Search Results

Search Results Summary
Criteria:
  • Contaminant/Media Pair: PCBs (Polychlorinated Biphenyl) and PCDD/Fs (polychlorinated dibenzo-p-dioxin/dibenzofuran) / Soil
Select Additional Criteria...
Sort Key:Reporting Organization (ascending)
Sites Found:214
Alternate Views
Choose an alternate view: Map XML CSV Financials Report
Results View Options

Results by Site Impact

Change results view to: Name and Location Contaminants and Media

FCSI Identifier
Site Name
Status Fiscal Year Classification Highest Step Completed
00000422
214 - Sachigo Lake - 06328 - SACHIGO LAKE 1 - 3000042096
Initial testing completed. No further action required. 2015-2016 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000903
Parcel 1
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
00000914
Yorkton
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000917
Ammo incinerator #2
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
00000949
CAM-4 SRR (Pelly Bay, Nunavut Territory)- Site Summit
Remediation / risk management completed. No further action required. 2017-2018 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00000994
Pesticide Container Landfill and Asphalt Dump
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
00001062
Inuvik RCMP Detachment Site
Initial testing completed. No further action required. 2019-2020 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00001660
Lomond #3 Community Pasture
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00001728
McDougald Dam
Initial testing completed. No further action required. 2019-2020 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00004105
243 - Kashechewan - 06258 - FORT ALBANY NO. 67 - 0402431305
Historical review completed. No further action required. 2011-2012   02 Historical Review
00006186
170 - Walpole Island - 06192 - WALPOLE ISLAND NO. 46 - 3000037395
Detailed testing completed. No further action required. 2011-2012 1 High Priority for Action 05 Detailed Testing Program
00006221
633 - Quatsino - 07077 - GRASS POINT 13 - 7000012794
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00006329
139 - Chippewas of Rama First Nation - 06195 - CHIPPEWAS OF RAMA FIRST NATION - 3000018095
Detailed testing completed. No further action required. 2015-2016 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00006367
169 - Oneida Nation of the Thames - 06191 - ONEIDA 41 - 3000039196
Long term monitoring completed. No further action required. 2013-2014 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
00006371
166 - Chippewas of the Thames First Nation - 06188 - CHIPPEWA OF THE THAMES FIRST NATION INDIAN RESERVE - 3000010094
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 05 Detailed Testing Program
00006451
648 - Snuneymuxw First Nation - 06816 - NANAIMO RIVER 2 - 0901876304
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00006526
182 - Constance Lake - 06294 - CONSTANCE LAKE 92 / 3000072096
Detailed testing completed. No further action required. 2012-2013 2 Medium Priority for Action 05 Detailed Testing Program
00006728
375 - Muskeg Lake Cree Nation #102 - 06559 - MUSKEG LAKE CREE NATION 102 - 0602813606
Confirmatory sampling completed. No further action required. 2015-2016 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00006889
555 - Squamish - 00009 - KITSILANO NO. 6 - 0901112102
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00007264
402 - Waterhen Lake - 06603 - WATERHEN 130 - 0603831608
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00007686
555 - Squamish - 07968 - SEYMOUR CREEK 2 / 0904441709
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00007857
630 - Mowachaht/Muchalaht - 07044 - AHAMINAQUUS 12 - 0904777710
Detailed testing completed. Remedial action plan under development. 2022-2023 1 High Priority for Action 06 Classify the site using the CCME National Classification System
00007899
630 - Mowachaht/Muchalaht - 07044 - AHAMINAQUUS 12 - BC04792810
Detailed testing completed. Remediation / risk management planned. 2022-2023 1 High Priority for Action 05 Detailed Testing Program
00008090
390 - Fishing Lake First Nation - 06576 - FISHING LAKE INDIAN RESERVE NO. 89 - SK04812211
Initial testing completed. Detailed testing underway. 2022-2023 1 High Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008372
LAB-1, Cape Kakkiviak, SRR Site
Initial testing completed. No further action required. 2017-2018 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008387
Denison Armoury
Historical review completed. Initial testing underway. 2022-2023   02 Historical Review
00008433
YA-5 Yarrows B - Lot Parking and Roads
Confirmatory sampling completed. No further action required. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008436
YA-4 Yarrows Former Shipyard
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008452
Parc Lemay (former dump)
Confirmatory sampling completed. No further action required. 2017-2018 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008458
YA-6 Yarrows Consolidatn Area Y-Gate
Confirmatory sampling completed. No further action required. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008494
CAM-1A
Detailed testing completed. No further action required. 2017-2018 N Not a Priority for Action 05 Detailed Testing Program
00008550
PIN-1BG Croker River
Initial testing completed. No further action required. 2017-2018   03 Initial Testing Program
00008574
Aurora Armoury
Initial testing completed. No further action required. 2018-2019 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008612
DY-28 Dockyard Signal Hill Bldg 506 - Fmr Oil & Paint Stores
Initial testing completed. No further action required. 2018-2019   03 Initial Testing Program
00008633
DY-16 Dockyard IL Dry Dock - Former subsite DY-4h
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008650
COL-31 Colwood Bldg 65
Detailed testing completed. Remedial action plan under development. 2022-2023 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00008659
COL-40 Colwood North Western Bank of Dunn's Nook
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00008661
BAR-1, Komakuk Beach
Detailed testing completed. No further action required. 2017-2018 3 Low Priority for Action 05 Detailed Testing Program
00008662
BAR-3, Tuktoyaktuk
Detailed testing completed. No further action required. 2017-2018 3 Low Priority for Action 05 Detailed Testing Program
00008663
BAR-4, Nicholson Peninsula
Initial testing completed. No further action required. 2017-2018 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008664
PIN-1BD, Keats Point
Initial testing completed. No further action required. 2017-2018 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008667
FOX-2, Longstaff Bluff
Initial testing completed. No further action required. 2017-2018 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008674
LAB-6
Initial testing completed. No further action required. 2017-2018 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008676
CAM-CB
Initial testing completed. No further action required. 2017-2018 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008678
CAM-A3A
Initial testing completed. No further action required. 2017-2018 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008679
PIN-EB
Initial testing completed. No further action required. 2017-2018   03 Initial Testing Program
00008680
PIN-DA
Initial testing completed. No further action required. 2017-2018 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008681
PIN-CB
Initial testing completed. No further action required. 2017-2018 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008682
PIN-2A
Initial testing completed. No further action required. 2017-2018 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008685
Encroachment SE Corner of Wainwright RTA
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00011438
Goose Bay UAS (PCB area)
Historical review completed. No further action required. 2008-2009   02 Historical Review
00012831
Lake Louise CPR Power House
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00012845
Trenton Parking Lot
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00012857
Bankhead Power Station
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00013045
Sidney Laboratory
Initial testing completed. No further action required. 2005-2006 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00016664
Summerside SAR (No Impacts Identified)
Initial testing completed. No further action required. 2012-2013 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00017963
ALBERTON (NORTHPORT) (No Land Based Impacts)
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00017982
LOWER MONTAGUE (BTEX/TPH in Soil, Cadmium, Arsenic, Copper, PAH in Sediment)
Confirmatory sampling completed. No further action required. 2017-2018 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00018444
Mouse Island - Radiobeacon - Former Utility poles and towers
Detailed testing completed. No further action required. 2008-2009 N Not a Priority for Action 05 Detailed Testing Program
00019038
Burgeo (L-SHAP e Finger Pier Site - Uplands - DFRP# 34528)
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00019068
Coomb's Cove (Waterlot property - Parcel B) - DFRP # 00618
Detailed testing completed. No further action required. 2017-2018 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00019129
Harbour Grace (Northside - Uplands - 00238 - Pipeline)
Detailed testing completed. No further action required. 2008-2009 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00021044
Pallant Creek Hatchery
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
00022940
WHITBY (Historical Inlet (backfilled)/Confined Disposal Facility)
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00022941
WHITBY (Port Whitby Marina and Shoreline Extension (backfilling))
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00023900
PIN A - PEARCE POINT
Confirmatory sampling completed. No further action required. 2011-2012 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00024052
Belza Farmhouse
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00024308
Dominion Radio Astrophysical Observatory-slag piles and other APECs
Remediation / risk management completed. No further action required. 2017-2018 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
00024389
ESCUMINAC (Dredge Spoil Containment Area)
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00024659
221-C20 PCB
Initial testing completed. No further action required. 2013-2014   03 Initial Testing Program
00024811
Shearwater (247) Abandoned Transformer Shed
Confirmatory sampling completed. No further action required. 2016-2017 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00024918
Shearwater Aircraft Burn Area (Site 252)
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024919
Utilily poles storage
Historical review planned. 2022-2023   01 Identify Suspect Sites
00024974
AH-7 Albert Head Northwest Power Generation Region
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00024987
ALD-7 Bldg 020 - Power Plant
Initial testing completed. No further action required. 2021-2022 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025009
MAT-11 Main Operations Complex
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025354
WHITBY (Public Boat Launch Area)
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025589
Bathurst Island - N-12 Allison R
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
00025941
605 - Shuswap Band - 07428 - SHUSWAP - BC04868416
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00026527
572 - Soowahlie - 08051 - SOOWAHLIE 14 - BC04882317
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00026559
673 - Metlakatla First Nation - 07754 - S1/2 TSIMPSEAN 2 - BC04887218
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00027542
Gordie Howe International Bridge - United States Port of Entry
Detailed testing completed. Remediation / risk management planned. 2022-2023 3 Low Priority for Action 05 Detailed Testing Program
00027660
Kenow Fire Impacted Areas
Remedial action plan completed. Remediation / risk management underway. 2022-2023 I Insufficient Information 07 Develop Remediation/Risk Management Strategy
00027769
Beak Point
Historical review completed. Initial testing underway. 2022-2023   02 Historical Review
00028068
Consul Irrigation Project
Historical review completed. Initial testing underway. 2022-2023   02 Historical Review
00348003
Parker's Pond Radio Site (5111) - Antenna Site (Herbicides)
Initial testing completed. No further action required. 1998-1999   03 Initial Testing Program
00961001
CFS Leitrim Sludge Pits(Disposal Area)
Detailed testing completed. No further action required. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
01822018
Canadian Side & Northside
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
01822076
Main Base and Civil Aviation Area
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
01822087
South Escarpment Landfills (SES 1000 Series)
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
01822094
Lower Tank Farm (LTF 2000 Series)
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
02338001
Lockeport (Metals, TPH and PCB Impacts in Soil)
Detailed testing completed. No further action required. 2013-2014 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
02717131
Hangar 9, Former Tank 33
Historical review completed. No further action required. 2002-2003   02 Historical Review
02739012
Meadowview Landfill - Aldershot
Long term monitoring completed. No further action required. 2017-2018 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
02739026
Former EME Vehicle Maintenance Garage and Sewer - Aldershot
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02762001
Newport Corner (3101) - Comp. Tech. Building (B9)
Confirmatory sampling completed. No further action required. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02762008
Newport Corner (3108) - Antenna Towers (3)
Initial testing completed. No further action required. 2000-2001 N Not a Priority for Action 03 Initial Testing Program
02861003
Osborne Head (5658) - B301 Septic Field
Initial testing completed. No further action required. 2000-2001   03 Initial Testing Program
02861008
Osborne Head (5663) - Former Transformer Site
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02863011
CFB Shearwater (211) - Landfill 1
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02863021
Shearwater (221) - Lower Fuel Compound and Firing Range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863039
Shearwater(239)-Former Transformer Site(Railway Spot)
Initial testing completed. No further action required. 2000-2001 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02865003
McNabs Island (2603) - APU/Generator Hut (B8)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02907002
Disposed - Willow Park (4322) - Paint Shop (EY7)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02907004
Disposed - Willow Park (4324) - CE Stores (EY3)*
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02907005
Disposed - Willow Park (4325) - CE Production Centre (EY5)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02907006
Willow Park POL Stores (4323)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02919005
Dockyard (1005) - PMQ's and Garage (D77, D78, D79 & D81)
Remediation / risk management completed. No further action required. 2014-2015 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02919008
Dockyard (1008) - SRU Building Bosuns Shops (D125)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02919010
Dockyard (1010) - Electronics Shop (D20)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
03044015
Disposed -Sandwich Pt.(7301) Fmr Pump house-AST/Transformer
Long term monitoring completed. No further action required. 2014-2015 1 High Priority for Action 10 Long-Term Monitoring (Optional)
03044016
Sandwich Point (7302) - Transformer (Water Pump Sta.)
Initial testing completed. No further action required. 2014-2015 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
03660003
CRS Sydney - FPS Radar Site (1702) - Radar Building B55
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
04028001
Cherry Islet - Metals & PCBs in Soil in Current Light Area
Detailed testing completed. No further action required. 2014-2015 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
04312002
LES ABOITEAUX (DUPUIS CORNER) - Benzene, Uranium and PAH Impacts in soil
Remediation / risk management completed. No further action required. 2016-2017 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
05020010
642 - Cowichan - 06799 - COWICHAN 1 - 7000019494
Initial testing completed. Detailed testing underway. 2022-2023 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
05042004
688 - Tk'emlúps te Secwépemc - 07173 - KAMLOOPS NO. 1 - 7000027694
Long term monitoring completed. No further action required. 2008-2009 I Insufficient Information 10 Long-Term Monitoring (Optional)
05042021
688 - Tk'emlúps te Secwépemc - 07173 - KAMLOOPS 1 - 7000070696
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
05053010
674 - Lax Kw'alaams - 07770 - LAX KW'ALAAMS 1 - 7000017394
Initial testing completed. Detailed testing underway. 2022-2023 1 High Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
05058004
659 - Ahousaht - 06852 - MARKTOSIS 15 - 7000012594
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
05082002
661 - Hesquiaht - 06887 - REFUGE COVE 6 - 7000089397
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
05088005
555 - Squamish - 07968 - SEYMOUR CREEK 2 - 7000081896
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
05100005
717 - Yunesit'in Government - 08277 - STONE 1 - 7000029194
Historical review completed. Initial testing underway. 2022-2023   02 Historical Review
05142001
372 - Whitecap Dakota First Nation - 06556 - WHITECAP NO. 94 - 5000026896
Remediation / risk management completed. No further action required. 2015-2016 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
05152001
126 - Couchiching First Nation - 06241 - COUCHICHING 16A - 3000014095
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
05307003
297 - Garden Hill First Nations - 06448 - GARDEN HILL FIRST NATION - 4000011894
Long term monitoring completed. No further action required. 2022-2023 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
05329002
290 - Sioux Valley Dakota Nation - 06409 - SIOUX VALLEY DAKOTA NATION - 4000039100
Detailed testing completed. No further action required. 2008-2009 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
05613001
Mount Apica - north slope
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
06710018
St-Hubert
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
06872011
Moras Island, Pumping station 
Detailed testing completed. No further action required. 2011-2012 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
06872024
Moras Island, Former disposal sites
Detailed testing completed. No further action required. 2011-2012 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
06985005
FEC- Field Electrical Center
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
07930013
Former 161 kV electrical substation - Building 111
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
09401040
Alaska Highway - Steamboat Maintenance Camp
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
09509001
421-C01 Electrical substation
Historical review completed. No further action required. 2011-2012   02 Historical Review
10352004
Site # 4 Vacant Lands at Lyon's Creek in City of Welland. Directly adjacent to Welland Canal.
Remediation / risk management completed. No further action required. 2016-2017 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
10829001
Stony Point (fmr Camp Ipperwash)
Detailed testing completed. Remedial action plan under development. 2022-2023 1 High Priority for Action 06 Classify the site using the CCME National Classification System
10855009
Golfland Area 6 PCB Site (Former Sub-station) - London Airport
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
12738006
Winnipeg Nav Can Transmitter Site Decommissioning
Confirmatory sampling completed. No further action required. 2010-2011 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
14976006
Cdn Abandoned Landfill Site (CAL Site)
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
15529002
Riverbend Receiver Site
Confirmatory sampling completed. No further action required. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
15531016
Building 206 and 208
Confirmatory sampling completed. No further action required. 2015-2016 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
15684031
Landfill Site 7
Initial testing completed. No further action required. 2017-2018 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
16749001
Former RCAF Transmitter Site (Richmond)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17348007
Lot 6: Swift Street; Herald Street Property; Pembroke Street Fill; Swift Street Fill; Herald Street North Fill; Store Street
Remediation / risk management completed. No further action required. 2013-2014 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
17348009
Lot 7: Bridge Street; J-17 Bridge Street East Fill; Bridge Street Centre Fill; Turner Street East Fill; Turner Street South
Confirmatory sampling completed. No further action required. 2017-2018 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
17348018
Lot 15: Captain Jacobsen's Park Fill; Paradise Road Wood Walkway; Filled Walkway North Side of West Bay; Gore Street Fill; Pa
Confirmatory sampling completed. No further action required. 2011-2012 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17432002
RP-6 Rocky Point CFAD Oily Waste Incinerator
Remediation / risk management completed. No further action required. 2015-2016 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
17451029
Mc Carthy Island
Initial testing completed. No further action required. 1996-1997   03 Initial Testing Program
17451030
Smart Island
Initial testing completed. No further action required. 1996-1997   03 Initial Testing Program
17966001
Seal Bay Transmitter Site
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
18664001
Former Fire Training Area
Initial testing completed. No further action required. 2013-2014 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
18976001
Power Plant at Det Holberg
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
19118010
650 - Penelakut Tribe - 06823 - PENELAKUT ISLAND 7 - 7000012394
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
20033001
Stokes Point
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
20247016
Alert Main Station Landfill
Long term monitoring completed. No further action required. 2017-2018 1 High Priority for Action 10 Long-Term Monitoring (Optional)
23148001
Contrecoeur landfill
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
29757001
Small calibre (Former dump), DRDC-South 
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
29757002
Dry material (former dump for), DRDC-South 
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
29757009
Plateau (demolition site), DRDC-Trials 
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
29757018
Former stop-butt, DRDC-South (ZIP 3) 
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
29757023
Former waste demolition and dump site (N4-1), DRDC-North 
Detailed testing completed. No further action required. 2011-2012 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
29763002
CFS St Johns(5010) - Emerald Vale Training Centre
Initial testing completed. No further action required. 2000-2001   03 Initial Testing Program
34422006
BAF-3 Brevoort Island LRR
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
34627001
Rose Blanche (Uplands - DFRP# 34772)
Confirmatory sampling completed. No further action required. 2012-2013 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
34932001
Surgeon Cove Point - Fuel Storage (DFO 001)
Remediation / risk management completed. No further action required. 2012-2013 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
58321006
Uplands - decommissioned oil filled high voltage cables
Confirmatory sampling completed. No further action required. 2016-2017 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
69610001
LAB-2 LRR Site (Saglek, Labrador) Staging Area
Long term monitoring completed. No further action required. 2013-2014 1 High Priority for Action 10 Long-Term Monitoring (Optional)
69610003
LAB-2 LRR (Saglek, Labrador) Sealift Beach Area
Long term monitoring completed. No further action required. 2013-2014 1 High Priority for Action 10 Long-Term Monitoring (Optional)
69778001
BAF-5 SRR (Resolution Island) - Beside road
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
70069005
Eureka - East Airstrip Landfill
Detailed testing completed. No further action required. 2016-2017 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
70069006
EC Eureka - Sewage Lagoon
Detailed testing completed. No further action required. 2015-2016 1 High Priority for Action 06 Classify the site using the CCME National Classification System
C1001001
CAM C - MATHESON POINT
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
C1002001
CAM D - SIMPSON LAKE
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C1003001
CAM E - KEITH BAY
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C1004001
CAM F - Sarcpa Lake
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C1005001
CAPE CHRISTIAN
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C1007001
BAR D - Atkinson Point
Long term monitoring completed. No further action required. 2011-2012 1 High Priority for Action 10 Long-Term Monitoring (Optional)
C1017001
BAF 5 - RESOLUTION ISLAND
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C1018001
FOX 1 - ROWLEY ISLAND
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
C1019001
FOX A - BRAY ISLAND
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
C1021001
FOX D - KIVITOO
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
C1022001
FOX E - DURBAN ISLAND
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
C1040001
PIN D - Ross Point
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
C1041001
CAM A - STURT POINT
Confirmatory sampling completed. No further action required. 2015-2016 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C1042001
CAM B - HAT ISLAND
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
C1044001
PIN C - BERNARD HARBOUR
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
C1045001
PIN-E Cape Peel
Long term monitoring completed. No further action required. 2015-2016 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
C1050001
PIN B - CLIFTON POINT
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C2501001
Snag Airstrip
Confirmatory sampling completed. No further action required. 2011-2012 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7007001
DEW-Line: BAR-1 Komakuk Beach
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7008001
DEW-Line - BAR-2 Shingle Point
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7009001
DEW-Line - BAR-3 Tuktoyaktuk
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7010001
DEW-Line - BAR-4 Nicholson Peninsula
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7011001
DEW-Line - PIN-M Cape Parry
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7012001
DEW-Line - PIN-1 Clinton Point
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7013001
DEW-Line - PIN-2 Cape Young
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
C7014001
DEW-Line - CAM-M Cambridge Bay
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7015001
DEW Line - PIN-4 Byron Bay
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7016001
DEW-Line - PIN-3 Lady Franklin Point
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7017001
DEW-Line - CAM-1 Jenny Lind Island
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7018001
DEW-Line CAM-2 Gladman Point
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7019001
DEW-Line - CAM-4 Pelly Bay
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7020001
DEW-Line - CAM-5 Mackar Inlet
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7021001
DEW-Line - FOX-M Hall Beach
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7022001
DEW-Line-FOX-2 Longstaff Bluff
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7023001
DEW-Line - FOX-3 Dewar Lakes
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7024001
DEW Line FOX-4 Cape Hooper
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7025001
DEW Line-FOX-5 Broughton Island
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7026001
DEW-Line - DYE-M Cape Dyer
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7027001
DEW-Line - CAM-3 Shepherd Bay
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
N7058001
Cornwallis
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
N7081001
BAR-E SRR (Horton River) - Site Summit
Detailed testing completed. No further action required. 2017-2018 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
N7093001
CF-18 Crash Site - A/C 188745 (Aug. 05)
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting