Search Results

Search Results Summary
Criteria:
  • Media Type: Air
Select Additional Criteria...
Sort Key:Municipality (descending)
Sites Found:114
Alternate Views
Choose an alternate view: Map XML CSV Financials Report
Results View Options

Results by Site Impact

Change results view to: Name and Location Contaminants and Media

FCSI Identifier
Site Name
Status Fiscal Year Classification Highest Step Completed
00001215
Hartley creek near Fort Mackay
Confirmatory sampling completed. No further action required. 2007-2008 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00006832
642 - Cowichan - 06799 - COWICHAN NO. 1 - 0903082806
Confirmatory sampling completed. No further action required. 2000-2001 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
00006859
610 - Kwadacha - 07576 - FORT WARE NO. 1 - 0903216807
Confirmatory sampling completed. No further action required. 2010-2011 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
00006618
570 - Shxwhá:y Village - 08048 - SKWAY 5 - 0902662806
Detailed testing completed. Remediation / risk management planned. 2023-2024 1 High Priority for Action 05 Detailed Testing Program
00008201
540 - Kitasoo Xai'xais Nation - 07886 - KITASOO 1 - BC04825611
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00006864
540 - Kitasoo - 07886 - KITASOO 1 / 0903229107
Initial testing completed. No further action required. 2012-2013 1 High Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00002410
FLATHEAD RIVER AT FLATHEAD
Confirmatory sampling completed. No further action required. 2010-2011 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00006865
608 - Takla Nation - 07518 - NORTH TACLA LAKE 7 - 0903229307
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00006918
683 - Iskut - 08363 - ISKUT 6 - 0903329007
Historical review planned. 2023-2024   01 Identify Suspect Sites
00019469
Bird Islet - Minor Shore Light
Historical review completed. No further action required. 2008-2009 N Not a Priority for Action 02 Historical Review
00006863
674 - Lax Kw'alaams - 07770 - LAX KW'ALAAMS 1 - 0903229007
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00006861
610 - Kwadacha Nation - 07576 - FORT WARE 1 - 0903228807
Detailed testing completed. Remediation / risk management planned. 2023-2024 3 Low Priority for Action 05 Detailed Testing Program
00019702
Hope Point - Minor Shore Light
Historical review completed. No further action required. 2008-2009 N Not a Priority for Action 02 Historical Review
00006913
573 - Skwah - 08055 - SKWAH 4 - 0902903306
Detailed testing completed. Remediation / risk management planned. 2023-2024 1 High Priority for Action 05 Detailed Testing Program
00007619
549 - Tsleil-Waututh Nation - 07903 - BURRARD INLET 3 - 0904281609
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00006919
722 - Ulkatcho - 08345 - ULKATCHO 14A - 0903329107
Historical review planned. 2023-2024   01 Identify Suspect Sites
00025907
560 - Kwikwetlem First Nation - 08010 - COQUITLAM 2 - BC04861715
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00021289
Christie Passage - Mooring Buoy 2
Historical review not required. 2008-2009 N Not a Priority for Action 01 Identify Suspect Sites
00019755
Lookout Point - Minor Shore Light
Historical review completed. No further action required. 2008-2009 N Not a Priority for Action 02 Historical Review
00006862
672 - Gitxaala Nation - 07734 - DOLPHIN ISLAND 1 - 0903228907
Detailed testing completed. Remediation / risk management planned. 2023-2024 1 High Priority for Action 05 Detailed Testing Program
00027779
Yoho Ranch
Confirmatory sampling completed. No further action required. 2021-2022 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008633
DY-16 Dockyard IL Dry Dock - Former subsite DY-4h
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00019597
Ekins Point - Possible lead-based paint on Shore Light
Historical review completed. No further action required. 2008-2009 N Not a Priority for Action 02 Historical Review
00008606
DY-22 Dockyard IL Bldg 20 & 21 Former Paint/Oil Stores & UST
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00026526
572 - Soowahlie - 08051 - SOOWAHLIE 14 - BC04882217
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00026527
572 - Soowahlie - 08051 - SOOWAHLIE 14 - BC04882317
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00020277
Porpoise Harbour Entrance Range Front - Possible lead-based paint on Shore Light
Historical review completed. No further action required. 2008-2009 N Not a Priority for Action 02 Historical Review
00008296
656 - Songhees Nation - 06839 - NEW SONGHEES 1A - BC04836012
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
05016002
584 - Cheam - 08081 - CHEAM 1 - 7000074096
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
00019667
Grebe Islets - Minor Shore Light
Historical review completed. No further action required. 2008-2009 N Not a Priority for Action 02 Historical Review
00026528
572 - Soowahlie - 08051 - SOOWAHLIE 14 - BC04882417
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00019489
Brunswick Point - Brunswick Point Minor Shore Light
Historical review completed. No further action required. 2008-2009 N Not a Priority for Action 02 Historical Review
00026582
555 - Squamish - 07969 - CAPILANO 5 - BC04886418
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
05045008
671 - Nisga'a Village of Gingolx - 07705 - KINCOLITH 14 - 7000110998
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00026525
572 - Soowahlie - 08051 - SOOWAHLIE 14 - BC04882117
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00008609
DY-25 Dockyard IL Bldg 199
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00026635
541 - Wuikinuxv Nation - 07900 - KATIT 1 - BC04897819
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00019845
Port Moody Range, Rear Light - Possible lead-based paint on Shore Light
Historical review completed. No further action required. 2008-2009 N Not a Priority for Action 02 Historical Review
00020549
Bedwell Bay - Possible asbestos-containing resin
Historical review completed. No further action required. 2008-2009 N Not a Priority for Action 02 Historical Review
00019620
Fishermans Cove Minor Shore Light
Historical review completed. No further action required. 2008-2009 N Not a Priority for Action 02 Historical Review
09401040
Alaska Highway - Steamboat Maintenance Camp
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
09401060
Alaska Highway - Muncho Lake Maintenance Camp
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00019615
Finisterre Island - Possible lead-based paint on Shore Light
Historical review completed. No further action required. 2008-2009 N Not a Priority for Action 02 Historical Review
00024982
AH-1d Albert Head Septic Tank & Field
Confirmatory sampling completed. No further action required. 2018-2019 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024983
AH-1g Albert Head Abandoned Grease Trap
Confirmatory sampling completed. No further action required. 2018-2019 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
19118088
675 - Gitga'at First Nation - 07846 - KULKAYU (HARTLEY BAY) 4 - BC04844813
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
09401050
Alaska Highway - Toad River Maintenance Camp
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00028109
Midway RCMP Detachment Site
Initial testing completed. No further action required. 2023-2024   03 Initial Testing Program
09401080
Alaska Highway - Fireside Maintenance Camp
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
09401270
Alaska Highway - Former Military Establishment (Ft Nelson Rec Centre) P-08I
Confirmatory sampling completed. No further action required. 2019-2020 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
19118090
675 - Gitga'at First Nation - 07846 - KULKAYU (HARTLEY BAY) 4 - BC04845213
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00017964
BORDEN - FISHERMEN'S WHARF (No Impacts- Boat Maintenance Area)
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00017967
COVEHEAD (no land impacts) Closed
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00013374
MALPEQUE COVE (MALPEQUE) - Zinc and Copper in Soil
Initial testing completed. No further action required. 2012-2013 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00217001
Seacow Head & North Point East
Confirmatory sampling completed. No further action required. 2021-2022 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
05310001
317 - Northlands Denesuline First Nation - 06468 - LAC BROCHET 197A - 4000018896
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
00000449
MB04831812
Confirmatory sampling completed. No further action required. 2012-2013 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00025781
Wasagaming Drive Commercial Property
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00000584
315 - Opaskwayak Cree Nation - 06423 - OPASKWAYAK CREE NATION RESERVE NO. 21A - 0502296805
Confirmatory sampling completed. No further action required. 2008-2009 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00002625
Kennebecasis River at Apohaqui (01AP004)
Confirmatory sampling completed. No further action required. 2010-2011 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
00024832
CFHA - 165-167 St. John Ave
Detailed testing completed. No further action required. 2016-2017 N Not a Priority for Action 05 Detailed Testing Program
00024830
CFHA - 55 Dakota Drive
Historical review not required. 2016-2017   01 Identify Suspect Sites
00024879
CFHA - 81 Miramichi Road
Confirmatory sampling completed. No further action required. 2016-2017 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00017630
Greys Point - No Further Work Required
Initial testing completed. No further action required. 2008-2009 N Not a Priority for Action 03 Initial Testing Program
00024829
CFHA - 51 Dakota Drive
Confirmatory sampling completed. No further action required. 2016-2017 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00002627
French Lake at Lakeville Corner (01AO010)
Confirmatory sampling completed. No further action required. 2010-2011 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00024805
CFHA - 24 Sarcee Crescent
Detailed testing completed. No further action required. 2016-2017 N Not a Priority for Action 05 Detailed Testing Program
00024885
CFHA - 30 Tweedsmuir Court
Detailed testing completed. No further action required. 2016-2017 N Not a Priority for Action 05 Detailed Testing Program
00024833
CFHA - 5 Oneida
Confirmatory sampling completed. No further action required. 2016-2017 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024828
CFHA - 22 Restigouche Road North
Confirmatory sampling completed. No further action required. 2016-2017 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024831
CFHA - 149 Wilmot Circle
Remediation / risk management completed. No further action required. 2016-2017 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00008703
CFHA - 29 Clark St
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00002628
Indian Brook at Indian Brook (01FE002)
Confirmatory sampling completed. No further action required. 2010-2011 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
00017780
FREEPORT-FISH POINT WHARF (sed impacts)
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
02717099
UST #40 B-125 Water Pumphouse
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02863030
Shearwater(230)-Bldg31,31A,31B,32(Mobl Spprt Maint)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863008
CFB Shearwater (208) - Former Maintenance Hangar
Long term monitoring completed. No further action required. 2019-2020 1 High Priority for Action 10 Long-Term Monitoring (Optional)
03002006
Windsor Park (4505) - PMQ Barracks
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
C1049001
FOX C - EKALUGAD FIORD
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
N0015008
Iqaluit Airport Utilidor Asbestos Abatement
Confirmatory sampling completed. No further action required. 2008-2009 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
83484001
Gargantua (West Shore Gargantua Harbour)
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024000
80 Bayview Main Building
Detailed testing completed. Remedial action plan under development. 2023-2024 1 High Priority for Action 06 Classify the site using the CCME National Classification System
00013778
Channel Entrance Range Front Daybeacon - No Contamination Identified
Initial testing completed. No further action required. 2012-2013   03 Initial Testing Program
11943006
Former Neebing Landfill Site
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00014036
St. Williams (Daybeacon Waterlot Area)
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
05171002
127 - Gakijiwanong Anishinaabe Nation - 06242 - NEGUAGUON LAKE 25D - 3000038095
Initial testing completed. Detailed testing underway. 2023-2024 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
58231001
Griffith Island - Vicinity of Lighthouse
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
11919002
MAMAINSE HARBOUR (Rock Cavern Waste Disposal Area)
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00023298
Ottawa River Parkway, North of Bayview Road
Initial testing completed. Detailed testing underway. 2023-2024 1 High Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00027484
335 River Road
Detailed testing completed. Remedial action plan under development. 2023-2024 1 High Priority for Action 06 Classify the site using the CCME National Classification System
00008214
239 - Neskantaga First Nation - 09213 - NESKANTAGA - ON04795310
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
08895002
Birks Building
Detailed testing completed. No further action required. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00012797
PORT CREDIT (Harbour Marina Building)
Detailed testing completed. No further action required. 2012-2013 I Insufficient Information 05 Detailed Testing Program
08895001
Parliamentary Precinct Block 2
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
05200002
51 - Listuguj Mi'gmaq Government - 06088 - LISTUGUJ / 2000000993
Initial testing completed. No further action required. 2012-2013 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
82087001
Chromium on former light site
Initial testing completed. No further action required. 2012-2013 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
05355002
72 - Odanak - 06099 - ODANAK 12 - 2000028196
Remediation / risk management completed. No further action required. 2015-2016 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
14131001
Central Heating Plant
Initial testing completed. No further action required. 2011-2012 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00006788
351 - Fond du Lac - 00178 - FOND DU LAC INDIAN RESERVE NO. 231 - 0603056806
Detailed testing completed. Remediation / risk management planned. 2023-2024 1 High Priority for Action 05 Detailed Testing Program
00018191
Cape Race - Loran C
Detailed testing completed. No further action required. 2008-2009 N Not a Priority for Action 05 Detailed Testing Program
00018153
Bonavista (VHF - Main Tower)
Historical review completed. No further action required. 2008-2009   02 Historical Review
00019383
Twillingate (Shoal Tickle - Uplands - DFRP# 34649)
Initial testing completed. No further action required. 2012-2013 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00013518 Detailed testing completed. No further action required. 2015-2016 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
34627001
Rose Blanche (Uplands - DFRP# 34772)
Confirmatory sampling completed. No further action required. 2012-2013 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00018481
Pistolet Bay - Transmitter / DGPS - Transmitter building
Detailed testing completed. No further action required. 2008-2009 N Not a Priority for Action 05 Detailed Testing Program
N0012006
Maintenance Garage Asbestos Abatement
Confirmatory sampling completed. No further action required. 2011-2012 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
C1031001
RAYROCK MINE (ROB GROUP; M.M. GROUP; ISLAND 2; BETA0
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00023468
OLD FROBISHER WELLS-HAY RIVER
Long term monitoring completed. No further action required. 2015-2016 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
C1026001
INDORE GOLD MINE/HOTTAH LAKE (PITCH 8 )
Detailed testing completed. Remedial action plan under development. 2023-2024 1 High Priority for Action 06 Classify the site using the CCME National Classification System
C1047001
COLOMAC MINE (BATON LAKE, INDIN LAKE, GOLDCREST, GRIZZLY BEAR )
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00023822
RIVER LAKE PORTAGE
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
C1052001
Clinton Creek
Detailed testing completed. Remediation / risk management planned. 2023-2024 1 High Priority for Action 05 Detailed Testing Program
09401090
Alaska Highway - Iron Creek Maintenance Camp
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy