Search Results

Search Results Summary
Criteria:
  • Federal Electoral District: Simcoe--Grey
Select Additional Criteria...
Sort Key:Reporting Organization (ascending)
Sites Found:130
Alternate Views
Choose an alternate view: Map XML CSV Financials Report
Results View Options

Results by Site Impact

Change results view to: Name and Location Contaminants and Media

FCSI Identifier
Site Name
Status Fiscal Year Classification Highest Step Completed
00008341
Hangar Line Complex
Detailed testing completed. No further action required. 2018-2019 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00008342
South PMQ Area
Initial testing completed. No further action required. 2009-2010 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008413
Skeet Range
Initial testing completed. No further action required. 2009-2010 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00012795
THORNBURY (Around USTs)
Initial testing completed. No further action required. 2021-2022 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00013152
THORNBURY (Waterlot)
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00014131
Collingwood MCTS (within the fenced compound, just south of the beacon building)
Historical review completed. No further action required. 2012-2013   02 Historical Review
00014242
Collingwood Sector Light (LL 853) (No Contamination Identified)
Historical review completed. No further action required. 2014-2015   02 Historical Review
00014313
Fisherman's Point Range Front - Unassessed
Historical review not required. 2012-2013   01 Identify Suspect Sites
00014314
Fisherman's Point Range Rear - Unassessed
Historical review planned. 2022-2023   01 Identify Suspect Sites
00014770
Nottawasaga River Entrance - Former aid locations
Historical review completed. No further action required. 2014-2015   02 Historical Review
00015016
Thornbury Sector Light - No Contamination Identified
Historical review not required. 2009-2010   01 Identify Suspect Sites
00015112
Banks MCTS - Unassessed
Historical review planned. 2022-2023   01 Identify Suspect Sites
00015192
Collingwood Gauging Station (No Contamination Identified)
Initial testing completed. No further action required. 2014-2015   03 Initial Testing Program
00023380
Angus Field Station
Historical review completed. No further action required. 2012-2013   02 Historical Review
00024960
South RV Compound and P-151 Compound Area
Detailed testing completed. Remediation / risk management planned. 2022-2023 3 Low Priority for Action 05 Detailed Testing Program
00025088
Transport Fleet Compound (O-95)
Detailed testing completed. Remediation / risk management planned. 2022-2023 I Insufficient Information 05 Detailed Testing Program
00025091
Training Area C2 Drainage
Detailed testing completed. Remediation / risk management planned. 2022-2023 I Insufficient Information 05 Detailed Testing Program
11022001
Roundel EOD Range
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
11022002
Sewage Sludge Drying Beds; Existing
Detailed testing completed. No further action required. 2018-2019 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
11022003
Transformer Substation #1; Former
Detailed testing completed. No further action required. 2020-2021 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
11022005
Coal Storage Area #3; Former
Long term monitoring completed. No further action required. 2021-2022 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
11022006
Construction Waste Landfill #4; Closed
Detailed testing completed. No further action required. 2021-2022 3 Low Priority for Action 05 Detailed Testing Program
11022009
Aircraft Fuel Storage Facility #2; Former
Remediation / risk management completed. No further action required. 2018-2019 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
11022010
Mustard Gas Site #2; Former
Detailed testing completed. No further action required. 2018-2019 N Not a Priority for Action 05 Detailed Testing Program
11022011
Construction Waste Landfill #2; Active
Detailed testing completed. No further action required. 2013-2014 2 Medium Priority for Action 05 Detailed Testing Program
11022012
Vehicle Refuelling Facility #1; Former (P-52)
Detailed testing completed. No further action required. 2018-2019 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
11022014
Bulk Fuel Storage Site; (Demolished O-89)
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
11022015
Emergency Generator Fuel Storage Site; Existing
Initial testing completed. No further action required. 2018-2019 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022016
Retail Gasoline Station #1; Former (A-179)
Initial testing completed. No further action required. 2016-2017 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022017
Salvage Yard; Former
Long term monitoring completed. No further action required. 2018-2019 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
11022018
Domestic/Industrial Waste Landfill #3; Closed
Remediation / risk management completed. No further action required. 2021-2022 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
11022019
Underground Fuel Oil Tank #1; Former; CFAD 207
Detailed testing completed. No further action required. 2021-2022 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
11022020
Underground Fuel Tank #2; Former; CFAD 52
Initial testing completed. No further action required. 2010-2011   03 Initial Testing Program
11022021
Chemical Storage Area #3, Former
Detailed testing completed. No further action required. 2021-2022 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
11022023
Aboveground storage tank @ R-35
Initial testing completed. No further action required. 2010-2011   03 Initial Testing Program
11022024
Aboveground storage tank @ R-24
Initial testing completed. No further action required. 2012-2013   03 Initial Testing Program
11022025
POL Shed @ E-182
Historical review not required. 2001-2002   01 Identify Suspect Sites
11022026
Aboveground storage tank @ O-122
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022027
Soil Remediation Landfarm
Remediation / risk management completed. No further action required. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
11022028
CFAD Angus Site at 2nd St. and Ismailia Rd.
Detailed testing completed. No further action required. 2018-2019 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
11022031
Domestic Landfill #2
Remediation / risk management completed. No further action required. 2013-2014 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
11022032
Borden Landfill
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022033
Ammunition Dump #1; Former Airforce Facility
Historical review completed. No further action required. 2016-2017   02 Historical Review
11022034
Sewage Sludge Ponds #1
Detailed testing completed. No further action required. 2018-2019 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
11022035
Castle EOD Range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
11022036
Mustard Gas Site #1
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
11022037
Waterloo Research Area #1 (Sand Pit Area)
Initial testing completed. No further action required. 2018-2019 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022038
Amiens Rifle Range
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
11022039
Fire Fighting Training Area #1
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
11022040
Paint Shop #1
Initial testing completed. No further action required. 2018-2019   03 Initial Testing Program
11022041
West Grenade Range
Remediation / risk management completed. No further action required. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
11022042
Vimy Rifle Range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
11022043
Mons Rifle Range
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
11022044
Langemark Range
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
11022045
Firehall #1
Initial testing completed. No further action required. 2016-2017 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022046
Firehall #2
Initial testing completed. No further action required. 2011-2012   03 Initial Testing Program
11022047
Simulated Mine Area
Initial testing completed. No further action required. 2016-2017 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022048
Vehicle Refuelling Facility #2
Detailed testing completed. No further action required. 2018-2019 3 Low Priority for Action 05 Detailed Testing Program
11022049
Septic System #1
Initial testing completed. No further action required. 2021-2022 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022050
Outdoor Armoured Vehicle Prking Area
Detailed testing completed. No further action required. 2018-2019 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
11022051
Vehicle Maintenance Area
Initial testing completed. No further action required. 2018-2019 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022052
Indoor Rifle Range #1
Detailed testing completed. No further action required. 2011-2012 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
11022054
Soap Plant; Former
Remediation / risk management completed. No further action required. 2016-2017 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
11022055
Central Heating Plant #1
Initial testing completed. No further action required. 2006-2007 N Not a Priority for Action 03 Initial Testing Program
11022057
Garage #2
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022058
Garage #3
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022059
Garage #4
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022060
Garage #5
Detailed testing completed. No further action required. 2020-2021 N Not a Priority for Action 05 Detailed Testing Program
11022064
Garage #6
Remediation / risk management completed. No further action required. 2016-2017 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
11022065
Garage #7
Detailed testing completed. No further action required. 2020-2021 3 Low Priority for Action 05 Detailed Testing Program
11022066
Coal Storage Area #1
Remediation / risk management completed. No further action required. 2021-2022 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
11022067
Indoor Rifle Range #3
Initial testing completed. No further action required. 2011-2012   03 Initial Testing Program
11022068
Petroleum Contaminated Soil Pile
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
11022069
Central Heating Plant #3
Remediation / risk management completed. No further action required. 2021-2022 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
11022070
Waterloo Research Area #2 (Forested Area)
Initial testing completed. No further action required. 2018-2019 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022071
Base Borden Disposal Range
Remediation / risk management completed. No further action required. 2021-2022 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
11022073
Paint Shop #2
Initial testing completed. No further action required. 2018-2019   03 Initial Testing Program
11022075
Coal Storage #2
Long term monitoring completed. No further action required. 2021-2022 1 High Priority for Action 10 Long-Term Monitoring (Optional)
11022076
Septic System #3
Remediation / risk management completed. No further action required. 2018-2019 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
11022077
Garage #8 Demolished
Detailed testing completed. No further action required. 2020-2021 N Not a Priority for Action 05 Detailed Testing Program
11022079
Wheeled Vehicle Hangar #3, Former (Bldg E-140)
Remediation / risk management completed. No further action required. 2014-2015 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
11022081
Domestic Waste Landfill #4; Closed
Remediation / risk management completed. No further action required. 2021-2022 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
11022082
Garage #17 (Former)
Remediation / risk management completed. No further action required. 2020-2021 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
11022083
Firehall #4 (Former Airforce Facility)
Long term monitoring completed. No further action required. 2018-2019 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
11022086
Fumigation Block ; Former (O-114)
Initial testing completed. No further action required. 2020-2021 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022087
Demolition Waste Dump
Remediation / risk management completed. No further action required. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
11022088
Chemical Storage Area #1; Former (HS-6)
Remediation / risk management completed. No further action required. 2020-2021 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
11022092
Retail Gas Station #2; Former P-134 (CANEX/Shell)
Long term monitoring completed. No further action required. 2021-2022 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
11022094
Central Heating Plant #5; Former Airforce Facility
Detailed testing completed. No further action required. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
11022095
Aircraft and Domestic Waste Landfill; Closed
Detailed testing completed. No further action required. 2021-2022 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
11022096
POL Storage Shed; E-184
Detailed testing completed. No further action required. 2021-2022 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
11022097
Small Ammunition Disposal Area; Former
Initial testing completed. No further action required. 2021-2022   03 Initial Testing Program
11022098
Sink Pit #1; Former
Detailed testing completed. No further action required. 2011-2012 2 Medium Priority for Action 05 Detailed Testing Program
11022099
Sink Pit #2; Former
Detailed testing completed. No further action required. 2011-2012 2 Medium Priority for Action 05 Detailed Testing Program
11022100
Sink Pit # 3; Former
Detailed testing completed. No further action required. 2011-2012 2 Medium Priority for Action 05 Detailed Testing Program
11022102
Workshop #2; Former (CFAD 151)
Detailed testing completed. No further action required. 2022-2023 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
11022113
Lisle Road
Historical review completed. No further action required. 2016-2017   02 Historical Review
11022114
Demolition Waste Dump
Initial testing completed. No further action required. 2010-2011   03 Initial Testing Program
11022119
Rocket Launcher Range
Confirmatory sampling completed. No further action required. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
11022121
Foxfield Battle Assault Range
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
11022122
CAEN Battle Assault Range
Initial testing completed. No further action required. 2018-2019   03 Initial Testing Program
11022124
Le Cateau Battle Assault Range
Confirmatory sampling completed. No further action required. 2018-2019 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
11022129
Toboggan Hill
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022131
Garage #16 Demolished
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
11022133
Septic System #4; Existing (CFAD 207)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022134
Incinerator #2 (Former)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022135
Central Heating Plant #4; Former Army Facility
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022136
Transformer Substation #2 ; Former
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022137
Carpenter Shopwood Storage Facility; Demolished
Detailed testing completed. No further action required. 2020-2021 3 Low Priority for Action 05 Detailed Testing Program
11022138
Garage #1; Existing (O-155)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022139
Vehicle Recovery Site
Detailed testing completed. No further action required. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
11022140
Coal Compound; Former (NW of CFAD 52)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022143
Septic System #5; Existing (CFAD 38)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022145
Workshop #1; Former CFAD 151
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022146
Workshop #3; Former (CFAD 200)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022148
Firehall #3; Former Army Facility
Initial testing completed. No further action required. 2016-2017 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022149
Ammunition Dump #2; Former Army Facility
Historical review completed. No further action required. 2016-2017   02 Historical Review
11022150
Landfill; Former (Current Skateboard Park)
Detailed testing completed. No further action required. 2018-2019 3 Low Priority for Action 05 Detailed Testing Program
11022152
Hangar 17 POL Compound
Initial testing completed. No further action required. 2016-2017 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022153
Gun Emplacement
Initial testing completed. No further action required. 2018-2019 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022154
Construction Waste Landfill #1; Closed
Detailed testing completed. No further action required. 2022-2023 2 Medium Priority for Action 05 Detailed Testing Program
11022155
Septic System #2-CFAD
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022156
Engine Test Site; Former
Initial testing completed. No further action required. 2016-2017 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022157
O-5 Impacted Fill
Initial testing completed. No further action required. 2011-2012 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022158
Circled Pine Maint. Shed, B O-138: Fuel Storage & Septic bed
Initial testing completed. No further action required. 2010-2011   03 Initial Testing Program
11032001
Nottawasaga Island - Vicinity of Tower & former Dwelling-Metals in Soil
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
11034001
44 Hurontario Street
Detailed testing completed. Remedial action plan under development. 2022-2023 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
11040001
Harbour Bed
Historical review not required. 2004-2005   01 Identify Suspect Sites
11048112
Edenvale Airfield
Remediation / risk management completed. No further action required. 2009-2010 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
N0076001
Former Oil Facility
Long term monitoring completed. No further action required. 2022-2023 1 High Priority for Action 10 Long-Term Monitoring (Optional)