Search Results

Search Results Summary
Criteria:
  • Limited to Closed Sites
  • Reporting Organization: Parks Canada Agency
Select Additional Criteria...
Sort Key:Country (ascending)
Sites Found:274
Alternate Views
Choose an alternate view: Map XML CSV Financials Report
Results View Options

Results by Site Impact

Change results view to: Name and Location Contaminants and Media

FCSI Identifier
Site Name
Status Fiscal Year Classification Highest Step Completed
00000910
Gilman River
Confirmatory sampling completed. No further action required. 2021-2022 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00002329
Lake Brook Warden Residence
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00002330
Decca station
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00002331
Maintenance Garage Compound
Detailed testing completed. No further action required. 2013-2014 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00002336
Pine Lake Dump Site Barrel Cache
Remediation / risk management completed. No further action required. 2013-2014 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00002337
Rideau Canal, Swale of Lot 2, Concession IV
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00002338
Warden's Operation Building
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008323
Abandonned bridge, former Combers Beach access road
Detailed testing completed. No further action required. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00008324
Sunwapta Warden Station
Confirmatory sampling completed. No further action required. 2013-2014 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00008325
Maligne Lake Warden Station
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00012826
Pukaskwa National Park, Administration Building Gas Shed
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00012829
Lake Louise Service Station
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00012830
Bath Creek Tie Camp
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00012831
Lake Louise CPR Power House
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00012832
Redstreak Sinkhole
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00012833
Dolly Varden Pit
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00012834
16 Mile Pit
Confirmatory sampling completed. No further action required. 2013-2014 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00012835
Abandoned barrels, with no known affiliation
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00012836
Barrels at Active Research Camp or Cabin, known affiliation
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00012837
Barrels at Inactive/Abandonned Cabin/Settlement, known affiliation
Detailed testing completed. No further action required. 2013-2014 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00012838
Barrels in active fuel caches, known affiliation
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00012839
Empty barrels sites
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00012840
K17 Nestor 2 living quarters building D
Detailed testing completed. No further action required. 2020-2021 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00012843
Wastes other than barrels
Historical review completed. No further action required. 2013-2014   02 Historical Review
00012844
Snow Creek
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00012846
Hawk Creek
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00012848
Waskesiu Lawn Bowling Green
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00012850
Former Site of the Port Renfrew Motel
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00012851
Roland Bay: Abandoned oil well site (Well L-41)
Detailed testing completed. No further action required. 2020-2021 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00012852
Spring River: abandoned oil well site (Well N-58)
Detailed testing completed. No further action required. 2020-2021 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00012853
Sheep Creek: placer gold mine
Detailed testing completed. No further action required. 2020-2021 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00012854
Castel Bay: abandoned oil well site (Well C-68)
Detailed testing completed. No further action required. 2017-2018 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00012855
Kusrhaak: abandoned oil well site (Well D-16)
Detailed testing completed. No further action required. 2017-2018 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00012857
Bankhead Power Station
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00012859
Minnewanka Power Plant
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00012860
Old Banff Industrial Block
Confirmatory sampling completed. No further action required. 2013-2014 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00012861
Public Library Site
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00012864
Monarch Campground
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00012865
Amiskwi Mill Site
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022198
Stalag Salt Storage
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00022200
Garden River Public Works Yard
Initial testing completed. No further action required. 2021-2022 1 High Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022201
Fifth Meridian Market AST
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022202
Garden River Trading (Charlie Rose) AST
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022203
Old Parks Compound
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022809
Vermillion Warden Station
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00022827
Garden River Landfill
Initial testing completed. No further action required. 2021-2022 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022828
Northlands School Historic AST
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022829
Garden River Sewage Lagoon
Historical review completed. No further action required. 2021-2022   02 Historical Review
00022830
Former Septic Tile Field
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00023292
Waskesiu Townsite Beaver Ponds
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 05 Detailed Testing Program
00023376
Site 1.2.1
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00023389
Cartier-Brebeuf Eastern Sector
Long term monitoring completed. No further action required. 2013-2014 1 High Priority for Action 10 Long-Term Monitoring (Optional)
00023390
Cartier-Brebeuf North-Eastern Sector
Detailed testing completed. No further action required. 2015-2016 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00023442
Gilman Glacier Camp
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00023445
Church Historic AST
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00023446
Swanson Camp 6 Sawmill at Sweetgrass Landing
Historical review completed. No further action required. 2013-2014   02 Historical Review
00023447
Swanson's Sawmill Camp # 3 Peace River
Historical review completed. No further action required. 2013-2014   02 Historical Review
00023448
Northern Transport Company Sawmill near Sawmill Island
Historical review completed. No further action required. 2013-2014   02 Historical Review
00023449
Sweetgrass Station Abattoir
Historical review completed. No further action required. 2013-2014   02 Historical Review
00023450
Fort Lawrence - Beaubassin National Historic Site
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00023451
Upper Rideau Lake
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00023452
Newboro Lake
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00023453
Indian Lake
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00023455
Northwest Astotin Lake
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00023456
Mount Agassiz
Confirmatory sampling completed. No further action required. 2015-2016 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00023467
Oil trap, operational centre's garage at Forillon National Park
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00023472
Torngat Mountains NP, Upper Kangalaksiorvik Lake
Remediation / risk management completed. No further action required. 2013-2014 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00023478
Brackley Pumphouse
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00023482
Brewster Chalet
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00023483
Airport Fuel Tank
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00023610
Fort No. 1, Lévis Forts National Historic Site
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00023971
Fort Battleford Garage and Maintenance Workshop
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00023974
Ingonish Beach Detachment
Historical review completed. No further action required. 2013-2014   02 Historical Review
00024052
Belza Farmhouse
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00024292
Sandy Pond Day-Use Area
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00024298
Former Wildlife Park
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024300
Former asphalt plant
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024304
Keltic Incinerator Site
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024305
Dufferin Terrace
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024309
Struggle Site
Initial testing completed. No further action required. 2018-2019 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024310
Tablesands site
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024573
Former Headquarters Service Station Site
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024575
Haslam Pit Pumphouse Former UST
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024576
Sandy Pond Boardwalk
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00024581
Cape Gulch, Shoal Cove and Tallek Arm
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00024582
Parmenter Island
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00024587
Ile des Cinq Point
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024668
Dixon Residence
Detailed testing completed. No further action required. 2013-2014 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00024676
Harbour of Cap-des-Rosiers
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00024804
Historic House
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025558
Creosote Treated Wood - Bennett Brook
Initial testing completed. No further action required. 2014-2015 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025564
Former UST 2242 Grand Pré Road
Detailed testing completed. No further action required. 2015-2016 3 Low Priority for Action 05 Detailed Testing Program
00025565
Old Apple Warehouse
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025807
2 Landing Road, mallorytown (dock and parking lot)
Initial testing completed. No further action required. 2013-2014   03 Initial Testing Program
00025822
Jasper NP Abandoned Oil Tank
Confirmatory sampling completed. No further action required. 2015-2016 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00026419
Parks Canada Garage, Sachs Harbour, NT
Detailed testing completed. No further action required. 2020-2021 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00026482
Fuel Transfer Area
Initial testing completed. No further action required. 2021-2022   03 Initial Testing Program
00027770
Georges Island National Historic Site
Remediation / risk management completed. No further action required. 2021-2022 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00027779
Yoho Ranch
Confirmatory sampling completed. No further action required. 2021-2022 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
01187001
Terra Nova Golf Course
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
01187002
Operations Compound
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
01775001
Red Bay (Principal Light Keeper's Residence)
Detailed testing completed. No further action required. 2016-2017 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
01775002
Red Bay (Fuel Storage Tank and Old Oil Dump)
Detailed testing completed. No further action required. 2017-2018 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
01775003
Red Bay (Fuel Drum Storage)
Detailed testing completed. No further action required. 2017-2018 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
02087001
Cavendish Maintenance Compound
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
02087002
Dalvay Compound - Chemical Storage Building
Confirmatory sampling completed. No further action required. 2016-2017 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02087003
Green Gables
Historical review not required. 2013-2014   01 Identify Suspect Sites
02595001
Petit Parc
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02750008
Former Railway Tie Storage Area
Confirmatory sampling completed. No further action required. 2013-2014 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
02991001
Ahern Avenue Old Maintenance Building
Confirmatory sampling completed. No further action required. 2013-2014 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
03604002
Irving Bulk Fuel Storage Site
Confirmatory sampling completed. No further action required. 2013-2014 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
03640001
Parks Canada Trade Waste Site
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
03640002
Former Town Landfill
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
03640005
Former military disposal site
Remediation / risk management completed. No further action required. 2013-2014 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
03640006
Maintenance Compound Fuel Spill Site
Confirmatory sampling completed. No further action required. 2013-2014 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
03842001
North Mountain Treated Wood Waste Temporary Storage Site
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
03842003
Jerome Mountain Incinerator Site
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
03842004
Ingonish Compound
Confirmatory sampling completed. No further action required. 2017-2018 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
03842005
Cheticamp Compound
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
03842006
Marrach Landfill
Confirmatory sampling completed. No further action required. 2013-2014 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
03842008
Broad Cove Incinerator Site
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
03842009
Highlands Links Golf Course Greens
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
03842010
Cheticamp Compound Fuel Spill Site
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
03842020
Grande Anse Compound
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
03863001
Potato Disinfection Pit - Former AGCAN Research Station
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
05828001
Cartier-Brebeuf Western Sector
Long term monitoring completed. No further action required. 2013-2014 1 High Priority for Action 10 Long-Term Monitoring (Optional)
06688001
Wharf area
Confirmatory sampling completed. No further action required. 2021-2022 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
06959001
Canal sediments
Detailed testing completed. No further action required. 2014-2015 1 High Priority for Action 05 Detailed Testing Program
06959006
Site 12.2
Confirmatory sampling completed. No further action required. 2013-2014 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
06959007
Site 13.3
Confirmatory sampling completed. No further action required. 2020-2021 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
06959012
Site 14.1.1
Detailed testing completed. No further action required. 2013-2014 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
06959013
Site 14.2
Detailed testing completed. No further action required. 2013-2014 3 Low Priority for Action 05 Detailed Testing Program
06959018
Site 15.5
Detailed testing completed. No further action required. 2021-2022 2 Medium Priority for Action 05 Detailed Testing Program
06959022
Site 03.4
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
06959029
Site 04.4
Initial testing completed. No further action required. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
06959036
Site 01.2
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
06959037
Site 01.3
Detailed testing completed. No further action required. 2013-2014 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
06959040
Site 02.2.0
Detailed testing completed. No further action required. 2013-2014 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
06959045
Site 03.5
Initial testing completed. No further action required. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
06959054
Site 06.2
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
06959055
Site 07.1 (north deposit site)
Remediation / risk management completed. No further action required. 2013-2014 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
06959062
Site 08.6 (north deposit site)
Remediation / risk management completed. No further action required. 2013-2014 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
06959084
Site 14.3
Remediation / risk management completed. No further action required. 2021-2022 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
06959090
Site 16.1 Peel Basin
Detailed testing completed. No further action required. 2013-2014 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
09412002
Old Sly's Lockstation
Remediation / risk management completed. No further action required. 2021-2022 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
09412003
Industrial Island Park
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
09412004
Shops Compound
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
09412007
Reserve Land, Part 3, Extension of Lot 132/133
Detailed testing completed. No further action required. 2018-2019 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
10667001
Camp Henry
Remediation / risk management completed. No further action required. 2013-2014 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
12008001
Otter Cove, Gas Shed
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
12008002
Otter Cove, Generator Site
Detailed testing completed. No further action required. 2013-2014 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
12705001
Underground Storage Tank
Detailed testing completed. No further action required. 2016-2017 N Not a Priority for Action 05 Detailed Testing Program
12897004
Townsite Washroom Former UST
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
12897005
Clear Lake Golf Course
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
12897008
Golf course maintenance yard former UST
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
13478002
Zahurski's Point Oil Dump Pit
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
13567001
Fort Walsh NHS Landfill
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
14567001
Commercial Property at Block 5 Lot 8, Waskesiu Townsite
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
14567003
Main Compound Fuel Storage
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
14567004
Narrows Campground Generator Site
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
14567006
Waskesiu Golf Course
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
14567007
Camp 18 Gravel Pit
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
14567010
Waskesiu Breakwater
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 05 Detailed Testing Program
15404002
Stephen Pit
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15404004
Fairview Pit
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15404016
Old Lake Louise Lumber Mill
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15404031
Lake Louise Compound
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
15404032
Saskatchewan Crossing Warden Station
Confirmatory sampling completed. No further action required. 2013-2014 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
15404034
Lake Louise Overflow
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15404037
Mosquito Creek
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15404040
Silverhorn
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15404045
Bow River Backwater
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15404047
Bow Summit Repeater Tower
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15404055
Old Lake Louise Compound
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15404058
Old Government Horse Corral
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
15404060
Fairview Lagoon
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15404061
Mount Coleman Rest Area
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15404065
Cougar Avenue Dump
Confirmatory sampling completed. No further action required. 2013-2014 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
15404067
Banff Golf Course Dump
Initial testing completed. No further action required. 2021-2022 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15404069
Red Earth Creek Sawmill
Historical review completed. No further action required. 2013-2014   02 Historical Review
15404070
Fairholme Ranch
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15404071
Castle Mountain Patrol Yard
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15412004
A4 Maligne Lake Road Borrow Pit
Historical review completed. No further action required. 2013-2014   02 Historical Review
15412005
A5 Km 35.0 Maligne Lake Road Borrow Pit
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15412006
A6 Km 39.1 Maligne Lake Road Borrow Pit
Initial testing completed. No further action required. 2013-2014 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15412010
A10 Km 10.5 Miette Hot Springs Road Borrow Pit
Historical review completed. No further action required. 2013-2014   02 Historical Review
15412011
A11 Km 14.1 Miette Hot Springs Road Storage
Initial testing completed. No further action required. 2013-2014 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15412012
A13 Sleepy Hollow Road / Waste Disposal Site
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
15412014
A15 Sleepy Hollow Work Camp Site
Initial testing completed. No further action required. 2013-2014 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15412019
C4 Miette Sewage Plant Site (Old Maintenance Area)
Initial testing completed. No further action required. 2017-2018 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15412066
Sunwapta Borrow Pit
Initial testing completed. No further action required. 2013-2014 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15412067
X1 Beauvert Lake Dump Site
Initial testing completed. No further action required. 2013-2014 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15412068
X2 93A - small pit
Initial testing completed. No further action required. 2013-2014 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15412070
X4 Wapiti Winter Camp
Initial testing completed. No further action required. 2013-2014 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15412071
X5 Ranger Creek
Historical review not required. 2017-2018   01 Identify Suspect Sites
15412072
X6 Maligne Lake
Historical review completed. No further action required. 2013-2014   02 Historical Review
15412073
X7 Pocahontas Mine (pits)
Historical review completed. No further action required. 2013-2014   02 Historical Review
15412074
X10 Highway 16 West, Km 20.6
Historical review completed. No further action required. 2013-2014   02 Historical Review
15412077
X8 Miette Rd. Km 15
Initial testing completed. No further action required. 2013-2014 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15412078
X9 Highway 93 Km 15
Historical review completed. No further action required. 2013-2014   02 Historical Review
15457001
Parkway Landfill
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15457002
Old Parks Canada Maintenance Compound/Trade Waste Landfill
Confirmatory sampling completed. No further action required. 2013-2014 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
15457003
North Camp Landfill
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15457004
South Entrance Landfill
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15457005
Recreational Area Sewage Lagoon
Detailed testing completed. No further action required. 2021-2022 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
15457006
Administration Area Sewage Lagoon
Detailed testing completed. No further action required. 2021-2022 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
15457008
Recreational Landfill
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15457009
Garage outflow pipe
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
15457011
Golf Course
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15457012
Gas/Diesel Filling Station
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15841001
Hay Camp
Remediation / risk management completed. No further action required. 2021-2022 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
16103001
McKay Creek Compound
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
16103002
Redstreak Pit
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
16103004
Marble Canyon
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
16103008
Four Mile Pit
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
16103009
Vermillion Pit
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
17800002
Works/Store Compound
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
17800003
Combers Beach
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
17800005
Sewage Lagoon
Initial testing completed. No further action required. 2013-2014   03 Initial Testing Program
17800006
Warden's Compound
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
17800007
Old Woodlot
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
17800012
Transmitter Site
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
17800015
Prideaux Island Dump Site
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17800017
Former Site of the Long Beach Service Station
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
18730006
Boulder Creek Compound
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
18730007
Ottertail Pit
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
18730008
Lumber Yard Dump #3
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
18730009
Field Dumpsite #1& #2
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
18730010
Field Firehall
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
18730011
Salt Shed
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
18730014
Boulder Creek Old Special Waste Storage
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
18730015
West Gate
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
18730016
Emerald Intersection
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
18730017
Hoodoo Creek Campground
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
18730018
Old Leanchoil Warden Station
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
18752004
Hermit Pit-Salt Storage
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
18753001
Mt. Fidelity
Confirmatory sampling completed. No further action required. 2017-2018 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
20032001
Court House
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
20033001
Stokes Point
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
20033002
Sheep Creek Warden Station
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
20106003
Haines Junction Research Landfill
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
20106004
Wardens Operational Center
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
32086001
Former Damage Control School of the Department of National Defense
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
54533001
Government Conference Centre
Remediation / risk management completed. No further action required. 2013-2014 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
55380001
Old Port of Montreal - Confinement Cell
Remediation / risk management completed. No further action required. 2021-2022 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
56455002
Petite-Île-au-Marteau Lighthouse
Initial testing completed. No further action required. 2013-2014 1 High Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
56455003
Former Lighthouse and other buildings at Île-aux-Perroquets
Remediation / risk management completed. No further action required. 2013-2014 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
56482004
Orphan fuel caches
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
56482009
Fort Conger Airstrip (site 9)
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
56482014
Lake Hazen Camp (site 14)
Confirmatory sampling completed. No further action required. 2013-2014 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
56482015
Ward Hunt Island (site 15)
Confirmatory sampling completed. No further action required. 2019-2020 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
56482016
Tanquary Fiord old camp (site 17)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
56482017
Tanquary fiord, Runway (site 17A)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
56482018
Tanquary fiord, New Camp
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
56488001
Park Works Compound
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
56488002
Trade Waste Pit
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
56488003
Prince of Wales Hotel
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
56488006
Former Fuel Storage Site (UST)
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
56488007
Former Barrel Storage
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
56491004
030 Copper Island
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
56491005
Beban Camp
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
56491006
032 Lucky Seven
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
56491007
Finger Point
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
56491008
073 George Island
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
56491009
016 Apex Mountain
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
56491010
029 Skincuttle Island
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
56511001
Husky Lake
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
56511002
DEW Line Access Trail
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
56522001
G-I-01
Long term monitoring completed. No further action required. 2013-2014 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
56522002
G-I-02
Confirmatory sampling completed. No further action required. 2015-2016 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
56522003
G-I-03
Long term monitoring completed. No further action required. 2013-2014 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
56525017
Dead Mosquito Site (K49 site)
Detailed testing completed. No further action required. 2013-2014 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
56525067
K83 Campbell's cabin
Confirmatory sampling completed. No further action required. 2020-2021 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
N0271001
Cap-de-Bon-Désir Lightstation