199
PORT MORIEN (Impacted Sediments- Metals/PAHs) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013201
DOVER (LITTLE DOVER) (impacted sediment) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00013202
BROOKLYN-FISHERMEN'S WHARF / SKIDWAY (Impacted Sediment) |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013205
SAND POINT (Sediments at the south side of the wharf) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00013208
Amherstburg CCG Base (Sediments in various locations close to the shore) |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013217
PORT DOVER-MARINA (Waterlot) |
Initial testing completed. No further action required. | 2006-2007 | N Not a Priority for Action | 03 Initial Testing Program |
00013233
NORTH RUSTICO (Impacted Sediments- Metals/PAHs) |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | I Insufficient Information | 05 Detailed Testing Program |
00013235
YARMOUTH BAR (Impacted Sediments) |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013242
Griffith Island - Sediments around and south of the historic dock |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00013251
CUPIDS (SCH - Waterlot) |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013253
Upper Island Cove (DFRP # 00246 - Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013255
Aquafort (SCH - DFRP# 00044 - Waterlot) |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013257
Brigus (SCH - Waterlot - DFRP# 00283 & 26794) |
Detailed testing completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013259
Riverhead (West - DFRP # 00072 - Waterlot) |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00013260
Cape Broyle (Waterlot) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013261
Carbonear (Waterlot) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013263
Renews (DFRP# 00037 - Waterlot) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013265
Hearts Delight (DFRP# 00161 - Waterlot - wharf site) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013266
Admirals Beach (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013268
MILL COVE (impacted sediments) |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013270
ORILLIA (TOWN) (Waterlot) |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013271
GRAND BEND (Sediments in various waterlot locations) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013272
KENSINGTON POINT (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013273
Ship Harbour (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013778
Channel Entrance Range Front Daybeacon - No Contamination Identified |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00014028
Squirrel Island Range Front -Waterlot |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00014036
St. Williams (Daybeacon Waterlot Area) |
Historical review completed. Initial testing underway. | 2022-2023 | 02 Historical Review | |
00014972
Port Lambton IRB (Waterlot) |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00015064
Waubaushene Inner Front Range Light (LL 892) (Unassessed) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00015197
Erieau Gauging Station (No Contamination Identified) |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00015272
Berens River North Side Range Rear - Soil around tower |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00015301
Dog Point Range Rear - No Contamination Identified |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00015320
Icelandic River Range Front - No Contamination Identified |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00015513
Hare Indian River Wharf |
Initial testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00015528
Wool Bay Buoy Cache |
Detailed testing completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00016194
Tsiigehtchic (Arctic Red River) - Site soils and sediment |
Initial testing completed. No further action required. | 2014-2015 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00016215
Aklavik Wharf |
Initial testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00016340
Deer Island Range - Soil around tower |
Initial testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00016474
Nanisivik (Strathcona Sound) (3rd party assessed) |
Detailed testing completed. No further action required. | 2016-2017 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
00016484
Pangnirtung Wharf |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00016552
BIG BAY (NORTH KEPPEL)(Waterlot) |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00016554
BLIND RIVER (Blind River Jetty Sediments) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00016555
BLIND RIVER (Blind River Harbour Sediments) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00016557
Campbell Bay Wharf - No Contamination Identified |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
00016562
CONSTANCE BAY - No Contamination Identified |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00016565
DILLON'S COVE (GEORGIAN BAY) -Sediment, East of Main Wharf |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00016576
LEAMINGTON - MARINA (Waterlot West of Launching Ramp) |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
00016577
LONG POINT (AMHERST ISLAND) (Water lot) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00016580
MICHIPICOTEN RIVER (Marina area) |
Initial testing completed. No further action required. | 2016-2017 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00016601
PORT HOPE (Sediments - Mouth of Ganaraska River) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00016613
STOKES BAY (Sediment from North Side of Wharf) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00016615
STONEY CREEK (FIFTY POINT) (Inner Basin Water lot) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00016621
WHITE CLOUD ISLAND (NORTH KEPPEL) (24 m S of S End of Wharf) |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00016627
OWEN SOUND-MARINA (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00016637
JORDAN HARBOUR (waterlot at west beach) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00016640
Waupoos (Waterlot) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00016663
Souris SAR (Metals and PAHs in Sediment) |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00016914
Blue Cove (Anse Bleue) Range Front (No Issues) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00016971
Shippagan SAR (PAHs in Soil and Sediment) |
Initial testing completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00016993
Lower Neguac Wharf Range Front (No Issues) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00017296
Guysborough (Metals in Soil) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00017492
Summerville (Potential PAHs/Metals In Waterlot Sediments, CLOSED) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00017719
AULDS COVE (Sediment Impacts) |
Initial testing completed. No further action required. | 2022-2023 | 03 Initial Testing Program | |
00017720
BALLANTYNES COVE (MCNAIR'S COVE) (Sediment Impacts) |
Initial testing completed. No further action required. | 2022-2023 | 03 Initial Testing Program | |
00017732
BLANDFORD (SHOAL COVE) - sediment impacts |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017739
CAPE JOHN (Metals and PAHs in Sediment) |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017753
COOPERS POINT - PAH and metals in sed |
Detailed testing completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00017756
CRIBBONS POINT - Sediment Impacts |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00017764
DRUM HEAD (sediment impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017771
EASTERN PASSAGE (sediment impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00017774
FELTZEN SOUTH (no land impacts Closed) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017776
FINLAY POINT - Waterlot Sediment Impacts |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00017780
FREEPORT-FISH POINT WHARF (sed impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00017782
GLACE BAY (Sediment impacts) |
Initial testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017790
HAVRE BOUCHER (Metals/PAHs in Sediment) |
Initial testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017793
INDIAN POINT (metals and PAH in sed) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017795
INGONISH FERRY (SOUTH INGONISH) (waterlot sed impacts) |
Initial testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017805
LEDGE HARBOUR - no sed impacts Cloased |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00017815
LITTLE HARBOUR (CHERRY HILL) (PAH/Metals Impacted Sediment) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017816
LITTLE HARBOUR (L'ARDOISE) (no impacts on soil Closed) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017818
LITTLE HARBOUR (SHELBURNE COUNTY) (sed impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017822
LITTLE JUDIQUE PONDS (sediment impacts) |
Initial testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017824
LITTLE LISCOMB (Sediment Impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00017842
LOWER WOODS HARBOUR (sed impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017846
MARGAREE HARBOUR (BELLE CÔTE) (Sediment Impacts) |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00017850
MARIE JOSEPH (PAH and Metals in seds) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017852
METEGHAN (No Soil/GW Impacts- Adj. Shipyard) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017871
NORTHWEST COVE (sed impacts PCB and PAH) |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017877
PEREAUX (DELHAVEN) (Metals in Sediment) |
Initial testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017879
PICTOU ISLAND (sed impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00017882
PLEASANT BAY (No Sediment Impacts) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00017884
POINT ACONI (MCCREADYVILLE) (PAH and Metals in Sediments) |
Initial testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017888
PORT BICKERTON WEST (Sed impacts waterlot) |
Remediation / risk management completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00017893
PORT MEDWAY (Metals in Soil and Sediment and PAHs in Sediment) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017897
PUGWASH (Sediment Impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00017903
SANDY COVE WEST (No Sediment Impacts) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017912
SLUICE POINT (Metals/PAHs in Sediment) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017917
SONORA (PAHs sediment impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00017923
TERENCE BAY (Sediment Impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017929
TONEY RIVER (no sediment impacts Closed) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00017932
VOGLERS COVE EAST (PAH and Metals in Sediment) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017938
WEST BERLIN (Sediment Impacts/No Land Based Impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00017940
WEST DOVER (sed impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017941
WEST GREEN HARBOUR (Metals in soil and sediment, P |
Confirmatory sampling completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00017944
WESTPORT -FERRY WHARF (metals in soil and sed) |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017945
WESTPORT (IRISHTOWN) (Sediment Impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017949
UPPER WHITEHEAD (sediment impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017960
CHETICAMP (LA DIGUE) (Sediment Impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00017969
DARNLEY (BRIDGE) ( Waterlot Sediment Metal and PAH |
Detailed testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00017976
GRAHAM POND - Waterlot sediment - No Concerns at this time |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00017982
LOWER MONTAGUE (BTEX/TPH in Soil, Cadmium, Arsenic, Copper, PAH in Sediment) |
Confirmatory sampling completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00017983
MACHONS POINT - PAH's and Metals in sediment |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00017985
MCAULEY'S SHORE (PINETTE RIVER) - Arsenic in Sediment, PAH in Soil |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017987
MILLIGANS SHORE - Sediment impact (historic activities) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00017991
MONTAGUE (Sediment Impacts) |
Confirmatory sampling completed. No further action required. | 2021-2022 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00017993
NEW LONDON (No Sediment Impacts) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00017995
NORTH LAKE (No Sediment Impacts) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018009
SOUTH RIVER (MURRAY HARBOUR) (PAH and Metals in Sediment) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018013
STANLEY BRIDGE (No Sediment Impacts) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00018027
BEAVER HARBOUR (PAH and metals in sediment) |
Initial testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018028
LEPREAU (BELAS BASIN) (PAH and metals in sediment) |
Detailed testing completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00018033
BURNT CHURCH (Dibenzo(a,h)anthracene and Mercury in Sediment) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018034
CAP-DES-CAISSIE (No Land Based Impacts Identified) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00018037
CAPE TORMENTINE (Arsenic and copper in sediment) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018046
GRANDE-ANSE (copper in sediment) |
Initial testing completed. No further action required. | 2022-2023 | 03 Initial Testing Program | |
00018049
HEAD HARBOUR - Sediment Impacts |
Confirmatory sampling completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00018051
INGALLS HEAD - Sediment Impacts |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00018055
JACQUET RIVER (Arsenic, Cadmium and Lead in Sediment) |
Detailed testing completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00018066
BAS-NEGUAC (LOWER NEGUAC) (Sediment Impacts) |
Initial testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018068
MACES BAY (no waterlot sediment impacts) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018076
MISCOU - Sediment Impacts- Cadmium & PAHs |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018086
POINTE-SAPIN (Impacted Sediment- PAHs) |
Initial testing completed. No further action required. | 2021-2022 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018088
RICHARDSON (Sediment Impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018091
CAP-LUMIÈRE (RICHIBUCTO CAPE) - No Sediment Impacts |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00018093
ROBICHAUD (No Sediment Impacts) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00018099
LE GOULET (Sediment Impacts- Copper) |
Initial testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018110
TRACADIE (Sediment impacts) |
Initial testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018116
WOODWARDS COVE - PAH in Sediment |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00018801
Glovertown (Wharf Light - Shed/wharf) |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00018843
Pass Island (Slipway Site) - DFRP#80044 |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00018940
Northeast Placentia Fishway |
Initial testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018988
Traverse Brook - Waterlot |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00018994
Little La Poile DFO Patrol Cabin |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 3 Low Priority for Action | 05 Detailed Testing Program |
00019001
Arnold's Cove (Waterlot) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019003
Baine Harbour (Northside - Waterlot - DFRP# 12304) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019008
Bartletts Harbour (Waterlot - DFRP# 01660) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019010
Bauline (Waterlot - DFRP# 00029) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019012
Bauline East (Waterlot - DFRP# 00025) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019014
Bay Bulls (Waterlot - DFRP# 23548) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019015
Bay De Verde (Waterlot - DFRP# 00219) |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019018
Beaumont (Waterlot - DFRP# 01479) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00019021
Black Duck Brook (SCH - Waterlot - DFRP# 55678) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00019025
Blue Beach (DFRP# 29034 - Waterlot) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019032
Brig Bay (Waterlot) |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019033
Brighton (SCH - Waterlot - DFRP# 29781) |
Detailed testing completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019034
Brigus South (Waterlot - DFRP# 00026) |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019036
BROWNS COVE (HEATHERTON - Waterlot) |
Initial testing completed. No further action required. | 2008-2009 | n Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019039
Burin (Waterlot - Collins Cove - Parcel 90-1 & Ship Cove 4) |
Remediation / risk management completed. No further action required. | 2020-2021 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00019042
Burnt Islands (Waterlot - DFRP# 34775) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019043
Calvert (Wharf Site - Waterlot Property - DFRP # 00032) |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019048
Cape St. Georges (Rouzes Brook - Waterlot - DFRP# 34782) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00019050
Catalina (Waterlot - DFRP# 01115) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00019053
Centreville (SCH - Waterlot - DFRP# 01238) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019054
Chance Cove (Waterlot) |
Detailed testing completed. No further action required. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019056
Change Islands (Coastal Wharf Site - Waterlot - DF |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019058
Coachmans Cove (Waterlot - DFRP# 34804) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019060
Coley's Point - Waterlot |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00019067
COOKS HARBOUR (SCH - Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019068
Coomb's Cove (Waterlot property - Parcel B) - DFRP # 00618 |
Detailed testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019069
Cox's Cove (Waterlot) |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019073
Daniel's Harbour (SCH Waterlot - DFRP# 01627) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019075
Davis Cove (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019078
Dildo (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019080
Dildo South (Waterlot) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019084
Eddie's Cove East |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00019085
Eddie's Cove West |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00019086
Fair Haven (Wharf Site - DFRP# 23017 - Waterlot) |
Remediation / risk management completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00019093
Fleur de Lys (Waterlot - DFRP# 34805) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019096
Fogo (SCH - Wigwam Point - Waterlot - DFRP# 01356) |
Detailed testing completed. No further action required. | 2021-2022 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019097
Forresters Point (Water lot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019100
Fox Harbour (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019102
Fox Roost (SCH North Wharf - DFRP# 00717) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019106
Frenchman's Cove (Bay of Islands - SCH - Waterlot - DFRP# 00942) |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019115
Grand Le Pierre (DFRP 26792 - Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019116
Grates Cove SCH - Waterlot DFRP# 00198 |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019118
Green's Harbour (Waterlot - DFRP# 00156) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019121
Greensponds (SCH - Marginal Wharf - Uplands & Waterlot - DFRP# 01244) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019126
Happy Adventure (Fish Plant - Waterlot - DFRP# 01192) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019130
Harbour Le Cou (Waterlot - DFRP# 00773) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019141
Hermitage (Waterlot - DFRP# 00650) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019145
Herring Neck (Goshen's Arm - Waterlot - DFRP# 01402) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00019147
Hibbs Cove (DFRP# 00265 - Waterlot) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00019148
Hickmans Harbour (DFRP# 01064 - Waterlot) |
Historical review completed. Initial testing underway. | 2022-2023 | 02 Historical Review | |
00019161
Job's Cove (Waterlot - DFRP# 00196) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019177
Lamaline (Allan's Island - DFRP# 34597 - Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019179
Lark Harbour (Small Craft Harbour - Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019180
Lawn (Sandy Point: Waterlot - DFRP# 34634) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019184
Leading Tickles West (Waterlot - DFRP# 01459) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019188
Marystown (Little Bay - Uplands and Waterlot - DFRP# 00531) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019190
Little Burnt Bay (Waterlot Property) |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019192
Little Heart's Ease (Uplands and Waterlot - DFRP# 01048) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019194
Little Port |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019212
Margaree (Waterlot - DFRP# 00713) |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00019215
Miles Cove (Waterlot - DFRP# 01563) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019217
Ming's Bight (DFRP # 10029 - Waterlot West) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00019218
Ming's Bight (DFRP # 01561 - Waterlot East) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00019221
Moretons Harbour (North - Waterlot - DFRP# 01397) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019225
New Bonaventure (Waterlot Property) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019227
New Harbour (Waterlot - DFRP# 00150) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019239
North Harbour (Placentia Bay - Waterlot) |
Detailed testing completed. No further action required. | 2016-2017 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019242
O'Donnell's (Waterlot) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00019246
Old Perlican (Waterlot - DFRP# 00214) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019248
Pacquet (Waterlot - DFRP # - 01543) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019250
Parkers Cove (Waterlot - DFRP# 00561and 55628) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019255
Petty Harbour (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019259
Plate Cove East (Waterlot and Uplands -DFRP# 01156) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 05 Detailed Testing Program |
00019263
Point au Gaul (Waterlot) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00019266
Pool's Cove (Wharf Site - Waterlot - DFRP# 34568) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019273
Port Saunders (DFRP 01644 - Waterlot - West) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00019277
Port Saunders (DFRP 01644 - Waterlot - West) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00019278
Portugal Cove (Waterlot) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019288
Quirpon (Small Craft Harbour - Waterlot Area) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019290
Ramea (SCH - Waterlot - DFRP# 00701) |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00019291
Red Harbour (Waterlot) |
Detailed testing completed. No further action required. | 2020-2021 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019305
Rushoon (Waterlot) |
Detailed testing completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019310
Seal Cove (White Bay - Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019319
SHOAL COVE WEST (WATERLOT) |
Detailed testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00019320
Shoe Cove (Waterlot Property) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019323
Sibley's Cove (SCH - Waterlot - DFRP# 00167) |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00019331
Southport (Waterlot - DFRP# 01040) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019336
St. Bernard's (East Wharf Site - Waterlot - DFRP# 00547) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019343
St. Bride's (SCH - Waterlot) |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019349
St. John's (Prosser's Rock - Waterlot - DFRP# 55785) |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019352
St. Lawrence (DFRP# 00456 - Waterlot) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019353
St. Lunaire (SCH - Waterlot - DFRP # 01740) |
Detailed testing completed. No further action required. | 2021-2022 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019356
St. Phillips (Waterlot - DFRP# 00350) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019359
St. Shott's (Waterlot) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00019361
Stag Harbour (SCH - Waterlot - DFRP# 01338) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00019363
Summerville (Waterlot - DFRP# 01153) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019367
Sweet Bay (Waterlot - DFRP# 01147) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019370
Thornlea (Waterlot) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019376
Trepassey (DFRP# 00012 - Waterlot) |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019382
Twillingate (Shoal Tickle - Waterlot -DFRP# 34649) |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019386
Westport (SCH - Waterlot - DFRP# 01559) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019389
Beachside (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019391
Wild Cove (Waterlot - DFRP# 22968) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019399
Merasheen (SCH - Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019401
Brent's Cove (SCH Wharf Site - DFRP# 55654) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019414
Carmanville (SCH - Waterlot - DFRP# 01323) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019417
Petit Forte (Waterlot - DFRP# 55771) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019428
Square Island (SCH - DFRP# 34770) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019466
Berry Point |
Initial testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019530
Cinque Island |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019598
Ekins Point - Submerged off-shore batteries |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
00019616
Finisterre Island - Submerged off-shore batteries |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
00019671
Griffiths Islet |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00019677
Hand Island - Minor Shore Light |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
00019678
Hand Island Passage - Minor Shore Light |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
00019693
Helen Point |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019709
Inskip Island Range |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00019755
Lookout Point - Minor Shore Light |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
00019765
Lyall Point - Battery Dump Area |
Initial testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019850
Prince Rupert CCG SAR Station, Fairview - Submerged off-shore batteries |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
00019861
Race Point |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019873
Richard Rock - Battery Dump Area |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019994
Tyee Spit Range Front |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00019995
Tyee Spit Range Rear |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00020118
Tsehum Harbour Entrance - Boat Grids |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00020119
Tsehum Harbour Entrance - Stormwater Discharge |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00020217
Split Head (Separation Point) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00020231
Baker Inlet |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00020278
Porpoise Harbour Entrance Range Front - Submerged off-shore batteries |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
00020300
Connis Islet |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00020328
Bush Rock |
Remediation / risk management completed. No further action required. | 2022-2023 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00020333
East Copper Island |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00020336
Gillatt Island |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00020339
Haswell Island - Battery Debris |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00020341
Kingui Island |
Remediation / risk management completed. No further action required. | 2020-2021 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00020342
Kwuna Point |
Detailed testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00020351
Selwyn Point |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
00020352
South Bay |
Remediation / risk management completed. No further action required. | 2020-2021 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00020996
Machmell Fisheries Camp |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
00021159
Kitimat Boathouse Moorage and Storage - Submerged off-shore batteries |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
00021276
ALERT BAY |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00021278
BAMFIELD WEST |
Initial testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021284
BURGOYNE BAY |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021285
Butler Cove - Mooring Buoys |
Historical review completed. Initial testing underway. | 2022-2023 | 02 Historical Review | |
00021286
Campbell River (Sediment Contamination) |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00021288
CAPE MUDGE |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00021293
Courtenay Slough - Contaminated Sediment and Soil |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00021295
Cowichan Bay (Contaminated Sediment) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00021310
DEGNEN BAY |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00021313
Edith Harbour Mooring Buoys |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00021314
EGMONT |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00021319
Freeman Passage, Porcher Peninsula, Mooring Buoys - Entire Site |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00021321
French Creek (Waterlot) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00021327
GIBSONS |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00021329
GORGE HARBOUR |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00021331
HERIOT BAY |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00021334
Hospital Bay - Possible refuse submerged in the Waterlot |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021340
Kiokathli Inlet - Mooring Buoys |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00021345
Klaskish Inle, Mooring Buoys - Entire Site |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00021354
Ladysmith (Stormwater Discharge) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00021356
Larsen Harbour-Mooring Buoys |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00021357
LUND |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00021358
MADEIRA PARK |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021360
MARKTOSIS (AHOUSAT VILLAGE) |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00021370
Minstrel Island - Docks and Floating Docks - Waterlot |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00021377
Nesto Inlet Mooring Buoys |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00021380
OCEAN FALLS |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00021382
OONA RIVER |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021392
Port Hardy (Lot 2119 Marine Portion) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021396
Port Hardy (Lot 2078) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021399
PORT SIMPSON |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021401
PRINCE RUPERT (COW BAY) |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
00021402
Prince Rupert (Cow Bay) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00021406
PORT EDWARD |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
00021408
PRINCE RUPERT (RUSHBROOK) |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
00021409
Prince Rupert (Rushbrook) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021410
QUATHIASKI COVE |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00021411
Queen Charlotte City - Subtidal Area of Property |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00021413
Queen Charlotte City (Fill Material) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00021415
SALTERY BAY |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 3 Low Priority for Action | 05 Detailed Testing Program |
00021425
Tsehum Harbour, Shoal Harbour (Water Lot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021432
Sointula (Sediments in Boat Grid Area) |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00021443
STEVESTON (GULF OF GEORGIA) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00021445
Tartu Inlet - Mooring Buoys |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00021447
TOFINO (ARMITAGE POINT) |
Initial testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021450
UCLUELET WEST |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021451
VANCOUVER (FALSE CREEK) |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00021455
WHISKEY SLOUGH (PENDER HARBOUR) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00021458
Willis Bay - Mooring Buoys |
Historical review completed. Initial testing underway. | 2022-2023 | 02 Historical Review | |
00021459
WINTER HARBOUR-WHARF & FLOATS |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00021474
Tofino, Wingen Lane - Waterlot |
Detailed testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 05 Detailed Testing Program |
00021488
GANGES-OUTER HARBOUR |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 1 High Priority for Action | 05 Detailed Testing Program |
00021491
Goose Cove - Mooring Buoys |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00021501
Powell River North - Creosote Pilings |
Initial testing completed. No further action required. | 2021-2022 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021672
Bécancour (rear range light) |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 3 Low Priority for Action | 05 Detailed Testing Program |
00021686
Sorel Base - sediments, 1993 |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00021709
Beloeil Bridge |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00021777
Dorval, road to |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00021881
Monument Price, former FRL |
Detailed testing completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 05 Detailed Testing Program |
00021937
Baie Johan Beetz (inner) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00021971
Tête à la Baleine (outer) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00021987
Île Robin |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00021991
Vieux-Fort Bay - wharf light |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00021993
Rivière Saint-Paul |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00022026
Sainte-Rosalie Island - former RL |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022032
AGUANISH OUEST - SCH, waterlot, wharf periphery, sediments |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022035
AYLMER SOUND (PORT HARRINGTON, SCH, WATERLOT, sedi |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022037
MUTTON BAY - SCH, WATERLOT, SEDIMENTS |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022045
CARLETON (FISHERIES SECTION, SCH, WATERLOT, SEDIMENTS) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022049
CHEVERY - CROSS RIVER, WHARF, SCH, WATERLOT AROUND WHARF, SEDIMENTS |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022062
GRANDE-RIVIERE (HARBOUR, SCH, WATERLOT, WHARF, SEDIMENTS) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022071
ENTRY ISLAND (ENTRY ISLAND) (SCH, WATERLOT, INTERIOR BASIN, SEDIMENTS) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022084
LA TABATIÈRE (FISHERIES SECTION, SCH, WATERLOT, FISHING WHARF, SEDIMENTS) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022093
MAL-BAY (ST-GEORGES, SCH, WATERLOT, WHARF) |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022098
MILLERAND (SCH, WATERLOT, INTERIOR BASIN, SEDIMENTS) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00022100
MONT-LOUIS-OUEST - SCH, WATERLOT, MAIN WHARF |
Initial testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022101
MONT-LOUIS-OUEST - SCH, WATERLOT, BOAT RAMP |
Initial testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022102
NEWPORT (ISLETS, SCH, WATERLOT, WHARF, SEDIMENTS) |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022107
PASPÉBIAC (FISHING WHARF AND LAUNCH RAMP, SCH, WATERLOT, SEDIMENTS) |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022111
PETITE-VALLÉE (SCH, WATERLOT, CENTRE OF THE RIVER, SEDIMENTS) Centre of the river (sediments). |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022133
SALMON BAY (SCH, WATERLOT, SEDIMENTS) |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022135
SHIGAWAKE (SCH, WATERLOT, TIMBER WHARF, SEDIMENTS) |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022137
ST-GODEFROI (SCH, WATERLOT, BOAT RAMP, SEDIMENTS) |
Remediation / risk management completed. No further action required. | 2022-2023 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00022144
STE-THÉRÈSE-DE-GASPÉ (SMALL RIVER, SCH, LAND LOT, NORTH WHARF, SEDIMENT) |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00022151
Wharf (metals + PAH) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00022153
TOURELLES (ST-JOACHIM, SCH, WATERLOT, SEDIMENTS) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022157
MINGAN (SCH, WATERLOT, SEDIMENTS) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00022162
BAIE-TRINITÉ (SCH, WATERLOT, NORTHWEST OF THE WHARF, SEDIMENTS) |
Initial testing completed. No further action required. | 2020-2021 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022166
BLANC-SABLON (SMALL FISHING WHARF, SCH, WATERLOT, SEDIMENTS) |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022172
RIVIÈRE-ST-PAUL (ESQUIMAUX ISLAND, SCH, WATERLOT, SEDIMENTS) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00022176
SEPT-ÎLES (BUNGE PARK, SCH, WATERLOT, SEDIMENTS) |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 3 Low Priority for Action | 05 Detailed Testing Program |
00022180
BRADOR BAY - UDELL ISLAND, SCH |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022929
Point Leamington (Waterlot) |
Initial testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022932
WEDGE POINT (WEDGEPORT) - No Sediment Impacts |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00022937
Cannings Cove (Waterlot - DFRP# 01163) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00022952
KESWICK (JERSEY RIVER)(Marina waterlot) |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022953
KESWICK (JERSEY RIVER) (Entrance Channel) |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022958
Change Islands (Fish Plant Site - Waterlot - DFRP# |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00022960
TOBERMORY (LITTLE TUB HARBOUR) (Waterlot) |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00022961
Comfort Cove (Southern Finger Pier Site - Waterlot - DFRP# 01430) |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00022970
Ferryland (Finger Pier Waterlot - DFRP# 34605) |
Detailed testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00022972
PORT LA TOUR (sediment impacts) |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | I Insufficient Information | 06 Classify the site using the CCME National Classification System |
00022990
GRAND RAPIDS RESERVE (NO.33) (Waterlot) |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 05 Detailed Testing Program |
00022992
THICKET PORTAGE (Lakebed Bottom) |
Detailed testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00022995
Burgeo (Slipway Site - Waterlot - DFRP# 34527) |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00022996
Burgeo (L-SHAP e Finger Pier Site Waterlot - DFRP# 34528) |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00022998
Francois (Community Stage Wharf - DFRP# 55602 - Waterlot) |
Detailed testing completed. No further action required. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00022999
Francois (Slipway Site DFRP# 34533 - Waterlot) |
Detailed testing completed. No further action required. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023000
Codroy (Waterlots - DFRP# 00779 & 00783) |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023011
West Vancouver Laboratory - Aquatic Portion |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00023025
Lamaline (Muddy Hole - DFRP# 34596 & 00463 - Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023026
Harbour Mille (Pardy's and Pittmans Slipway Site - Waterlot - DFRP# 34560) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00023030
St. Bernard's (Breakwater Wharf Site - Waterlot - DFRP# 24795) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023033
Hant's Harbour (L-Shaped Finger Pier Site - Waterlot -DFRP#00181) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023038
REEFS HARBOUR (WATERLOT) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00023041
PETIT SHIPPAGAN (Sediment Impacts) |
Initial testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023045
MAMAINSE HARBOUR (Soil) |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023061
Quidi Vidi (DFRP# 34830/34970 - Water Lot) |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 05 Detailed Testing Program |
00023065
Piccadilly (Waterlot) |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00023077
South East Bight (Waterlot - DFRP# 00555) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023079
MOOSE HARBOUR - sediment impacts |
Remediation / risk management completed. No further action required. | 2022-2023 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00023080
Boat Harbour (Site 1 - Waterlot - DFRP# 00551) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023082
Boat Harbour (Site 2 - Waterlot - DFRP# 00551) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023085
LITTLE SHEMOGUE (EMILY'S POINT) - Sediment Impact |
Initial testing completed. No further action required. | 2020-2021 | 03 Initial Testing Program | |
00023086
BAR HAVEN (WATERLOT) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023087
Woody Point (Waterlot - DFRP# 10640) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023090
Petites (SCH - Waterlot - DFRP# 00767) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023091
SCOTS BAY (LITTLE COVE) (Contaminated Marine Sedim |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00023093
FAIRHAVEN (Sediment Contamination) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00023095
PLAYGREEN POINT (Waterlot) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00023096
GOOD HARBOUR (PACHETA BAY) - Sediment around wharf |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00023097
DUCK BAY - Sediment near wharf |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00023098
DENBEIGH POINT - Waterlot sediment surrounding wharf |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00023105
PENETANGUISHENE (TOWN OF PENETANGUISHENE) (Waterlot near sewage treatment plant) |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023106
PENETANGUISHENE (TOWN OF PENETANGUISHENE)(Waterlot near west harbour marina) |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023107
PENETANGUISHENE (TOWN OF PENETANGUISHENE) (Waterlot near Dutchman's Cove Marina) |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023108
BIG RIVER (Waterlot) |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00023110
LITTLE GRINDSTONE POINT (Waterlot) |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00023111
PINE DOCK (LITTLE BULLHEAD POST OFFICE) (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023121
WELSHPOOL (sediment contamination - metals and PAH |
Initial testing completed. No further action required. | 2021-2022 | 03 Initial Testing Program | |
00023122
WARREN LANDING (Waterlot Wharf Area) |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00023124
NORTH SYDNEY-BALLAST GROUNDS (Sediment contamination) |
Initial testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023129
Conception Harbour (Waterlot - DFRP# 26796) |
Remediation / risk management completed. No further action required. | 2020-2021 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00023131
BLOW ME DOWN (WATERLOT) |
Initial testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023141
CATFISH CREEK - Sediment around wharf |
Detailed testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 05 Detailed Testing Program |
00023142
POINTE-VERTE (Impacts in Dredge spoils disposal pile) |
Detailed testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023143
ALDER POINT (Sediment impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023145
KRAUT POINT (RIVERPORT) (Sediment contamination) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00023146
SAINTE-MARIE-SUR-MER (Dredge Spoil Disposal Area) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00023156
MCCALLUM (WATERLOT) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023157
BARENEED (WATERLOT) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023158
Campbellton (Waterlot - DFRP# 34838) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023184
New Harbour (Waterlot - DFRP # 13463) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023186
Beaumont (Waterlot - DFRP# 01478) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00023194
Little Harbour East (Waterlot - DFRP# 00540) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023195
Little Paradise (Waterlot - DFRP# 34584) |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023201
Southern Harbour (North Wharf - Waterlot - DFRP# 34518) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023203
Southern Harbour (Best Cove - Waterlot - DFRP# 09564) |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00023209
Holyrood (Kings Wharf - Waterlot - DFRP# 34500) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023212
Middle Arm (West - Waterlot - DFRP# 01525) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023214
Middle Arm (East - Waterlot - DFRP# 11081) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023339
Leamy Lake |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00023355
Jacques Cariter Park South |
Long term monitoring completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
00023391
Kingston Inner Harbour Marsh |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023443
Mosquito Creek |
Initial testing completed. Detailed testing underway. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023451
Upper Rideau Lake |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023452
Newboro Lake |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023453
Indian Lake |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023544
BEAULIEU MINE (JOHN LAKE; BRANDY; IRENE; NORMA; TUNGSTEN AND GOLD MINES LIMITED) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00023545
ROCHER RIVER |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00023547
BURNT ISLAND (ARDOGO, GOOD HOPE, GOO, GIANT BAY, GORDON LAKE) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00023689
NORRIS LAKE |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023817
PTARMIGAN MINE (TREMINCO) |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
00023963
NW-030-B strip of land (west) adjacent to Welland Canal and strip of land (east) NW-027-B adjacent to Welland Canal |
Initial testing completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024057
Montreal Road Complex ON |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024088
Land and sediments |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024091
Les Méchins - water lot - sediments |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024120
KNIGHT BAY (KIDNEY POND) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024141
KNIGHT BAY (TREACY NO.1) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024145
STORM PROPERTY - GORDON LAKE |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024153
Johnston Lake |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024154
Waldron River |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024155
Try Me |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024168
Pine Point Railbed |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024299
Russell Island Homestead |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024307
Center for Surface Transportation Technology - Wetland |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024316
Port Blandford (Waterlot - DFRP# 01169) |
Initial testing completed. No further action required. | 2020-2021 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024345
Greensponds (SCH - Floating Dock Site - Uplands & Waterlot - DFRP# 55910) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024346
St. Anthony (SCH - Waterlot - DFRP# 32101) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024351
Frenchman's Cove (Bay of Islands - SCH - Uplands & Waterlot - DFRP# 34797) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024353
Cottlesville (SCH - Waterlot - DFRP# 34826) |
Detailed testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024377
VOGLERS COVE WEST (sed imapcts of metals and PAHs) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024379
BIG BLACK RIVER (Waterlot Sediment) |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024380
HERB LAKE POST OFFICE (WEKUSKO LAKE) (Waterlot sediment around structure) |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024381
MOSSEY RIVER (Waterlot) |
Initial testing completed. No further action required. | 2021-2022 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024393
BARRE-DE-COCAGNE (CORMIERVILLE) (PAH and TPH in seds) |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024422
Mersey Biodiversity Facility (Metals in Drainage Ditches) |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 05 Detailed Testing Program |
00024423
ROSSVILLE (Waterlot) |
Detailed testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00024432
Port Burwell - Portion of Big Otter Creek and inner harbour of the Port Burwell SCH |
Detailed testing completed. No further action required. | 2016-2017 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024461
Little Bay (La Poile - South site - Waterlot - DFRP# 00763) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024463
Little Bay (La Poile - North site - Waterlot - DFRP# 34550) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024468
Norris Point (Waterlot - DFRP# 01609) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024469
Port Au Bras (Waterlot - DFRP# 00435) |
Detailed testing completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 05 Detailed Testing Program |
00024476
Robert's Arm (Waterlot - DFRP# 01493) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024478
Moretons Harbour (South - Waterlot - DFRP# 34636) |
Detailed testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00024482
Grand Bruit (Waterlot - DFRP# 34538) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024483
Port Albert (Waterlot - DFRP# 01316) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00024487
Baine Harbour (Finger Pier - Waterlot - DFRP# 34583) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024495
Plum Point (Waterlot - DFRP# 01664) |
Detailed testing completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 05 Detailed Testing Program |
00024496
Phillips Head (Waterlot - DFRP# 01454) |
Initial testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024502
Gooseberry Cove (Waterlot - DFRP# 01043) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024504
MALLOCH BEACH (NORTH ROAD) - Sediment Impacts- Metals/PAHs |
Detailed testing completed. No further action required. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024505
Jenkins Cove (Waterlot - DFRP# 01383) |
Detailed testing completed. No further action required. | 2021-2022 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024506
Princeton (Waterlot - DFRP# 01149) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024507
Keels (Waterlot - DFRP# 01140) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024509
Tizzard's Harbour (Waterlot - DFRP# 01396) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024510
St. Carols (Waterlot - DFRP# 01722) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024513
Petit Forte (Waterlot - DFRP# 15461) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024514
Bay Roberts (Waterlot - DFRP# 00253) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024520
Ramea (SCH - Waterlot - DFRP# 34542) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024521
Ramea (SCH - Waterlot - DFRP# 34543) |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024523
Herring Neck (Green Cove - Waterlot - DFFRP# 34645) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00024524
Herring Neck (Starve Harbour - Waterlot - DFFRP# 34646) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00024525
Herring Neck (Toogood Arm - Waterlot - DFFRP# 34648) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00024528
Loon Straits Entrance Channel Range - Waterlot |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00024529
Winnipegosis (Waterlot SE corner of the wharf ) |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024540
Fond du Lac River Entrance - Waterlot |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024541
Mansel Island Racon (Swanfield Harbour) - Waterlot |
Detailed testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024556
Jacksons Arm (Waterlot - DFRP# 32988) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024558
Jacksons Arm (Waterlot and Uplands - DFRP# 00879) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024667
Harriet Harbour |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024676
Harbour of Cap-des-Rosiers |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024826
Bronze Range (30 lines) |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | N Not a Priority for Action | 05 Detailed Testing Program |
00024837
Anglin's Bay |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024856
Fire Hall, Building 19 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024914
Shearwater CC-144B Challenger Crash Site (Site 249) |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00025014
HRR-8 Heals Rifle Range Former 400-1000 yrd Range |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00025080
NRR-1C Nanaimo Rifle Range 25m Pistol Range & Beyond ACTIVE |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025087
Canadian Ranger Patrol Group Former Small Arms Range - Burgeo |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025091
Training Area C2 Drainage |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | I Insufficient Information | 05 Detailed Testing Program |
00025157
F-Lines |
Suspected site | 2 Medium Priority for Action | ||
00025322
BERRY BAY (WEKUSKO LAKE) (Sediment around dock) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025325
St. Lawrence (DFRP# 00457 - Waterlot) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025327
Isle Valen SCH - Waterlot - DFRP# 00573 |
Remediation / risk management completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025328
South Bar (Sediment Impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025330
East Ferry (Isolated Sediment Impact) |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025347
Triton West - Cards Hr - DFRP# 01475 - Waterlot |
Initial testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025349
Dowker Point - sediments |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00025361
Musgrave Harbour (Waterlot - DFRP# 10894) |
Detailed testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00025380
Harbour Breton SCH - Waterlot - DFRP# 34549 |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00025557
Botwood Harbour Bed |
Detailed testing completed. No further action required. | 2015-2016 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
00025559
Fortune Harbour Bed |
Detailed testing completed. No further action required. | 2012-2013 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
00025566
Anthracite Mine Site |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00025577
Canol Trail |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025579
FAT LAKE |
Detailed testing completed. No further action required. | 2015-2016 | 1 High Priority for Action | 05 Detailed Testing Program |
00025780
2501 Shingle Bay Road |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00025819
Surge Narrows Public Port Facility |
Confirmatory sampling completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025891
602 - ?aqam - 07422 - KOOTENAY 1 - BC04858715 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00025907
560 - Kwikwetlem First Nation - 08010 - COQUITLAM 2 - BC04861715 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00026015
27 - Millbrook - 06059 - MILLBROOK 27 - AT04876617 |
Initial testing completed. No further action required. | 2022-2023 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00026077
Fort Chipewyan Public Port Facility |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00026089
Gros Cacouna- aquatic portion |
Initial testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00026091
KEL,SET (Reay) Creek and Reay Creek Pond |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00026420
833-C03 Mountain - Sutherland Road Site |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00026494
647 - Malahat Nation - 06814 - MALAHAT 11 - BC04880417 |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | I Insufficient Information | 06 Classify the site using the CCME National Classification System |
00026555
673 - Metlakatla First Nation - 07754 - S1/2 TSIMPSEAN 2 - BC04886818 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00026559
673 - Metlakatla First Nation - 07754 - S1/2 TSIMPSEAN 2 - BC04887218 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00026562
674 - Lax Kw'alaams - 07770 - LAX KW'ALAAMS 1 - BC04886218 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00026626
70 - Mohawks of Kahnawá:ke - 06097 - KAHNAWAKE NO.14 - QC04892619 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00026686
446 - Tallcree Tribal Government - 06664 - TALL CREE 173 - AB04903920 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00026725
648 - Snuneymuxw First Nation - 06815 - NANAIMO TOWN 1 - BC04913122 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00027545
Rideau Canal, Dow's Lake to Ottawa Locks |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00027551
Point Pelee Marsh |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 1 High Priority for Action | 05 Detailed Testing Program |
00027593
Technical and Protective Operations Facility (TPOF) |
Remediation / risk management completed. No further action required. | 2021-2022 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00027614
Ottawa River |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00027618
Cap-des-Rosiers Harbour South Jetty |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00027693
Holyrood Harbour Bed |
Confirmatory sampling completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00027860
St. Mary's River at Stillwater |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00027914
French River at Portage Dam |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00027923
Duffins Creek at Pickering |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00027925
Little Rouge Creek at Scarborough |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00027926
Petticoat Creek near Dunbarton |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00027927
West Duffins Creek near Pickering |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00027931
Halfway Creek at Moosonee |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00027932
Rainy Lake at Northwest Bay |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00027935
Lake of the Woods at Cyclone Island |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00027966
Come by chance harbour bed |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00028032
Trout River at Kilometre 783.7 Alaska Highway |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00028046
Somass River near Alberni |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00028047
Yakoun River near Port Clements |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00028066
Nashlyn Irrigation Project |
Historical review completed. No further action required. | 2022-2023 | 02 Historical Review | |
00028067
Consul Irrigation Project |
Historical review completed. No further action required. | 2023-2024 | 02 Historical Review | |
00173002
Heart's Content (DFRP# 00173 - Waterlot) |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00173003
Heart's Content (DFRP# 00171 - Waterlot) |
Detailed testing completed. No further action required. | 2021-2022 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00273001
CFS ST John's (4710) - Cambrai Rifle Range |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00339015
Marine Fire Training Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00490003
Fortune (Fish Plant Wharf - DFRP# 00494 - Waterlot) |
Detailed testing completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00500004
Grand Bank (Waterlot) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00527002
Public Harbour and Wharf (Cow Head Leased Property) |
Detailed testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 05 Detailed Testing Program |
00626002
Harbour Breton (DFRP # 00627 - Waterlot) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 05 Detailed Testing Program |
00626003
Harbour Breton - Fish Plant Wharf (Waterlot only) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00651001
Sandyville (Dawson's Cove - Waterlot) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00670003
Public Harbour and Wharf |
Initial testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00698001
Water lot sediments |
Remediation / risk management completed. No further action required. | 2009-2010 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
00723001
Port aux Basques Ferry Terminal |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00748001
Channel-Port aux Basques (Waterlot) |
Remediation / risk management completed. No further action required. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00854003
Pinetree Site - Area B |
Remediation / risk management completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00854004
Pinetree Site - Area C |
Confirmatory sampling completed. No further action required. | 2019-2020 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00854005
Pinetree Site - Area D |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00967001
Waste Disposal Site |
Confirmatory sampling completed. No further action required. | 2020-2021 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00967004
Waste Disposal Site |
Confirmatory sampling completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00978009
Combined Outfalls - 1,2 & 3 & Drainage Ditch by FFTA |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
01027001
Public Wharf and Oil Dock – Upland |
Detailed testing completed. No further action required. | 2014-2015 | I Insufficient Information | 05 Detailed Testing Program |
01085002
Champney's West (Waterlot Property) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01122003
Bonavista (Waterlot Property) DFRP # - 01122 |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01183002
Glovertown (Waterlot Property) |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 3 Low Priority for Action | 05 Detailed Testing Program |
01208002
Salvage (Waterlot Property) |
Detailed testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01247002
Cape Freels (DFRP# 01247 & 01248 - Waterlot) |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01261002
Valleyfield (Waterlot Property) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01267003
Wesleyville (Main Wharf Waterlot Property) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01303002
Musgrave Harbour (Fish Plant Wharf - Waterlot - 01 |
Detailed testing completed. No further action required. | 2021-2022 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01303003
Musgrave Harbour (DFRP# 01305 - Waterlot) |
Detailed testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01333002
Seldom Come By (South - Waterlot - DFRP# 01333) |
Detailed testing completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01334002
Deep Bay (Waterlot Property) |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01489001
Water lot sediments |
Detailed testing completed. No further action required. | 2009-2010 | I Insufficient Information | 05 Detailed Testing Program |
01526001
Tilt Cove Uplands |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01526002
Tilt Cove Water Lot |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
01600001
Trout River |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
01633002
Cow Head (Waterlot) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01669003
Green Island Cove (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
01674001
Big Brook (SCH - Waterlot - DFRP# 01674) |
Detailed testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01686001
Port au Choix (DFO Wharf - Waterlot (01686)) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01686002
Port au Choix (FPI Wharf - Waterlot (55837)) |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 3 Low Priority for Action | 05 Detailed Testing Program |
01693002
Anchor Point (Waterlot- DFRP# 01693) |
Remediation / risk management completed. No further action required. | 2021-2022 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
01744001
Raleigh (SCH - Waterlot) |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
01767001
L'Anse-au-Clair (Waterlot Area) |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 3 Low Priority for Action | 05 Detailed Testing Program |
01778001
Forteau (SCH - Waterlot) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
01822086
Survival Tank Farm (STF 3000 Series) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01822087
South Escarpment Landfills (SES 1000 Series) |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
01822094
Lower Tank Farm (LTF 2000 Series) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01930001
MURRAY RIVER (Lead, copper, and PAHs in Waterlot sediments) |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
01955001
Sediment POD |
Detailed testing completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01958001
LAUNCHING POND - PAHs and metals in Waterlot sediments |
Detailed testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
01963002
ANNANDALE (Metals and PAHs in Waterlot sediments) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
02054001
Coast Guard Base |
Confirmatory sampling completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02284002
UPPER PORT LA TOUR |
Initial testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02561001
Granville Range-Granville Ferry |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02739001
Aldershot Landfill/Former Incinerator |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02739002
Mill Pond and Sewage Lagoons - Aldershot |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
02739004
Former Photo Lab (B95) - Aldershot |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02739007
Active 100m Range - Aldershot |
Initial testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 03 Initial Testing Program |
02739012
Meadowview Landfill - Aldershot |
Long term monitoring completed. No further action required. | 2017-2018 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
02762001
Newport Corner (3101) - Comp. Tech. Building (B9) |
Confirmatory sampling completed. No further action required. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02858004
Bedford Rifle Range (704) - Rifle Range |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02858005
Bedford Rifle Range (705) - Pistol Range |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02858011
Bedford Rifle Range (714) - Former 1940's Infrastructure |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02858014
Bedford Rifle Range (711) - Septic Tanks |
Initial testing completed. No further action required. | 2007-2008 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02859001
CFAD Bedford (801) - Ridge Landfill |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859003
CFAD Bedford (803) - Former Landfill (West of B162) |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859006
CFAD Bedford (806) - Sewage Treatment Plant |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859014
CFAD Bedford (815) - Central Heating Plant (B190) |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859018
CFAD Bedford (819) - Existing Jetty |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859019
CFAD Bedford (820) - Former Landfill near B206 |
Long term monitoring completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
02859032
CFAD East-side property (7403) - Area North of Highway 7 |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859034
Wrights Cove (8604) - Pond disposal area |
Long term monitoring completed. No further action required. | 2017-2018 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
02859035
Wrights Cove (8606) - Storm Drain |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859046
Navy Island (7501) |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02860008
Hartlen Point (5550) - Former Beacon/Explosives Area |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
02863001
CFB Shearwater (201) - Landfill 6 - Airfield |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02863008
CFB Shearwater (208) - Former Maintenance Hangar |
Long term monitoring completed. No further action required. | 2019-2020 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
02863011
CFB Shearwater (211) - Landfill 1 |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863012
CFB Shearwater (212) - Landfill 2 |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02863013
CFB Shearwater (213) - Landfill 3 |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863014
CFB Shearwater (214) - Landfill 4 |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863016
CFB Shearwater (216) - Fill Area West of Alpha Taxiway |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02863017
Shearwater (217) - Engine Run Up Area (DIPM Site) |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
02863020
Shearwater (220) - Fill Area South of Hangar H |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863053
CFB Shearwater (204B) - Former Heavy Equipment Compound |
Long term monitoring completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
02884012
Melville Island (5912) - Mooring Field |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02898001
Bedford Basin Measured Mile Beacon - PCB, PAH, and metals in sediments of Waterlot |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
02919004
Dockyard (1004) - Mainguy Building (D201) |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919005
Dockyard (1005) - PMQ's and Garage (D77, D78, D79 & D81) |
Remediation / risk management completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02919006
Dockyard (1006) - Pollution Control DREA (D17) |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919007
Dockyard (1007) - Sheet metal & Refrig. Shops (D19) |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919010
Dockyard (1010) - Electronics Shop (D20) |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919011
Dockyard (1011) - Inflammable Stores (D57) |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919013
Dockyard (1013) - Base Supply (D40 and D155) |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919014
Dockyard (1014) - Main Base Supply (D206) |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919015
Dockyard (1015) - Underwater Repair building (D53) |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02919017
Dockyard (1017) - Outside Fitters and Machine Shop (D108) |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919023
Dockyard (1023) - Corrosion Prevention & Sub Squadron |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919024
Dockyard (1024) - FMG and SRU (D166) |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919025
Dockyard (1025) - Shipwrights Shop (D174) |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919031
Dockyard (1031) - Transformers East of Building D14 |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919032
Water Lots (9908) - Dockyard |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919048
Dockyard (1036) - Former D17 |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02991001
Ahern Avenue Old Maintenance Building |
Confirmatory sampling completed. No further action required. | 2013-2014 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
03011008
Disposed - Water Lots, Shannon Park (9904) |
Confirmatory sampling completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03044015
Disposed -Sandwich Pt.(7301) Fmr Pump house-AST/Transformer |
Long term monitoring completed. No further action required. | 2014-2015 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
03186001
Amherst Rifle Range (5403) - Range firing pts, butt stops |
Long term monitoring completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
03186002
Amherst Rifle Range - Clear Cut Area |
Confirmatory sampling completed. No further action required. | 2007-2008 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03281002
LITTLE HARBOUR (PICTOU COUNTY) (Sediment Impacts- |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
03455001
Gillis Cove Field Camp - PAH and metals in soil near former slip |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03634002
Main-A-Dieu |
Initial testing completed. No further action required. | 2022-2023 | 03 Initial Testing Program | |
03662001
Sydney Rifle Range (3801) - Rifle Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03759003
Canadian Coast Guard College (Metal/PAH impacts in Crawley Creek Sediment) |
Remediation / risk management completed. No further action required. | 2016-2017 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03765001
Real Property |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
03907003
PORT CREDIT (Waterlot) |
Detailed testing completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 05 Detailed Testing Program |
04024001
LEONARDVILLE (Waterlot Sediment PAH and Metal Impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
04042001
BLACKS HARBOUR (PCB's-Metals-PAH's in sediment) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
04089007
Mons Small Arms Rifle Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
04089010
Shirley Rd. Dump |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
04089023
Indoor Tank Wash and Lagoon |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
04523001
HARDWICKE (FRENCH RIVER) (Pb, Cu & PAH's in water lot sediments) |
Initial testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
04890002
POINTE-VERTE (Metals/PAHs in water lot sediment) |
Detailed testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05020004
642 - Cowichan - 06799 - COWICHAN 1 - 7000019894 |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05036003
625 - Kwikwasut'inuxw Haxwa'mis - 06978 - GWAYASDUMS 1 - 7000003993 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
05058003
464 - Cold Lake First Nations - 06712 - COLD LAKE 149 / 7000012494 |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 2 Medium Priority for Action | 05 Detailed Testing Program |
05095004
595 - Tsal'alh - 08151 - SLOSH 1 - 7000026794 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
05156012
243 - Kashechewan - 06258 - FORT ALBANY 67 - 3000052496 |
Initial testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
05185001
201 - Serpent River - 06185 - SERPENT RIVER 7 - 3000047696 |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
05198003
70 - Mohawks of Kahnawá:ke - 06097 - KAHNAWAKE NO.14 - 2000040696 |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 1 High Priority for Action | 05 Detailed Testing Program |
05198007
70 - Mohawks of Kahnawá:ke - 06097 - KAHNAWAKE NO.14 - 2000007693 |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05352002
67 - Long Point First Nation - 06133 - WINNEWAY INDIAN SETTLEMENT - 2000051098 |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05570001
Sediments around wharf |
Confirmatory sampling completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05582001
Harbour sediments |
Confirmatory sampling completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05613001
Mount Apica - north slope |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05906047
Former dump Château Road |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06148001
Harbour sediments |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
06294001
Adminstrative Area-Domaine, Lozeau and Bougainville Islands |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
06514001
Road to Dupas Island - front range light |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
06578001
Sorel wharf site |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
06959001
Canal sediments |
Detailed testing completed. No further action required. | 2014-2015 | 1 High Priority for Action | 05 Detailed Testing Program |
07525123
Isachsen High Arctic Weather Station |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
07930009
POL tank farm |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
07930011
Central Heating Plant |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
07930017
Marsh - North of highway 170 |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
07981001
Monument Price |
Remediation / risk management completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08044001
Sediments around wharf |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
08148002
Sediments around wharf |
Detailed testing completed. No further action required. | 2021-2022 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
08201001
Harbour sediments |
Remediation / risk management completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08231001
BLANC-SABLON (SLIPWAY, SCH, LAND LOT, SOILS) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
08477003
Cornwall - Harbour Bed |
Detailed testing completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09126001
Harbour Bed |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
09189001
IVY LEA (waterlot) |
Historical review completed. No further action required. | 2014-2015 | 02 Historical Review | |
09303001
SEELEYS BAY (Waterlot) |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
09359001
WESTPORT (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
09401040
Alaska Highway - Steamboat Maintenance Camp |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09407008
Arrowhead Beach |
Initial testing completed. No further action required. | 1997-1998 | 03 Initial Testing Program | |
09412007
Reserve Land, Part 3, Extension of Lot 132/133 |
Detailed testing completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
09434003
451-C02 Pittsburgh Institution - Marsh |
Detailed testing completed. No further action required. | 2010-2011 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09445001
Fort Frontenac Water Lots |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09461002
Graving Dock |
Confirmatory sampling completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09461003
Water Lot |
Detailed testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 05 Detailed Testing Program |
09500001
CROW LAKE - Waterlot |
Historical review completed. Initial testing underway. | 2022-2023 | 02 Historical Review | |
09540012
8 W Fire Fighting Training Area /Hazardous Materials Storage |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09589001
PICTON (Waterlot) |
Initial testing completed. No further action required. | 2012-2013 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
09731004
D26 Little Lake to Rice Lake |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09998001
Vacant Land near Sawmill Creek |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
10457001
PORT DOVER - COMMERCIAL FISHING FACILITY (Main Marina Area Waterlot On-Site) |
Detailed testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
10675001
CEDAR BEACH (Sediment - North Portion of Property - Nickel) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
10686001
COLCHESTER (Sediment - Fuel Dispenser) |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
10703001
Fort Malden Front Range L.L 667 (soil surrounding structure) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
10711002
Waterlot |
Long term monitoring completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
10855008
Former Landfill - London Airport |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
10855009
Golfland Area 6 PCB Site (Former Sub-station) - London Airport |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
10941001
WENDOVER (Sediment Nearshore) |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
10964002
LION'S HEAD (Waterlot) |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
11022001
Roundel EOD Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022121
Foxfield Battle Assault Range |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11366001
MATTAWA (Waterlot) |
Detailed testing completed. No further action required. | 2021-2022 | N Not a Priority for Action | 05 Detailed Testing Program |
11406001
STURGEON FALLS (Waterlot) |
Historical review completed. No further action required. | 2006-2007 | 3 Low Priority for Action | 02 Historical Review |
11559002
GORE BAY (GB 304 sediment east of lot 16) |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11559003
GORE BAY (GB 604 Sediment east of lot 20) |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11569001
MELDRUM BAY (Main Wharf Waterlot) |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
11570001
Silver Water (Wharf) |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11819001
BRUCE MINES (Near the launching ramp) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11919001
MAMAINSE HARBOUR (Old House of Ferroclad fishing) |
Detailed testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
11919002
MAMAINSE HARBOUR (Rock Cavern Waste Disposal Area) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
11943001
Thunder Bay International Airport - Former Firefighting Training Area |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11994001
NIPIGON (Waterlot) |
Initial testing completed. No further action required. | 2012-2013 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
12052001
HURKETT (Area surrounding the ramp and wharf (east, west and south sides)) |
Historical review completed. Initial testing underway. | 2022-2023 | 02 Historical Review | |
12127001
SIOUX NARROWS (Waterlot) |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
12131001
KEEWATIN (Water lot north of the gov wharf) |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
12131002
KEEWATIN (Waterlots north of Bay Street) |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
12290001
ARNPRIOR (Waterlot Nearshore) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
14121004
Burdick Range |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
15305008
Camp Fish Pond and Area |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
15305010
Range #1 |
Initial testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
15412079
Stormwater Outfall |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
15684018
Skeet Range |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
16096079
Wilmer Marsh (dumping area) |
Confirmatory sampling completed. No further action required. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
16506001
Slesse Demolition Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
16506002
General Vokes Range |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
16568002
ALD- 2 Aldergrove Former Skeet Range |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
16662001
Victoria Junction Tailings Basin |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
16781002
Lot S30 and Apron III |
Confirmatory sampling completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17026001
New Westminster Railway Bridge |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17178003
HRR-2 Heals Rifle Range Former Grenade & Trap Shooting Range |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17348007
Lot 6: Swift Street; Herald Street Property; Pembroke Street Fill; Swift Street Fill; Herald Street North Fill; Store Street |
Remediation / risk management completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17348008
Lot 6A: Barclay Point; Rock Bay East Fill; Rock Bay North Fill; Bay Street East Fill; J-15 Bay Street Centre Fill; J-16 Bay S |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17402008
WP-3abce Work Point Macaulay Point Park Fill RL/PL |
Remediation / risk management completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17403007
DY-1AG Dockyard B Jetty Fill |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17403011
ESQ-1 - Esquimalt Harbour |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 1 High Priority for Action | 05 Detailed Testing Program |
17404001
DY-3 Dockyard Signal Hill Hood Bldg & Parking Lot |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17405001
MUN-1 Munroe Head |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17410007
Esquimalt Graving Dock Waterlot - AEC's 11,15 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17410014
Esquimalt Graving Dock - Canadian Forces Sailing Association (CFSA) Waterlot |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17432004
RP-2a Rocky Point Active Explosive Ordnance Disposal |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
17432007
RP-7 Rocky Point Area A Helgesen Point Former Landfill |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17432011
RP-3ad Rocky Point Small Arms Slag Dump Former Landfills |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17451011
COL-12 Colwood Former Contaminated Soil Storage Area |
Confirmatory sampling completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17451017
COL-11 Colwood Mooring Depot |
Confirmatory sampling completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17452002
RRU-2 Royal Roads University- Small Lakes Area |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17528001
COWICHAN BAY |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
17673001
Nanoose Harbour |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
18082001
Waterlot |
Confirmatory sampling completed. No further action required. | 2016-2017 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
18319001
Waterlot |
Confirmatory sampling completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
18704002
Vernon Mt Commonage 300m Rifle Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
19103001
Cracroft Point - Cracoft Island Minor Shore Light |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
19183001
Waterlot |
Confirmatory sampling completed. No further action required. | 2016-2017 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
19266001
Waterlot |
Detailed testing completed. No further action required. | 2016-2017 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
20247016
Alert Main Station Landfill |
Long term monitoring completed. No further action required. | 2017-2018 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
20247042
Sewage Outfall |
Long term monitoring completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
20247043
Lower Dumbell Lake |
Confirmatory sampling completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
20625001
Former Sambault garabage dump |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
21352001
Site 21352001 - Drummond Barrel (1979) Inc. |
Remediation / risk management completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
21941001
Institute of Ocean Sciences and Victoria MCTS - Past Fuel Storage ASTs |
Remediation / risk management completed. No further action required. | 2014-2015 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
21956001
Owen Sound Harbour - Land Lots and Harbour Bed |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
22430002
GEORGETOWN - FISHERMEN'S WHARF ((PAH, PCB & Metal Impacts in Waterlot Sediment) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
22500002
Prescott CCG Base (Waterlot) |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 05 Detailed Testing Program |
22905008
Outer Harbour Bed |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
22905009
Inner Harbour |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
22949001
HALIBURTON (HEAD LAKE) (Finger floats north of the main wharf) |
Initial testing completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
22967002
Bridgeport (Waterlot Property) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
23175001
PETERBOROUGH (GEORGE STREET) (Waterlot) |
Detailed testing completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 05 Detailed Testing Program |
23863001
Goose Cove (Waterlot) |
Detailed testing completed. No further action required. | 2021-2022 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
23867001
BAYFIELD (Waterlot) |
Initial testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
23970001
Nearshore (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
28614001
SIOUX LOOKOUT - LAUNCHING RAMP (Waterlot) |
Historical review completed. No further action required. | 2005-2006 | N Not a Priority for Action | 02 Historical Review |
29757001
Small calibre (Former dump), DRDC-South |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
29757002
Dry material (former dump for), DRDC-South |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
29757011
Former stop-butt, bldg 321 (S8-1), DRDC-South |
Confirmatory sampling completed. No further action required. | 2015-2016 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
29757014
South Outfall, DRDC-South |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
29757024
North Outfall, DRDC-North |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
30017002
Belleoram (Waterlot) |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
30048001
BRONTE (OAKVILLE) (Sediment-Southeast Portion of W |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
30246001
BELLEVILLE (Zwick's East Landfill) |
Detailed testing completed. No further action required. | 2013-2014 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
30458001
Mont Louis - material in wharf and sediments |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
30506001
WESTMEATH (Nearshore Sediments) |
Historical review completed. Initial testing underway. | 2022-2023 | 02 Historical Review | |
31409001
West Wharf |
Detailed testing completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 05 Detailed Testing Program |
31510001
CORNWALL-MARINA (Nearshore of Waterlot) |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 05 Detailed Testing Program |
31513001
NORTH BAY-MARINA (Waterlot) |
Historical review completed. No further action required. | 2008-2009 | N Not a Priority for Action | 02 Historical Review |
32039001
Disposed-British Prop.No1, Site 5(6201)Garage/waste oil tank |
Initial testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
32039003
Disposed -British Prop. No1,Site 5(6203)-Former Machine Shop |
Initial testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
32166001
L'orginal waterlot |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
32668002
Fermeuse (Lumley's Cove Waterlot -32668) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
32668003
Fermeuse (Sheeps Head Cove Waterlot - 00040) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
33510001
Zinc and copper |
Confirmatory sampling completed. No further action required. | 2009-2010 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
33984001
KENORA-MARINA (Entire Waterlot) |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
34337001
MAL-1 HMCS Malahat |
Confirmatory sampling completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
34337002
VIC-1 HMCS Malahat Waterlot |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
34476004
Mtn View - Inner Landfill Site |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
34555002
St. Lewis (Waterlot) |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 2 Medium Priority for Action | 05 Detailed Testing Program |
34627002
Rose Blanche (Water lot - DFRP# 34772) |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
34627004
Rose Blanche (Diamond Cove Waterlot - DFRP# 34627) |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 3 Low Priority for Action | 05 Detailed Testing Program |
34658001
L'Anse-au-Loup (Fish Plant Waterlot - 34658) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 05 Detailed Testing Program |
34658002
L'Anse-au-Loup (Boat Basin Waterlot - 01773) |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 3 Low Priority for Action | 05 Detailed Testing Program |
34810001
Barr'd Harbour (SCH - Waterlot - DFRP# 34810) |
Detailed testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
34819001
Flowers Cove (SCH - Waterlot - DFRP# 34819) |
Detailed testing completed. No further action required. | 2021-2022 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
36293001
Waterlot |
Confirmatory sampling completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
36293002
Waterlot |
Confirmatory sampling completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
36347001
MISSISSAUGA (LAKEFRONT PROMENADE PARK) (Waterlot) |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
38009002
Princess Site - Princess Wash Plant Site |
Confirmatory sampling completed. No further action required. | 2018-2019 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
38128001
Dominion 6 (PCD1 - Clyde Mine) |
Confirmatory sampling completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
52107001
Water lots(9905),Harbour Front (Naval staff house) |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
54011002
TORONTO (BLUFFERS PARK) (Sediment, SW Corner of Property) |
Detailed testing completed. No further action required. | 2005-2006 | 3 Low Priority for Action | 05 Detailed Testing Program |
54012002
PETERBOROUGH (WOLFE STREET)(Waterlot Much of the Property) |
Detailed testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 05 Detailed Testing Program |
54026001
PARRY SOUND-BOB'S POINT MARINA (Waterlot West of West Wharf ) |
Detailed testing completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
54091001
KINGSTON (TREASURE ISLAND) (located in water lot o |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
54092001
JORDAN HARBOUR (waterlot east beach) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
54093001
TRENTON (BAY MARINE) (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
54094001
HAILEYBURY (within Marina waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
54500001
Pembroke Small Craft Harbour - (Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
55547001
Griquet (Lower Griquet Waterlot - 01739) |
Detailed testing completed. No further action required. | 2021-2022 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
55547004
Griquet (Upper Griquet Waterlot - 55547) |
Detailed testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
55767002
Savage Cove (Waterlot) |
Remediation / risk management completed. No further action required. | 2021-2022 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
55793022
Shag Pond |
Confirmatory sampling completed. No further action required. | 2019-2020 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
55793023
Little Shag Pond. |
Detailed testing completed. No further action required. | 2015-2016 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
55793024
Cain's Pond. |
Detailed testing completed. No further action required. | 2014-2015 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
55793025
Island Pond. |
Confirmatory sampling completed. No further action required. | 2011-2012 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
55793026
The Pond |
Detailed testing completed. No further action required. | 2014-2015 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
55800001
Argentia Harbour |
Detailed testing completed. No further action required. | 2014-2015 | I Insufficient Information | 05 Detailed Testing Program |
55909002
Harbour Grace (Northside - 00238 - Waterlot) |
Detailed testing completed. No further action required. | 2017-2018 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
56126002
Indian River - Fisheries Research Camp - Dumpsite |
Detailed testing completed. No further action required. | 2006-2007 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
56156002
Rose Blanche (Bait Depot - Waterlot) |
Detailed testing completed. No further action required. | 2014-2015 | 1 High Priority for Action | 05 Detailed Testing Program |
56224001
Chatham Warehouse & Compound (Metals and PAHs in Waterlot sediments) |
Detailed testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
56505001
Creek at Bennett Lake |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
56631001
Isle Aux Morts (East - DFRP# 00733 - Waterlot) |
Detailed testing completed. No further action required. | 2018-2019 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
56631002
Isle Aux Morts (West - DFRP# 56631 - Waterlot) |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 3 Low Priority for Action | 05 Detailed Testing Program |
56665001
AECL Heavy Water Plant Site |
Confirmatory sampling completed. No further action required. | 2018-2019 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58231001
Griffith Island - Vicinity of Lighthouse |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67165001
CanmetMINING Val-d'Or |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67197001
Real Property |
Detailed testing completed. No further action required. | 2011-2012 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
67590001
Area A (West Wharf) - Centre and North portions were divested to the City of Oshawa in the 2011/12 FY. The South portion rem |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67590005
Area E (Marina) |
Remediation / risk management completed. No further action required. | 2016-2017 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67590008
Area C - Marina/waterlot |
Detailed testing completed. No further action required. | 2011-2012 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
67622002
St. Anthony SAR - Waterlot |
Detailed testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 05 Detailed Testing Program |
67652001
Michipicoten Island East End (E. Landfill/Generator Build./Lighthouse) |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67652002
Michipicoten Island East End (SE & W of W. Landfill) |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
69920001
HMCS Champlain - Chicoutimi Naval Reserve |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
70011001
Upper Indian Pond Firing Range |
Confirmatory sampling completed. No further action required. | 2014-2015 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
70069006
EC Eureka - Sewage Lagoon |
Detailed testing completed. No further action required. | 2015-2016 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
70069013
DND - Eureka - New Grey Water Outfall |
Remediation / risk management completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
70679001
Portland Slip |
Long term monitoring completed. No further action required. | 2016-2017 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
72019003
St. John's (Base - Waterlot) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
72045001
Waterlot |
Initial testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
72064001
Rue du Quai (wharf street) |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
72064003
Sediments - Gaspé wharf |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
72066002
Pelee Harbour |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
80023001
Burin (SAR Waterlot) |
Detailed testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
82078001
Portneuf (front range light) |
Detailed testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
82087001
Chromium on former light site |
Initial testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
82115001
Tétreaultville - front range light |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
82198001
Île des Béliers, Former RRL |
Remediation / risk management completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
83484001
Gargantua (West Shore Gargantua Harbour) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
84779001
Upper Puntledge Hatchery - Dump/Burn Areas |
Initial testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
85604001
Port Carling (Sediment South of Concrete Dock-Metals) |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
86027001
Crystal Bay Compensating Dyke - Soil contamination |
Initial testing completed. No further action required. | 2008-2009 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
C1010001
TERRA # 1 (NORTH MINE, SILVER BEAR PROPERTIES) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
C1024001
DISCOVERY MINE (DISCOVERY YELLOWKNIFE MINES LTD.; CONSOL DISCOVERY YK MINES) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C1031001
RAYROCK MINE (ROB GROUP; M.M. GROUP; ISLAND 2; BETA0 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
C1033001
RUTH GOLD MINE |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C1035001
TUNDRA-TAURCANIS MINE (BULLDOG YELLOWKNIFE GOLD MINES, TAMCANIS MINES LIMITED, TUNDRA GOLD MINES) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
C1038001
OUTPOST ISLAND |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C1051001
CONTACT LAKE MINE (INTERNATIONAL URANIUM, M GROUP, SAM, KAYO) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
C1052001
Clinton Creek |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
C2503001
FARO MINE |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
C2504001
Ketza River |
Initial testing completed. Detailed testing underway. | 2023-2024 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
C2506001
Arctic Gold and Silver |
Initial testing completed. Detailed testing underway. | 2023-2024 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
C2507001
Venus Tailings/Mill Site |
Initial testing completed. Detailed testing underway. | 2023-2024 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
N0032002
Dumpsite G - Former Army Camp |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0032003
Dumpsite P - Former fighter hangar |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N0032004
Dumpsite U - Former borrow pit |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N7008001
1998 GAF Crash Site (CRA13020) |
Historical review completed. No further action required. | 2006-2007 | 02 Historical Review | |
N7009001
LG2 RAF Crash Site (1996) (CRA13030) |
Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
N7048001
Pat Bay Former POLCompound |
Long term monitoring completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
N7056001
St. Pierre Lake Range - CYR 606 |
Confirmatory sampling completed. No further action required. | 2006-2007 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N7075001
Dome Mountain, RCAF and Camp Sites (5 W) |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
N7076001
2000 GAF Crash Site (CRA13040) |
Historical review completed. Initial testing underway. | 2022-2023 | 02 Historical Review |
- Version: