Search Results

Search Results Summary
Criteria:
  • Federal Electoral District: Dartmouth--Cole Harbour
Select Additional Criteria...
Sort Key:Province or Territory (ascending)
Sites Found:181
Alternate Views
Choose an alternate view: Map XML CSV Financials Report
Results View Options

Results by Site Impact

Change results view to: Name and Location Contaminants and Media

FCSI Identifier
Site Name
Status Fiscal Year Classification Highest Step Completed
00013041
Dartmouth Laboratory
Initial testing completed. No further action required. 2005-2006 N Not a Priority for Action 03 Initial Testing Program
03017002
Bedford Institute of Oceanography (Metal in soil- South of VanSteenburgh building)
Detailed testing completed. No further action required. 2012-2013 N Not a Priority for Action 05 Detailed Testing Program
00025315
Sable Island- Potential Hydrocarbon Impacts at Former Fuel Drum Storage Area
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
00017597
Bear Cove MMB Front (No Impacts)
Historical review completed. No further action required. 2012-2013   02 Historical Review
00017541
Coast Guard Large Vessel Warehouse - Unassessed
Historical review not required. 2012-2013   01 Identify Suspect Sites
02835001
Sambro Island - Metals and Petroleum in soil
Remediation / risk management completed. No further action required. 2015-2016 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00017542
Coast Guard Vessel Support - Unassessed
Historical review not required. 2012-2013   01 Identify Suspect Sites
00017598
Bear Cove MMB Rear (No Impacts)
Historical review completed. No further action required. 2012-2013   02 Historical Review
00011539
Coast Guard Helicopter Refueling Pad
Detailed testing completed. No further action required. 2013-2014 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00017471
Sandwich Point Range Rear- No Impacts Identified
Initial testing completed. No further action required. 2012-2013   03 Initial Testing Program
00012606
Portuguese Cove (No Impact Closed)
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00017791
HERRING COVE (unassessed)
Historical review not required. 2012-2013   01 Identify Suspect Sites
00017297
Georges Island Halifax Harbour Inner Range Front - Metals in Soil
Detailed testing completed. No further action required. 2014-2015 2 Medium Priority for Action 05 Detailed Testing Program
00017531
Sambro Harbour, Bull Point - Light Bouy Only
Historical review completed. No further action required. 2008-2009 N Not a Priority for Action 02 Historical Review
00017308
Herring Cove - Metal Impacts
Detailed testing completed. No further action required. 2016-2017 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00017283
Georges Island Radar - Metals in Soil
Initial testing completed. No further action required. 2012-2013 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00017555
Landy Building Parking Lot (Unassessed)
Historical review not required. 2013-2014   01 Identify Suspect Sites
00013370
Portuguese Cove MMB Front (Zinc in Soil within SSCs)
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00023160
Sambro Island former dwelling areas - No Further Work Required
Initial testing completed. No further action required. 2012-2013   03 Initial Testing Program
00017309
Herring Cove Breakwater (Unassessed)
Historical review not required. 2014-2015   01 Identify Suspect Sites
00017468
Sambro SAR (No Impacts Identified)
Historical review completed. No further action required. 2012-2013   02 Historical Review
00017551
Halifax Tide Gauge (Unassessed)
Historical review not required. 2012-2013   01 Identify Suspect Sites
00017943
WEST PENNANT (Unassessed)
Historical review not required. 2012-2013   01 Identify Suspect Sites
00017351
Herring Cove Boathouse (Metal Impacts)
Initial testing completed. No further action required. 2012-2013 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00013106
Bedford Institute of Oceanography (Fume hood discharge area-Metals in soil)
Detailed testing completed. No further action required. 2012-2013 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00017298
Halifax Harbour Inner Range Rear (Metals in Soil)
Remediation / risk management completed. No further action required. 2016-2017 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00017579
Shannon Hill MCTS Centre - No further work required
Initial testing completed. No further action required. 2012-2013   03 Initial Testing Program
00017802
KETCH HARBOUR (Unassessed)
Historical review not required. 2012-2013   01 Identify Suspect Sites
00017467
Sambro Remote Transmitter (Metals in Soil)
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00017315
Chebucto Head Measured Mile Beacon Front - No Concerns Identified
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00017901
SAMBRO CREEK - no impacts Closed
Historical review completed. No further action required. 2009-2010 N Not a Priority for Action 02 Historical Review
02842001
Chebucto Head - Metals in soil and Petroleum in groundwater and soil
Detailed testing completed. No further action required. 2013-2014 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00017470
Sandwich Point Range Front - Zinc Impacts in Soil
Initial testing completed. No further action required. 2012-2013 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00022919
Portuguese Cove Measured Mile Beacon Rear (Zinc in Soil)
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02844001
Inner Sambro Island - Metals Impacts in Soil
Detailed testing completed. No further action required. 2013-2014 2 Medium Priority for Action 05 Detailed Testing Program
03017001
Bedford Institute of Oceanography (Hydrocarbons in Soil - Fmr. UST)
Detailed testing completed. No further action required. 2015-2016 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
03034001
Coast Guard Base Dartmouth (Metal/PAH/Hydrocarbons in Soil/Groundwater)
Detailed testing completed. No further action required. 2014-2015 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
03017003
Bedford Institute of Oceanography (Shipping containers- Metal in soil)
Detailed testing completed. No further action required. 2012-2013 N Not a Priority for Action 05 Detailed Testing Program
00005884
27 - Millbrook - 06058 - COLE HARBOUR 30 / 0202609205
Historical review not required. 2013-2014   01 Identify Suspect Sites
00026534
- AT04881617
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00026015
27 - Millbrook - 06059 - MILLBROOK 27 - AT04876617
Initial testing completed. Detailed testing underway. 2023-2024 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02863052
Shearwater(236)-Frm UST Loc(WWII)Bravo Taxiwy
Initial testing completed. No further action required. 2014-2015 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02919002
Dockyard (1002) - Boat Shed (D5)
Initial testing completed. No further action required. 2007-2008   03 Initial Testing Program
03044005
DCD School (905) - POL compound
Detailed testing completed. No further action required. 2010-2011 1 High Priority for Action 05 Detailed Testing Program
02863040
CFB Shearwater (240) - West Hangar Line, Fmr UST at B15
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863039
Shearwater(239)-Former Transformer Site(Railway Spot)
Initial testing completed. No further action required. 2000-2001 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
03011005
Shannon Park (3405) - Former Storage Building (B5)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863061
Shearwater - PMQs, Former Brick Yard (Hornsby's) (234B)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863029
Shearwater(229)-Upr Fuel Cmpnd,Upgradient Dmpg Area
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02907004
Disposed - Willow Park (4324) - CE Stores (EY3)*
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02859040
Bedford Degaussing Range (605) B4 Existing Sc. Structure
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
03002001
Windsor Park (4502) - Auto Hobby Club WP 87
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
52107001
Water lots(9905),Harbour Front (Naval staff house)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
03011002
Shannon Park (3402) - Fmr POL Storage Behind (B2)
Remediation / risk management completed. No further action required. 2014-2015 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
03011008
Disposed - Water Lots, Shannon Park (9904)
Confirmatory sampling completed. No further action required. 2014-2015 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03011010
Shannon Park (3410) - Residential Area
Remediation / risk management completed. No further action required. 2014-2015 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
03013009
Water Lots (9913), DREA Accoustic Barge
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03044006
DCD School (906) - Upper Garage
Confirmatory sampling completed. No further action required. 2009-2010 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
03044016
Sandwich Point (7302) - Transformer (Water Pump Sta.)
Initial testing completed. No further action required. 2014-2015 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02859057
Disposed:Bedford Degauss Rnge(7701),Naval Reserve Tufts Cove
Historical review completed. No further action required. 1999-2000 N Not a Priority for Action 02 Historical Review
02859039
Bedford Degaussing Range (602) - Paint Locker beside B7
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02859009
CFAD Bedford (810) - Otto Fuelling & Defuelling B48
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859035
Wrights Cove (8606) - Storm Drain
Confirmatory sampling completed. No further action required. 2017-2018 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859021
CFAD Bedford (822) - Buildings BD169-BD178, BD182 &BD183
Confirmatory sampling completed. No further action required. 2016-2017 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02859008
CFAD Bedford (808) - Railcar off loading plat & B191
Initial testing completed. No further action required. 2003-2004   03 Initial Testing Program
02863011
CFB Shearwater (211) - Landfill 1
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00024914
Shearwater CC-144B Challenger Crash Site (Site 249)
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
02863009
Disposed: Shearwater (209) - Coast Guard Assigned Property
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863002
CFB Shearwater (202) - EOD Disposal Area (DIPM site)
Confirmatory sampling completed. No further action required. 2016-2017 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859028
CFAD Bedford (829) - Camera Hut (BD44)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
02859041
Bedford Degaussing Range (604) B5 Existing Sc. Structure
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02859026
CFAD Bedford (827) - Former Metal Scrap Yard
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859017
CFAD Bedford (818) - Otto Fuel Storage (BD164)
Initial testing completed. No further action required. 2002-2003 N Not a Priority for Action 03 Initial Testing Program
02863013
CFB Shearwater (213) - Landfill 3
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859003
CFAD Bedford (803) - Former Landfill (West of B162)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863014
CFB Shearwater (214) - Landfill 4
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863012
CFB Shearwater (212) - Landfill 2
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859034
Wrights Cove (8604) - Pond disposal area
Long term monitoring completed. No further action required. 2017-2018 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
02859052
CFAD Bedford (832), Asbestos pipe on access road B79/107/109
Remediation / risk management completed. No further action required. 2009-2010 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02863008
CFB Shearwater (208) - Former Maintenance Hangar
Long term monitoring completed. No further action required. 2019-2020 1 High Priority for Action 10 Long-Term Monitoring (Optional)
02859024
CFAD Bedford (825) - Former Maintenance Garage
Initial testing completed. No further action required. 2016-2017 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02863031
Shearwater(231)-W.Property Boundary
Initial testing completed. No further action required. 2000-2001 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02859006
CFAD Bedford (806) - Sewage Treatment Plant
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02863017
Shearwater (217) - Engine Run Up Area (DIPM Site)
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863019
CFB Shearwater (219) - Suspect Burn Pit No 2/Coal Storage
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
02859036
Wrights Cove (8603) - Two suspected dump areas
Confirmatory sampling completed. No further action required. 2018-2019 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02863004
CFB Shearwater (204A) - Former Mobile Asphalt Plant
Remediation / risk management completed. No further action required. 2019-2020 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02863020
Shearwater (220) - Fill Area South of Hangar H
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859027
CFAD Bedford (828) - Former Location of Buildings 47 &48
Initial testing completed. No further action required. 2009-2010 N Not a Priority for Action 03 Initial Testing Program
02863033
Shearwater(233)-Fmr MT Garage(BJ)Adjcnt Trnsfrmr Substn
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859014
CFAD Bedford (815) - Central Heating Plant (B190)
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863024
Shearwater (224): Canex Garage (132), Former Firehall & UST
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
02863026
Shearwater (226) C. Heating Plant (56) & Fuel (rail) Comp.
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859042
Bedford Degaussing Range (603) - B6 Existing Bulk Structure
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02863006
Shearwater (206) Former Barrel site HH (DIPM Site)
Confirmatory sampling completed. No further action required. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02863021
Shearwater (221) - Lower Fuel Compound and Firing Range
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859033
CFAD UXO Impacted Area (830) - Rent Point explosion
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863035
Shearwater(235)-Frm Centrl Htg Plnt(G)Trnsfrmr Vault
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859019
CFAD Bedford (820) - Former Landfill near B206
Long term monitoring completed. No further action required. 2017-2018 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
02863034
Shearwater(234A)-PMQs, Former Brick Yd(Hornsby's)
Long term monitoring completed. No further action required. 2012-2013 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
02863059
Water Lots (9910), Shearwater
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859051
CFAD Bedford (831) - Open well NE of B146
Remediation / risk management completed. No further action required. 2009-2010 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02863010
Shearwater (210) - Fire Fighting Training Area
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863042
CFB Shearwater (242) - Hangar 3 and Annex
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859048
Bedford Degaussing Range (608) - B9 POL STORAGE CABINET
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02859022
CFAD Bedford (823) - POL Storage Building (BD27)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
00024920
Shearwater Sea King Crash Site (Site 248)
Historical review planned. 2023-2024   01 Identify Suspect Sites
02859011
CFAD Bedford (812) - Otto Fuel Waste Burning Area BD220
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00024811
Shearwater (247) Abandoned Transformer Shed
Confirmatory sampling completed. No further action required. 2016-2017 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00008673
CFB Shearwater (204C) - Former Arrestor Gears
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00008427
DCD School (912) - Gravel Entrance Parking Lot
Initial testing completed. No further action required. 2010-2011 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02859046
Navy Island (7501)
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02859020
CFAD Bedford (821) - Existing Jetty -NN at Wrent Point
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
02858013
Bedford Degaussing Rng (607)- B1Caretaker Res (Cntrl Bldg)
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02859029
CFAD Bedford (809) - Otto Fuel Storage B203
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859018
CFAD Bedford (819) - Existing Jetty
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859001
CFAD Bedford (801) - Ridge Landfill
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863001
CFB Shearwater (201) - Landfill 6 - Airfield
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00024918
Shearwater Aircraft Burn Area (Site 252)
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024917
Shearwater FFTA (Alpha Taxiway) (Site 250)
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02859023
CFAD Bedford (824) - Former Heating Plant (B140)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859010
CFAD Bedford (811) - Former UST's, BM 95 & BM 47*
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859007
CFAD Bedford (807) - BCE Storage Yard
Initial testing completed. No further action required. 2002-2003   03 Initial Testing Program
02859054
Wrights Cove (8602) - CN Rail Tracks/Building
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02863041
CFB Shearwater (241) - East Hangar Line and Ramp Area
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863060
Shearwater (243), Buried Lines Connect. Fmr Fuel Tank Farm
Historical review completed. No further action required. 2001-2002 N Not a Priority for Action 02 Historical Review
02859053
Wrights Cove (8607) - Upgradient Industrial Area
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02863028
Shearwater(228)-B9(Fmr Firehall,Tender Gar)Crown AssetsB70
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
03009022
Dockyard Annex (1117) - W53 Garage
Remediation / risk management completed. No further action required. 2009-2010 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02863016
CFB Shearwater (216) - Fill Area West of Alpha Taxiway
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859032
CFAD East-side property (7403) - Area North of Highway 7
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00024953
Roads and Grounds Storage Yard
Historical review planned. 2023-2024   01 Identify Suspect Sites
02858012
Bedford Degaussing Range (606)- B3 Existing Bulk Structure
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00024954
Groundwater Recirculation Discharge Station Aerodome (254)
Initial testing completed. Detailed testing underway. 2023-2024   04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02859038
Wrights Cove (8605) - Two infilled areas
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02859025
CFAD Bedford (826) - Former Maintenance Area, Labs
Confirmatory sampling completed. No further action required. 2016-2017 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024913
Shearwater Fire Hall Storage Shed (SH40) (Site 253)
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00025081
12 Wing Shearwater PFAS Site-Wide
Detailed testing completed. Remediation / risk management planned. 2023-2024 1 High Priority for Action 05 Detailed Testing Program
00025054
CF Ammunition Depot Bedford Site-Wide PFAS
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00024915
Shearwater Former FFTA (North Delta Taxiway) (Site 251)
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
03009008
Dockyard Annex (1110) - Silica Sand Blast (W61)
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
03044002
DCD School (902) - AST at B3
Long term monitoring completed. No further action required. 2013-2014 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
03044001
DCD School (901) - Former USTs at Bldg B1
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02919018
Dockyard (1018) - Base Supply (D66)
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02919022
Dockyard (1022) - Oil Waste water Treatment
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
03044015
Disposed -Sandwich Pt.(7301) Fmr Pump house-AST/Transformer
Long term monitoring completed. No further action required. 2014-2015 1 High Priority for Action 10 Long-Term Monitoring (Optional)
03009024
Water Lots (9907), Dockyard Annex
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03011001
Shannon Park (3401) - Central Heating Plant (B4)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03011004
Shannon Park (3404) - Swimming Pool (B10)
Historical review completed. No further action required. 2001-2002   02 Historical Review
03011003
Shannon Park (3403) - Snow Stockpile area, behind (B4)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
03044014
DCD School (903) - AST at B6
Long term monitoring completed. No further action required. 2014-2015 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
03011007
Shannon Park (3407) - Former Location of Storage (B7)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02920010
Stadacona Gym (3710) - Former UST
Confirmatory sampling completed. No further action required. 2007-2008 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
03013010
Fuel Lines fr Bunker AST to French Cable Wharf (1404)
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
03013004
DRDC (1408) - Waste solvent dumping (East of building 2)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
02859056
Bedford Degaussing Range (601) Ind. workshop/garage (B8)
Remediation / risk management completed. No further action required. 2019-2020 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02863054
CFB Shearwater (205) - Ammunition Compound
Remediation / risk management completed. No further action required. 2019-2020 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
02865006
Water Lots (9903), Bedford Degaussing Range
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859055
Water Lots (9901) CFAD Bedford
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863030
Shearwater(230)-Bldg31,31A,31B,32(Mobl Spprt Maint)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
03011009
Shannon Park (3408) -CHP Ash Disposal
Remediation / risk management completed. No further action required. 2014-2015 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02863018
CFB Shearwater (218) - Suspect Burn Pit No 1
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03002010
Windsor Park (4511) - UST Site WP90
Confirmatory sampling completed. No further action required. 2007-2008 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02863023
Shearwater (223) - Building 4 and H (POL)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
03009015
Dockyard Annex (1101) - Hazardous Storage Area (W45)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
03011006
Shannon Park (3406) - Skating Rink (B20)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
02863003
CFB Shearwater (203) - Incinerator/Fill Site (DIPM Site)
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
02863053
CFB Shearwater (204B) - Former Heavy Equipment Compound
Long term monitoring completed. No further action required. 2019-2020 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
03011011
Shannon Park (3409) - Fill Area, Rink
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02863022
Shearwater (222A): Former POL (D) & UST (S) at bldg 212 & HY
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03010001
Water Lots (9906), French Cable Warf
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863051
Osborne Head (5665) - Former Radar Site
Initial testing completed. No further action required. 2000-2001   03 Initial Testing Program
03009023
Dockyard Annex (1118) - W54 Residence
Remediation / risk management completed. No further action required. 2009-2010 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00025784
IMB Halifax
Initial testing completed. No further action required. 2018-2019 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025797
Institute for Marine Biosciences, Sandy Cove
Confirmatory sampling completed. No further action required. 2017-2018 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02991001
Ahern Avenue Old Maintenance Building
Confirmatory sampling completed. No further action required. 2013-2014 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
02983001
Phase I ESA 1919 Upper Water Street Site- no contamination confirmed
Historical review not required. 2011-2012   01 Identify Suspect Sites
05669001
Marine House Building, Halifax
Remediation / risk management completed. No further action required. 2012-2013 I Insufficient Information 08 Implement Remediation/Risk Management Strategy
03020001
Parking
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00022658
Halifax RCMP
Historical review completed. No further action required. 2011-2012   02 Historical Review
00013450
Cole Harbour RCMP
Initial testing completed. No further action required. 2010-2011   03 Initial Testing Program