Search Results
Search Results Summary | |
---|---|
Criteria: |
|
Sort Key: | FCSI Identifier (ascending) |
Sites Found: | 411 |
Results by Site Impact
Change results view to: Name and Location Contaminants and Media
FCSI Identifier Site Name |
Status | Fiscal Year | Classification | Highest Step Completed |
---|---|---|---|---|
N7077001
Main Gate & Hamilton River Road Plume (UPL 16000 series) 5W |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0281016
Historic Tank Farm - APEC 32 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0281012
Historic Military Base - APEC 22 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0281008
Former USTs (Maintenance Garage and Hangar) - APEC 6 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0281005
Old Dump Site - APEC 8 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0281003
Historic Parcel F Dump / Capped Landfill - APEC 4 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0281002
Fire Training Area - APEC 1 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0281001
Gully Dump - APEC 3 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0126001
Air Navigation Facility: Flight Service Station |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0090002
Zone 1 & 2 Area North of Graving Dock |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0017003
Old Landfill/Main Drum Cache |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0017001
Fire Training Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0016002
Fire Training Area |
Remediation / risk management completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0015006
Landfill/Scrap Metal Dump |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0014004
Landfill |
Remediation / risk management completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0013001
Fire Training Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0011001
Old Maintenance Garage UST and AST |
Remediation / risk management completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
N0002003
Southern Fuel Distribution Lines |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
C1035001
TUNDRA-TAURCANIS MINE (BULLDOG YELLOWKNIFE GOLD MINES, TAMCANIS MINES LIMITED, TUNDRA GOLD MINES) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
C1033001
RUTH GOLD MINE |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C1022001
FOX E - DURBAN ISLAND |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C1021001
FOX D - KIVITOO |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C1016001
PADLOPING ISLAND |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
C1001001
CAM C - MATHESON POINT |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
84359001
Lawyer Islands - New Engine/Room Generator Compound |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
84306001
Holland Rock - Heavy metals within building foundation walls |
Remediation / risk management completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
83474001
Jannacks Narrows - Light Tower (former and current) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
82124001
Nord-Est Point - minor shore light |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
82123001
Nord-Est Point - rear range light |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
82065001
Melocheville (rear range light) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
82062001
Lotbinière (front range light) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
82056001
Petite Traverse - rear range light |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
82017001
Bastille Point - rear range light |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
72064003
Sediments - Gaspé wharf |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
72020002
Discovery Mountain - Fuel Spill in Fuel Filling Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
72011001
Wesleyville (Helo Fuel Dump) |
Remediation / risk management completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
70070001
CAM-M LRR (Cambridge Bay, NU - Landfill) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
70019001
FOX-M LRR (Hall Beach, NU - Landfill) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
69968001
FOL IQALUIT - Nose dock hangar (T-325) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
67683001
McInnes Island |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67682001
Ivory Island |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67681001
Green Island |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67680001
Egg Island |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67679001
Dryad Point |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67678001
Boat Bluff |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67677001
Addenbroke Island |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67652002
Michipicoten Island East End (SE & W of W. Landfill) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67652001
Michipicoten Island East End (E. Landfill/Generator Build./Lighthouse) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
67590001
Area A (West Wharf) - Centre and North portions were divested to the City of Oshawa in the 2011/12 FY. The South portion rem |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
58231001
Griffith Island - Vicinity of Lighthouse |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
56505001
Creek at Bennett Lake |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
56027003
Slate Island - North Side of Slate Island |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56027002
Slate Island - Light Tower |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
56027001
Slate Island - South Side of the Island |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
38378001
Summit (waste rock pile) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
38240002
Dominion 11 - Mine Water passive treatment system |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
38240001
Dominion 11 - Covered Waste Rock |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
38204002
Dominion 25 - Mine Water discharge to surface |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
38204001
Dominion 25 - Mine Waste Rock Pile |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
38162001
Dominion 6 - (Waste Rock Pile) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
38107001
Broughton (Waste Rock Pile) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
38099001
Beaver & Nicholson |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
38086002
Franklin (#5 Prospect) - mine water |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
38086001
Franklin - Waste Rock |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
38018001
Former Gowrie Wash Plant |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
38010002
Victoria Junction (small pile) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
38010001
Victoria Junction (Main Pile) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
38009003
Princess Site - Edwards Pond |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
38009001
Princess Site - Mine Waste Rock Pile |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
38002001
Dominion 26 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
36618001
Nord-Est Point - front range light |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
36528001
Hunter Point |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
36440002
Cabot Head - Old Lighthouse Dwelling, Lightkeepers Dwelling, Waste pile |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
36286001
Rupert Inlet - Van Inlet |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
34422006
BAF-3 Brevoort Island LRR |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
32081001
Leclercville (front range light) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
31119002
Toluene contamination - apron southwest sector |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
31119001
Aquifer - nitrate contamination |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
29864001
Site C - Churchill |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
28744001
Chevery airport |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
23148001
Contrecoeur landfill |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
22403001
Taxation Centre |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
20625001
Former Sambault garabage dump |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
20146012
Historic 6 Bay Garage - APEC 11 |
Remediation / risk management completed. No further action required. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
20146009
Historical On-Site Buildings - APEC 40 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
20146003
Former Tenant Air Fuelling Facility - APEC 6 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
19878001
Pleasant Camp Border Crossing, YT |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
19482001
Bonilla Island - Sector Light |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
19401001
Langara Island |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
19158001
Dawsons Landing Field Station - Generator ASTs |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
19125001
Pine Island |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
19118004
555 - Squamish - 07968 - SEYMOUR CREEK 2 - 7000081796 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
19084001
Pulteney Point |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
19052001
Scarlett Point |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
19007001
Cape Scott - Main station |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
19006001
Quatsino, Kains Island - Assistant keeper's house & engine room |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
18976001
Power Plant at Det Holberg |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
18752001
Rogers Pass Maintenance Compound |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
18704002
Vernon Mt Commonage 300m Rifle Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
18460001
Merry Island |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
18090001
Chatham Point |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
18086001
Nootka Island |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
18001001
Chrome Island - Range Light |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17970001
High Speed Refueling Compound |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17813001
Estevan Point |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17812001
Lennard Island |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17810001
Pachena Point |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17809001
Cape Beale |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17766003
Robertson Creek Hatchery - Former and current dump/burn areas |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17611001
Entrance Island |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17533001
Carmanah Point |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17410007
Esquimalt Graving Dock Waterlot - AEC's 11,15 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17348008
Lot 6A: Barclay Point; Rock Bay East Fill; Rock Bay North Fill; Bay Street East Fill; J-15 Bay Street Centre Fill; J-16 Bay S |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17330001
Trial Islands |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
17132004
PB-2 Pat Bay Hangar 17 Area |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
16760001
STEVESTON (PARAMOUNT) - Maintnance area (Building 33) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
16662001
Victoria Junction Tailings Basin |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
16568001
ALD-1 Aldergrove Former Sewage Lagoon |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
16560001
831-C03 Matsqui Firefighting Training Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
16506001
Slesse Demolition Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
15473005
Airside Operations and Maintenance Centre |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
15305006
Dump on Shore of Bushy Head Lake |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
15305004
Constructed Fire Training Area |
Remediation / risk management completed. No further action required. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
14976056
DRES Willis Center Trench |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
14976014
DRES Radioactive Liquid Spill(Near Fraggle Rock)-AtomicVault |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
13820001
15 Wing B58 & EME Shop Test Site 2 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
13252002
'Q' Area Fuel Storage Tanks |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
13201002
Fire Training Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
12897002
Maintenance Compound Garage, Former UST Site |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
12579004
17 Wing Former Building 87 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
12577001
St-Charles Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11943008
Waste Oil Tank #3 (Thunder Bay Flying School) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11943007
Underground storage tanks (Former AVIS) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11943005
Bulk fuel storage area (ESSO) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11789001
Moose Factory (Weeneebayko) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11725001
Air Navigation Facility: Non Directional Beacon |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11454001
Parry Sound Base (SW of Marine Emergency Washdown, Soil) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11318004
Area C (leaching field of former septic tank C-1 & PHC impacts to the south of hangar) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11032001
Nottawasaga Island - Vicinity of Tower & former Dwelling-Metals in Soil |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022044
Langemark Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022043
Mons Rifle Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022038
Amiens Rifle Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
11022001
Roundel EOD Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
10667002
Maintenance Compound |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09820033
PIN 614458 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
09820009
PIN 614120 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09540020
POL Compound - area of removed tanks |
Remediation / risk management completed. No further action required. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09540012
8 W Fire Fighting Training Area /Hazardous Materials Storage |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09445002
Fort Frontenac Courtyard |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09412001
Lower Reach Park |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08835003
St. Laurent Square |
Remediation / risk management completed. No further action required. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08708013
Gloucester Landfill |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08708007
Building T107 (Shell Tank Farm) - Ottawa Macdonald-Cartier International Airport |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08708005
Bulk fuel storage facility (Esso Tank Farm) - Ottawa Macdonald-Cartier International Airport |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08591002
Communications Research Centre |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08591001
Communications Research Centre |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08313001
Oeufs Island - light station |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08032001
Bagot - escarpment, minor shore light |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08031003
Sud-Ouest Point - former light station and tower |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
07930019
Cadet camp-Former dry material disposal site |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
07930018
Bowser maintenance shop - Building 77 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
07930017
Marsh - North of highway 170 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
07930009
POL tank farm |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
07199001
Jean Canfield Building |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06959081
Site 13.2 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06959067
Site 10.1 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06875001
Camp Bouchard, Ex Ammo Dump |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06680004
Royal Military College, Former reservoir T20 (building 102) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06679002
Former Garage and service station, ASU St-Jean |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06679001
Hydraulic elevator H-101, ASU St-Jean |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06651003
Demolition site, CEF Farnham |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
06517001
Road to Dupas Island - rear range light |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05906047
Former dump Château Road |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05906011
Forest Station |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05742002
Québec Base - helicopter workshop |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05668001
Pilier de pierre – light Station |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05379004
554 - Tla'amin Nation - 07961 - SLIAMMON 1 - 7000081296 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05379001
554 - Tla'amin Nation - 07961 - SLIAMMON 1 - 7000055295 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05364002
683 - Iskut - 08363 - ISKUT 6 - 7000046394 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05362001
536 - Gitwangak - 06775 - GITWANGAK 1 - 7000067896 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05348001
591 - Cayoose Creek - 08117 - CAYOOSH CREEK 1 - 7000118898 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05340001
26 - Membertou - 06054 - CARIBOU MARSH 29 - 1000038295 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05328001
307 - Shamattawa First Nation - 06460 - SHAMATTAWA 1 - 4000032198 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05317012
315 - Opaskwayak Cree Nation - 06427 - OPASKWAYAK CREE NATION 21E - 0501144102 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05311001
270 - Little Grand Rapids - 06376 - LITTLE GRAND RAPIDS 14 - 4000001593 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05310001
317 - Northlands Denesuline First Nation - 06468 - LAC BROCHET 197A - 4000018896 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05280001
Cap-Chat (light station) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05260005
308 - Barren Lands - 06458 - BROCHET 197 - 0501870404 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05198007
70 - Mohawks of Kahnawá:ke - 06097 - KAHNAWAKE NO.14 - 2000007693 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05198006
70 - Mohawks of Kahnawá:ke - 06097 - KAHNAWAKE NO.14 - 2000007493 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
05198004
70 - Mohawks of Kahnawá:ke - 06097 - KAHNAWAKE NO.14 - 2000007793 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05137002
432 - Tsuut'ina Nation - 06639 - TSUU T'INA NATION 145 - 6000024396 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05119001
451 - Duncan's First Nation - 06678 - DUNCANS 151A - 6000000993 |
Remediation / risk management completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05114001
728 - Yekooche First Nation - 07556 - YE KOO CHE 3 - 7000070196 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05112005
719 - Williams Lake First Nation - 08286 - WILLIAMS LAKE 1 - 0902014305 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05100007
717 - Yunesit'in Government - 08277 - STONE 1 - 7000096597 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05092008
562 - Skatin - 08015 - SKOOKUMCHUCK 4 - 7000081096 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05088012
555 - Squamish - 07968 - SEYMOUR CREEK 2 / 7000073096 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05076009
597 - Penticton - 07397 - PENTICTON 1 - 7000053995 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05076008
597 - Penticton - 07397 - PENTICTON 1 - 7000053295 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05076002
597 - Penticton - 07397 - PENTICTON 1 - 7000053495 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 1 High Priority for Action | 07 Develop Remediation/Risk Management Strategy |
05064006
557 - Lil'wat Nation - 08005 - MOUNT CURRIE 10 - 0902062405 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05064001
557 - Lil'wat Nation - 08005 - MOUNT CURRIE 10 - 7000080096 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05042021
688 - Tk'emlúps te Secwépemc - 07173 - KAMLOOPS 1 - 7000070696 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05041008
638 - Ka:'yu:'k't'h'/Che:k:tles7et'h' First Nations - 07119 - HOUPSITAS 6 - 7000006494 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05033006
592 - Xaxli'p - 08120 - FOUNTAIN 1 - 7000124198 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05030001
235 Principale Street, Îles-de-la-Madeleine |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05024001
Havre-Aubert Island (around the light station near the residence) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05023003
672 - Gitxaala Nation - 07734 - DOLPHIN ISLAND 1 - 7000038094 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
05009001
686 - Bonaparte First Nation - 07165 - BONAPARTE 3 - 7000081996 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
05007003
538 - Heiltsuk - 07857 - BELLA BELLA 1 / 7000126598 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
04498001
St Louis Gully - Metals in Soil, Potential TPH - Fmr. Front Light |
Remediation / risk management completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
04089039
Salt and Sand Sheds |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
04089007
Mons Small Arms Rifle Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
04086002
Fire Training Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03875003
Fire Training Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03662001
Sydney Rifle Range (3801) - Rifle Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03660004
CFS Sydney - FPS Radar Site (1703) - Former PCB Storage |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03660002
CFS Sydney- FPS Radar Site (1701)- Scrap Stg Compound |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03642001
Guyon Island - Metals and Hydrocarbon Impacts in Soil/GW |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03288004
New Glasgow Armoury (2902) - POL Storage Building |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03044011
DCD School (911) - Construction Debris Site |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03044010
DCD School (910) - Former Ordnance Demolition Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03044008
DCD School (908) - Contaminated Spoil Fill Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
03002006
Windsor Park (4505) - PMQ Barracks |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02920014
Stadacona (7604) - Queens Printer Bldg S93 Furn./Coal chute |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02919049
Dockyard (1041) - Fomer D49 |
Remediation / risk management completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02919047
Dockyard (1034) - Former D7 |
Remediation / risk management completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02919041
Dockyard (1033) - Former B122 and 60 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919036
Dockyard (1037) - Former D19 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919035
Dockyard (1035) - Former D15 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02919015
Dockyard (1015) - Underwater Repair building (D53) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02916001
RA Park (3301) - Officers Mess (RA1) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02913001
Water Lots (9911) - HMCS Scotian |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02865004
McNabs Island (2604) - Residence and AST (B10) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02865002
McNabs Island (2602) - Flammable Stores Building (B5) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02863016
CFB Shearwater (216) - Fill Area West of Alpha Taxiway |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863012
CFB Shearwater (212) - Landfill 2 |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02863001
CFB Shearwater (201) - Landfill 6 - Airfield |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02859054
Wrights Cove (8602) - CN Rail Tracks/Building |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859053
Wrights Cove (8607) - Upgradient Industrial Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859050
Wrights Cove (8608) - National Gypsum Leased property |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859046
Navy Island (7501) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02859020
CFAD Bedford (821) - Existing Jetty -NN at Wrent Point |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02858001
Bedford Rifle Range(701) former pesticide drum disposal area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02762009
Newport Corner (3110) - Sewage Treatment Plant (package) |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
02739003
Former Garage (B46) and Septic Tank Area - Aldershot |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02731002
The Atlantic Food and Horticulture Research Centre |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02717099
UST #40 B-125 Water Pumphouse |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02717082
25 Yard Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02717015
Hangar 5 - Greenwood |
Remediation / risk management completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
02717006
MADD Shack Dump Area-Greenwood |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
01831002
North Side Property - All Areas |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
01822087
South Escarpment Landfills (SES 1000 Series) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
01822076
Main Base and Civil Aviation Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
01822043
Hydrant Area Fuel Plumes (HYD9010) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
01729001
Cape Bauld - Lower dwelling |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00978029
Building 108 Hoist |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00978022
Bldg 36 Curling Club |
Remediation / risk management completed. No further action required. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00978014
9 Wing B107 103 Rescue Unit |
Remediation / risk management completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00978011
Bldg 17 MSE Garage |
Remediation / risk management completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00978009
Combined Outfalls - 1,2 & 3 & Drainage Ditch by FFTA |
Remediation / risk management completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00854008
Pinetree Site - Area G |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00620001
Sagona Island Fog - Main SIte Area - CS1 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00490002
Fortune (Fish Plant Wharf - DFRP# 00494 - Uplands) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00339015
Marine Fire Training Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00027758
Champlain Bridge |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00027713
JCP- section 8 (entre Viger et Maisonneuve Est) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
00027618
Cap-des-Rosiers Harbour South Jetty |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00027538
Northern Transportation Route |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00026701
353 - Lac La Ronge - 06515 - LITTLE RED RIVER 106C - SK04906121 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00026421
Shirleys Bay Campus, P9 parking |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00026081
PIN 614334.1-B |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00026013
395 - Flying Dust First Nation - 06584 - FLYING DUST FIRST NATION 105 - SK04876417 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025911
555 - Squamish - 07984 - STAWAMUS 24 - BC04862215 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
00025874
462 - Saddle Lake Cree Nation - 06702 - SADDLE LAKE 125 - 6000009695 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025833
459 - Whitefish Lake - 06696 - UTIKOOMAK LAKE 155 - 6000014995 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025820
Esquimalt Harbour Fill Sites |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025776
Depot Grounds |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025590
Bathurst Island - J-34 Bathurst Caledonia |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025589
Bathurst Island - N-12 Allison R |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00025391
Burin Lifeboat Station |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025099
CFHA - 48 Dakota Drive, Oromocto |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025098
CFHA - 20 Oneida Street, Oromocto |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025097
CFHA - 191 St. Lawrence Avenue, Oromocto |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025086
19 Wing Heritage Park |
Confirmatory sampling completed. No further action required. | 2023-2024 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00024981
4 Wg Canex Gas Station |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024971
CFHA - 36 Restigouche Road |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024940
CFHA - 157, 159, 161, 163, 165, 167 St. Lawrence Avenue |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024931
FOX-3 Dewar Lakes, Nunavut |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024913
Shearwater Fire Hall Storage Shed (SH40) (Site 253) |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024883
CFHA - 203 MacKenzie Avenue |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024837
Anglin's Bay |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024810
Hangar 5 & 6 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024735
352-C11 La Macaza - TCE Contamination 2010 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024675
833-C02 Mountain - Fire Fighting Training Area |
Remediation / risk management completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024670
Historic Military Base West of Runways - APEC 20C |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024545
Cove Island - Main Dump |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024301
Cambridge Bay Apron |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024258
ROMULUS - PANARCTIC C-42 WELL SITE |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024257
Bathurst Island - Stokes Range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024167
Bathurst Island - Bent Horn (Cameron Island) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024162
Chantry Inlet Lodge |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00024128
Illecillewaet Campground : Campsite # 30 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00023983
Central LeBreton |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00023964
SPECTRUM LAKE ( AA/BB, BENVENTUM) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00023544
BEAULIEU MINE (JOHN LAKE; BRANDY; IRENE; NORMA; TUNGSTEN AND GOLD MINES LIMITED) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00023326
Kingsview Park, Ottawa |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00023183
New Harbour (Uplands - DFRP # 13463) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00022204
Long Pèlerin, the former boathouse |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00021984
Guet Island - minor shore light |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00021963
Chevery (former land for JP-4 tank) |
Remediation / risk management completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00021639
Long Pèlerin, the - light station structure and range light |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00021536
Entry Island (light station) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00021422
SHOAL BAY (EAST THURLOW ISLAND) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00021360
MARKTOSIS (AHOUSAT VILLAGE) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00021293
Courtenay Slough - Contaminated Sediment and Soil |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00021129
Upper Pitt River Hatchery - Diesel Day Tank, Generator Building |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00021044
Pallant Creek Hatchery |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00021003
Mathers Creek - Enhancement |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00020345
McCoy Cove - Sector Light |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00020336
Gillatt Island |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00020335
Flowery Islet |
Remediation / risk management completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00020333
East Copper Island |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00019837
Race Point Lightstation- Porlier Pass Front |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00019648
Godkin Point |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00019465
Berens Island - Berens Island Shore light |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00019107
Garden Cove (Uplands - DFRP# 00590) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00018385
Lamaline, Allans Island - Exisitng and former Ligh |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00018116
WOODWARDS COVE - PAH in Sediment |
Remediation / risk management completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00017979
JUDES POINT - Hydrocarbons in Soil and GW |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00017804
KRAUT POINT (RIVERPORT) (Hydrocarbon and Metal Impacts Soil and GW) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00014156
Beauty Island - Metal & Petroleum Hydrocarbon Soil Contamination |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00013280
Port Hope Area |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00013147
BROCKVILLE (Impacted Soils SE and W sides of grassed area and SW of Customs Building) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00013127
Long Point (Battery disposal) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00013095
Pointe du Chene Range Rear (Rear Light - Soil Metal Impacts) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00013027
831-C04 Matsqui - Heating fluid leak |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00013023
530-L01 Drumheller - Former Landfill at South West |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00012429
Docee River Sockeye Counting Fence and Cabin - Entire Site |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00012305
Pennant Harbour - Barium and Lead in Soil |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008693
WP-11 Work Point Former USTs at PMQs |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008529
MA-1a Masset Skeet Range |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008429
South Escarpment Stillwaters (SES 1100 series) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008407
Dunnage Pit |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008405
North redoubt CMR St-Jean |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008348
CANEX contaminated site |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008344
25 m small arms range |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008328
Fort Conger Historic Site |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008202
565 - Matsqui First Nation - 08036 - MATSQUI MAIN 2 - BC04825711 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00007916
299 - Wasagamack First Nation - 09148 - WASAGAMACK - MB04794710 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00007908
307 - Shamattawa First Nation - 06460 - SHAMATTAWA 1 - 4000004594 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00007713
562 - Skatin - 08016 - SKOOKUMCHUCK 4A - 0904501809 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00007709
562 - Skatin - 08015 - SKOOKUMCHUCK 4 - 0904500309 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00007697
561 - Douglas - 08012 - TIPELLA 7 - 0904491909 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00007686
555 - Squamish - 07968 - SEYMOUR CREEK 2 / 0904441709 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00007683
728 - Yekooche First Nation - 07556 - YE KOO CHE 3 - 0904427809 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00007307
79 - Atikamekw d'Opitciwan - 06105 - OBEDJIWAN 28 - 0303903608 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00007212
660 - Tla-o-qui-aht First Nations - 06875 - ESOWISTA 3 - 0903801808 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00007102
301 - Bunibonibee Cree Nation - 06446 - OXFORD HOUSE 24 - 0503619008 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006949
561 - Douglas - 08012 - TIPELLA 7 - 0903415208 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006908
541 - Wuikinuxv Nation - 07900 - KATIT 1 - 0903284807 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006898
574 - Squiala First Nation - 08056 - SQUIAALA 7 - 0903276907 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006867
700 - Boothroyd - 07263 - SPEYUM 3 - 0903244807 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006815
716 - Xatsull First Nation - 08276 - DEEP CREEK 2 - 7000130700 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006814
311 - Mathias Colomb - 06456 - PUKATAWAGAN 198 - 4000002393 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006809
588 - Union Bar First Nation - 08091 - PUCKATHOLETCHIN 11 - 7000045894 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006801
432 - Tsuut'ina Nation - 06639 - TSUU T'INA NATION 145 - 6000024696 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006749
668 - Ucluelet First Nation - 06940 - ITTATSOO 1 - 0902956206 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006601
298 - St. Theresa Point - 09147 - ST THERESA POINT - 4000038700 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006600
70 - Mohawks of Kahnawá:ke - 06097 - KAHNAWAKE NO.14 - 2000007593 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006547
612 - Nadleh Whuten - 07469 - NAUTLEY (FORT FRASER) 1 - 7000111798 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006396
705 - Lytton - 07337 - KLICKKUMCHEEN 18 - 7000085696 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006383
724 - Gwa'Sala-Nakwaxda'xw - 06987 - TSULQUATE 4 - 7000001593 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006332
371 - Muskoday First Nation - 06555 - MUSKODAY FIRST NATION / 5000040400 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006253
555 - Squamish - 07986 - CHEKWELP 26 - 7000081496 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00006221
633 - Quatsino - 07077 - GRASS POINT 13 - 7000012794 |
Historical review completed. Initial testing underway. | 2023-2024 | 2 Medium Priority for Action | 02 Historical Review |
00005697
317 - Northlands Denesuline First Nation - 06468 - LAC BROCHET 197A - 0502590505 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00005696
268 - Kinonjeoshtegon First Nation - 06371 - JACKHEAD 43 - 0502590405 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00005059
440 - Enoch Cree Nation #440 - 06652 - ENOCH CREE NATION 135 - 0702526705 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00004861
462 - Saddle Lake Cree Nation - 06703 - WHITE FISH LAKE 128 - 0702506905 |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00002747
Eureka High Arctic Weather Station |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00002327
Parcel 3 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00001451
Atlantic Cool Climate Crop Research Centre |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00001129
Marystown RCMP |
Remediation / risk management completed. No further action required. | 2023-2024 | I Insufficient Information | 08 Implement Remediation/Risk Management Strategy |
00001056
Island Lake RCMP Detachment Site |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000991
Dry Solid Waste Landfill |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000965
NAD-1 Naden Jr NCM |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000937
CFS Leitrim, Former UST site between buildings #250D & #138 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000903
Parcel 1 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000881
Pr Rupert Marine Station, Sourdough Bay - Fire Pit and Oil Change Ramp |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000879
Sheringham Point - Entire Site |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000878
Point Atkinson - Vicinity of the Light Tower |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000877
Corossol Island - minor shore light |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000863
Cove Island - Soil around Lighthouse and associated structures |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000645
559 - Sts'ailes - 00005 - CHEHALIS NO. 5A - 0902082505 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000560
638 - Ka:'yu:'k't'h'/Che:k:tles7et'h' First Nations - 07115 - MISSION ISLAND 2 - 0902247305 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000558
663 - Huu-ay-aht First Nations - 06905 - NUMUKAMIS 1 - 0902247105 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000518
555 - Squamish - 07967 - MISSION 1 - 0902170705 |
Remediation / risk management completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000471
581 - Seabird Island - 08073 - SEABIRD ISLAND - 0902096605 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000468
581 - Seabird Island - 08073 - SEABIRD ISLAND - 0902096305 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000432
448 - Dene Tha' - 06671 - HAY LAKE 209 - 6000020195 |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 03 Initial Testing Program |
00000405
JOON MINE (CAMPBELL LAKE, JUNE MINE, STRIKE LAKE) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00000400
High Arctic - Dale Payne |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000288
Lougheed Island (L1) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000282
Bathurst Island - Ile Vanier |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000266
Bathurst Island - Young Inlet (East of Humphries Hill) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000244
DRAKE POINT - SABINE PENINSULA/MELVILLE ISLAND |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000231
REA POINT (1)/MELVILLE ISLAND |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000230
THOR ISLAND / PANARCTIC OILS/H-28 WELL |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000068
BULLMOOSE LAKE MINE (FORMERLY MANN LAKE) |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
- Version:
- 40