Search Results
Search Results Summary | |
---|---|
Criteria: |
|
Sort Key: | FCSI Identifier (ascending) |
Sites Found: | 114 |
Results by Site Impact
Change results view to: Name and Location Contaminants and Media
FCSI Identifier Site Name |
Status | Fiscal Year | Classification | Highest Step Completed |
---|---|---|---|---|
00001117
Oxford RCMP |
Historical review completed. No further action required. | 2006-2007 | 02 Historical Review | |
00001159
Guysborough RCMP |
Historical review completed. No further action required. | 2006-2007 | 02 Historical Review | |
00001171
Tatamagouche RCMP |
Historical review completed. No further action required. | 2006-2007 | 02 Historical Review | |
00001172 | Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00001173 | Historical review completed. No further action required. | 2006-2007 | 02 Historical Review | |
00001181
Pugwash RCMP |
Historical review completed. No further action required. | 2006-2007 | 02 Historical Review | |
00001182 | Historical review completed. No further action required. | 2006-2007 | 02 Historical Review | |
00001183 | Historical review completed. No further action required. | 2006-2007 | 02 Historical Review | |
00001184
Parrsboro RCMP |
Historical review not required. | 2007-2008 | 01 Identify Suspect Sites | |
00001185 | Historical review not required. | 2007-2008 | 01 Identify Suspect Sites | |
00001186 | Historical review not required. | 2007-2008 | 01 Identify Suspect Sites | |
00001331
Nappan Research Centre |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 03 Initial Testing Program |
00002370
Chignecto Amherst Point NWS |
Historical review completed. No further action required. | 2011-2012 | 02 Historical Review | |
00002479
Wallace Bay |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00006158
27 - Millbrook - 06059 - MILLBROOK 27 / 0202636605 |
Historical review not required. | 2013-2014 | 01 Identify Suspect Sites | |
00006159
27 - Millbrook - 06059 - MILLBROOK 27 / 0202636705 |
Historical review not required. | 2013-2014 | 01 Identify Suspect Sites | |
00011493
Chignecto Lusby Marsh |
Historical review completed. No further action required. | 2011-2012 | 02 Historical Review | |
00011504
Amherst Point Church |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00011505
Chignecto NWA |
Detailed testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00011507
Former on-site rail line |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00011508
Former gypsum mine |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00011509
Chignecto National Wildlife Area (Lusby/Amherst Point Migratory Bird Sanctuary) (Consolidated) |
Detailed testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 05 Detailed Testing Program |
00012315
Ile Haute - Metals/Benzene Impacted Soil- Fmr. Buildings/Dump Area |
Confirmatory sampling completed. No further action required. | 2019-2020 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00012320
Coldspring Head - Metal Impacts in Soil |
Confirmatory sampling completed. No further action required. | 2012-2013 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00012425
Apple River Lightstation - Metals in Soil near light structure |
Detailed testing completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013005
210-C02 Active firing range |
Initial testing completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013006
210-C03-A Springhill Institution - Former Fuel Storage Tank Near Building 19 |
Detailed testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013007
210-C03-B Springhill Institution - Fuel Storage tanks |
Initial testing completed. No further action required. | 2011-2012 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013187
MALAGASH (Copper in Sediments) |
Initial testing completed. No further action required. | 2022-2023 | 03 Initial Testing Program | |
00013214
Cape dOr - Hydrocarbon Impacted Soil at Inn |
Detailed testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013418
Millbrook RCMP |
Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
00013420 | Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00013423
Stewiacke RCMP |
Confirmatory sampling completed. No further action required. | 2011-2012 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00013427
Cumberland RCMP |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00013429
Amherst RCMP |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
00013444 | Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
00013449 | Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
00016811
Bergeman Point Range Front - Zinc in Soil |
Initial testing completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00016812
Bergeman Point Range Rear - No Impacts |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00016813
Biglow Point Range Front - Zinc in Soil not Exceeding SSCs near Towers |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00016814
Biglow Point Range Rear - Zinc in Soil not Exceeding SSCs near Towers |
Initial testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00016833
Fishing Point Range Front - Metals in Soil |
Detailed testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00016834
Fishing Point Range Rear - Metals in Soil not Exceeding SSCs |
Detailed testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00016848
Former Stevens Front - No Impacts |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00016849
Malagash Wharf (No Impacts) |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00016876
Pugwash (Metals in Soil and in Paint) |
Detailed testing completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00016879
Stevens Point Range Front - No Issues |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00016880
Steven Point Range Rear - Lead in Soil |
Remediation / risk management completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00016885
Wallace Harbour Sector - Metals Impacts |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 05 Detailed Testing Program |
00016886
Wallace Wharf (No Impacts) |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00016891
Malagash Property (Disposed) (Unassessed) |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00016899
Wallace Fisheries Building (Unassessed) |
Historical review not required. | 2014-2015 | 01 Identify Suspect Sites | |
00016900
West Pugwash Brownell Building (Unassessed, Disposed) |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00017178
Advocate Harbour (Metals in Soil) |
Initial testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017184
Barnes Point - Unassessed |
Historical review not required. | 2013-2014 | 01 Identify Suspect Sites | |
00017219
Cape Sharp - Potential Metals near Former Garage |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00017220
Cape Sharp - No Action Required near Foundation/Transformers |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017310
Highland Village (No Impacts Identified) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00017357
Port Greville Range Rear (Metals Impacted Soil) |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017417
Parrsboro Wharf (No Soil) |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00017440
Port Greville Range Front (Metal Impacts in Soil) |
Initial testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017458
Ragged Point - No Soil |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00017483
Shulie Light (Unassessed) |
Historical review not required. | 2013-2014 | 01 Identify Suspect Sites | |
00017530
Five Islands (Unassessed) |
Historical review not required. | 2013-2014 | 01 Identify Suspect Sites | |
00017545
Birch Hill Camp - Unassessed |
Historical review not required. | 2013-2014 | 01 Identify Suspect Sites | |
00017706
Spencer Island - Unassessed |
Historical review not required. | 2015-2016 | 01 Identify Suspect Sites | |
00017712
Advocate (No Soil or Sediment Impacts) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00017778
FIVE ISLANDS (sed samples within guidelines closed) |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017798
JOGGINS (TWO RIVERS POINT) (Unassessed) |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00017867
NORTHPORT (PAH in sediment) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00017868
NORTHPORT (no metals contamination Closed) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00017897
PUGWASH (Sediment Impacts) |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00017898
Pugwash-(No Land Based Impacts) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00017933
WALLACE (Metal in Soil; BTEX in Soil) |
Detailed testing completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 05 Detailed Testing Program |
00023450
Fort Lawrence - Beaubassin National Historic Site |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024574
210-C10 Springhill - Former UST Near Building A4 (removed in 2009) |
Detailed testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024660
210-C04-A Springhill Institution - Aboveground Storage Tank Spill at A-13 |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00026384
210-C09 Springhill - Fluid leak near the Central heating plant |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00027670
train 15 |
Confirmatory sampling completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00027852
Salmon River at Union |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00027947
Great Village River near Scrabble Hill |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
03130001
Truro Armoury (4001) - Armoury Building (B1) |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03130003
Truro Armoury (4003) - Indoor Rifle Range |
Initial testing completed. No further action required. | 2000-2001 | 03 Initial Testing Program | |
03130005
Truro Armoury (4004) - Former POL Storage Locations |
Detailed testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
03136001
Truro RCMP District Office Site |
Confirmatory sampling completed. No further action required. | 2020-2021 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03138001
Masstown (2501) - Receiver Building |
Historical review completed. No further action required. | 2001-2002 | 02 Historical Review | |
03138002
Masstown (2502) - Antenna Field |
Historical review completed. No further action required. | 1999-2000 | N Not a Priority for Action | 02 Historical Review |
03144001
Debert Rifle Range (1201) - Rifle/Pistol Range |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03144002
Debert Rifle Range |
Initial testing completed. No further action required. | 2001-2002 | N Not a Priority for Action | 03 Initial Testing Program |
03146001
Great Village Transmitter Site (2001) - Existing AST |
Confirmatory sampling completed. No further action required. | 2014-2015 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03148001
Disposed - Folly Lake (1601) Control Building/Radar Facility |
Initial testing completed. No further action required. | 2006-2007 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
03148002
Disposed - Folly Lake (1602) - Garage/POL Building |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
03163001
Cape Sharp - Metal Impacts in Soil |
Confirmatory sampling completed. No further action required. | 2019-2020 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03174001
Parrsboro (Metals and Benzene Impacts in Soil) |
Confirmatory sampling completed. No further action required. | 2020-2021 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03184001
210-C04-B Springhill Institution - Fuel Storage System |
Detailed testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
03184002
210-C04-C Springhill Institution - Underground Strorage System |
Confirmatory sampling completed. No further action required. | 2010-2011 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03185001
Nappan Research Centre |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03186001
Amherst Rifle Range (5403) - Range firing pts, butt stops |
Long term monitoring completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
03186002
Amherst Rifle Range - Clear Cut Area |
Confirmatory sampling completed. No further action required. | 2007-2008 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03186004
Amherst Rifle Range (5404) - Troop Shelter |
Historical review completed. No further action required. | 2001-2002 | N Not a Priority for Action | 02 Historical Review |
03186005
Amherst Rifle Range (5402) - Markers Shelter |
Historical review completed. No further action required. | 2001-2002 | N Not a Priority for Action | 02 Historical Review |
03186006
Amherst Rifle Range (5401) - Target Shed |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
03205001
Amherst Armoury Building (501) |
Confirmatory sampling completed. No further action required. | 2018-2019 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
03205002
Amherst Armoury (502) - former POL shed |
Long term monitoring completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
03214001
Cobequid Biodiversity Centre (Metals & Hydrocarbons in Soil near Residence) |
Detailed testing completed. No further action required. | 2005-2006 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
03214002
Cobequid Biodiversity Centre (Metals in Soil near the Hatchery) |
Detailed testing completed. No further action required. | 2005-2006 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
03214003
Cobequid Biodiversity Centre (Metals/Hydrocarbons-Soil-Burn Pit & Debris Areas) |
Detailed testing completed. No further action required. | 2005-2006 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
03244001
Mullins Point Front and Rear Range - Lead and zinc in soil around Front Range Light |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
03244002
Mullins Point Front and Rear Range - Lead & zinc in soil - fmr rear locations/fmr shed |
Detailed testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 05 Detailed Testing Program |
05358001
27 - Millbrook - 06059 - MILLBROOK 27 - 1000000393 |
Historical review completed. Initial testing underway. | 2022-2023 | 02 Historical Review | |
10003001
Land |
Remediation / risk management completed. No further action required. | 2009-2010 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
26612001
West Advocate, Cumberland, NS |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
32771001
Springhill Armoury (3601) - Armoury Building |
Long term monitoring completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
58224002
Cape dOr - Metal Impacted Soil |
Detailed testing completed. No further action required. | 2013-2014 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
- Version:
- 40