Results by Site Impact
Change results view to: Name and Location Contaminants and Media
FCSI Identifier Site Name |
Status | Fiscal Year | Classification | Highest Step Completed |
---|---|---|---|---|
00024892
15 Wing 25 m Range |
Detailed testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00024950
15 Wing B87 Former Waste UST |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00000928
15 Wing Former Skeet Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024658
221-C17 Pesticides associated with F-17 |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00024627
221-F01 Dorchester Complex - Farmland |
Historical review completed. No further action required. | 2011-2012 | 02 Historical Review | |
19118012
291 - Rolling River - 06410 - ROLLING RIVER INDIAN RESERVE NO. 67 - 4000042901 |
Long term monitoring completed. No further action required. | 2010-2011 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
00006731
375 - Muskeg Lake Cree Nation #102 - 06559 - MUSKEG LAKE CREE NATION 102 - 0602813906 |
Confirmatory sampling completed. No further action required. | 2015-2016 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00006610
377 - Kinistin Saulteaux Nation - 06561 - KINISTIN 91 - 0602654806 |
Confirmatory sampling completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00007004
383 - Pasqua First Nation #79 - 06569 - PASQUA NO. 79 - 0603521008 |
Confirmatory sampling completed. No further action required. | 2011-2012 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00026013
395 - Flying Dust First Nation - 06584 - FLYING DUST FIRST NATION 105 - SK04876417 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05116003
435 - Blood - 06645 - BLOOD 148 - 6000027997 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00024738
441-C09 Frontenac Institution - Manure Composting at Sewage Lagoon |
Detailed testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00026386
451-C22 Pittsburgh Greenhouse (PP56 and PP63) |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
05058003
464 - Cold Lake First Nations - 06712 - COLD LAKE 149 / 7000012494 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
05088013
555 - Squamish - 07968 - SEYMOUR CREEK 2 - 7000035794 |
Historical review not required. | 2014-2015 | 01 Identify Suspect Sites | |
05088005
555 - Squamish - 07968 - SEYMOUR CREEK 2 - 7000081896 |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
00006816
555 - Squamish - 07984 - STAWAMUS 24 - 7000035394 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00006924
565 - Matsqui First Nation - 08035 - SAHHACUM 1 - 0903341307 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00006925
565 - Matsqui First Nation - 08035 - SAHHACUM 1 - 0903341407 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00025888
602 - ?aqam - 07422 - KOOTENAY 1 - BC04858415 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
05053010
674 - Lax Kw'alaams - 07770 - LAX KW'ALAAMS 1 - 7000017394 |
Initial testing completed. Detailed testing underway. | 2023-2024 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00006917
682 - Tahltan - 07655 - TELEGRAPH CREEK 6 - 0903328907 |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00006918
683 - Iskut - 08363 - ISKUT 6 - 0903329007 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00000521
687 - Skeetchestn - 07169 - SKEETCHESTN - 0902171505 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00006919
722 - Ulkatcho - 08345 - ULKATCHO 14A - 0903329107 |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00002464
Alaksen National Wildlife Area |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024991
ALD-12 Antenna Field |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02739001
Aldershot Landfill/Former Incinerator |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
02739056
Alleged Drum Dump Area - Aldershot |
Initial testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024297
Alpine Lakes |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
09540010
AMDU Landfill Site |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00002701
APEC 5 - Impoundment VI |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
12290001
ARNPRIOR (Waterlot Nearshore) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00342001
Atlantic Cool Climate Crop Research Centre |
Detailed testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00024947
B0008 Trench |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00000913
Baldy Hughes |
Long term monitoring completed. No further action required. | 2018-2019 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
00001333
Benton Ridge Research Farm |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
04716001
Benton Ridge Research Farm |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
30048001
BRONTE (OAKVILLE) (Sediment-Southeast Portion of Waterlot) |
Initial testing completed. No further action required. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008347
Cadet Camp Landfill & Firing Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
C1003001
CAM E - KEITH BAY |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
10667001
Camp Henry |
Remediation / risk management completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
01822018
Canadian Side & Northside |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02087001
Cavendish Maintenance Compound |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
08625001
Central Experimental Farm |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00001618
Central Experimental Farm |
Remediation / risk management completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00001700
Central Experimental Farm |
Remediation / risk management completed. No further action required. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02863054
CFB Shearwater (205) - Ammunition Compound |
Remediation / risk management completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02863011
CFB Shearwater (211) - Landfill 1 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
14567001
Commercial Property at Block 5 Lot 8, Waskesiu Townsite |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
N7075001
Dome Mountain, RCAF and Camp Sites (5 W) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
14976008
DRES Low Radioactive Waste Burial Site - EPG |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
N0281007
Drums in Watson Lake - APEC 5 |
Confirmatory sampling completed. No further action required. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00000991
Dry Solid Waste Landfill |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
15305006
Dump on Shore of Bushy Head Lake |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008612
DY-28 Dockyard Signal Hill Bldg 506 - Fmr Oil & Paint Stores |
Initial testing completed. No further action required. | 2018-2019 | 03 Initial Testing Program | |
N0025002
Escarpment Landfill (historic) |
Long term monitoring completed. No further action required. | 2011-2012 | I Insufficient Information | 10 Long-Term Monitoring (Optional) |
17410007
Esquimalt Graving Dock Waterlot - AEC's 11,15 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N7060001
Former Red Route Dump |
Initial testing completed. No further action required. | 2023-2024 | 03 Initial Testing Program | |
29793001
Former Red Route Dump East Site |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
11022086
Fumigation Block ; Former (O-114) |
Initial testing completed. No further action required. | 2020-2021 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
36304003
Harrington Farm |
Detailed testing completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00001676
Harrow Research and Development Centre |
Detailed testing completed. No further action required. | 2020-2021 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00001484
Indian Head |
Confirmatory sampling completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00001353
Indian Head Research Farm |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
13749002
Indian Head Shelterbelt Centre |
Remediation / risk management completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00001638
Kamloops Range Research Ranch |
Detailed testing completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00001632
Kelowna Research Farm |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00027660
Kenow Fire Impacted Areas |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
C1057001
Kittigazuit Bay |
Confirmatory sampling completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00001340
Lacombe Research Centre |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00002662
Land adjacent to Cranberry Farming Operations |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00002664
Land adjacent to Cranberry Farming Operations |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
15684038
Landfill Site 1 |
Detailed testing completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
15684031
Landfill Site 7 |
Initial testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00001346
Lethbridge Research Centre |
Detailed testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 05 Detailed Testing Program |
01822094
Lower Tank Farm (LTF 2000 Series) |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
01822076
Main Base and Civil Aviation Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
14567003
Main Compound Fuel Storage |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
10667002
Maintenance Compound |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00028062
Maple Creek Irrigation Project |
Detailed testing completed. No further action required. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00028065
Maple Creek Irrigation Project |
Initial testing completed. No further action required. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025006
MAT-8 Antenna Towers and Arrays |
Detailed testing completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02739002
Mill Pond and Sewage Lagoons - Aldershot |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
36347001
MISSISSAUGA (LAKEFRONT PROMENADE PARK) (Waterlot) |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024057
Montreal Road Complex ON |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
15404005
Niblock Pit |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
11994001
NIPIGON (Waterlot) |
Initial testing completed. No further action required. | 2012-2013 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008648
North Bay Former FFTA |
Detailed testing completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 05 Detailed Testing Program |
16479022
Pacific Agri-Food Research Centre (Agassiz) |
Detailed testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
02739055
Peach Lake - Aldershot |
Detailed testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
C2502001
Peel and Caribou Rivers |
Long term monitoring completed. No further action required. | 2011-2012 | 1 High Priority for Action | 10 Long-Term Monitoring (Optional) |
00000994
Pesticide Container Landfill and Asphalt Dump |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00001416
Pesticide Rinsate Area |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
13749001
PFRA - Indian Head - Shelterbelt Centre |
Confirmatory sampling completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C1040001
PIN D - Ross Point |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00027551
Point Pelee Marsh |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
00016591
PORT BURWELL (Waterlot - Vicinity of Sewage Treatment Plant) |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00024432
Port Burwell - Portion of Big Otter Creek and inner harbour of the Port Burwell SCH |
Detailed testing completed. No further action required. | 2016-2017 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00012785
PORT BURWELL(Waterlot - E of Talismen ASTs) |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
70679001
Portland Slip |
Long term monitoring completed. No further action required. | 2016-2017 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
04667006
Potato Research Centre |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
10992025
Potential Herbicide Barrels Burial Site |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00008517
Range Control Trenches |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00001352
Regina Research Farm |
Detailed testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
13663008
Regina Research Farm |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00028124
Rideau Falls Dam & Central Heating NRC (Plant Site) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00001674
Rudy Rosedale Community Pasture |
Confirmatory sampling completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
07304002
Sainte-Clothilde Research Farm |
Long term monitoring completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
14567009
Salt Shed |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00002429
Sand Pond National Wildlife Area |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00000403
SAWMILL BAY/GREAT BEAR LAKE |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00001351
Semiarid Prairie Agricultural Research Centre |
Detailed testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
13854002
Semiarid Prairie Agricultural Research Centre |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
04454002
Senator Herve-J.-Michaud Experimental Farm |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
00001347
Senator Herve-J.-Michaud Experimental Farm |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00001327
Sheffield Mills Research Farm |
Detailed testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00001537
Sheffield Mills Research Farm |
Detailed testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00001539
Sheffield Mills Research Farm |
Detailed testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00013045
Sidney Laboratory |
Initial testing completed. No further action required. | 2005-2006 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013047
Sidney Laboratory |
Initial testing completed. No further action required. | 2005-2006 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013048
Sidney Laboratory |
Initial testing completed. No further action required. | 2005-2006 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013049
Sidney Laboratory |
Initial testing completed. No further action required. | 2005-2006 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00001350
Smithfield Experimental Farm |
Confirmatory sampling completed. No further action required. | 2011-2012 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09609003
Smithfield Research Farm |
Detailed testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09609004
Smithfield Research Farm |
Confirmatory sampling completed. No further action required. | 2011-2012 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C2501001
Snag Airstrip |
Confirmatory sampling completed. No further action required. | 2011-2012 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
01822087
South Escarpment Landfills (SES 1000 Series) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
54050001
Spadina Quay Marina |
Long term monitoring completed. No further action required. | 2016-2017 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
70680001
Spadina Slip |
Long term monitoring completed. No further action required. | 2016-2017 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
20033001
Stokes Point |
Confirmatory sampling completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
10829001
Stony Point (fmr Camp Ipperwash) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00008562
Stream draining former DDT site in Farnham |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
02731002
The Atlantic Food and Horticulture Research Centre |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00013152
THORNBURY (Waterlot) |
Initial testing completed. No further action required. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00025091
Training Area C2 Drainage |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
01822085
Upper Tank Farm - Fuel Recovery Site (UTF 4000 Series) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
14567010
Waskesiu Breakwater |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 05 Detailed Testing Program |
00023292
Waskesiu Townsite Beaver Ponds |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 05 Detailed Testing Program |
02919032
Water Lots (9908) - Dockyard |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008436
YA-4 Yarrows Former Shipyard |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008433
YA-5 Yarrows B - Lot Parking and Roads |
Confirmatory sampling completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008458
YA-6 Yarrows Consolidatn Area Y-Gate |
Confirmatory sampling completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |