ARCHIVED - 2007-2008 DPRs - Details on Project Spending

Warning This page has been archived.

Archived Content

Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.




Agriculture and Agri-Food Canada

Table 6: Details on Project Spending 1


Projects over $5 million Current 
Estimated Total Cost2
2005-2006 2006-2007 2007-2008
Actual Spending Actual Spending Main
Estimates
Planned
Spending
Authorities Actual Spending
Ontario (Ottawa),
Skyline Campus 3
(Project Close Out Phase)
14.1 1.7 1.4 1.9 1.9 1.1 1.1
Projects With Specific Program Activities:  
Business Risk Management  
Enhancements to the Delivery Systems for the Business Risk Management Programs under the Agricultural Policy Framework
(Project Definition Phase)4
125.0 6.5 3.8 - - 16.2 5.0
Total Business Risk Management 125.0 6.5 3.8 - - 16.2 5.0
   
Environment  
Saskatchewan (Swift Current), Duncairn Dam/Water Infrastructure Upgrades
(Project Close Out Phase)4
10.0 1.0 0.1 - - 0.0 0.0
National Land and Water Information Service (NLWIS)
(Project Definition Phase)
100.1 14.9 21.3 28.3 28.3 25.3 25.3
Saskatchewan (Maple Creek), Junction Dam Rehabilitation
(Project Construction Phase)
7.3 0.6 0.1 6.0 6.0 3.9 3.9
Manitoba (Winnipeg), St.Boniface General Hospital
(Project Close Out Phase)
5.7 1.4 2.9 0.9 0.9 0.6 0.6
Total Environment 123.1 17.9 24.4 35.2 35.2 29.8 29.8
         
Innovation and Renewal        
Quebec (Lennoxville), Dairy Research Facility
(Initial Planning and Identification Phase)5
10.0 0.2 0.3 5.2 5.2 0.5 0.5
Ontario (Ottawa), Greenhouse and Growth Chamber Facility
(Initial Planning and Identification Phase)6
10.9 0.7 2.1 7.3 7.3 7.6 7.6
Total Innovation and Renewal 20.9 0.9 2.4 12.5 12.5 8.1 8.1
         
Total for Projects over $5 million 283.1 27.0 32.0 49.6 49.6 55.2 44.1

Notes:

1 All current approved projects with an estimated value of over $5 million are listed in this table.

2  The Current Estimated Total Cost number includes both expenditures made in previous years and expenditures for 2007-2008 and beyond.

3  Skyline Campus figures reflect only those costs to be funded through AAFC reference levels. This project is corporate in nature and pertains to all Program Activities.

4 Project work for the Business Risk Management Program Delivery System was delayed due to uncertainty surrounding the approval of funding

5 Final clean-up on Duncairn dam was completed in 2007/08.

6 Actual spending for the Dairy Resaerch Facility is lower than planned due to delays in construction in 2007-08. Actuals costs have been incurred for plans and estimates.

The figures in the above table have been rounded to the nearest millions of dollars. For this reason, figures that cannot be listed in millions of dollars are shown as 0.0.

Due to rounding, figures may not add to the totals shown.

Top of Page

Canada Border Services Agency

Details on Project Spending

Table 3.9: Details on the CBSA’s Project Spending


(Thousands of dollars)
Program Activity  Current Estimated Cost 2005–2006 Actual 2006–2007 Actual 2007–2008
Main Estimates Planned Spending [2] Total Authorities [3] Actual
             
Projects – Close-out
Clarenceville, Que. 1,385 125 12 80 80 80 79
Revenue ledger 2,232         2,700 2,232
Projects – Implementation
Andover, N.B. 6,445 264 4,208 820 820 953 953
Cascade, B.C. 2,980 227 2,043 167 167 148 148
Douglas, B.C. 44,000 4,209 12,765 19,243 19,243 15,253 14,761
Emerson West, Man. 12,658 5 3 5 5    
Lacolle, Que. 1,586   440 1,305 1,305 2,004 2,004
Stanstead Route 55 (Rock Island), Que. 18,000 8,238 1,398 373 373 171 171
NEXUS Air expansion 58,448     13,095 13,095 13,095 12,793
Business resumption program 23,963     7,075 7,075 7,551 7,551
Projects – Initial Planning and Identification
St. Stephen, N.B. 21,509 66  535 1,520 1,520 5,160 4,865
Rigaud, Que. 54,000   318 2,412 2,412 861 861
Fraser, B.C. 1,400   144 1,040 1,040 953 949
Aldergrove, B.C 15,000 10 6 150 150    
Enhancing road and rail cargo security – eManifest 396,001     98,532 123,267 98,532 36,353
Canada–U.S. Harmonized Risk Scoring/Advance Trade Data 30,996     6,222 6,222 6,222 2,206
Passenger Name Record Push initiative 53,157     13,835 13,835 13,835 6,716
Electronic Primary Inspection Line 2,724         2,518 518
Air Cargo Security 12,100     3,700 3,700 3,700 2,999
Total 758,584 13,144 21,872 169,574 194,309 173,736 96,159

[2] Planned spending comprises Main Estimates.

[3] Total authorities comprises Main Estimates, Supplementary Estimates and internal transfers.
Top of Page

Canada Revenue Agency

Table 6 Details on Project Spending


 
 
(in thousands of dollars)
 
 
2007-2008
Initiative Name
2006-2007 Actual
Prior Years’ Expenditures to March 31, 2007
Planned FTEs
Planned Spending
Actual FTEs
Actual Spending
Assessment and Benefit Services Branch
 
 
 
 
 
 
 
GOL – My Business Account
3,074
4,474
48
3,777
48
3,130
 
GOL – Third Party Privilege Management[Footnote 1] 
602
4,532
16
1,183
16
761
 
Individual Identification Renewal
1,973
2,784
56
6,564
56
5,806
 
GST/HST Redesign[Footnote 1]
43,513
151,531
190
23,543
170
21,983
 
T3 Redesign
350
350
8
628
409
 
 
Sub-total[Footnote 2] 
49,512
163,671
318
35,695
290
32,091
Taxpayer Services and Debt Management Branch
 
 
 
 
 
 
 
Integrated Revenue Collections
17,700
46,051
221
21,591
197
21,500
 
Payroll Deductions Accounting and Collections Renewal
1,180
2,794
21
1,975
24
1,456
 
Non-Tax Collections Integration
2,900
5,022
69
4,000
20
2,008
 
 
Sub-total[Footnote 2]
21,780
53,867
311
27,566
241
24,964
Compliance Program Branch
 
 
 
 
 
 
 
Compliance Systems Redesign
8,736
26,691
96
10,300
74
8,217
 
Enterprise Work Management
3,863
3,863
103
13,000
60
6,657
 
 
Sub-total[Footnote 2]
12,599
30,554
199
23,300
134
14,875
Appeals Branch
 
 
 
 
 
 
 
Taxpayer Relief Registry Redesign project (formerly Fairness Management Information System)
289
289
0
523
523
 
 
Sub-total[Footnote 2]
289
289
0
523
0
523
Public Affairs Branch
 
 
 
 
 
 
 
Intranet Renewal
700
1,441
39
3,893
39
3,754
 
Publishing Content Management Solution
2,118
3,543
9
2,440
9
2,292
 
 
Sub-total[Footnote 2]
2,818
4,984
48
6,333
48
6,047
Information Technology Branch
 
 
 
 
 
 
 
Business Intelligence/Decision Support
2,967
10,802
3
3,000
3
887
 
Security Modernization Program
4,625
12,154
16
6,146
16
5,776
 
Data Centre Recoverability
3,689
44,626
11
5,300
11
3,132
 
Service Availability
3,065
38,083
0
0
0
0
 
Data Center Facilities
2,260
4,193
3
2,431
3
2,424
 
Corporate Administrative Systems Sustainability
460
460
0
1,502
0
1,411
 
Data Stewardship
592
786
0
350
0
252
 
Managed Distributed Environment
8,675
17,415
16
7,703
16
7,547
 
Network Services Enhancements
3,018
5,218
4
1,881
4
1,864
 
 
Sub-total[Footnote 2]
29,351
133,737
53
28,313
53
23,294
Finance and Administration Branch
 
 
 
 
 
 
 
Financial Information Strategy – Revenue Ledger Strategic Plan (formerly FIS Development Phase 2)
415
21,502
2
200
2
89
 
Enhanced Travel Management Solution
547
547
0
40
0
40
 
 
Sub-total[Footnote 2]
962
22,049
2
240
2
129
Human Resources Branch
 
 
 
 
 
 
 
Agency Classification Standard
3,392
6,470
50
5,300
50
2,742
 
Compensation Service Delivery Renewal
10,400
53,177
43
3,000
43
3,000
 
 
Sub-total[Footnote 2]
13,792
59,647
93
8,300
93
5,742
Total
131,103
468,798
1,024
130,270
861
107,665

[Footnote 1] Prior Years’ Expenditures to March 31, 2007 have been restated to more accurately reflect the total spending attributable to these initiatives.
[Footnote 2] Any discrepancies in the sum of Sub-total amounts can be attributed to rounding.
Top of Page

Canada School of Public Service

Table 5: Details on Project Spending


  Current Estimated Total Cost Actuals 2006-2007 Main Estimates Planned Spending Total Authorities Actuals
Corporate Level Services:
Registration Systems Project Definition - PPA $1,341 $773 $369 $369 $610 $551
Registration Systems Project Implementation - EPA $4,039 $0 $2,335 $2,335 $2,276 $0
Total $5,380 $773 $2,704 $2,704 $2,886 $551

Top of Page

Canadian Human Rights Commission

Table 4: Details on Project Spending ($ thousands)



  Current Estimated Total Cost 2002-2007

2007-2008

Actual
Spending
Main
Estimates
Planned
Spending
Total
Authorities
Actual
Spending
Dispute Resolution and Discrimination Prevention
Case Audit and Initiative management system (previously Case Management Technology project)
1,400 954 450 450 566 589

Phase 4- Implementation of the Case and audit management system


Top of Page

Canadian Space Agency

3.3.4) Details on Project Spending


($ in millions) Current
Estimated
Total Cost
Actual
2005-2006
Actual
2006-2007
2007-2008
Main
Estimates
Planned
Revenue
Total
Authorities
Actual
Space Based Earth Observation
(Q) RADARSAT-1 (MCP) 723.1 8.1 8.2 11.2 8.8 11.4 7.5
(BC-Q) RADARSAT-2 (MCP) 418.6 17.0 10.6 18.5 12.3 17.3 12.9
(O-Q) SWIFT - CHINOOK (PPA) 1 93.1 1.5 0.9 16.8 18.3 10.0 0.8
(BC-M-O-Q) SAR CONSTELLATION (PPA) 143.2 4.7 8.2 33.8 32.2 33.7 2.6
Space Science and Exploration
(BC) APXS (EPA) 8.7 - 4.0 5.2 1.4 4.1 3.1
(O) JWST (MCP) 134.7 8.3 22.2 34.1 23.3 32.1 30.3
(O) MARS PHOENIX (EPA) 27.8 11.9 6.7 1.7 0.5 1.5 0.8
(O) NEOSSAT (EPA) 5.4 - 0.1 4.5 2.1 5.5 2.1
(O) UVIT (EPA) 5.7 1.3 1.5 2.8 2.7 3.0 1.0
Satellite Communications
(O) M3MSAT (PPA) 5.4 - 0.0 - - 0.1 0.1
TOTAL 1565.9 52.8 62.4 128.6 101.5 118.7 61.1



Notes:

  • Due to rounding, figures may not add to totals shown.
  • Difference between Total Authorities and Actual Spending is mainly due to re-profiling of funds from 2007-2008 to 2008-2009, 2009-2010 and 2010-2011 associated with the management of Capital Projects.


Provinces where the capital project
will be carried out
:
O = Ontario
Q = Quebec
BC = British Columbia
M = Manitoba

Class of Project:
MCP = Major Crown Project
EPA = Effective Project Approval
PPA = Preliminary Project Approval


1 SWIFT - CHINOOK (PPA): Project under redefinition.

Top of Page

Correctional Service Canada

Table 7 - Details on Project Spending

Capital Projects by Program Activity ($ millions)


Program Activity Current
Total Estimated
Cost
Actual
2005-2006
Actual
2006-2007
2007-2008
Main Estimates Total
Planned Spending
Total
Authority (1)
Actual
Care & Custody              
A. New Accommodation Projects (2)              
RHC Pacific Expansion 71.5 0.1 0.0 0.0 0.0 0.0 0.0
Archambault New CRSM & Redevelopment 33.0 0.4 0.1 1.8 1.8 1.8 0.7
Saskatchewan Pen 96-Bed Maximum Unit 21.7 0.0 6.3 9.0 12.0 9.0 11.2
Edmonton 96-Bed Maximum Unit (unapproved) (3) 33.5 0.0 0.0 0.5 0.5 0.5 0.0
Kent 96-Bed Maximum Unit 23.1 0.0 0.6 13.4 15.0 13.4 10.8
               
B. Major Asset Preservation              
Springhill Institution Refurbish/ Replace 32.2 7.9 9.2 2.1 2.3 2.1 0.7
Collins Bay Refurbish/ Replace 57.6 22.0 19.1 7.4 5.4 7.4 3.0
Cowansville Refurbish/ Replace 49.5 0.6 4.2 18.8 18.5 18.8 0.9
Saskatchewan Pen Refurbish/ Replace (4) 180.0 1.2 0.0 7.0 7.0 7.0 0.0

(1) Main Estimates plus Supplementary Estimates and other authorities.
(2) CSC's delegation authority level is $18 million according to TB decision of December 14, 1995; therefore, only capital projects with total estimated cost of $18 million or above have been listed.
(3) The Edmonton 96-Bed Maximum Unit had been planned prior to the issue of the CSC Transformation Study Report, and inserted into the Report on Plans and Priorities for 2007-2008; it is not approved at this time.
(4) Saskatchewan Penitentiary Refurbish/Replace funding is beyond the Department's current reference level; the project requires approval and funding from Treasury Board of Canada, if supported.
Top of Page

Courts Administration Service

Table 4: Details on Project Spending

(in $ millions)


Current Estimated Total Cost Actual
2005-2006
Actual
2006-2007
2007-2008
Main Estimates Planned Spending Total Authorities Actual
Corporate Services
Lorne Building Project1 1.6 0 0 0 0 0 0.1
Case Management System2 2.9 0 0 0 0 0 0.2

Notes:

  1. The Lorne relocation project consists of the complete retrofit of the 4th, 5th and 6th floor in the Thomas D'Arcy McGee building. This fit-up allow 160 employees to be relocated from the Lorne building to the TDM building. All project costs including the in house purchases have been budgeted in the 1.6 million allocated to the project.
  2. The Case Management System provides access to all information necessary by the registries of the courts. It is a web based computer system that follows the rules of the courts and allows the cases of each court to be implemented effectively. The scope and definition of this project has evolved over the past year to be clearly associated with case management only.
  3. All costs include Employee Benefit Plans.
Top of Page

Environment Canada

Details on Project Spending

This table identifies the Department's projects that are exceeding the delegated project approval level and the amount of resources expended.






2007-2008
($ millions) Current
Estimated
Total Cost
Actual
2005-2006
Actual
2006-2007
Main
Estimates
Planned
Spending
Total
Authorities
Actual

Improved knowledge and information on weather and environmental conditions influence decision-making
Weather station construction Eureka, Nunavut - Generator Replacement Phase (EPA) (Project Implementation) 15.4 1.8 0.1 1.8 1.8 1.8 1.5
Hydrometric Program (EPA) (Project Close-out) 10.0 0.1 0.0 0.0 0.0 0.0 0.0
Canadian Meteorological Centre - Facility Extension (EPA) (Project Close-out) 8.3 0.1 0.0 0.0 0.0 0.0 0.0
Supercomputer Facility Upgrade to Electrical and Cooling Capacity (EPA) (Project Implementation) (1) 6.1 0.1 1.2 5.0 5.0 5.0 2.5
Modernization of the Climate Observing Program (EPA) (Project Implementation) 8.6 1.4 1.0 0.6 0.6 0.6 0.6
UPS Replacement - Dorval Facility (EPA) (Project Implementation) 10.6 0.0 0.1 1.4 1.4 1.4 0.2








Total Projects 59.0 3.5 2.4 8.8 8.8 8.8 4.8

Totals may differ between and within tables due to rounding of figures.

This Table lists major projects by program activity exceeding the departmental project approval. Environment Canada's delegated authority is $2.5M for general projects, $2M for new technology (with a $5M replacement limit) and $2.5M for real property projects. All of the major projects listed have received Effective Project Approval (EPA). EPA implies Treasury Board's approval of, and expenditure authorization for, the objectives of the project implementation phase. Sponsoring departments and agencies are to submit for EPA only when the scope of the overall project has been defined and when the estimates have been refined to the substantive level.

(1) Delays encountered by the architects during the design phase of the project delayed the start of the construction phase, which is the phase where most of the expenditures are incurred.

GST is included in these actual expenditures.

Top of Page

Fisheries and Oceans Canada

Details on Project Spending

The Department's project approval authority is:

  • $2 million for new Information Technology projects;
  • $5 million for replacement Information Technology projects; and
  • $20 million for all other projects.

DFO has nine projects that exceed delegated project approval levels.

In the table below, S-EPA refers to Substantive - Effective Project Approval, I-PPA to Indicative - Preliminary Project Approval.

 

(Figures in millions of dollars)


Program Activity/Province/Project Current Estimated Total Cost Actual 2005-2006 Actual 2006-2007 Main Estimates 2007-2008 Planned Spending 2007-2008 Total Authorities 2007-2008 Actual 2007-2008

Canadian Coast Guard
Quebec
Acquisition of Air Cushion Vehicle
(S-EPA)
27.9 0.2 2.6 11.8 11.8 6.9 6.9
Multi-Province
Offshore Fisheries Research Vessel
(I-PPA)
187.0 0.3 0.5 32.3 32.3 1.0 1.0
Mid-Shore Patrol Vessels (S-EPA) 212.5 0.6 1.7 19.8 19.8 2.8 2.8
National Communications Control System - Marine Communications and Traffic Services Modernization (I-PPA) 42.1 0.3 0.3 11.0 11.0 0.3 0.3
Search and Rescue Lifeboat Replacement - Phase II (S-EPA) 41.1 5.3 1.1 0.5 0.5 1.1 1.1
Automatic Identification System - Security Funding (S-EPA) 20.0 1.0 1.0 7.0 7.0 1.0 1.0
Configuration Management and Technical Data Management System (I-PPA) 10.4 0.2 4.3 4.3 0.2 0.2
Program Enablers - Information Management and Information Technology
Multi-Province
IMIT - Security Enhancements (S-EPA) 6.8 1.3 1.1 0.8 0.8 0.7 0.7
Program Enablers - Real Property Safety and Security
New Brunswick
St. Andrews Biological Station - New Science Building and Web Lab Construction (S-EPA) 54.9 2.0 0.3 8.9 8.9 0.5 0.5

Top of Page

Indian Residential Schools Resolution Canada

Table 3: Details on Project Spending


  Current Estimated Total Cost Actual 2005-
2006
Actual 2006-
2007
2007–2008
Main Estimates Planned Spending Total Authorities Actual
Program Activity:
Claims Resolution
             
Project name and project phase: SADRE 11.767 1.063 1.360 N/A 2.8 N/A 2.993

Top of Page

National Defence

Table 4a: Details on Project Spending (Capital Equipment Program) Greater than $30M

Projects listed in the table below have been identified as either: (1) projects in which the estimated expenditure exceeds the delegated approval authority granted to DND by the Treasury Board ($30 million with substantive cost estimates), or (2) projects in which the risk is particularly high, regardless of the estimated amounts.


PROJECT NUMBER

PROJECT TITLE

PHASE

Main Estimates 2007-2008 Total Estimated Cost

Current Estimated Total Cost ($000)

Previous Expenditures to end
 2006-2007
($000)

Planned Spending
2007–2008 ($000)

Actual Spending
2007–2008 ($000)

VARIANCE ($000)

Program Activity: GENERATE AND SUSTAIN RELEVANT, RESPONSIVE AND EFFECTIVE COMBAT-CAPABLE INTEGRATED FORCES
MARITIME EFFECTS

1216

Arctic/Offshore Patrol Ship

D

42,800

42,434

0

1,689

2,001

-312

1487

Canadian Towed Array Sonar System

C/O

120,926

120,651

120,651

275

0

275

2549

Canadian Submarine Capability Life Extension

I

869,832

887,856

753,719

54,462

43,212

11,250

2573

Maritime Environmental Protection Project

I

55,507

55,507

46,610

2,300

1,834

466

2586

Halifax Class Modernization/Frigate Life Extension (FELEX)

D/I

22,952

800,951

9,272

14,480

10,728

3,752

2640

Evolved Sea Sparrow Missiles

I

504,000

504,000

486,443

5,253

2,088

3,165

2664

Advanced Electro-optic Sensor

I

240,528

240,499

77,290

44,766

40,586

4,180

2673

Joint Support Ship

D

37,525

50,173

15,884

27,400

23,308

4,092

2796

YAG 300 Training Vessel Replacement

I

99,020

98,840

49,937

20,687

27,621

-6,934

TOTAL MARITIME EFFECTS

 

1,993,090

2,800,911

1,559,806

171,312

151,378

19,934

LAND EFFECTS

58

Wheeled Light Armoured Vehicle Life Extension

I

159,250

160,454

74,482

21,533

16,753

4,780

84

Army GPS Equipment Replacement

I

43,963

40,509

26,306

9,653

6,368

3,285

224

Defence Information Broker

I

37,910

44,047

18,007

14,074

13,877

197

1017

Lightweight 155mm Towed Howitzer (M777 LWTH) (Note 3)

I

87,632

87,264

62,559

14,695

11,469

3,226

1070

Armoured Patrol Vehicle

I

123,683

123,684

93,381

18,606

19,588

-982

1203

Armoured Heavy Support Vehicle

I

108,247

148,827

1,868

96,739

65,222

31,517

1204

Light Armoured Vehicle Remote Weapon System

I

41,272

42,326

2,272

33,024

7,907

25,117

1241

Main Battle Tank

I

285,000

208,882

0

95,247

99,008

-3,761

1436

Low Level Air Defence Modernization

I

1,093,179

1,091,549

1,073,352

8,890

8,642

248

2058

Weapons Effect Simulator

I

108,002

119,307

95,305

9,791

17,599

-7,808

2346

Medium Support Vehicle System

D

24,585

1,066,680

3,076

20,398

5,222

15,176

2349

Light Utility Vehicle Wheeled

I

298,400

302,965

280,129

7,900

5,934

1,966

2556

Canadian Forces Point Biological Agent Detection, Sampling and Identification Project

I

48,155

40,049

7,885

17,935

15,080

2,855

2637

Armoured Personnel Carriers

I

2,343,695

2,348,900

2,058,864

138,196

76,375

61,821

2652

Multi Mission Effects Vehicle (Work Suspended Pending Gov’t Decision to Terminate Project)

 

0

5,004

2,923

0

347

-347

2684

Improved Landmine Detection System

C/O

33,663

33,489

31,802

1,073

771

302

2731

Armoured Personnel Carriers Life Extension

I

345,939

352,162

321,525

18,667

12,527

6,140

TOTAL LAND EFFECTS

 

5,182,575

6,216,098

4,153,736

526,421

382,689

143,732

AEROSPACE EFFECTS

86

Operational Flight Program

I

111,521

111,521

40,708

21,624

7,967

13,657

113

Advanced Distributed Combat Training System

I

187,675

187,742

146,427

12,165

5,606

6,559

180

CF-18 Multi-purpose Display Group Project

I

98,761

61,959

61,617

222

0

222

273

CF-18 Advanced Multi-role Infrared Sensor

I

186,060

186,060

834

45,656

34,591

11,065

295

Aurora Communication Management System Replacement

I

89,745

88,770

63,494

16,753

3,078

13,675

317

Aurora Electro-optical System Replacement

I

49,162

49,137

46,167

1,705

2,143

-438

410

Aurora - Flight Deck Simulator

I

40,862

40,906

37,141

3,434

682

2,752

423

Aurora - Electronic Support Measures Replacements

I

194,457

194,379

111,887

27,843

11,944

15,899

428

Aurora - Imaging Radar Acquisition

I

280,018

284,676

132,277

35,061

30,940

4,121

451

Primrose Lake Evaluation Range TSPI System

I

42,615

42,615

23,343

7,459

4,016

3,443

536

Aurora – Operator Mission Simulator

I

44,633

44,754

6,020

2,050

7,251

-5,201

583

CF18 - Engineering Change Proposal 583

I

987,308

851,946

829,559

23,656

15,057

8,599

609

Fixed Wing Search and Rescue Project

D

8,200

4,912

4,905

3,263

7

3,256

743

Tactical Control Radar Modernization

I

36,764

39,019

2,278

5,668

1,025

4,643

1007

Medium to Heavy Lift Helicopters

D

8,488

2,014,542

3,221

3,255

6,153

-2,898

1036

Airlift Capability Project (Tactical)

I

6,297

3,061,677

2,557

3,400

159,209

-155,809

1117

Airlift Capability Project (Strategic)

I

1,609,000

1,805,171

170,069

1,060,000

928,405

131,595

1686

CF18 - Advanced Air to Air Weapon - Short Range

I

36,685

36,685

20,863

2,090

78

2,012

2320

Military Automated Air Traffic System

I

164,865

157,015

150,154

6,161

2,143

4,018

2371

Advanced Navigation and Precision Approach

I

97,830

98,039

69,075

22,423

5,658

16,765

2517

Canadian Forces Utility Tactical Transport Helicopters

I

1,093,100

1,093,098

1,072,477

5,800

4,133

1,667

2526

Region/Sector Air Operation Centre

I

134,668

137,568

124,798

9,801

2,964

6,837

2619

Air Combat Manoeuvering Instrumentation System

I

33,290

33,289

30,913

1,890

580

1,310

2657

CC150 Strategic Air-to-Air Refuelling (SAAR)

I

126,253

133,305

111,490

8,953

9,942

-989

2678

Canadian Search and Rescue Helicopter

I

779,239

772,138

763,238

6,123

1,037

5,086

2680

Maritime Helicopters

I

3,160,300

3,160,349

709,067

425,841

143,665

282,176

2754

CF-18 Advanced Medium Range Air-to-Air Missile

I

138,488

100,250

69,056

6,382

4,973

1,409

5832

CF18 - Engineering Change Proposal - Phase 2

I

413,394

423,280

132,559

103,014

56,036

46,978

TOTAL AEROSPACE EFFECTS

 

10,159,678

15,214,802

4,936,194

1,871,692

1,449,283

422,409

JOINT, NATIONAL, UNIFIED, and SPECIAL OPERATIONS

402

Canadian Forces Joint Experimentation

I

30,992

52,347

5,806

18,753

571

18,182

439

Allied Vaccine Development Project

I

31,684

24,440

20,962

1,331

1,593

-262

625

Polar Epsilon Joint Space-Based Wide Area Surveillance and Support

I

57,509

25,482

3,528

4,060

3,502

558

2398

Joint Command System

I

32,965

29,937

22,117

4,377

3,621

756

2469

Canadian Forces Command System I (CFCS)

I

65,416

67,221

63,921

433

1,890

-1,457

2783

Identification Friend or Foe (Amalgamated with FELEX)

I

38,176

0

572

601

0

601

2800

Canadian Forces Health Information System

I

49,345

78,436

29,367

21,202

14,057

7,145

Various

Canadian Cryptographic Modernization Project

D

102,988

119,036

35,202

27,448

7,640

19,808

XXXX

Clothe The Soldier Omnibus Project

I

276,617

214,258

190,349

35,290

21,341

13,949

TOTAL JOINT, NATIONAL, UNIFIED, and SPECIAL OPERATIONS

 

685,692

611,157

371,824

113,495

54,215

59,280

TOTAL GENERATE AND SUSTAIN RELEVANT, RESPONSIVE AND EFFECTIVE COMBAT-CAPABLE INTEGRATED FORCES

 

18,021,035

24,842,968

11,021,560

2,682,920

2,037,565

645,355

 
Program Activity: CONDUCT OPERATIONS

276

Intelligence, Surveillance, Target Acquisition & Reconnaissance 

D/I

134,715

100,949

43,289

23,500

7,010

16,490

2803

Protected Military Satellite Communication

I

507,543

531,450

310,769

32,393

24,029

8,364

TOTAL CONDUCT OPERATIONS

 

642,258

632,399

354,058

55,893

31,039

24,854

 
Program Activity: INTERNAL SERVICES

2272

Materiel Acquisition and Support Information System

I

179,164

200,321

176,598

862

17,439

-16,577

2400

Defence Integrated Human Resource System

I

87,200

92,566

78,553

4,677

10,915

-6,238

2536

Role Three Health Support

I

42,453

40,179

37,732

2,179

0

2,179

TOTAL INTERNAL SERVICES

 

308,817

333,066

292,883

7,718

28,354

-20,636

 
TOTAL PROGRAM ACTIVITIES

 

18,972,110

25,808,433

11,668,501

2,746,531

2,096,958

649,573


Source: Assistant Deputy Minister (Materiel) Group

Legend: D = Definition, I = Implementation, C/O = Close-Out

Notes:

  1. Employee Benefit Plans (EBP) are not included in project expenses.
  2. Projects listed have been identified as either:
    1. those in which the estimated expenditure exceeds the delegated approval authority granted to DND by the Treasury Board ($30 million with substantive cost estimates); or;
    2. those in which the risk is particularly high, regardless of the estimated amounts.
  3. $5,450 of the $11,469 expenses incurred in 2007-2008 are expenses related to the accrual budgetary portion of the M777 project.

TABLE 4b: Capital Construction Program (Spending Over $60M)


Project #

Project Name
($ thousands)

Total Project Amount

Past Years Expendi-tures at 31 March 2007

Planned Spending
2007–2008

Actual Spending
2007–2008

Planned Future 5‑year Spending

Alberta

0886

Upgrade Roads/Utilities (Cold Lake) (PD/PI)

60,627

2,290

7,860

985

49,000

British Columbia

0221

Replace “A ” Jetty (OA)

250,000

480

1,000

0

6,000

4360

FMF Cape Breton Phases I to IV (PI) (Note 1)

314,000

106,270

16,910

7,966

174,000

4451

Colwood Refueling Facility (PI)

64,035

60,730

3,305

2,141

795

New Brunswick

0344

RTA Sedimentation Remediation (Gagetown) (PD/PI)  (Note 2)

72,680

4,270

3,810

0

0

0453

Utilities Upgrade Gagetown (PD/PI)

80,680

18,160

21,720

7,841

54,140

Nova Scotia

0511

Replace Jetty NJ & NK1

Halifax (OA)  (Note 3)

54,650

1,650

0

0

0

Newfoundland

0640

Pleasantville Consolidation (PD) (Note 1)

142,118

1,520

4,840

1,521

95,449

Québec

0457

5 Combat Engineer Regiment Facility in Valcartier (OA) (Note 4)

60,800

0

4,390

0

0

Ontario

0411

RMC Kingston Dormitories (PI)  (Note 1)

70,784

31,100

14,550

8,054

29,947

0402

Joint Experimentation Centre Ottawa (PI)

67,580

1,681

24,890

132

65,000

Various

0407

Omnibus Cadet Support Training Centre (PD/PI) (Note 5)

41,441

33,794

3,996

156

6,740

  Total

$1,279,395

$261,945

$101,271

$28,796

$481,071


Source: Assistant Deputy Minister (Infrastructure and Environment) Group

Notes:

  1. Cost estimates to complete the project have increased.  Revised expenditure authority will be sought from Treasury Board in 2008. The table reflects the new cost estimates.
  2. This project is being restructured along program lines, with smaller individual projects within the overall program.
  3. Project has been cancelled.  Jetty NJ will now be funded as part of the Arctic Offshore Patrol Ship project and Jetty NK will not be rebuilt.
  4. Project has been put on hold.
  5. Total project cost was previously estimated at $63,030K.  Cost estimates have been revised down from that in RPP 2007-2008 and are now below the reporting threshold.
  6. All figures include capital costs only and are exclusive of GST/HST.
  7. Past years expenditures are as of March 31, 2007.
Top of Page

National Research Council Canada


Table 3-6: Details on Project Spending (millions of dollars)

 

2007-08

Program Activity

Current Estimated Total Cost

Actual 2005-06

Actual 2006-07

Total Main Estimates

Total Planned Spending

Total Authorities

Actual

 

 

 

 

 

 

 

 

Research and Development

 

 

 

 

 

 

 

Advanced Aerospace Manufacturing Technology Centre, Project Close-out Phase, (S-EPA)

34.1

0.4

-

-

-

-

-

Aluminium Technology Centre, Project Close-out Phase, (S-EPA)

34.4

2.5

 

7.8

7.8

7.8

7.8

Construction of the Canadian Photonics Fabrication Centre, Project Close-out Phase, (S-EPA)

19.0

1.1

-

6.2

6.2

6.3

6.3

Construction of an Industrial Partnership Facility (IPF) adjacent to NRC-IBD, Project Close-out Phase, (S-EPA)

11.0

1.7

-

0.1

0.1

0.1

0.1

Move of the National Research Council's Innovation Centre, Project Close-out Phase, (S-EPA)

18.7

13.1

1.6

0.0

0.0

0.0

0.0

Construction of Industry Partnership Facility (IPF) at NRC-IMB, Project Close-out Phase, (DA)

7.2

0.5

-

0.1

0.1

0.1

0.1

Lease Project Approval for the National Institute for Nanotechnology, Project Implementation Phase (I-LPA)

87.2

5.4

2.4

1.3

1.3

1.3

1.3

Lease Project Approval for the Institute for Nutrisciences and Health, Project Implementation Phase (I-LPA)

20.9

-

0.3

0.5

0.5

0.5

0.5

 

Notes

  • Due to rounding, figures may not add to total shown.

Top of Page

Parks Canada

Details on Project Spending (in millions of dollars)

This table identifies the Agency’s projects that are exceeding the delegated project approval level and the amount of resources expended.


Program Activity Current
Estimated
Total
Cost
2005‑2006
Actual
2006‑2007
Actual
2007-2008
Planned
Spending
Total
Authorities
Actual
Conserve Heritage Resources
Quebec City – Dufferin Terrace Stabilization and Major Repairs 11.6 1.9 4.3 2.9 6.5 3.6
Promote Public Appreciation and Understanding
Quebec City – Old Port of Quebec Interpretation Centre Enhancements 24.0 0.9 2.9 14.7 20.2 15.5
Throughway Management
Central Ontario – Bolsover Dam Replacement 17.4 0.3 0.4 11.9 0.0 0.0
Banff NP – Trans Canada Highway Twinning 87.0 9.2 28.2 24.2 48.7 20.8

Top of Page

Public Health Agency of Canada


($ millions) Current Estimated Total Cost Actual
2005-06
Actual
2006-07
2007–08
Main
Estimates
Planned
Spending
Total
Authorities
Actual
Program Activity:
Disease Prevention and Control
42.11 0 0.2 5.4 5.4 3.42 3.4
Project name Winnipeg Lab and Space Optimization3
Project Phase 7-year project – 2006 to 2012 

NOTES

  1. The Current Estimated Total Cost of $42.1 million represents the Effective Project Approval (EPA) received in September 2007 for the acquisition and retrofit of the Ward Laboratory in Winnipeg.
  2. While initial project approval was for the period 2006-2011, timing was extended to 2012 and funds were reprofiled from 2007-08 to 2008-09 due to a delay in finalizing the transaction to acquire the lab from the Province of Manitoba. A reprofile exercise is also planned for the subsequent year.
  3. Also known as the Logan, Ward, or J.C. Wilt Laboratory.

Effective Project Approval (EPA) was obtained from Treasury Board for this project. EPA implies Treasury Board approval of, and expenditure authorization for the objectives of the project implementation phase. Sponsoring departments and agencies are to submit for EPA only when the scope of the overall project has been defined and when the estimates have been refined to the substantive level.

Top of Page

Public Service Commission of Canada

Details on Project Spending


($ thousands) Current Estimated Total Cost Actual 2005-2006 Actual 2006-2007 Main
Estimates
2007-2008
Planned
Spending
2007-2008
Total
Budget Authorities
2007-2008
Total
Actual
2007-2008
Staffing Services and Assessment
Program Activity
             
Public Service Staffing Modernization Project (PSSMP)              
Interim Solution (PSRS) 27,924 8,213 7,412 9,768 9,768 8,686 8,330
Longer Term Solution 4,098 2,354   2,343 2,343 2,343 1,097
Grand Total 32,022 10,567 7,412 12,111 12,111 11,029 9,427

Top of Page

Public Works and Government Services Canada

Table 8: Details on Project Spending



(in millions of dollars)
Project Current Estimated Total
Cost
Actual 2005-2006 Actual 2006-2007 Planned Spending 2007-2008 Total Authorities (at March 31, 2008) Actual 2007-2008
REAL PROPERTY SERVICES
Office Accommodation Projects
Nova Scotia
Halifax - New Government of Canada Building, Bedford Institute of Oceanography – (CANCELLED)

0.0

0.0

0.3

0.4

0.0

0.0

Halifax - New Royal Canadian Mounted Police Government of Canada Building - Construction (LPA)1

109.3

2.3

1.0

2.5

109.3

1.2

Prince Edward Island
Charlottetown – Jean Canfield Building - Construction (S-EPA)2

52.8

13.8

19.4

7.2

50.3

6.9

Quebec
Montréal - 740 Bel-Air Street – Construction of multi-purpose building including items funded by National Defence (S-EPA)

54.7

25.0

2.0

0.2

60.3

0.2

National Capital Area (Quebec)
Gatineau - Laurier Taché Garage - Renovation (S-EPA)

67.9

13.4

11.6

4.5

67.9

6.1

National Capital Area (Ontario)
Ottawa - Federal Judicial Building –New Construction – (DEFERRED)

0.0

0.1

0.0

0.0

0.0

0.0

Ottawa - Skyline Campus - Renovation and Federal Occupancy (S-EPA-MCP)3

105.8

7.4

9.3

55.0

114.3

35.9

Ottawa - Central Heating and Cooling Plant - East Tunnel Replacement (I-PPA)

31.1

0.0

0.2

1.2

1.8

0.2

Parliamentary Precinct 4
Ottawa - Library of Parliament (LOP) - Conservation, Rehabilitation and Upgrade (EPA)

127.9

17.5

7.4

4.4

127.9

0.9

Ottawa - West Block (PPA)5

769.2

15.3

13.5

167.7

252.2

24.7

Ottawa - Site Infrastructure - New Construction (PPA)5, 6

82.5

0.1

0.0

0.0

4.6

0.0

Ottawa - Wellington Building - Renovation (PPA)5

425.2

0.7

1.0

14.8

101.4

1.0

Ottawa - Bank Street - New Construction (PPA)5, 6
(DEFERRED)

197.9

0.1

0.0

0.0

18.9

0.0

Saskatchewan
Regina - Government of Canada Building – Acquisition, renovation and fit-up (EPA) 7

48.4

20.0

4.7

8.8

48.4

6.0

British Columbia
Surrey - Royal Canadian Mounted Police "E" Division HQ Relocation - Purchase Land and Public Private Partnership (P3) Design, Build, Finance, Maintain (DBFM) (I-PPA-MCP)8

1,000.0

2.5

0.8

2.4

438.7

1.6

Non-Office Accommodation Projects
Parliamentary Precinct
Ottawa – Portrait Gallery of Can. – Renovation (EPA)9

32.4

2.7

0.8

10.0

32.3

0.1

Lease Accommodation Projects
National Capital Area (Ontario)
269 Laurier Avenue West, Ottawa, (LPA)10,11

231.4

5.1

24.0

5.6

45.9

12.2

131 Queen Street, Ottawa, (LPA)4

166.3

4.3

39.2

44.9

166.3

24.3

181 Queen Street, Ottawa, (LPA)4

59.9

6.4

6.3

5.5

59.9

6.3

Ontario
180 Queen Street West, Toronto, (LPA) (COMPLETED)12

239.0

9.3

12.8

8.6

239.0

4.4

277 Front Street East, Toronto, Lease (LPA)13

75.5

0.3

0.2

4.7

75.5

7.9

Engineering Assets Projects
Newfoundland and Labrador
Argentia - Environmental remediation (EPA)

93.5

6.0

4.8

10.0

93.5

4.1

National Capital Area (Quebec)
Laniel Dam - Reconstruction (R-EPA)

36.0

2.9

6.7

5.8

36.0

6.8

National Capital Area (Ontario)
Alexandra Bridge - Rehabilitation/Deck
Replacement (EPA)

28.7

0.5

0.3

0.4

28.7

0.4

PUBLIC SERVICE COMPENSATION
Pension Modernization Project- Definition Phase (PPA)14

18.415

5.6

7.8

1.3

18.4

1.3

Pension Modernization Project- Implementation Phase (EPA)16

200.117

0.0

0.0

44.618

200.1

29.619


1 The RCMP “H” project has now been approved as a lease project, so Total Authority represents the Lease Project Approval (LPA) amount. Capital required for upfront costs only.
2 The Jean Canfield project is seeking increased revised Authority. The submission is currently scheduled to be presented to Treasury Board for consideration in fall 2008.
3 Based on speculative contract cost forecasts at completion, it is anticipated that there will be excess overall project funding. This is currently identified as fiscal year 2010-2011 expenditures and includes the PWGSC fee mark-up.
4 Updated financial information on Parliamentary Precinct projects was provided to the Cabinet Committee on Government Operations on May 15, 2007, as part of discussions on the RPP 2007-2008. Two projects greatly revised planned spending for 2007-2008: West Block (from $167.7 million to $28.8 million) and 131 Queen Street, Ottawa (from $44.9 million to $27.4 million). Smaller amendments were made to other projects.
5 Additional information is available in Table 9- Status Report on Major Crown Projects of this report.
6 Current Estimated Total Cost has been reduced to the Preliminary Project Approval (PPA) Approved amount.
7 Total Treasury Board submission for this project was for $ 50.7 million, inclusive of $2.9 million in GST. The project is expecting $1.7 million for 2008-2009.
8 Current Estimated Total Cost is over 25 years. Total Authorities as of March 31, 2008 for the Revised Preliminary Project Approval (R-PPA) were $438.7 million including GST of $23.6 million to acquire 62,439 m2 office and special purpose space.
9 Transferred from National Capital Region to Parliamentary Precinct.
10 Planned spending 2007-2021 is rent only.
11 Total Authorities are based on Estimated Total Considerations of fiscal years 2005-2006, 2006-2007 and 2007-2008.
12 2007-2008 actual reflects net rent only.
13 Revised to include $2.6 million annual net rent, as well as PWGSC and client-funded fit-up as identified in the Treasury Board submission.
14 Numbers include all salaries, operating and management activities, employee benefits, health care and accommodation costs, but exclude GST.
15 These figures represent the authorities for the Definition Phase of the project, last revised and approved by Treasury Board on March 29, 2007. The phase has been completed at a cost of $18.4 million (expenditures in 2004-2005 were $3.6 million)
16 Numbers include all salaries, operating and management activities, employee benefits, health care and accommodation costs, but exclude GST.
17 Effective Project Approval (EPA) was received on June 13, 2007, authorizing $18.4 million for the main Pension Modernization Project and $15.3 million for the Legacy Systems Initiatives in support of the Pension Modernization Project.
18 Included $40.7 million for the Pension Modernization Project and $3.9 million for the Legacy Systems Initiatives in support of the Pension Modernization Project. A Treasury Board Submission is currently in the final review process to reprofile unspent funding from 2007-2008 into future years.
19 Included $25.7 million for the Pension Modernization Project and $3.9 million for the Legacy Systems Initiatives in support of the Pension Modernization Project
Top of Page

Royal Canadian Mounted Police

Table 5: Details on Project Spending


Projects by Program Activity
($ millions)
Project Current Estimated Total Cost Actual
2004-2005
Actual
2005-2006
 2006-2007 ($ millions)
Main
Estimates
Planned
Spending
Total
Authorities
Actual
A. Federal and International Operations 1 Ontario – Windsor-Sarnia IBET (DA) (project cancelled) 7.0 0.0 0.0 0.0 0.0 0.0 0.0
B. Community, Contract and Aboriginal Policing 1 Saskatchewan - Modernization Telecom System (EPA) 47.3 13.3 11.4 3.0 1.5 4.3 3.3
2 Newfoundland and Labrador - Modernization Telecom System (DA) (seeking PPA & EPA) 33.4 1.4 1.5 9.4 8.2 9.8 0.3
3 CIIDS Implementation (EPA) 18.0 0.2 0.3 0.3 0.4 0.3 0.2
C. National Police Services 1 Real Time Identification (RTID) 136.5 14.6 30.6 25.1 31.8 25.1 17.9
D. Corporate Infrastructure

 

 

        
1 North West Territories - Behchoko Detachment (Pre-PPA) 9.1 0.0 0.0 0.7 0.7 0.7 0.0
2 Nunavut - Iqaluit - "V" Division HQ and Detachment (EPA) 31.6 1.5 1.2 8.6 8.6 8.6 5.6
3 British Columbia - "E" Division Headquarters (PPA) 153.1 0.8 0.4 7.4 7.4 7.4 0.7
4 British Columbia - Golden Detachment (Pre-PPA)
9.8 0.1 0.3 3.5 3.5 3.5 0.2
6 British Columbia - 100 Mile House Detachment (Pre-PPA) 10.1 0.2 0.1 0.1 0.1 0.1 0.0
7 Alberta - High Level Detachment (PPA) 11.7 0.0 0.0 1.4 1.4 1.4 0.0
8 Alberta - Grande Cache Detachment (PPA) 7.1 0.0 0.0 3.0 3.0 3.0 0.0
9 Alberta - Fort McLeod Detachment (Pre-PPA) 4.5 0.0 0.0 0.7 0.7 0.7 0.0
10 Alberta - Evansburg Detachment (PPA) 4.7 0.0 0.0 0.5 0.5 0.5 0.1
11 Saskatchewan - Regina, Depot, New Mess (PPA) 18.0 0.1 0.1 9.0 9.0 9.0 3.8
12 Saskatchewan - Regina , Deport, Electrical Distribution Network (Seeking PPA & EPA) 20.4 0.0 0.1 6.1 6.1 6.1 0.8
14 Saskatchewan - Regina, Depot, 25 metre Firing Range (Seeking PPA) 5.3 0.0 2.2 3.6 3.6 3.6 2.8
15 Saskatchewan - Regina, Depot, Dorms (Seeking PPA) 89.8 0.0 0.1 1.3 1.3 1.3 0.6
20 Saskatchewan - Regina, Depot, C-Block (Pre-PPA) 10.4 0.0 0.0 0.0 0.0 0.0 0.0
22 Saskatchewan - Regina, Depot, Heritage Centre (EPA) 5.0 0.0 2.5 2.5 2.5 2.5 2.5
23 Ontario -Toronto West Detachment (Pre-PPA) 5.3 0.0 0.0 0.2 0.2 0.2 0.7
30 Ontario - Ottawa, TPOF Relocation (Pre-PPA) 6.2 0.0 0.0 0.0 0.4 0.4 0.0
31 Ontario - Ottawa, NCA, Nicholson HQ (Seeking PPA) 104.5 0.6 0.8 18.5 18.5 18.5 2.5
32 Ontario - Ottawa, New Administration Building (PPA) 7.3 0.0 0.2 6.1 6.1 6.1 1.4
33 Ontario - Ottawa, Outdoor Training Area (Seeking-PPA) 5.3 0.0 0.0 0.0 0.0 0.0 0.0
34 Ontario - Ottawa, TPOF Armory Expansion (Seeking-PPA) 5.1 0.0 0.0 0.6 0.6 0.6 0.2
35 New Brunswick - Grand Falls, District Office (PPA) 10.0 0.0 0.0 0.3 0.3 0.3 0.0
36 Nova Scotia - "H" Division Headquarters (PPA) 50.8 0.3 0.0 10.3 10.3 10.3 0.0
37 National Criminal Justice Index (NCJI) / N-III Project 18.2 2.1 6.6 6.7 6.7 6.7 3.6
Since the 07/08 RPP there have been revised estimates for the following projects which drop them below the $3 M reporting level.
D. Corporate Infrastructure 5 British Columbia - Chilliwack Detchment (Pre-PPA) 0.0 0.0 0.0 2.1 2.1 2.1 0.0
13 Saskatchewan - Regina, Depot, Security and Access Centre (Seeking PPA) 0.0 0.0 0.0 2.0 2.0 2.0 0.0
16 Saskatchewan - Regina, Depot, Central Cooling Plant (PPA) 0.2 0.0 0.2 1.8 1.8 1.8 0.2
17 Saskatchewan - Regina, Depot, Site Drainage (PPA) 2.9 0.0 0.2 1.8 1.8 1.8 0.9
18 Saskatchewan - Regina, Depot, Centralized Training (Pre-PPA) 0.0 0.0 0.0 1.0 1.0 1.0 0.0
19 Saskatchewan - Regina, Depot, Post Garage (Pre-PPA) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
21 Saskatchewan - Regina, Depot, Civil Works Renewal (Pre-PPA) 2.0 0.0 0.8 1.0 1.0 1.0 0.2
24 Ontario - Ottawa, CPC Building D (Pre-PPA) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
25 Ontario - Ottawa, CPC Executive Training Centre (Pre-PPA) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
26 Ontario - Ottawa, CPC Site Visitor Interpretation Centre (Pre-PPA) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
27 Ontario - Ottawa, CPC New Residence (Pre-PPA) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
28 Ontario - Ottawa, CPC Scenario Training Facility (Pre-PPA) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
29 Ontario - Ottawa, CPC Building C Annex (Pre-PPA) 0.0 0.0 0.0 0.5 0.5 0.5 0.0
Notes:
* PPA - prelimimary project approval
* EPA - effective project approval

Top of Page

Supreme Court of Canada

2007-08 User Fees


        2007- 2008
User Fee Fee Type Fee Setting Authority Date Last Modified Forecast Revenue
($ 000 )
Actual Revenue ($ 000)
Sale of Bulletin of Proceedings

Other Products and Services

Supreme Court Act
October 13, 2006
8.0
2.4
Sale of Judgments

Other Products and Services

Supreme Court Act
October 13, 2006
12.0
6.0
Sale of Certificates

Other Products and Services

Supreme Court Act
October 13, 2006
8.0
1.7
Photocopies

Other Products and Services

Supreme Court Act
October 13, 2006
30.0
46.0
Other Fees

Other Products and Services

Supreme Court Act
October 13, 2006
56.0
76.0
Sub-Total          
Sub-Total          
Sub-Total          
Total
2007-08
     
114.0

132.1



 
2007-08
Planning Years
User Fee
Fiscal Year
Forecast Revenue
($ 000)
Sale of Bulletin of Proceedings
2008-09
2009-10
2010-11
3.0
3.0
3.0
Sale of Judgments
2008-09
2009-10
2010-11
6.0
6.0
6.0
Sale of Certificates
2008-09
2009-10
2010-11
2.0
2.0
2.0
Photocopies
2008-09
2009-10
2010-11
40.0
40.0
40.0
Other Fees
2008-09
2009-10
2010-11
70.0
70.0
70.0
Sub-Total
2008-09
121.0
Sub-Total
2009-10
121.0
Sub-Total
2010-11
121.0
Total 2007-08
 
 

Note: User fees are set by the Supreme Court Act, and reporting is not required under the User Fees Act. However, since details of user fees have been reported in the past, they are included here for comparative purposes.

Top of Page

Treasury Board of Canada Secretariat

Table 4: Details on Project Spending


($ thousands)
  2007-08
Project Current
Estimated
Total
Cost
Actual
2005-06
Actual
2006-07
Main
Estimates
Planned
Revenue
Total
Authorities
Actual

Management and Expenditure Performance

Expenditure Management Information System: Phase B―Budget Office Systems Renewal (BOSR)

14,942.0

4,427.0

9,867.0

9,867.0

9,867.0

8,000.9


In March 2004, the Treasury Board granted effective project approval (EPA) for the implementation of the Expenditure Management Information System (EMIS) project. A scheduled internal audit in late 2004 found a number of project-related deficiencies.

In October 2006, the Treasury Board considered a renewed Business Case for EMIS and granted EPA for the BOSR project as Phase B of a replanned EMIS strategy.

In December 2007, EMIS was launched, and the new systems replaced the former legacy systems. Phase B is therefore now deemed complete. Some funding was reprofiled to 2008-09 for post-implementation activities, such as archiving of old data.

The new EMIS Strategic Plan divides work into the following four distinct phases:

A―Conceptual Architecture and Design
B―BOSR
C―Results Information Integration (RII)
D―Actual Expenditures Information Integration (AEII)

Phase A―Conceptual Architecture and Design was completed in early 2006.

Phase B―BOSR focussed on the replacement of existing, at-risk Budget Office functionality with a single integrated solution. As a result of this integration, internal Secretariat business processes are streamlined and rationalized.

Preliminary project approval (PPA) for Phases C and D may be sought in 2008-09.

Top of Page

Veterans Affairs Canada

Details on Project Spending


($ millions) Current Estimated Total Cost Actual 2005-2006 Actual 2006-2007 2007-2008
Main Estimates Planned Spending Total Authorities Actual
Ste. Anne's Hospital Renovation 114.3 17.2 11.9 23.2 23.2 26.5 26.4
European Monument Restoration 29.8 8.9 9.3   0.4 0.4 0.2
Total 144.1 26.1 21.2 23.2 23.6 26.9 26.6