Search Results

Search Results Summary
Criteria:
  • Limited to Active Sites
  • Reporting Organization: National Defence
Select Additional Criteria...
Sort Key:Municipality (ascending)
Sites Found:724
Alternate Views
Choose an alternate view: Map XML CSV Financials Report
Results View Options

Results by Site Impact

Change results view to: Name and Location Contaminants and Media

FCSI Identifier
Site Name
Status Fiscal Year Classification Highest Step Completed
00000911
Residential Housing Units Fort Henry Heights
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00000925
HMCS Jolliet-Sept-Iles naval reserve
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00000927
15 Wing Hangar 6
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000928
15 Wing Former Skeet Range
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00000929
15 Wing Hangar 2
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000930
15 Wing Landfarm
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000933
15 Wing Landfill
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00000935
15 Wing Hangar 5
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00000937
CFS Leitrim, Former UST site between buildings #250D & #138
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00000940
Connaught Rnge Primary Trng Ctre- 35 Shirley Blvd, B34 AST
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00000941
Suffield Experimental Proving Ground (EPG) Project
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00000954
15 Wing Former FFTA
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000955
Alpha Range
Detailed testing completed. Remediation / risk management planned. 2022-2023 I Insufficient Information 05 Detailed Testing Program
00000956
Bravo Range
Initial testing completed. Detailed testing underway. 2022-2023 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000965
NAD-1 Naden Jr NCM
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
00000982
Petawawa Research Forest
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000984
Fire Fighting Training Areas
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000991
Dry Solid Waste Landfill
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00000996
Aircraft Fuel Dumping Ground
Detailed testing completed. Remediation / risk management planned. 2022-2023 3 Low Priority for Action 05 Detailed Testing Program
00000997
Aircraft boneyard-Ghost Squadron
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00001001
Skeet Range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00001005
Mewata Armoury
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00001007
Kipp Rifle Range
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00008332
CPR Lakes
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00008334
Uplands Marina, CFSU(O)
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 03 Initial Testing Program
00008335
CFB Petawawa RTA - Area 8 (Demolition Range)
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00008337
Former skeet range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00008338
Block 7741 Military Training Area
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008339
Dundurn B155
Initial testing completed. Detailed testing underway. 2022-2023 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008340
DRDC Transport Facility Site (CFB Suffield site)
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008344
25 m small arms range
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00008345
Car Club - used oil storage
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00008347
Cadet Camp Landfill & Firing Range
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00008348
CANEX contaminated site
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00008352
Burn Pit (adjacent to Range Warden Compound)
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008353
Pickled Sand Storage Site
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008356
Camp Hughes
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008357
Training Area Borrow Pit
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00008358
General Sir Arthur Currie Bldg
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008363
HRR-1 Heals Rifle Range 400yd & Beyond
Detailed testing completed. Remedial action plan under development. 2022-2023 1 High Priority for Action 06 Classify the site using the CCME National Classification System
00008364
NRR-1A Nanaimo Rifle Range 600 yd & Beyond
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008371
BAR-DA1, Liverpool Bay, SRR Site
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008374
BAR-B, Stokes Point, SRR Site - Beach
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00008389
9 Wing Heavy Equipment Building Site - Parcel #1
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00008391
Pine Street Armoury
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00008402
Firing range(Centre de biathlon Myriam-Bedard)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008405
North redoubt CMR St-Jean
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00008406
CMR Chapel
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008407
Dunnage Pit
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00008408
CFB Gagetown
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00008409
Wellington Anti-Tank Range
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008425
Connaught Ranges Range Butt Stop Stockpile
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
00008429
South Escarpment Stillwaters (SES 1100 series)
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00008431
CFRB Hamilton/HMCS Star
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008436
YA-4 Yarrows Former Shipyard
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008441
former small arm range Caen
Detailed testing completed. Remediation / risk management planned. 2022-2023 2 Medium Priority for Action 05 Detailed Testing Program
00008446
Woodland at NE.corner of Dugas&Jean-Brillant
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008449
CFB Shilo: Demolition Range
Detailed testing completed. Remediation / risk management planned. 2022-2023 N Not a Priority for Action 05 Detailed Testing Program
00008450
RTA Burial Pit
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00008453
Former small arm range Falaise
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008457
Quebec Citadel
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008460
Range and training Area Characterization - NOT A CS
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00008463
South redoubt RMC St-Jean
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008467
FOB Atlantic dump
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008468
S.DRDC-other former firing rngs
Detailed testing completed. Remediation / risk management planned. 2022-2023 3 Low Priority for Action 05 Detailed Testing Program
00008469
South Complex
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00008471
Old UXO destructn site St-Maurice Proof rng
Detailed testing completed. Remediation / risk management planned. 2022-2023 2 Medium Priority for Action 05 Detailed Testing Program
00008476
Amiens Small Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008477
Reichwald Sm. Arms Rifle Rng
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008478
Somme Small Arms Rifle Range
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008479
Flanders Sm. Arms Rifle Range
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008480
Ardennes Sm. Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008481
Old Vimy Sm. Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008482
Old Amiens Small Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008483
Old Mons Small Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008485
Old Reichwald SmArms Rifle Rng
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008486
Dieppe Small Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00008487
Vimy Small Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008488
Batoche Sm. Arms Rifle Rng
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008489
Salisbury Sm. Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2022-2023 1 High Priority for Action 06 Classify the site using the CCME National Classification System
00008490
Alexandra Sm. Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008491
Former landfill north of 195 Ave
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008493
BAF-2
Detailed testing completed. Remediation / risk management planned. 2022-2023 I Insufficient Information 05 Detailed Testing Program
00008495
CAM-B
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00008497
FOX-1
Detailed testing completed. Remediation / risk management planned. 2022-2023 I Insufficient Information 05 Detailed Testing Program
00008498
FOX-A
Detailed testing completed. Remediation / risk management planned. 2022-2023 I Insufficient Information 05 Detailed Testing Program
00008499
Cedar Springs Rifle Range & Danger Area
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008500
Winona Rifle Range
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008501
DRDC Pile at Landfarm
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008511
former grenade range Château F
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008512
Former firing range G1
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008513
Former firing range G
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
00008515
former firing range G3
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008517
Range Control Trenches
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00008521
Willow Park (4327) - TEME North Site
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00008522
Willow Park (4328) - Armoury South Site
Initial testing completed. Detailed testing underway. 2022-2023 I Insufficient Information 03 Initial Testing Program
00008528
Dundurn FFTA
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008529
MA-1a Masset Skeet Range
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
00008535
Sussex Small Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2022-2023 1 High Priority for Action 06 Classify the site using the CCME National Classification System
00008536
Gloucester Small Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2022-2023 1 High Priority for Action 06 Classify the site using the CCME National Classification System
00008537
Lethbridge Airport CF18 Crash Site
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008538
CF18 Crash Site on AB Gov Land
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008539
B184-Former APU for Steam Plant
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008541
New ATESS Refinishing Shop
Detailed testing completed. Remedial action plan under development. 2022-2023 1 High Priority for Action 06 Classify the site using the CCME National Classification System
00008543
Former Ammo Dump, Bernatchez Rd.
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008556
Former firing range P
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00008558
Beauport armoury
Detailed testing completed. Remediation / risk management planned. 2022-2023 3 Low Priority for Action 05 Detailed Testing Program
00008559
Megantic Lake Armoury
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00008561
Trois-Rivières Armoury
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008562
Stream draining former DDT site in Farnham
Detailed testing completed. Remedial action plan under development. 2022-2023 1 High Priority for Action 06 Classify the site using the CCME National Classification System
00008564
Water filtration plnt of city in CMR St-Jean
Detailed testing completed. Remediation / risk management planned. 2022-2023 N Not a Priority for Action 05 Detailed Testing Program
00008565
Former POL/JTFW Site
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008577
Grenade Range (Area A)
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00008582
Sector 6 demolition site
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008593
DY-32 Dockyard Signal Hill Off. Mess & Prk Lot E of Bldg 520
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008616
NAD-10 Naden South - East of Admirals
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00008621
NAD-15 Naden North PMQ Housing
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008625
RP-4 Rocky Point Bentinck Island Active Site
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008626
RP-10 Rocky Point Bldg 36A Steam-out Hut- Former/Current AST
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00008628
RP-12 Rocky Point Vehicle Maintenance Garage
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00008631
RP-15 Rocky Point Whirl Bay
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008636
Past Landfill activities (A2)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008637
Past landfill activities - C
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008644
COL-26 Colwood Section of Wilfert Rd near F-Jetty
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008645
COL-27 Colwood Laydown Area near Bldg 205
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008649
COL-30 Colwood Joe’s Creek East of Wilfert Rd
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008650
COL-31 Colwood Bldg 65
Detailed testing completed. Remedial action plan under development. 2022-2023 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00008653
COL-34 Colwood Aggregate Storage Yard (Active Site)
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008655
COL-36 Colwood Helicopter Pad and Parking Lot
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00008656
COL-37 Colwood Smart Island
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00008657
COL-38 Colwood McCarthy Island
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00008659
COL-40 Colwood North Western Bank of Dunn's Nook
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00008668
FOX-4, Cape Hooper
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00008669
FOX-5, Broughton Island
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00008683
Former Grenade Range
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00008684
Former Demolition Range
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008685
Encroachment SE Corner of Wainwright RTA
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00008691
Burwash CFTA
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008693
WP-11 Work Point Former USTs at PMQs
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00008700
Connaught Skeet Range
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00008701
B314 parking lot
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00024809
DY-10 Dockyard Signal Hill Building 575 & Surrounding Area
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00024810
Hangar 5 & 6
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
00024817
PLER Site Release
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024825
Battle Runs 12A and 15A
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00024826
Bronze Range (30 lines)
Detailed testing completed. Remediation / risk management planned. 2022-2023 N Not a Priority for Action 05 Detailed Testing Program
00024827
Palladium Range
Detailed testing completed. Remediation / risk management planned. 2022-2023 N Not a Priority for Action 05 Detailed Testing Program
00024834
Tanks K1090 and K 1091 near Building 102
Detailed testing completed. Remediation / risk management planned. 2022-2023 N Not a Priority for Action 05 Detailed Testing Program
00024837
Anglin's Bay
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
00024838
Niagara-on-the-Lake Tank Training Area
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00024844
B163 - Fire Hall
Initial testing completed. Detailed testing underway. 2022-2023 1 High Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024845
Building B-12
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00024846
Fire Hall, Building 85
Detailed testing completed. Remedial action plan under development. 2022-2023 1 High Priority for Action 06 Classify the site using the CCME National Classification System
00024847
FOL - Maintenance Transport Shop, 76
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00024849
4 Wing Fire Hall, Blding 4
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024850
Transport Office (former EME shop), Blding 5
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024851
15 Wing EME Shop Test Site 1
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00024853
15 Wing Fire Hall Test Area 1
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00024856
Fire Hall, Building 19
Initial testing completed. Detailed testing underway. 2022-2023 1 High Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024857
17 Wing Former B87 EME Shop
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00024858
17 Wing B88 Fire Hall
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00024859
17 Wing NW of Log Building 129
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00024864
Dundurn Fire Hall
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00024869
Fuel Oil Spill 13 Hgr
Detailed testing completed. Remedial action plan under development. 2022-2023 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00024877
22 Wing Building 45
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00024878
Cratère Training Range
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00024883
CFHA - 203 MacKenzie Avenue
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00024894
Building B19
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024903
Fire Fighting Training Area
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00024904
Guelph Armoury
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024912
Former Building B6
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024913
Shearwater Fire Hall Storage Shed (SH40) (Site 253)
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00024914
Shearwater CC-144B Challenger Crash Site (Site 249)
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00024915
Shearwater Former FFTA (North Delta Taxiway) (Site 251)
Detailed testing completed. Remediation / risk management planned. 2022-2023 2 Medium Priority for Action 05 Detailed Testing Program
00024917
Shearwater FFTA (Alpha Taxiway) (Site 250)
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024918
Shearwater Aircraft Burn Area (Site 252)
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024921
Argus Waste Drop Zone
Detailed testing completed. Remedial action plan under development. 2022-2023 1 High Priority for Action 06 Classify the site using the CCME National Classification System
00024923
19 Wing Hangar 7
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024924
Building PC-317
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024925
Building TA-1
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00024927
22 Wing PFAS Monitoring
Detailed testing completed. Remedial action plan under development. 2022-2023 1 High Priority for Action 06 Classify the site using the CCME National Classification System
00024931
FOX-3 Dewar Lakes, Nunavut
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00024932
WP-3d Work Point Former Outdoor 25 Yard Firing Range
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00024940
CFHA - 157, 159, 161, 163, 165, 167 St. Lawrence Avenue
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00024948
Kapyong Site
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00024949
RP-3c Rocky Point White Phosphorus Active Disposal Area
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00024951
John Foote Armoury
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024952
Fire Fighting Training Area #2
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00024954
Groundwater Recirculation Discharge Station Aerodome (254)
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00024955
MA-3 Masset Former Operation Centre
Detailed testing completed. Remediation / risk management planned. 2022-2023 3 Low Priority for Action 05 Detailed Testing Program
