00000002
Stanley Park |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00000004
LeBreton Flats |
Detailed testing completed. No further action required. | 2014-2015 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00000006
LeBreton Flats |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00000007
LeBreton Flats |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00000008
LeBreton Flats |
Detailed testing completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00000009
LeBreton Flats |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00000010
LeBreton Flats |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00000011
LeBreton Flats |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00000012
LeBreton Flats |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00000013
LeBreton Flats |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00000014
Lebreton South |
Detailed testing completed. No further action required. | 2007-2008 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00000015
LeBreton Flats - Nepean Bay |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00000016
Riverfront Park |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00000912
Former Disposal Area, South of Water Tower, Shirleys Bay |
Remediation / risk management completed. No further action required. | 2013-2014 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000937
CFS Leitrim, Former UST site between buildings #250D & #138 |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00000940
Connaught Rnge Primary Trng Ctre- 35 Shirley Blvd, B34 AST |
Detailed testing completed. No further action required. | 2023-2024 | 05 Detailed Testing Program | |
00001540
Central Experimental Farm |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00001541
Central Experimental Farm |
Initial testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00001542
Central Experimental Farm |
Detailed testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00001618
Central Experimental Farm |
Remediation / risk management completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00001619
Central Experimental Farm |
Initial testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00001620
Central Experimental Farm |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00001621
Central Experimental Farm |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00001700
Central Experimental Farm |
Remediation / risk management completed. No further action required. | 2022-2023 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00002337
Rideau Canal, Swale of Lot 2, Concession IV |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00002359
Little Castor River near Embrun |
Confirmatory sampling completed. No further action required. | 2010-2011 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00002684
Carp Radar |
Historical review completed. No further action required. | 2006-2007 | 02 Historical Review | |
00008316
Bells Corners Complex |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
00008317
Bells Corners Complex |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 3 Low Priority for Action | 05 Detailed Testing Program |
00008318
Bells Corners Complex |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008319
Bells Corners Complex |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008320
Bells Corners Complex |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00008334
Uplands Marina, CFSU(O) |
Confirmatory sampling completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008423
Cartier Square Armoury,Frmr UST,along drill hall Queen E.Dr. |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00008424
Dow's Lake Armoury and Drill Hall |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00008425
Connaught Ranges Range Butt Stop Stockpile |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00008426
CFSU(O) Leitrim, PWGSC Office Area, Building 251. |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00008700
Connaught Skeet Range |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 06 Classify the site using the CCME National Classification System | |
00008747
Mississippi Lake NWA - Office Building Area |
Initial testing completed. No further action required. | 2008-2009 | 03 Initial Testing Program | |
00011668
Sugar shack |
Initial testing completed. No further action required. | 2008-2009 | 03 Initial Testing Program | |
00011669
abandonned wood shed |
Historical review completed. No further action required. | 2008-2009 | 02 Historical Review | |
00011670
metallic debris area |
Historical review completed. No further action required. | 2008-2009 | 02 Historical Review | |
00012652
DUNROBIN (Waterlot SE portion of the South Basin) |
Initial testing completed. No further action required. | 2005-2006 | 2 Medium Priority for Action | 03 Initial Testing Program |
00012674
BROCKVILLE (Waterlot) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00012710
IVY LEA (IVY LEA INN) (Unassessed) |
Initial testing completed. No further action required. | 2005-2006 | 03 Initial Testing Program | |
00013147
BROCKVILLE (Impacted Soils SE and W sides of grassed area and SW of Customs Building) |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00013369
L'Orignal, ancien FA (Unassessed) |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00013706
Saint-Zotique - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00013709
St. Anicet West Range Rear (No Contamination Identified) |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00013721
Armitage Marina West (Unassessed) |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00013723
Astounder Island - No Contamination Identified |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00013724
Aylmer Island LL 1299 - Vicinity of the previous lightstation and associated buildings |
Detailed testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00013731
Baskin's Beach Range - Front Range Tower |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013737
Beaurivage Island - No Contamination Identified |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00013748
Brockville Breakwater (No Contamination Identified) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00013752
Buck Island - No Contamination Identified |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00013760
Butternut Island Range Front - No Contamination Identified |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00013761
Butternut Island Range Rear - No Contamination Identified |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00013762
Camerons Island Lower Range Front - No Contamination Identified |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00013763
Camerons Island Lower Range Rear- Around the navig |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013764
Camerons Island Upper Range Front- No Contamination Identified |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00013765
Camerons Island Upper Range Rear- No Contamination Identified |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00013766
Cardinal Marine Radio - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00013767
Cardinal DGPS - No Contamination Identified |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00013782
Chimney Island - No Contamination Identified |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00013783
Light 144 - No Contamination Identified |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00013784
Club Island - Around the navigational aid structur |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013792
Cornwall MCTS (Unassessed) |
Historical review completed. No further action required. | 2021-2022 | 02 Historical Review | |
00013793
Cornwall Island Range Front (No Contamination Identified) |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00013794
Cornwall Island Range Rear (Around the navigationa |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013795
Cornwall Marina (No Contamination Identified) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00013799
Crossover Range Front - No Contamination Identified |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00013800
Crossover Range Rear - Crossover Brockville Minor Shore Light |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00013801
De Watteville Rear Range - Surrounding navigation |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013806
Doran Shoal Range Front - Around the navigational |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013807
Doran Shoal Range Rear - No Contamination Identified |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00013808
Drummond Island Range Front - Around the navigatio |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013809
Drummond Island Range Rear - Around the navigation |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013811
Fiddlers Elbow - Around the navigational aid |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013820
Gananoque Floating Breakwall (Unassessed) |
Historical review not required. | 2015-2016 | 01 Identify Suspect Sites | |
00013821
Gananoque Harbour (No Contamination Identified) |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00013822
Gananoque Narrows East (No Contamination Identified) |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00013823
Gananoque Narrows West (No Contamination Identified) |
Historical review completed. No further action required. | 2012-2013 | 02 Historical Review | |
00013824
Goose Island - No Contamination Identified |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00013825
Gooseneck Shoal Range Front - No Contamination Identified |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00013826
Gooseneck Shoal Range Rear - No Contamination Identified |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00013832
Haffie Shoal - No Contamination Identified |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00013839
Iroquois Approach Range Front -No Contamination Identified |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00013840
Iroquois Approach Range Rear - Around the navigati |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013841
Iroquois Lock Direction - Range Front around the |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013843
Iroquois Lock West Approach - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00013845
Jackstraw Shoal - Around the navigational aid |
Initial testing completed. No further action required. | 2021-2022 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013858
Lancaster Bar D41 (Fill material) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00013859
Lancaster Range Front D50 (Close to the navigation |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013860
Lancaster Range Rear (LL#124)- No Contamination Identified |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00013867
Light 10 Direction & Sector - No Contamination Identified (LL#185/185.2) |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00013869
Light 110 Iroquois West Approach - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00013870
Harkness Island Light 111 - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00013871
Light 114 - Toussaint Island - E, No Contamination Identified |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00013872
Light 143 - No Contamination Identified |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00013873
Light 144 - No Contamination Identified |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00013874
Light 147 - No Contamination Identified |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00013875
Light 150 - No Contamination Identified |
Historical review completed. No further action required. | 2023-2024 | 02 Historical Review | |
00013876
Light 151 - No Contamination Identified |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00013877
Light 2 (Cornwall Island) - Around the navigational aid structure |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013879
Pier Light 68 - No Contamination Found |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00013880
Pier Light 70 - No Contamination Found |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00013881
Light 81 - No Contamination Identified |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00013882
Light 82 - No Contamination Identified |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00013883
Light 96 - No Contamination Identified |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00013906
Lower Lakes Terminal, Prescott (Unassessed) |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00013907
Lyndoch Island - Minor Shore Light |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013909
Mariatown Approach Range - Around the navigational |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013912
Mariatown Range - Front |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00013916
Mc Coy Island Light 141 - Minor Shore Light |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013917
McGibbon's Point D80 Direction - Sector Light |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00013918
McNair Island 137 - Unassessed |
Historical review completed. No further action required. | 2023-2024 | 02 Historical Review | |
00013924
Myers Island - Small zone around the navigational |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00013925
Creg Quay - Unassessed |
Historical review completed. No further action required. | 2023-2024 | 02 Historical Review | |
00013931
Needles Eye Island Around the navigational aid str |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00014000
Prescott Heritage Harbour (Minor Shore Light) |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00014002
Renshaw Island Daybeacon (D66) - No Contamination Identified |
Historical review completed. No further action required. | 2014-2015 | 02 Historical Review | |
00014009
Royal Island Light 142 - No Contamination Identified |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00014012
Sandhills - Minor Shore Light |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00014022
Skeleton Island 138 - Around the navigational aid structure |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00014026
Spectacles Shoal - No Contamination Identified |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00014027
Spencer Island Pier - Unassessed |
Historical review completed. No further action required. | 2023-2024 | 02 Historical Review | |
00014038
Stanley Crab Direction - No Contamination Identified |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00014039
Stanley Island - No Contamination Identified |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00014040
Stanley Island East Directional - No Contamination Identified |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00014043
Stovin Island - Around the navigational aid struct |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00014046
Tar Island - No Contamination Identified |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00014050
The Punts - Around the navigational aid structure |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00014051
Third Crab Island - No Contamination Identified |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00014057
Toussaint Island West - No Contamination Identified |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00014059
Wallace Island - Structure |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00014065
Weaver Shoal Range Front - Around the navigational |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00014066
Weaver Shoal Range Rear - Around the navigational |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00015111
Gananoque MCTS (No Contamination Identified) |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00015121
Rockport IRB Station - Unassessed |
Historical review not required. | 2012-2013 | 01 Identify Suspect Sites | |
00015126
Light 4 (Cornwall Island) - No Contamination Identified |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
00015128
Stillwater Park (Graham Bay) - Close to the naviga |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00015135
Prescott/Ogdensburg Bridge North (No Contamination Identified) |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00015136
Prescott/Ogdensburg Bridge South (No Contamination Identified) |
Historical review completed. No further action required. | 2009-2010 | 02 Historical Review | |
00015139
Cornwall Buoy Maintenance Compound -Soil surrounding the existing building |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00015142
Hill Island (IRB) - Surrounding structure |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00015184
Brockville Gauging Station (No Contamination Identified) |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00015193
Cornwall Gauging Station (No Contamination Identified) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00015213
Iroquois Locks Gauging Station - No Contamination Identified |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00015214
Iroquois Locks Gauging Station (Upper) - No Contamination Identified |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00015238
Summerstown Gauging Station (No Contamination Identified) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00015259
Morrisburg Gauging Station (No Contamination Identified) |
Initial testing completed. No further action required. | 2012-2013 | 03 Initial Testing Program | |
00016562
CONSTANCE BAY - No Contamination Identified |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00016567
GANANOQUE (Unassessed) |
Historical review not required. | 2013-2014 | 01 Identify Suspect Sites | |
00021796
Green Flats - former RL |
Historical review completed. No further action required. | 2016-2017 | 02 Historical Review | |
00022025
Site unassessed |
Initial testing completed. No further action required. | 2008-2009 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022026
Sainte-Rosalie Island - former RL |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | I Insufficient Information | 05 Detailed Testing Program |
00022027
L'Orignal (amont), ancien FR - No Contamination Identified |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00022028
L'Orignal (amont), ancien FR (No Contamination Identified) |
Initial testing completed. No further action required. | 2008-2009 | N Not a Priority for Action | 03 Initial Testing Program |
00022029
Métaux lourds |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00022030
Wendover, ancien FA - Former FRL |
Historical review completed. No further action required. | 2021-2022 | 02 Historical Review | |
00022031
Wendover, ancien FP - Unassessed |
Historical review completed. No further action required. | 2021-2022 | 02 Historical Review | |
00022812
Hurdman South |
Detailed testing completed. Remedial action plan under development. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00022822
Hurdman North |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 1 High Priority for Action | 05 Detailed Testing Program |
00022831
Bayview |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00022833
Bank Street/Highway 31 at Leitrim Road |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00022834
Land East of Tailrace - LeBreton |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00022835 | Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00022836
Hurdman West |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00022837
Mooney's Bay |
Detailed testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00022838
Tremblay / Belfast / VIA station |
Initial testing completed. No further action required. | 2022-2023 | 03 Initial Testing Program | |
00022839
Tremblay / Belfast / VIA station |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00022840
Tremblay / Belfast / VIA station |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022841
Tremblay / Belfast / VIA station |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00022842
Tremblay / Belfast / VIA station |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022843
Aviation Parkway at Walkley Rd |
Historical review completed. No further action required. | 2007-2008 | 02 Historical Review | |
00022844
Walkley & Highway 417 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00022845
Ramsayville Road |
Initial testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022846
Nicholas and Queensway |
Detailed testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00022847
4790 And 4800 Russell Rd |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00022848
Anderson Rd (North Of Russell) |
Remediation / risk management completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00022849
Mann Avenue |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00022854
Stanley Park |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00022858
Stanley Park West |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00022864
Hurdman West |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00022867
2606 Prince of Wales |
Initial testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022870
4787 Ridge Road |
Detailed testing completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00022872
3659 Carling Avenue |
Initial testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022875
3150 Davidson Road, Ottawa |
Remediation / risk management completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00022877
3197 Davidson Road, Ottawa |
Detailed testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00022878
1501 St. Joseph, Ottawa |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00022884
4727 Ridge Road, Ottawa, ON |
Initial testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022885
Victory Hill |
Initial testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00022891
1645 Woodroffe |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00022892
Stanley Park |
Confirmatory sampling completed. No further action required. | 2017-2018 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00022902
Cornwall Island - various parcels |
Confirmatory sampling completed. No further action required. | 2018-2019 | I Insufficient Information | 09 Confirmatory Sampling and Final Reporting |
00023296
597 Robertson Road |
Initial testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023297
605 Robertson Road |
Initial testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023298
Ottawa River Parkway, North of Bayview Road |
Initial testing completed. Detailed testing underway. | 2023-2024 | 1 High Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023300
100 Bayview Road |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023301
90 Bayview Rd |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023303
Champagne Corridor, Breezehill Ave At Somerset Street |
Detailed testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 05 Detailed Testing Program |
00023304
Former Dow's Lake Landfill and Commissioner's Park |
Detailed testing completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023305
3448 Richmond Road, Ottawa |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023306
Victoria Island |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00023311
Watts Creek Sewage Treatment Plant |
Initial testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023313
Rifle Road East |
Initial testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023314
Ottawa River Parkway |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00023315
Former Bayview Landfill |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00023316
LeBreton East |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00023317
King Edward Park |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023318
Former Maple Island Landfill |
Initial testing completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023319
Former Maple Island Landfill |
Initial testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023320
Former John Street Landfill |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023321
Former Dow's Lake Landfill and Commissioner's Park |
Initial testing completed. No further action required. | 2017-2018 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023322
979 Heron Rd (Sawmill Creek West) |
Long term monitoring completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
00023323
Southwest Corner of Riverside Dr at Bank St |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00023324
Vacant Land, Albion Road and Lester Road, Ottawa |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023325
Pine Grove, Ottawa |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00023326
Kingsview Park, Ottawa |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00023328
Property North of 3880 Farmers Way |
Initial testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023330
Rockcliffe Yacht Club |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023333
Tremblay / Belfast / VIA station |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023334
Garden of The Provinces |
Detailed testing completed. Remediation / risk management planned. | 2023-2024 | N Not a Priority for Action | 05 Detailed Testing Program |
00023335
West field North of former Ridge Road Landfill |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00023336
Ramsayville Rd at Ridge Rd NE corner (Ridge Road Landfill) |
Detailed testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00023337
Bate Island |
Long term monitoring completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
00023338
Hurdman West |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00023340
Canland B |
Confirmatory sampling completed. No further action required. | 2016-2017 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00023341
Watts Creek Sewage Treatment Plant (Carling Ave at Rifle Rd) |
Initial testing completed. Detailed testing underway. | 2023-2024 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023342
Carling Avenue, near Davidson's Side Road |
Historical review completed. No further action required. | 2015-2016 | 02 Historical Review | |
00023343
Herzberg Road and Bayfield Road |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023344
River Road, South of Balmoral |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00023348
Hurdman West |
Initial testing completed. No further action required. | 2009-2010 | 03 Initial Testing Program | |
00023350
Southern Corridor |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00023351
Southern Corridor |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00023352
Hudrman North |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00023354
Hurdman West |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00023356
Pathway below Parliament Hill |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00023357
Former McGee Farm Landfill |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023358
Robertson Road near Eagleson |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00023359
Ridge Road, between Anderson and Ramsayville |
Initial testing completed. No further action required. | 2018-2019 | 03 Initial Testing Program | |
00023360
Hawthorne Road at Hunt Club Road |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00023361
Lebreton - East |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023362
Vincent Massey Park |
Initial testing completed. No further action required. | 2022-2023 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023363
Vincent Massey Park |
Initial testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023364
Hog's Back Park |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00023365
Richmond Road, West Hunt Club Road, Moodie Dr. |
Historical review not required. | 2015-2016 | 01 Identify Suspect Sites | |
00023366
Riverside Dr. E side N of Uplands to McCarthy |
Detailed testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00023367
Bearbrook Road |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00023368
Rusell Road |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00023369
Russell Road and Belgreen Road |
Historical review not required. | 2009-2010 | 01 Identify Suspect Sites | |
00023370
Innes Road, east of Anderson |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00023371
Stornoway |
Initial testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023372
Riverside Drive at Neil Street, Southwest Corner |
Detailed testing completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00023373
Prince of Wales at Fallowfield |
Detailed testing completed. No further action required. | 2018-2019 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00023443
Mosquito Creek |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023444
Parks Canada Trail along water in Perth |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023451
Upper Rideau Lake |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023452
Newboro Lake |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023453
Indian Lake |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023975
Farmland near Anderson Rd. |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00023976
Colonel By Drive |
Initial testing completed. No further action required. | 2018-2019 | 03 Initial Testing Program | |
00023977
160 Middle Street |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00023978
Pathway below Parliament Hill |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00023979
Innes Road |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00023980
Leitrim Road and Conroy |
Initial testing completed. No further action required. | 2019-2020 | 03 Initial Testing Program | |
00023981
Innes Road at Anderson Road |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00023982
North of the RA Centre |
Detailed testing completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00023983
Central LeBreton |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00023985
Sussex-Alexander |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00023986
Sussex Alexander |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00023987
Burnside Site |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
00023988
Confederation Park |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023990
Victoria Island |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00023991
Mackenzie Ave |
Historical review completed. No further action required. | 2022-2023 | 02 Historical Review | |
00023995
Rockcliffe Compound |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00023996
3339 Leitrim Road Farm Land |
Initial testing completed. No further action required. | 2016-2017 | 03 Initial Testing Program | |
00023997
Ridge Road |
Initial testing completed. No further action required. | 2018-2019 | 03 Initial Testing Program | |
00023998
Sir John A MacDonald Parkway - Westboro Beach |
Initial testing completed. Detailed testing underway. | 2023-2024 | I Insufficient Information | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00023999
234 Atlantis Ave |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00024000
80 Bayview Main Building |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00024001
80 Bayview Shed |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00024002
80 Bayview Shed 2 |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00024003
80 Bayview Garage |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00024005
Queen Elizabeth Drive N of, W of Preston |
Detailed testing completed. No further action required. | 2018-2019 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024006
191 Colonel By Drive |
Detailed testing completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 05 Detailed Testing Program |
00024007
150 Middle Street |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024009
Westboro Beach |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00024011
Cliff Street |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00024012
Booth Street, West of LeBreton near Chaudiere Falls |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024013
Booth Street East, West of Wellington |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024014
Chaudiere Island Lot Pa |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024015
Chaudiere Island Lot P |
Detailed testing completed. No further action required. | 2022-2023 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00024016
Cliff Street |
Historical review planned. | 2022-2023 | 01 Identify Suspect Sites | |
00024047
Shirleys Bay, Ottawa, ON |
Historical review completed. No further action required. | 2018-2019 | N Not a Priority for Action | 02 Historical Review |
00024055
Center for Surface Transportation Technology |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024056
National Research Council Laboratories, Uplands |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00024057
Montreal Road Complex ON |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00024306
Center for Surface Transportation Technology - Landfill |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024307
Center for Surface Transportation Technology - Wetland |
Confirmatory sampling completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00024538
Baskin's Beach Range - Rear Range Tower |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024544
Iroquois Lock Direction - Range Rear around the vestiges of the four concrete bases still present on site |
Initial testing completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024546
Mariatown Range - Rear |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00024615
NRC Research facility at 100 Sussex |
Initial testing completed. No further action required. | 2015-2016 | 03 Initial Testing Program | |
00024693
Greenbank ON - CHU Time Signal Station |
Initial testing completed. No further action required. | 2017-2018 | 03 Initial Testing Program | |
00024806
Former B164/79 and via Venus |
Confirmatory sampling completed. No further action required. | 2015-2016 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00025396
Cornwall Island - Aquatic, Battery Disposal Site |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025397
Cornwall Harbour - Aquatic, Battery Disposal Site |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00025775
Colonel By Drive/Rideau Canal |
Detailed testing completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00025803
Institute for Research in Construction, Carleton Place |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00025806
Fort Wellington Maintenance Compound |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00025807
2 Landing Road, mallorytown (dock and parking lot) |
Initial testing completed. No further action required. | 2013-2014 | 03 Initial Testing Program | |
00025823
Land south of the Government of Canada Conference Center |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00026078
Cornwall harbour lands |
Detailed testing completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00026421
Shirleys Bay Campus, P9 parking |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00026457 | Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00027484
335 River Road |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00027485
Ottawa station |
Initial testing completed. Detailed testing underway. | 2022-2023 | 03 Initial Testing Program | |
00027541
Lansdowne |
Remediation / risk management completed. No further action required. | 2017-2018 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00027545
Rideau Canal, Dow's Lake to Ottawa Locks |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00027547
Fort Wellington NHS |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00027548
Prescott Arena Lands |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00027549
Former CP Lands Prescott |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
00027590
Limebank soil pile |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00027593
Technical and Protective Operations Facility (TPOF) |
Remediation / risk management completed. No further action required. | 2021-2022 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
00027600
156 Middle Street |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00027601
160 Middle Street |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00027602
Middle Street |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00027614
Ottawa River |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00027615
Middle Street to Booth Street |
Detailed testing completed. No further action required. | 2023-2024 | 1 High Priority for Action | 06 Classify the site using the CCME National Classification System |
00027616
161 Middle Street |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00027617
Middle Street |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
00027622
Russell Rd and Sheffield Rd |
Historical review completed. Initial testing underway. | 2023-2024 | 02 Historical Review | |
00027623
3339 Leitrim Road Farm Land |
Initial testing completed. No further action required. | 2019-2020 | 03 Initial Testing Program | |
00027638
Dominion Observatory |
Historical review completed. No further action required. | 2018-2019 | 02 Historical Review | |
00027669
25 George Street |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00027754
3637 Bank Street |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00027755
Bank St, Conroy Rd, Park Lane (next to 3637 Bank Street) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00027768
Sir George Etienne Cartier Parkway, Land Around Aviation Museum |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00027822
Bear Brook near Bourget |
Detailed testing completed. No further action required. | 2021-2022 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
00027929
Mississippi at Appleton |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
00027930
East Castor River near Russell |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
00027968
Ottawa Fallowfield Laboratory |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00027999
Smith fall sub spill due to fire on adjacent land |
Long term monitoring completed. No further action required. | 2022-2023 | 10 Long-Term Monitoring (Optional) | |
00028026
Rockcliffe Park |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00028027
Rockcliffe Park |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00028028
Rockcliffe Park |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
00028121
Jackson Building (122 Bank Street) |
Initial testing completed. No further action required. | 2023-2024 | 03 Initial Testing Program | |
00028122
L'Esplanade Laurier |
Initial testing completed. No further action required. | 2023-2024 | 03 Initial Testing Program | |
00028124
Rideau Falls Dam & Central Heating NRC (Plant Site) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
00028125
Sir Charles Tupper Building |
Detailed testing completed. No further action required. | 2023-2024 | 05 Detailed Testing Program | |
00028132
Long Island Campground |
Historical review planned. | 2023-2024 | 01 Identify Suspect Sites | |
07822001
Cornwall Island - Canadian Customs Warehouses |
Historical review not required. | 2011-2012 | 01 Identify Suspect Sites | |
08448001
Wendover, ancien FA - South of river |
Historical review completed. No further action required. | 2021-2022 | 02 Historical Review | |
08477001
Bulk chemical storage site |
Confirmatory sampling completed. No further action required. | 2008-2009 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08477002
Former UST |
Confirmatory sampling completed. No further action required. | 2008-2009 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08477003
Cornwall - Harbour Bed |
Detailed testing completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
08482001
Water St. Park |
Remediation / risk management completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08591001
Communications Research Centre |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08591002
Communications Research Centre |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08598001
Connaught Range Primary Training Centre - Bldgs 142 & 143 |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08598002
Connaught Rnge Primary Trng Ctre,Various Former Supply Wells |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
08598005
Connaught Range Primary Training Ctre Former Transport Comp. |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08598006
Connaught Range Primary Training Centre Former Landfill Site |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08598007
Connaught Range Primary Training Centre - Building 36 |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08625001
Central Experimental Farm |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
08625018
Central Experimental Farm |
Detailed testing completed. No further action required. | 2011-2012 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
08625019
Central Experimental Farm |
Detailed testing completed. No further action required. | 2012-2013 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
08625021
Central Experimental Farm |
Confirmatory sampling completed. No further action required. | 2011-2012 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08625023
Central Experimental Farm |
Detailed testing completed. No further action required. | 2015-2016 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
08625031
Central Experimental Farm |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
08625036
Central Experimental Farm |
Remediation / risk management completed. No further action required. | 2011-2012 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08636001
Central Heating Plant in Rockcliffe - Disposed to NCC |
Confirmatory sampling completed. No further action required. | 2014-2015 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08636002
CFSU(O) Rockcliffe PMQ Trailer Storage Compound |
Detailed testing completed. No further action required. | 2009-2010 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
08651001
RA Centre |
Historical review not required. | 2016-2017 | I Insufficient Information | 01 Identify Suspect Sites |
08708001
Areas U-61 and U-62 (NRCan sublease) |
Confirmatory sampling completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08708002
Former 9000 litre heating oil UST - 0-115 |
Confirmatory sampling completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08708003
Area T-99 (TC Aviation Services) |
Initial testing completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
08708004
Former De-icing Area - Main Apron |
Confirmatory sampling completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08708005
Bulk fuel storage facility (Esso Tank Farm) - Ottawa Macdonald-Cartier International Airport |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08708006
East end of Building T-96 |
Detailed testing completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
08708007
Building T107 (Shell Tank Farm) - Ottawa Macdonald-Cartier International Airport |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08708008
East end of Building T-96 (National Car Rental facility) |
Confirmatory sampling completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08708009
DND's former fire fighting training area |
Confirmatory sampling completed. No further action required. | 2015-2016 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08708010
DND's Petroleum, oils and lubricants (POL) tank farm |
Confirmatory sampling completed. No further action required. | 2015-2016 | 2 Medium Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08708011
DND's Petroleum, oils & lubricants (POL) Compound |
Initial testing completed. No further action required. | 2016-2017 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
08708012
Building T-96 (car rental facility) - Ottawa Macdonald-Cartier International Airport |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
08708013
Gloucester Landfill |
Remediation / risk management completed. Confirmatory sampling underway. | 2023-2024 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08708014
Hunt Club Road Pinestand - Ottawa Macdonald-Cartier International Airport |
Initial testing completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
08734011
Canadian Police College RCMP |
Detailed testing completed. No further action required. | 2008-2009 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
08803001
Booth Street Buildings (William Logan and Administration ) |
Confirmatory sampling completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08803003
Booth Street Buildings (William Logan and Administration) |
Confirmatory sampling completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08803004
Booth Street Buildings (William Logan and Administration) |
Confirmatory sampling completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08803005
Booth Street Buildings (William Logan and Administration) |
Remediation / risk management completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08831001
National Press Block |
Confirmatory sampling completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08834001
East Part of Bank Street Valley (see 08835.005 for West Part) |
Remediation / risk management completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08834002
Centre Block Building |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
08834003
East Block Building |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
08835002
Cliff Street Central Heating Plant |
Remediation / risk management completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08835003
St. Laurent Square |
Remediation / risk management completed. No further action required. | 2023-2024 | 1 High Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08835004
Justice, Supreme Court, Confederation, Fed. Annex, Central Heating Plant Buildings |
Confirmatory sampling completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08835005
West Part of Bank Street Valley (see 08834.001 for East Part) |
Remediation / risk management completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08837001
West Memorial Building |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
08838001
Garden of Provinces et Territories |
Detailed testing completed. No further action required. | 2014-2015 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
08839001
Library and Archives Canada Building |
Remediation / risk management completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
08886001
Former NCC Building |
Confirmatory sampling completed. No further action required. | 2009-2010 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
08895001
Parliamentary Precinct Block 2 |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
08895002
Birks Building |
Detailed testing completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
09026001
Major-General G.R. Pearkes Building |
Detailed testing completed. No further action required. | 2011-2012 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
09031001
LaSalle Academy, 373 Sussex Drive, Ottawa, Ontario |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
09126001
Harbour Bed |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
09144001
Vacant land (Building demolished) |
Long term monitoring completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
09189001
IVY LEA (waterlot) |
Historical review completed. No further action required. | 2014-2015 | 02 Historical Review | |
09303001
SEELEYS BAY (Waterlot) |
Initial testing completed. No further action required. | 2014-2015 | 03 Initial Testing Program | |
09359001
WESTPORT (Waterlot) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
09412001
Lower Reach Park |
Remediation / risk management completed. Confirmatory sampling underway. | 2022-2023 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09412002
Old Sly's Lockstation |
Remediation / risk management completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
09412003
Industrial Island Park |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
09412004
Shops Compound |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
09412005
Mooney's Bay Marina (Hog's Back) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
09412006
Ayling's Marina |
Initial testing completed. Detailed testing underway. | 2023-2024 | 2 Medium Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
09412007
Reserve Land, Part 3, Extension of Lot 132/133 |
Detailed testing completed. No further action required. | 2018-2019 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
09998001
Vacant Land near Sawmill Creek |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
10941001
WENDOVER (Sediment Nearshore) |
Initial testing completed. No further action required. | 2013-2014 | N Not a Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
22500001
Prescott CCG Base (Soil Across Property) |
Detailed testing completed. No further action required. | 2022-2023 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
22500002
Prescott CCG Base (Waterlot) |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 05 Detailed Testing Program |
23029001
RA Centre |
Confirmatory sampling completed. No further action required. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
23970001
Nearshore (Waterlot) |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
24245001
FITZROY HARBOUR (Waterlot sediments) |
Detailed testing completed. No further action required. | 2019-2020 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
24426002
Vacant Land (Former temporary Building # 8) |
Confirmatory sampling completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
24739001
Aubrey Island LL 370 - Surrounding the navigational aid |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
24781001
350 King Edward (Former Bank of Canada Bldg) |
Remediation / risk management completed. No further action required. | 2011-2012 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
30918001
Confederation Heights Central Heating Plant |
Detailed testing completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
30918002
Confederation Heights Insurance Building |
Remediation / risk management completed. No further action required. | 2019-2020 | 3 Low Priority for Action | 08 Implement Remediation/Risk Management Strategy |
31510001
CORNWALL-MARINA (Nearshore of Waterlot) |
Detailed testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 05 Detailed Testing Program |
32166001
L'orginal waterlot |
Initial testing completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
32595001
Uniform #2 Building, 79 Bentley Avenue, Ottawa, Ontario |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | N Not a Priority for Action | 06 Classify the site using the CCME National Classification System |
33263001
Walkley/Holland POL Storage Area |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
33270001
HMCS Gloucester |
Confirmatory sampling completed. No further action required. | 2015-2016 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
50064001
Environmental Health Centre |
Confirmatory sampling completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
50066001
Bureau of Medical Devices and Radiation Protection |
Confirmatory sampling completed. No further action required. | 2008-2009 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
54097001
Lionel Chevrier Building |
Remediation / risk management completed. No further action required. | 2017-2018 | N Not a Priority for Action | 08 Implement Remediation/Risk Management Strategy |
54521001
Former Sir John Carling Building |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
54533001
Government Conference Centre |
Remediation / risk management completed. No further action required. | 2013-2014 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
54977001
Pavilions Sussex, Rideau, Bytown |
Confirmatory sampling completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
54977002
Pavilions Sussex, Rideau, Bytown |
Confirmatory sampling completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
54977003
Pavilions Sussex, Rideau, Bytown |
Confirmatory sampling completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
54977004
Pavilions Sussex, Rideau, Bytown |
Confirmatory sampling completed. No further action required. | 2009-2010 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58259001
De Watteville Island Front Range - Surrounding navigational aid |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58321001
Hunt Club Road Pinestand Property, Ottawa Airport |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58321002
Pipeline (near Tank Farm), 7 Wing CFB Ottawa |
Confirmatory sampling completed. Long term monitoring underway. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58321003
Former Central Heating Plant (Building 309), Uplands |
Confirmatory sampling completed. No further action required. | 2023-2024 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58321004
Uplands Marina, CFSU Ottawa |
Long term monitoring completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 10 Long-Term Monitoring (Optional) |
58321005
CFSU(O) Uplands PMQ Trailer Storage Compound |
Confirmatory sampling completed. No further action required. | 2013-2014 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58321006
Uplands - decommissioned oil filled high voltage cables |
Confirmatory sampling completed. No further action required. | 2016-2017 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58321007
Uplands Bldg 329 (Bell Building) Former UST |
Long term monitoring completed. No further action required. | 2013-2014 | N Not a Priority for Action | 10 Long-Term Monitoring (Optional) |
58321008
CFSU Uplands Alert Road former Dump |
Initial testing completed. No further action required. | 2004-2005 | N Not a Priority for Action | 03 Initial Testing Program |
58321009
Uplands Self-Help Housing Maintenance Compound |
Confirmatory sampling completed. No further action required. | 2023-2024 | 3 Low Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58321010
Former USTs at the PMQs at Uplands |
Confirmatory sampling completed. No further action required. | 2013-2014 | N Not a Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58321011
Uplands Former Tank Farm |
Confirmatory sampling completed. No further action required. | 2013-2014 | 1 High Priority for Action | 09 Confirmatory Sampling and Final Reporting |
58322001
Golf Course Maintenance Compound (401), CFB Ottawa (south) |
Long term monitoring completed. No further action required. | 2023-2024 | 2 Medium Priority for Action | 10 Long-Term Monitoring (Optional) |
58431001
Bells Corners Complex |
Initial testing completed. Detailed testing underway. | 2023-2024 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
58475001
555 Booth Street |
Remedial action plan completed. Remediation / risk management underway. | 2023-2024 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
58479001
Booth Street |
Remediation / risk management completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
58479002
Booth Street |
Remediation / risk management completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
58479003
Booth Street |
Remediation / risk management completed. No further action required. | 2011-2012 | 2 Medium Priority for Action | 08 Implement Remediation/Risk Management Strategy |
63096001
Head Museum Building |
Initial testing completed. Detailed testing underway. | 2023-2024 | 03 Initial Testing Program | |
82214001
Heavy metals in soils |
Detailed testing completed. No further action required. | 2012-2013 | N Not a Priority for Action | 07 Develop Remediation/Risk Management Strategy |
82255001
Wendover, ancien FP - Former RRL |
Initial testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 04 Pre-Classify contaminated site using the CCME National Classification System (optional) |
83764001
Prince Regent Island - Soil in Vicinity of Light |
Detailed testing completed. No further action required. | 2020-2021 | 3 Low Priority for Action | 07 Develop Remediation/Risk Management Strategy |
83804001
Light 92 - Surrounding navigational aid |
Detailed testing completed. Remedial action plan under development. | 2023-2024 | 2 Medium Priority for Action | 06 Classify the site using the CCME National Classification System |
83869001
Duck Rock Island (Area N, E and S of the Nav Aid) |
Detailed testing completed. No further action required. | 2021-2022 | 3 Low Priority for Action | 06 Classify the site using the CCME National Classification System |
83878001
Grenadier Island L.L 361 - Surrounding the navigational aid. |
Detailed testing completed. No further action required. | 2019-2020 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
85123001
Wood Island - Adjacent to Former Light Base |
Detailed testing completed. No further action required. | 2012-2013 | 2 Medium Priority for Action | 07 Develop Remediation/Risk Management Strategy |
N0103001
Air Navigation Facility: Storage Building |
Historical review completed. No further action required. | 2001-2002 | 02 Historical Review |
- Version: