Search Results
Search Results Summary | |
---|---|
Criteria: |
|
Sort Key: | FCSI Identifier (ascending) |
Sites Found: | 155 |
Results by Site Impact
Change results view to: Name and Location Contaminants and Media
FCSI Identifier Site Name |
Status | Fiscal Year | Classification | Highest Step Completed |
---|---|---|---|---|
00000995
Dump by Tracks |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00000452
302 - Manto Sipi Cree Nation - 06449 - GOD'S RIVER 86A - 4000045102 |
Historical review completed. Initial testing underway. | 2022-2023 | 02 Historical Review | |
00000990
Abandoned construction landfill |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00000987
Liquid Waste Dump |
Initial testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00001008
Ghost River Cadet Camp |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00000994
Pesticide Container Landfill and Asphalt Dump |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00000989
Golf Course - landfill |
Initial testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00001367
Kapuskasing Beef Research Farm |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 05 Detailed Testing Program |
00006851
431 - O'Chiese - 06637 - O'CHIESE 203 - 0700533002 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00007279
394 - Canoe Lake Cree First Nation - 06581 - CANOE LAKE NO. 165 - 0603849708 |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00001328
Senator Herve-J.-Michaud Experimental Farm |
Initial testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00000992
Old Dump Site |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00001290
ASH RIVER BELOW MORAN CREEK |
Confirmatory sampling completed. No further action required. | 2010-2011 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00007277
394 - Canoe Lake Cree First Nation - 06581 - CANOE LAKE 165 - 0603847708 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00007490
401 - Clearwater River Dene - 06602 - CLEARWATER RIVER DENE BAND 223 - 0604066108 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00006841
5 - Esgenoopetitj First Nation - 06006 - ESGENOÔPETITJ INDIAN RESERVE NO. 14 - 0203131306 |
Initial testing completed. Detailed testing underway. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00006242
434 - Sunchild First Nation - 06644 - SUNCHILD 202 - 6000016795 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00007283
396 - Makwa Sahgaiehcan First Nation - 06586 - MAKWA LAKE 129 / 0603855608 |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00006274
88 - Montagnais de Pakua Shipi - 06139 - ST-AUGUSTIN INDIAN SETTLEMENT - 2000043398 |
Historical review completed. Initial testing underway. | 2022-2023 | 02 Historical Review | |
00007271
401 - Clearwater River Dene - 06601 - CLEARWATER RIVER DENE 222 / 0603839608 |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00001293
MURRAY CREEK AT 216 STREET, LANGLEY |
Confirmatory sampling completed. No further action required. | 2010-2011 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00007491
401 - Clearwater River Dene - 06602 - CLEARWATER RIVER DENE BAND 223 - 0604067608 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008049
282 - Pine Creek - 06396 - PINE CREEK 66A - MB04809611 |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00007323
401 - Clearwater River Dene - 06601 - CLEARWATER RIVER DENE 222 - 0603939608 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00007333
400 - English River First Nation - 06594 - LA PLONGE 192 - 0603955608 |
Initial testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008564
Water filtration plnt of city in CMR St-Jean |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | N Not a Priority for Action | 05 Detailed Testing Program |
00006429
315 - Opaskwayak Cree Nation - 06424 - OPASKWAYAK CREE NATION 21B / 0501176303 |
Initial testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00007202
400 - English River First Nation - 06598 - WAPACHEWUNAK 192D - 0603795908 |
Initial testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00001366
Kapuskasing Beef Research Farm |
Detailed testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00008557
Beauceville armoury |
Remediation / risk management completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008368
Groundwater-monitoring perimeter - DND RTA/Shannon limit |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
00007326
396 - Makwa Sahgaiehcan First Nation - 06586 - MAKWA LAKE 129 - 0603941708 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008358
General Sir Arthur Currie Bldg |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00006595
686 - Bonaparte - 07165 - BONAPARTE 3 - 7000082196 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00007199
400 - English River First Nation - 06598 - WAPACHEWUNAK 192D - 0603795608 |
Initial testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00021129
Upper Pitt River Hatchery - Diesel Day Tank, Generator Building |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006764
538 - Heiltsuk - 07857 - BELLA BELLA 1 - 0903014806 |
Confirmatory sampling completed. No further action required. | 2018-2019 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008691
Burwash CFTA |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00007740
394 - Canoe Lake Cree First Nation - 06581 - CANOE LAKE 165 - 0604550409 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008354
Range and Training Area |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00008391
Pine Street Armoury |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00007726
444 - Samson - 06658 - SAMSON 137 - 0704517609 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00007203
400 - English River First Nation - 06594 - LA PLONGE 192 - 0603796008 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022822
Hurdman North |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 1 High Priority for Action | 05 Detailed Testing Program |
00006913
573 - Skwah - 08055 - SKWAH 4 - 0902903306 |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 1 High Priority for Action | 05 Detailed Testing Program |
00024621
511-F01 Rockwood - Farm Land |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
00023378
848-L01 Ferndale Institution - Landfill for Clean Fill |
Confirmatory sampling completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024985
ALD-5 Former Mobile Kitchen |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024628
441-F01 Frontenac - Farmland |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
00018891
Colinet (Warehouse) |
Initial testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00018570
Springdale (Helo Fuel Dump) |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 05 Detailed Testing Program |
00025946
395 - Flying Dust First Nation - 06584 - FLYING DUST FIRST NATION 105 - SK04869016 |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00007194
400 - English River First Nation - 06598 - WAPACHEWUNAK 192D / 0603791708 |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00024623
521-F01 Riverbend Institution - Farmland |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00027533
Gordie Howe International Bridge |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00026522
434 - Sunchild First Nation - 06644 - SUNCHILD 202 - AB04878417 |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 05 Detailed Testing Program |
04089039
Salt and Sand Sheds |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024625
Andover Border Crossing |
Confirmatory sampling completed. No further action required. | 2010-2011 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00026508
431 - O'Chiese - 06637 - O'CHIESE 203 - AB04878717 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024167
Bathurst Island - Bent Horn (Cameron Island) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00007282
396 - Makwa Sahgaiehcan First Nation - 06586 - MAKWA LAKE 129 - 0603853608 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024914
Shearwater CC-144B Challenger Crash Site (Site 249) |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00024622
511-C06 Rockwood - Feedlot and Dairy Operations |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
00024624
537-F01 Bowden - Farmland |
Initial testing completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
05317009
315 - Opaskwayak Cree Nation - 06427 - OPASKWAYAK CREE NATION 21E - 0501142102 |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00024629
451-F01 Pittsburgh - Farmland |
Initial testing completed. No further action required. | 2011-2012 | 03 Initial Testing Program | |
02863020
Shearwater (220) - Fill Area South of Hangar H |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05353001
73 - Kitigan Zibi Anishinabeg - 06100 - KITIGAN ZIBI - 2000015993 |
Initial testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00006590
546 - Halfway River First Nation - 06956 - HALFWAY RIVER 168 - 7000071796 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
05201002
76 - Montagnais du Lac St.-Jean - 06101 - MASHTEUIATSH / 2000026896 |
Detailed testing completed. No further action required. | 2012-2013 | I Insufficient Information | 07 Develop Remediation/Risk Management Strategy |
02863014
CFB Shearwater (214) - Landfill 4 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863012
CFB Shearwater (212) - Landfill 2 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05353003
73 - Kitigan Zibi Anishinabeg - 06100 - KITIGAN ZIBI / 2000016093 |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 05 Detailed Testing Program |
02863004
CFB Shearwater (204A) - Former Mobile Asphalt Plant |
Remediation / risk management completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02863021
Shearwater (221) - Lower Fuel Compound and Firing Range |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05376003
74 - Algonquins of Barriere Lake - 06135 - RAPID LAKE - 2000091400 |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
02863001
CFB Shearwater (201) - Landfill 6 - Airfield |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
05317006
315 - Opaskwayak Cree Nation - 06427 - OPASKWAYAK CREE NATION 21E - 4000043201 |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
05036003
625 - Kwikwasut'inuxw Haxwa'mis - 06978 - GWAYASDUMS 1 - 7000003993 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
05198005
70 - Mohawks of Kahnawá:ke - 06097 - KAHNAWAKE NO.14 - 2000007893 |
Detailed testing completed. Remediation / risk management planned. | 2022-2023 | 1 High Priority for Action | 05 Detailed Testing Program |
05354001
58 - Cree Nation of Chisasibi - 06128 - CHISASIBI / 2000026696 |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 05 Detailed Testing Program |
02863053
CFB Shearwater (204B) - Former Heavy Equipment Compound |
Long term monitoring completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
03186001
Amherst Rifle Range (5403) - Range firing pts, butt stops |
Long term monitoring completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
11048074
Lagoons (Edenvale) |
Initial testing completed. No further action required. | 2006-2007 | N Not a Priority for Action | 03 Initial Testing Program |
02863013
CFB Shearwater (213) - Landfill 3 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00028056
Brandon Research and Development Centre |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
05367008
57 - Eastmain - 06132 - EASTMAIN - 2000024296 |
Remediation / risk management completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02739012
Meadowview Landfill - Aldershot |
Long term monitoring completed. No further action required. | 2017-2018 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
10855009
Golfland Area 6 PCB Site (Former Sub-station) - London Airport |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
02920005
Stadacona (3705) - CE Production Centre (S30) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00273001
CFS ST John's (4710) - Cambrai Rifle Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
12448001
Sewage Lagoon |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00024844
B163 - Fire Hall |
Initial testing completed. Detailed testing underway. | 2023-2024 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
06651004
Fire Range P12/P13,CEF Farnham |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
09401280
Alaska Highway - Former Kledo Creek Bridge Construction Camp R-01 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09820029
Drinking water wells |
Remediation / risk management completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022158
Circled Pine Maint. Shed, B O-138: Fuel Storage & Septic bed |
Initial testing completed. No further action required. | 2010-2011 | 03 Initial Testing Program | |
00024814
Historic Annual ARFFV Testing Area, Hotel Taxiway |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
05353002
73 - Kitigan Zibi Anishinabeg - 06100 - KITIGAN ZIBI - 2000015793 |
Detailed testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
13352001
Torquay Border Crossing |
Confirmatory sampling completed. No further action required. | 2009-2010 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02717103
Former Hangar 1 |
Confirmatory sampling completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859003
CFAD Bedford (803) - Former Landfill (West of B162) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
11943006
Former Neebing Landfill Site |
Confirmatory sampling completed. Long term monitoring underway. | 2022-2023 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
10992001
Garrison Landfilll; Closed |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
15305006
Dump on Shore of Bushy Head Lake |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05095004
595 - Tsal'alh - 08151 - SLOSH 1 - 7000026794 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
06710002
Hangar 3, Bottemless drain St-Hubert Complex |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
56665001
AECL Heavy Water Plant Site |
Confirmatory sampling completed. No further action required. | 2018-2019 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
09401270
Alaska Highway - Former Military Establishment (Ft Nelson Rec Centre) P-08I |
Confirmatory sampling completed. No further action required. | 2019-2020 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02860001
Hartlen Point (5543) - Former Boiler House |
Detailed testing completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
12448005
Storm Sewer Outfall |
Detailed testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11022154
Construction Waste Landfill #1; Closed |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 05 Detailed Testing Program |
20625001
Former Sambault garabage dump |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06679007
St-Jean Garrson, Used snow site near H104 (2A) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02739013
Rocket Range |
Initial testing completed. No further action required. | 2006-2007 | 03 Initial Testing Program | |
09401030
Alaska Highway - Fort Nelson Gravel Pit |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11181001
98 Manitoba St. |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
07221008
Used snow sites, ASU LP |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17385004
Victoria Base - DFO-CCG Waterlot |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
13440001
West Poplar Border Crossing - Septic |
Confirmatory sampling completed. No further action required. | 2009-2010 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
17432003
RP-8 Rocky Point Fire Break - Former Burning Slab |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
06679009
St-Jean Garrson, Used snow site (2B) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859007
CFAD Bedford (807) - BCE Storage Yard |
Initial testing completed. No further action required. | 2002-2003 | 03 Initial Testing Program | |
54521001
Former Sir John Carling Building |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
15412080
Snow Dump |
Remedial action plan completed. Remediation / risk management underway. | 2022-2023 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
15684031
Landfill Site 7 |
Initial testing completed. No further action required. | 2017-2018 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
05351002
60 - Cree Nation of Wemindji - 06130 - WEMINDJI - 2000025496 |
Initial testing completed. Detailed testing underway. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
09401010
Alaska Highway - Wonowon Maintenance Camp |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05906016
Arnhem Firing Range |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
16479015
Pacific Agri-Food Research Centre (Agassiz) |
Initial testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
09820028
Drinking water wells - aesthetic concerns |
Remediation / risk management completed. No further action required. | 2011-2012 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09401020
Alaska Highway - Sikanni Maintenance Camp |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
16479004
Pacific Agri-Food Research Centre (Agassiz) |
Initial testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
20146017
On-Site Dump- APEC 37 |
Initial testing completed. No further action required. | 2022-2023 | 03 Initial Testing Program | |
09401050
Alaska Highway - Toad River Maintenance Camp |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
34476001
Mountain View - Outer Landfill Site |
Detailed testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09401060
Alaska Highway - Muncho Lake Maintenance Camp |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
17410011
Esquimalt Graving Dock Uplands - Naden Buildings 4, N11 and N12 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
11449001
Parry Sound Harbour |
Initial testing completed. No further action required. | 2008-2009 | 03 Initial Testing Program | |
09401040
Alaska Highway - Steamboat Maintenance Camp |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09401090
Alaska Highway - Iron Creek Maintenance Camp |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09401070
Alaska Highway - Liard Maintenance Camp |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
12448004
Vehicle Wash Q Lines (8209) |
Confirmatory sampling completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C2503001
FARO MINE |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
05185001
201 - Serpent River - 06185 - SERPENT RIVER 7 - 3000047696 |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
N7076001
2000 GAF Crash Site (CRA13040) |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
20624001
Former St-Germain Foundry inc. |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
23148001
Contrecoeur landfill |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05155004
144 - Moose Cree First Nation - 06261 - FACTORY ISLAND 1 - 3000032095 |
Detailed testing completed. No further action required. | 2022-2023 | I Insufficient Information | 05 Detailed Testing Program |
N7009001
LG2 RAF Crash Site (1996) (CRA13030) |
Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
29793001
Former Red Route Dump East Site |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
38410001
Dominion No. 18 |
Confirmatory sampling completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
11022124
Le Cateau Battle Assault Range |
Confirmatory sampling completed. No further action required. | 2018-2019 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
N7008001
1998 GAF Crash Site (CRA13020) |
Historical review completed. No further action required. | 2006-2007 | 02 Historical Review | |
N7060001
Former Red Route Dump |
Initial testing completed. No further action required. | 2023-2024 | 03 Initial Testing Program |
- Version:
- 40