00024957
MA-4 Masset Radio Communications Center
Detailed testing completed. Remediation / risk management planned. 2022-2023 I Insufficient Information 05 Detailed Testing Program
00024958
FOX-MAIN Hydrocarbon Plume
Initial testing completed. Detailed testing underway. 2022-2023 1 High Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024959
CAM-MAIN Hangar Legacy Hydrocarbon Plume
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00024960
South RV Compound and P-151 Compound Area
Detailed testing completed. Remediation / risk management planned. 2022-2023 3 Low Priority for Action 05 Detailed Testing Program
00024961
Former Gas Station
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00024962
Former PCB Storage Area
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00024971
CFHA - 36 Restigouche Road
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00024972
Radar PAR
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00024974
AH-7 Albert Head Northwest Power Generation Region
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00024975
AH-8 Albert Head Sewage Lagoon
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024976
AH-10 Albert Head Energetics Testing & Shoreline Region
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00024978
AH-9 Albert Head Gun Embankments, Central Uplands Region
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00024979
NMC Bunker Nanaimo Military Camp
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00024980
VC-301
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00024981
4 Wg Canex Gas Station
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00024984
ALD-4 PMQ Heating Oil USTs
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00024985
ALD-5 Former Mobile Kitchen
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00024988
ALD-8 Bldg 022 - Main Operations
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00024991
ALD-12 Antenna Field
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00024999
VA-6 Three fueling tanks and the gas dock
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025000
MAT-2 PMQ Heating Oil USTs
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025004
MAT-6 Sewage Treatment Facility
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025005
MAT-7 Former Septic Field
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00025006
MAT-8 Antenna Towers and Arrays
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025007
MAT-9 Former building complex
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00025009
MAT-11 Main Operations Complex
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025012
HRR-5 Heals Rifle Range Main Compound Training Area
Remedial action plan completed. Remediation / risk management underway. 2022-2023 I Insufficient Information 07 Develop Remediation/Risk Management Strategy
00025014
HRR-8 Heals Rifle Range Former 400-1000 yrd Range
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00025015
19 Wing PFAS Sitewide
Detailed testing completed. Remediation / risk management planned. 2022-2023 1 High Priority for Action 05 Detailed Testing Program
00025016
8 Wing 10 Hangar
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025028
CFHA - 6-7 Dunn Court, Oromocto, NB
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00025029
HRR-7 Heals Rifle Range Soil Storage Near Pistol Range
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00025030
Goose Bay Site Wide PFAS
Initial testing completed. Detailed testing underway. 2022-2023 1 High Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025031
PB-5 Pat Bay hangar wash pad
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00025033
PB-6: Pat Bay Hanger 17 fmr POL Shed/UST
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025036
Pond Site B225
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00025038
Juliette Tank
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00025042
CFB Edmonton Site-Wide PFAS
Detailed testing completed. Remediation / risk management planned. 2022-2023 1 High Priority for Action 05 Detailed Testing Program
00025043
Wainwright Site-Wide PFAS
Detailed testing completed. Remediation / risk management planned. 2022-2023 1 High Priority for Action 05 Detailed Testing Program
00025045
MH-5 MARY HILL FORTIFICATION LANDFILL
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025046
MH-6 MARY HILL SEARCHLIGHT AND POWERHOUSE (MH-1027)
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025049
14 Wing Greenwood Site-Wide PFAS
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00025050
West of 1 Field Ambulance Building
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025055
Camp Utopia and Ranges
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025056
Dundurn Hardstand 6 Site
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025057
CFHA - 10 Armstrong Court, Oromocto, NB
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025058
CFHA - 28 Comox Street, Oromocto, NB
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00025059
CFHA - 29 Shirley Court, Oromocto, NB
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025060
CFHA - 50 Dakota Drive, Oromocto, NB
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00025061
CFHA - 59 Restigouche Road, Oromocto, NB
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025062
Former Underground Tank B215
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025064
MH-7 MARY HILL FORMER NW BURN SITE
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00025073
19 Wing EOD Site
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025077
8 Wing Site Wide PFAS
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00025078
PB-7 PAT BAY CONTAMINATION FROM OFFSITE ASTs/USTs
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00025079
HRR-9 HEALS RIFLE RANGE 100 yd PISTOL RANGE & Beyond (Active
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00025080
NRR-1C Nanaimo Rifle Range 25m Pistol Range & Beyond ACTIVE
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025081
12 Wing Shearwater PFAS Site-Wide
Detailed testing completed. Remediation / risk management planned. 2022-2023 1 High Priority for Action 05 Detailed Testing Program
00025082
22 Wing Behind Building 14
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025083
CFHA – 9-11 Oneida Street, Oromocto, NB
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00025085
CFHA - 6 McElroy Crescent, Oromocto, NB
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025086
19 Wing Heritage Park
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 I Insufficient Information 08 Implement Remediation/Risk Management Strategy
00025087
Canadian Ranger Patrol Group Former Small Arms Range - Burgeo
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00025088
Transport Fleet Compound (O-95)
Detailed testing completed. Remediation / risk management planned. 2022-2023 I Insufficient Information 05 Detailed Testing Program
00025090
Canadian Rang. Pat. Grp. Former Small Arms Range - Channel
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025091
Training Area C2 Drainage
Detailed testing completed. Remediation / risk management planned. 2022-2023 I Insufficient Information 05 Detailed Testing Program
00025093
CFHA - 48 Inchby Drive, Oromocto, NB
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025094
CFHA - Huron Street, Oromocto
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00025097
CFHA - 191 St. Lawrence Avenue, Oromocto
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00025098
CFHA - 20 Oneida Street, Oromocto
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00025099
CFHA - 48 Dakota Drive, Oromocto
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00025101
TCE au site du QRA
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00025102
CFHA - 24 Comox Street, Oromocto
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025105
5 CRPG - Rocky Harbour (Cow Head)
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025106
5 CRPG - Former Small Arms Range - Terra Nova
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025107
5 CRPG - Former Small Arms Range - Port Saunders
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025109
CFHA - 48 Carleton Street, Oromocto
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025112
5 CRPG Former Small Arms Range - Hermitage
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025113
5 CRPG Former Small Arms Range - Bonavista (Port Rexton)
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025122
CFHA – 76 MacLaren Drive, Oromocto
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00273001
CFS ST John's (4710) - Cambrai Rifle Range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00348002
CFS St John's (5110) - Parkers Pond Transmitter Site
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00418002
CFS St John's (4801) - 200 Compound
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00961002
9 Wing 25m Firing Range
Detailed testing completed. Remedial action plan under development. 2022-2023 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00978002
9 Wing POL Compound
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00978004
9 Wing B109 Wing Fire Hall
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00978006
9 Wing B16 Central Heat Plant (CHP)
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00978007
9 Wing Bldg 21 POL Pumphouse
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00978009
Combined Outfalls - 1,2 & 3 & Drainage Ditch by FFTA
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00978011
Bldg 17 MSE Garage
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00978012
Bldg 108 Storage and Maintenance
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00978014
9 Wing B107 103 Rescue Unit
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00978015
9 Wing FFTA
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00978020
9 Wing B115 Former CANEX Site
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00978022
Bldg 36 Curling Club
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00978024
9 Wing B106 Former CANEX site
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00978027
Scrap Compound / Supply Storage Area
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00978029
Building 108 Hoist
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
01822018
Canadian Side & Northside
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
01822043
Hydrant Area Fuel Plumes (HYD9010)
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
01822076
Main Base and Civil Aviation Area
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
01822085
Upper Tank Farm - Fuel Recovery Site (UTF 4000 Series)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
01822086
Survival Tank Farm (STF 3000 Series)
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
01822087
South Escarpment Landfills (SES 1000 Series)
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
01822094
Lower Tank Farm (LTF 2000 Series)
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
02267011
CFS Barrington
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02561001
Granville Range-Granville Ferry
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
02717001
Former Sludge Pit Runway 26 - Greenwood
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
02717002
Former Sludge Pit Adjacent Golf Course - Greenwood
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02717004
POL Compound - Greenwood
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
02717006
MADD Shack Dump Area-Greenwood
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02717007
Active EOD Range - Greenwood
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
02717008
Bldg. 110 Community Centre - Greenwood
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
02717010
CE Storage Area - Greenwood
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
02717012
AMSE paint shop floor drain, Hangar 4 - Greenwood
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
02717013
Armament Area - Greenwood
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
02717015
Hangar 5 - Greenwood
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02717073
Sewage Treatment Plant POL Storage
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
02717082
25 Yard Range
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02717083
Heavy Machinery Practice Area
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02717085
7 Hangar Floor Drains
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02717099
UST #40 B-125 Water Pumphouse
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02717105
Operation Area Soils & GW (11 Hgr)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02717114
Battery Disposal Sump Hangar 8
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02739001
Aldershot Landfill/Former Incinerator
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02739002
Mill Pond and Sewage Lagoons - Aldershot
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
02739003
Former Garage (B46) and Septic Tank Area - Aldershot
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02739011
Former 500yd Range - Aldershot
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
02739014
Former Building 37 Aldershot
Detailed testing completed. Remedial action plan under development. 2022-2023 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
02739026
Former EME Vehicle Maintenance Garage and Sewer - Aldershot
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02762009
Newport Corner (3110) - Sewage Treatment Plant (package)
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02858001
Bedford Rifle Range(701) former pesticide drum disposal area
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02858004
Bedford Rifle Range (704) - Rifle Range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02858005
Bedford Rifle Range (705) - Pistol Range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02858010
Beford Rifle Range (710) - Former Rifle and Skeet Range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02858011
Bedford Rifle Range (714) - Former 1940's Infrastructure
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02859001
CFAD Bedford (801) - Ridge Landfill
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859003
CFAD Bedford (803) - Former Landfill (West of B162)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859009
CFAD Bedford (810) - Otto Fuelling & Defuelling B48
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859010
CFAD Bedford (811) - Former UST's, BM 95 & BM 47*
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859011
CFAD Bedford (812) - Otto Fuel Waste Burning Area BD220
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859014
CFAD Bedford (815) - Central Heating Plant (B190)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859018
CFAD Bedford (819) - Existing Jetty
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859020
CFAD Bedford (821) - Existing Jetty -NN at Wrent Point
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
02859023
CFAD Bedford (824) - Former Heating Plant (B140)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859026
CFAD Bedford (827) - Former Metal Scrap Yard
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859029
CFAD Bedford (809) - Otto Fuel Storage B203
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859032
CFAD East-side property (7403) - Area North of Highway 7
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859033
CFAD UXO Impacted Area (830) - Rent Point explosion
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859046
Navy Island (7501)
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02859050
Wrights Cove (8608) - National Gypsum Leased property
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02859053
Wrights Cove (8607) - Upgradient Industrial Area
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02859054
Wrights Cove (8602) - CN Rail Tracks/Building
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02859055
Water Lots (9901) CFAD Bedford
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02860012
Hartlen Point (5554) - (B156 Old Work Shop)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863001
CFB Shearwater (201) - Landfill 6 - Airfield
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02863003
CFB Shearwater (203) - Incinerator/Fill Site (DIPM Site)
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
02863006
Shearwater (206) Former Barrel site HH (DIPM Site)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02863009
Disposed: Shearwater (209) - Coast Guard Assigned Property
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863010
Shearwater (210) - Fire Fighting Training Area
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863011
CFB Shearwater (211) - Landfill 1
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02863012
CFB Shearwater (212) - Landfill 2
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
02863013
CFB Shearwater (213) - Landfill 3
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863014
CFB Shearwater (214) - Landfill 4
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863016
CFB Shearwater (216) - Fill Area West of Alpha Taxiway
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
02863017
Shearwater (217) - Engine Run Up Area (DIPM Site)
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
02863018
CFB Shearwater (218) - Suspect Burn Pit No 1
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863019
CFB Shearwater (219) - Suspect Burn Pit No 2/Coal Storage
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
02863020
Shearwater (220) - Fill Area South of Hangar H
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863021
Shearwater (221) - Lower Fuel Compound and Firing Range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863022
Shearwater (222A): Former POL (D) & UST (S) at bldg 212 & HY
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
02863023
Shearwater (223) - Building 4 and H (POL)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863024
Shearwater (224): Canex Garage (132), Former Firehall & UST
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
02863026
Shearwater (226) C. Heating Plant (56) & Fuel (rail) Comp.
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863028
Shearwater(228)-B9(Fmr Firehall,Tender Gar)Crown AssetsB70
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02863029
Shearwater(229)-Upr Fuel Cmpnd,Upgradient Dmpg Area
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02863030
Shearwater(230)-Bldg31,31A,31B,32(Mobl Spprt Maint)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863033
Shearwater(233)-Fmr MT Garage(BJ)Adjcnt Trnsfrmr Substn
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863035
Shearwater(235)-Frm Centrl Htg Plnt(G)Trnsfrmr Vault
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863040
CFB Shearwater (240) - West Hangar Line, Fmr UST at B15
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863041
CFB Shearwater (241) - East Hangar Line and Ramp Area
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863042
CFB Shearwater (242) - Hangar 3 and Annex
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863057
CFB Shearwater (245) - Hanger F
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863059
Water Lots (9910), Shearwater
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863061
Shearwater - PMQs, Former Brick Yard (Hornsby's) (234B)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02865002
McNabs Island (2602) - Flammable Stores Building (B5)
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02865004
McNabs Island (2604) - Residence and AST (B10)
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02865006
Water Lots (9903), Bedford Degaussing Range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02865007
Water Lots (9909), McNabs Island
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02884012
Melville Island (5912) - Mooring Field
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
02913001
Water Lots (9911) - HMCS Scotian
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02914001
Halifax Armoury Building (2201) - Main Armoury Building
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02916001
RA Park (3301) - Officers Mess (RA1)
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
02918005
Willow Park (4306) - Utilities Shed (WL15) & Former WL34*
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02918011
Willow Park (4312) - RCCS Garage (WL31)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02918017
Willow Park (4318) - Suspect Fmr Grease/Oil Pit (WL17)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02918018
Willow Park (4319) - Vehicle Maintenance Garage WL22
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02918022
Willow Park (4320) - Salt Dome (WL36)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919001
Dockyard (1001) - CE Office and Shops (D2)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919004
Dockyard (1004) - Mainguy Building (D201)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02919006
Dockyard (1006) - Pollution Control DREA (D17)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02919007
Dockyard (1007) - Sheet metal & Refrig. Shops (D19)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02919010
Dockyard (1010) - Electronics Shop (D20)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02919011
Dockyard (1011) - Inflammable Stores (D57)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919013
Dockyard (1013) - Base Supply (D40 and D155)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919014
Dockyard (1014) - Main Base Supply (D206)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919015
Dockyard (1015) - Underwater Repair building (D53)
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02919016
Dockyard (1016) - Central Heating Plant (D62)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919017
Dockyard (1017) - Outside Fitters and Machine Shop (D108)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919019
Dockyard (1019) - Packing and Preservation Bldg (D67)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919020
Dockyard (1020) - SRU Main Building (D200)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919021
Dockyard (1021) - Submarine Shelter (D170)
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02919023
Dockyard (1023) - Corrosion Prevention & Sub Squadron
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919024
Dockyard (1024) - FMG and SRU (D166)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919025
Dockyard (1025) - Shipwrights Shop (D174)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919029
Dockyard (1029) - Rectifier Building (D47)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919030
Dockyard (1030) - Maritime Command Headquarters (D14)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919031
Dockyard (1031) - Transformers East of Building D14
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02919032
Water Lots (9908) - Dockyard
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02919035
Dockyard (1035) - Former D15
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02919036
Dockyard (1037) - Former D19
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02919037
Dockyard (1039) - Former D95
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919039
Dockyard (1038) - Former D88
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919040
Dockyard (1040) - Former D20
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919041
Dockyard (1033) - Former B122 and 60
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02919042
Dockyard (1042) - Former D159
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919043
Dockyard (1044) - Former D127
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919044
Dockyard (1045) - Former D109
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919045
Dockyard (1046) - Former D63
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919046
Dockyard (1032) - Fomer CN Rail Line btwn parking & building
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919047
Dockyard (1034) - Former D7
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02919048
Dockyard (1036) - Former D17
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919049
Dockyard (1041) - Fomer D49
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02919050
Dockyard (1043) - Former D59
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02920005
Stadacona (3705) - CE Production Centre (S30)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02920009
Stadacona (3708) - Gardens - rear of Bldg S52(Admiral's Res)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02920014
Stadacona (7604) - Queens Printer Bldg S93 Furn./Coal chute
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
03002001
Windsor Park (4502) - Auto Hobby Club WP 87
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
03002002
Windsor Park (4501) - CHP (WP62) & POL Shed (WP58)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03002006
Windsor Park (4505) - PMQ Barracks
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
03009015
Dockyard Annex (1101) - Hazardous Storage Area (W45)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
03009024
Water Lots (9907), Dockyard Annex
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03010001
Water Lots (9906), French Cable Warf
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03011001
Shannon Park (3401) - Central Heating Plant (B4)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03011003
Shannon Park (3403) - Snow Stockpile area, behind (B4)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
03011005
Shannon Park (3405) - Former Storage Building (B5)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
03013004
DRDC (1408) - Waste solvent dumping (East of building 2)
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
03013009
Water Lots (9913), DREA Accoustic Barge
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03042001
West Chezzetcook Bombing Range (5769)
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
03044007
DCD School (907) - Fire Fighting Training Area
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
03044008
DCD School (908) - Contaminated Spoil Fill Area
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
03044010
DCD School (910) - Former Ordnance Demolition Area
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
03044011
DCD School (911) - Construction Debris Site
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
03130001
Truro Armoury (4001) - Armoury Building (B1)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
03144001
Debert Rifle Range (1201) - Rifle/Pistol Range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03288003
New Glasgow Armoury (2901) - Armoury Buidling
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03288004
New Glasgow Armoury (2902) - POL Storage Building
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
03660002
CFS Sydney- FPS Radar Site (1701)- Scrap Stg Compound
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
03660004
CFS Sydney - FPS Radar Site (1703) - Former PCB Storage
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
03662001
Sydney Rifle Range (3801) - Rifle Range
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
03690001
Glace Bay Armoury (1801) - Armoury (B1)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03708001
Victoria Park (4101) - Headquarters Building (B8)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03708003
Victoria Park (4103) - Heating Plant (B11)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
04089001
POL Compound
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
04089007
Mons Small Arms Rifle Range
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
04089008
Fire Fighting Training Area and Adjacent Swamp
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
04089010
Shirley Rd. Dump
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
04089011
POL Service Area - K20
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
04089024
C7 Hobby Shop
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
04089028
Static Range Impact Area
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
04089038
Blissville Airport
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
04089039
Salt and Sand Sheds
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
05613001
Mount Apica - north slope
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
05647014
Montmagny Armoury
Detailed testing completed. Remediation / risk management planned. 2022-2023 N Not a Priority for Action 05 Detailed Testing Program
05750001
St-Malo Armoury
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
05751001
PMQ Old Quebec City
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
05906001
Ground of building 622 (DEV-6) 
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
05906002
Base building 621 
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
05906008
Former Jean-Brillant Snow Dump 
Detailed testing completed. Remediation / risk management planned. 2022-2023 2 Medium Priority for Action 05 Detailed Testing Program
05906010
Biathlon (Myriam-Bédard Centre) 
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
05906011
Forest Station 
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
05906016
Arnhem Firing Range
Detailed testing completed. Remediation / risk management planned. 2022-2023 1 High Priority for Action 05 Detailed Testing Program
05906036
Rivière-du-loup Armoury, Thériault Boulevard
Initial testing completed. Detailed testing underway. 2022-2023 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
05906037
Home base, lift - bldg 110
Detailed testing completed. Remediation / risk management planned. 2022-2023 2 Medium Priority for Action 05 Detailed Testing Program
05906038
Home base, bldg 311, ACI-311 
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
05906040
Training sector, ''AP'' and ''TE'' impact area 
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
05906041
Le RHIN former demolition area
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
05906044
Training areas, former CARPIQUET firing range
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
05906047
Former dump Château Road
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
05906052
Training areas, BOFFIN firing range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
05906053
Training areas, TERMOLI firing range
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
05906054
Training areas, LIRI Impact
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
05906058
Building 310
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
05906059
Castor center PHL T-610
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
05906060
AFFF Heliport
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
05906061
Land adjacent to the former well P-2 
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
05928001
Building 1 - Levis Armoury
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
06294001
Adminstrative Area-Domaine, Lozeau and Bougainville Islands
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
06651003
Demolition site, CEF Farnham
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
06679001
Hydraulic elevator H-101, ASU St-Jean 
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
06679002
Former Garage and service station, ASU St-Jean 
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
06679007
St-Jean Garrson, Used snow site near H104 (2A) 
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
06679009
St-Jean Garrson, Used snow site (2B) 
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
06680004
Royal Military College, Former reservoir T20 (building 102)
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
06710016
St-Hubert, playing field, reservoir T-40 
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
06710017
St-Hubert, Hangar 3, hydraulic elevators 
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
06872002
Moras Island
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
06872038
Sector OP-1 to OP-6
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
06875001
Camp Bouchard, Ex Ammo Dump
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
06972001
Pointe-Picard Marina - Marine sediments
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
07221008
Used snow sites, ASU LP 
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
07930004
Aerodrome - West of runway 18-36 
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
07930006
Former landfill site
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
07930007
FFTA & PFAS Bagotville
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
07930009
POL tank farm
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
07930011
Central Heating Plant 
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
07930012
Landfarming site 
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
07930013
Former 161 kV electrical substation - Building 111
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
07930014
Former sewage treatment plant - Building 118 
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
07930015
New destruction centre for explosives - New EOD
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
07930016
Former demolition centre for explosives - Former EOD
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
07930017
Marsh - North of highway 170 
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
07930018
Bowser maintenance shop - Building 77
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
07930019
Cadet camp-Former dry material disposal site
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
07930021
Former B-244 APU location 
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
08598005
Connaught Range Primary Training Ctre Former Transport Comp.
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
08598006
Connaught Range Primary Training Centre Former Landfill Site
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
08598007
Connaught Range Primary Training Centre - Building 36
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
09406001
Soil remediation Site/Abandoned Landfill, Gore Training Area
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
09406002
600 Yard Rifle Range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
09406006
75 Yard Small Arms Classification Range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
09406008
Abandoned Landfill - McNaughton Barracks
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
09407007
B24 Vimy Hydraulic Hoist
Detailed testing completed. Remedial action plan under development. 2022-2023 I Insufficient Information 06 Classify the site using the CCME National Classification System
09445001
Fort Frontenac Water Lots
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
09445002
Fort Frontenac Courtyard
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
09540005
EME Shop, Bldg 113 and Skeet Range
Detailed testing completed. Remedial action plan under development. 2022-2023 1 High Priority for Action 06 Classify the site using the CCME National Classification System
09540009
Middleton Park Landfill Site
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
09540010
AMDU Landfill Site
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
09540012
8 W Fire Fighting Training Area /Hazardous Materials Storage
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
09540016
Area of Bldg 163 & 201
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
09540020
POL Compound - area of removed tanks
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
09586002
Pt Petre - Previous artillery range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
09596001
Carrying Place north of bldg.
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
10626002
Niagara-on-the-lake Rifle Range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
10829001
Stony Point (fmr Camp Ipperwash)
Detailed testing completed. Remedial action plan under development. 2022-2023 1 High Priority for Action 06 Classify the site using the CCME National Classification System
10868001
TCE Contamination - Highbury Complex
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
10869001
Wolseley Barracks
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
10885001
HMCS Prevost Marina
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
10885002
HMCS Prevost Armoury
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
10992001
Garrison Landfilll; Closed
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
11022001
Roundel EOD Range
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
11022032
Borden Landfill
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022035
Castle EOD Range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
11022038
Amiens Rifle Range
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
11022039
Fire Fighting Training Area #1
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
11022042
Vimy Rifle Range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
11022043
Mons Rifle Range
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
11022044
Langemark Range
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
11022068
Petroleum Contaminated Soil Pile
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
11022121
Foxfield Battle Assault Range
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
11378001
22 Wing RV Compound
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
11378002
22 Wing Former POL Tank Farm
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
11378005
22 Wing 25m Outdoor Range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
12439001
Inactive Landfill
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
12439007
Rifle Range 3 (small arms)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
12448002
Incinerator Site
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
12577001
St-Charles Range
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
12579001
17 Wing Bulk Fuel POL & B82 Pumphouse
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
12579004
17 Wing Former Building 87
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
13820001
15 Wing B58 & EME Shop Test Site 2
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
14121002
Small Arms Ammunition Destruction Complex
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
14121004
Burdick Range
Detailed testing completed. Remedial action plan under development. 2022-2023 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
14121005
Dundurn Demolition Area
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
14876001
Landfill Site 34
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
14876002
Landfill Site 35
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
14876004
Landfill Site 31
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
14876005
Landfill Site 32
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
14976006
Cdn Abandoned Landfill Site (CAL Site)
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
14976008
DRES Low Radioactive Waste Burial Site - EPG
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
14976011
DRES 25 Pounder Gun Tower - EPG
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
14976013
DRES 490 West Area (EPG) Coyote & Rabbit RDS (DRES site 6a)
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
14976014
DRES Radioactive Liquid Spill(Near Fraggle Rock)-AtomicVault
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
14976016
DRES Willis Centre - EPG
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
14976042
490 Site - 604 Layout (EPG) Coyote & Rabbit Rds
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
14976044
DRES 155mm Gun Tower - EPG
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
14976054
DRES 490 Inner Compound Building area
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
14976055
DRES Chemical Mixing Dumpsite
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
14976056
DRES Willis Center Trench
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
14976057
DRES Range and Accuracy Layout
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
14976058
DRES Cameron Center
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
14976062
Serial 19 Trenches (WAD Site B)
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15305004
Constructed Fire Training Area
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
15305006
Dump on Shore of Bushy Head Lake
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
15305009
Former Firing Range 7
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15531009
SAC Site
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
15680002
42 Radar Squadron (Cold Lake)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
15684001
4 AES Runway Training Pad / ATCO Pipeline
Detailed testing completed. Remedial action plan under development. 2022-2023 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
15684008
Base POL Farm
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
15684009
Firefighter Training Area
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
15684010
Old Imperial Oil Service Station
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
15684011
Building 111
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
15684012
Building 170
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15684013
Dry Cleaning
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
15684015
Small Arms Range
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15684017
Building 83
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
15684018
Skeet Range
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
15684020
TAC POL Farm
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
15684026
4 Wing Landfarm
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
15684030
Auto Hobby Club B168
Initial testing completed. Detailed testing underway. 2022-2023 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15684036
Landfill Site 6
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15684037
Landfill Site 8 (A/C Burial Site)
Initial testing completed. Detailed testing underway. 2022-2023 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15684038
Landfill Site 1
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
15684039
Central Heating Plant Investigation
Initial testing completed. Detailed testing underway. 2022-2023 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15729007
300 Meter Range (active)
Detailed testing completed. Remediation / risk management planned. 2022-2023 I Insufficient Information 05 Detailed Testing Program
15729008
Landfill Site 28
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15729009
Landfill Site 29
Initial testing completed. Detailed testing underway. 2022-2023 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15730001
PLER POL
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
15730002
Jimmy Lake Range
Detailed testing completed. Remediation / risk management planned. 2022-2023 2 Medium Priority for Action 05 Detailed Testing Program
15730003
Shaver River Range
Detailed testing completed. Remediation / risk management planned. 2022-2023 I Insufficient Information 05 Detailed Testing Program
15730005
F-18 A/C Site
Remedial action plan completed. Remediation / risk management underway. 2022-2023 I Insufficient Information 07 Develop Remediation/Risk Management Strategy
16506001
Slesse Demolition Range
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
16506002
General Vokes Range
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
16568001
ALD-1 Aldergrove Former Sewage Lagoon
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
16568002
ALD- 2 Aldergrove Former Skeet Range
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
17132004
PB-2 Pat Bay Hangar 17 Area
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
17178003
HRR-2 Heals Rifle Range Former Grenade & Trap Shooting Range
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
17402009
WP-4n Work Point Dry Storage Area
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
17403003
DY-4 Dockyard FMF Consolidation
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
17403007
DY-1AG Dockyard B Jetty Fill
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17403011
ESQ-1 - Esquimalt Harbour
Detailed testing completed. Remediation / risk management planned. 2022-2023 1 High Priority for Action 05 Detailed Testing Program
17404001
DY-3 Dockyard Signal Hill Hood Bldg & Parking Lot
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
17430001
MH-1 Mary Hill Machine Shop Area
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17430002
MH-3 Mary Hill Former Rifle Range Area
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17430004
MH-4 Mary Hill Battery
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
17430006
MH-2 Mary Hill Former Rocket Range
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
17431002
AH-5 Albert Head- Grenade Range (Active Site)
Detailed testing completed. Remediation / risk management planned. 2022-2023 2 Medium Priority for Action 05 Detailed Testing Program
17432001
RP-1 Rocky Point CFAD Active Propellant Burn Area
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
17432004
RP-2a Rocky Point Active Explosive Ordnance Disposal
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
17432010
RP-2b Rocky Point Former Landfill B
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
17432011
RP-3ad Rocky Point Small Arms Slag Dump Former Landfills
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
17451002
COL-1B-1L Colwood Supply Area Bunkers 44, 45 & 48
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
17451004
COL-14 Colwood Supply Area Bldg 93 & 112
Detailed testing completed. Remedial action plan under development. 2022-2023 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
17451005
COL-16 Colwood Supply Area Building 66A
Detailed testing completed. Remedial action plan under development. 2022-2023 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
17451008
BP-1 Belmont Park - Former Canex Gas Station at Building 15
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17451013
COL 4 Colwood Fire Fighting Training Area
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
17451023
BP-1b Belmont Park - Former Canex Gas Station at Building 17
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
17452014
RRU-3 Royal Roads University Boathouse Area
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
17966001
Seal Bay Transmitter Site
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
17970001
High Speed Refueling Compound
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
17970003
Refuelling Vehicle Compound near B-100
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
17970012
Comox FFTA (non-PFAS)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
17970014
Upper Tankfarm
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
18704002
Vernon Mt Commonage 300m Rifle Range
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
18976001
Power Plant at Det Holberg
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
20247006
Alert Main Station
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
20247025
Alert TX Site
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
20247029
Alert Airfield
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
20612001
Float Dock 440 Sqn Yellowknife
Detailed testing completed. Remediation / risk management planned. 2022-2023 2 Medium Priority for Action 05 Detailed Testing Program
29757001
Small calibre (Former dump), DRDC-South 
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
29757002
Dry material (former dump for), DRDC-South 
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
29757003
Atmosphere simulation (former dump), DRDC-South 
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
29757005
Sector for bldg 307, DRDC-Trials
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
29757006
''MDR'' (former dump for), DRDC-Trials 
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
29757007
TCE Contamination- Valcartier
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
29757008
Dry material 2,500 m (former dump for), DRDC-Trials
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
29757009
Plateau (demolition site), DRDC-Trials 
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
29757012
Former stop-butts 341-316, DRDC-South (S14) 
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
29757014
South Outfall, DRDC-South 
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
29757016
Former Firing Temp for SNC Tec site (ZIP 1), Donnacona Block
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
29757017
Former firing temp formed by Donnacona Block (ZIP 2) 
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
29757020
Former Impact Area (rebound/ricochet) Donnacona Blck(ZIP 5) 
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
29757022
Former stop-butt for building 235, DRDC-South 
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
29757024
North Outfall, DRDC-North 
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
29757025
Stop-butts 207 and 211, DRDC-South (S6) 
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
29793001
Former Red Route Dump East Site
Detailed testing completed. Remediation / risk management planned. 2022-2023 2 Medium Priority for Action 05 Detailed Testing Program
32044002
CFS St Johns (5210) - Shea Height's Tank Farm
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
32046002
Pier 26 (5301) - British Property Site 7c (Cabot Boatshed)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
32047002
Pier 27 (5302) - Brit. Prop. Site 7c
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
34337002
VIC-1 HMCS Malahat Waterlot
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
34422006
BAF-3 Brevoort Island LRR
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
34430001
Northern Fuel Cache Site - Resolution Island
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
34452001
BAR-BA3 SRR (Storm Hills, NWTel Parson's Lake) Site Summit
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
34476004
Mtn View - Inner Landfill Site
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
36056001
Water Lots (9912), Navy Buoys
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
52107001
Water lots(9905),Harbour Front (Naval staff house)
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
58321001
Hunt Club Road Pinestand Property, Ottawa Airport
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
58321002
Pipeline (near Tank Farm), 7 Wing CFB Ottawa
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
58321003
Former Central Heating Plant (Building 309), Uplands
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
58321009
Uplands Self-Help Housing Maintenance Compound
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
58322001
Golf Course Maintenance Compound (401), CFB Ottawa (south)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
58374001
Trail Stoney Creek Training & Demolition Area
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
58520001
Rimouski Naval Reserve, Montée Industrielle street
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
58520002
Rimouski Naval Reserve, boathouse
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
69613001
LAB-3 SRR (Cape Kiglapait) Summit
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
69735001
Trail - Casino Ranges
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
69765001
CAM-2 SRR (Gladman Point) - Site Summit
Remedial action plan completed. Remediation / risk management underway. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
69766001
CAM-D SRR (Simpson Lake) - Site Summit
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
69775001
FOX-B SRR (Nadluardjuk Lake) - North-West of site summit
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
69920001
HMCS Champlain - Chicoutimi Naval Reserve
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
69968001
FOL IQALUIT - Nose dock hangar (T-325)
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 I Insufficient Information 08 Implement Remediation/Risk Management Strategy
70019001
FOX-M LRR (Hall Beach, NU - Landfill)
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
70069014
Eureka - North Airstrip Apron
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70070001
CAM-M LRR (Cambridge Bay, NU - Landfill)
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
C7007001
DEW-Line: BAR-1 Komakuk Beach
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7008001
DEW-Line - BAR-2 Shingle Point
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7009001
DEW-Line - BAR-3 Tuktoyaktuk
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7010001
DEW-Line - BAR-4 Nicholson Peninsula
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7011001
DEW-Line - PIN-M Cape Parry
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7012001
DEW-Line - PIN-1 Clinton Point
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7013001
DEW-Line - PIN-2 Cape Young
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
C7014001
DEW-Line - CAM-M Cambridge Bay
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7015001
DEW Line - PIN-4 Byron Bay
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7016001
DEW-Line - PIN-3 Lady Franklin Point
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7017001
DEW-Line - CAM-1 Jenny Lind Island
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7018001
DEW-Line CAM-2 Gladman Point
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7019001
DEW-Line - CAM-4 Pelly Bay
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7020001
DEW-Line - CAM-5 Mackar Inlet
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7021001
DEW-Line - FOX-M Hall Beach
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7022001
DEW-Line-FOX-2 Longstaff Bluff
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7023001
DEW-Line - FOX-3 Dewar Lakes
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7024001
DEW Line FOX-4 Cape Hooper
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7025001
DEW Line-FOX-5 Broughton Island
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7026001
DEW-Line - DYE-M Cape Dyer
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7027001
DEW-Line - CAM-3 Shepherd Bay
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
N7019001
Northern Fuel Cache Site - Cartwright (Chopper Pad site)
Initial testing completed. Detailed testing underway. 2022-2023 1 High Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
N7040001
Saglek Bay Sediments
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
N7060001
Former Red Route Dump
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
N7070001
Fire Fighting Training Area
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
N7071001
Bldg 187
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
N7075001
Dome Mountain, RCAF and Camp Sites (5 W)
Detailed testing completed. Remedial action plan under development. 2022-2023 1 High Priority for Action 06 Classify the site using the CCME National Classification System
N7077001
Main Gate & Hamilton River Road Plume (UPL 16000 series) 5W
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
N7083001
BAR-E SRR (Horton River) - Site Summit
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
N7087001
5 Wing Practice Target Area
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
N7096001
Former CFS Moisie - Site Admin
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting