Search Results

Search Results Summary
Criteria:
  • Reporting Organization: National Defence
Select Additional Criteria...
Sort Key:FCSI Identifier (ascending)
Sites Found:1,950
Alternate Views
Choose an alternate view: Map XML CSV Financials Report
Results View Options

Results by Site Impact

Change results view to: Name and Location Contaminants and Media

FCSI Identifier
Site Name
Status Fiscal Year Classification Highest Step Completed
29757006
''MDR'' (former dump for), DRDC-Trials 
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00978017
1 Hangar 103 Rescue Unit
Remediation / risk management completed. No further action required. 2021-2022 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00008400
100 tons balance
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00025081
12 Wing Shearwater PFAS Site-Wide
Detailed testing completed. Remediation / risk management planned. 2023-2024 1 High Priority for Action 05 Detailed Testing Program
00025049
14 Wing Greenwood Site-Wide PFAS
Detailed testing completed. Remedial action plan under development. 2023-2024   06 Classify the site using the CCME National Classification System
00025132
14.5 Tow Tracking Range: SRIA
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00024892
15 Wing 25 m Range
Detailed testing completed. No further action required. 2019-2020 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
13820001
15 Wing B58 & EME Shop Test Site 2
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00024950
15 Wing B87 Former Waste UST
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00024851
15 Wing EME Shop Test Site 1
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00024853
15 Wing Fire Hall Test Area 1
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00000954
15 Wing Former FFTA
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000928
15 Wing Former Skeet Range
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00000929
15 Wing Hangar 2
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000935
15 Wing Hangar 5
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00000927
15 Wing Hangar 6
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000930
15 Wing Landfarm
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000933
15 Wing Landfill
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025051
15 Wing Moose Jaw Site-Wide PFAS
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00024858
17 Wing B88 Fire Hall
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
12579001
17 Wing Bulk Fuel POL & B82 Pumphouse
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00024857
17 Wing Former B87 EME Shop
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
12579004
17 Wing Former Building 87
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00024875
17 Wing Former Canex
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
00024859
17 Wing NW of Log Building 129
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00025052
17 Wing Winnipeg Site-Wide PFAS
Historical review planned. 2023-2024   01 Identify Suspect Sites
00025118
19 Wing 25m Outdoor Range
Historical review planned. 2023-2024   01 Identify Suspect Sites
00025073
19 Wing EOD Site
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024923
19 Wing Hangar 7
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025086
19 Wing Heritage Park
Confirmatory sampling completed. No further action required. 2023-2024 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
00025015
19 Wing PFAS Sitewide
Detailed testing completed. Remediation / risk management planned. 2023-2024 1 High Priority for Action 05 Detailed Testing Program
00025100
19 Wing Temp FFTA
Historical review planned. 2023-2024   01 Identify Suspect Sites
00024906
1941 April Lake Hurrican Crash Site
Historical review planned. 2023-2024   01 Identify Suspect Sites
N7008001
1998 GAF Crash Site (CRA13020)
Historical review completed. No further action required. 2006-2007   02 Historical Review
00008466
200 places prkng Mtl Garrison
Remediation / risk management completed. No further action required. 2013-2014 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
N7076001
2000 GAF Crash Site (CRA13040)
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
11378005
22 Wing 25m Outdoor Range
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00025082
22 Wing Behind Building 14
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00024877
22 Wing Building 45
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
11378002
22 Wing Former POL Tank Farm
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00025089
22 Wing MTO Dump
Historical review planned. 2023-2024   01 Identify Suspect Sites
00024927
22 Wing PFAS Monitoring
Detailed testing completed. Remedial action plan under development. 2023-2024 1 High Priority for Action 06 Classify the site using the CCME National Classification System
11378001
22 Wing RV Compound
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00024876
22 Wing Underground Complex
Historical review completed. No further action required. 2017-2018   02 Historical Review
00008344
25 m small arms range
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02717082
25 Yard Range
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
09406004
25 Yard Range Central
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
09406003
25 Yard Range North
Remediation / risk management completed. No further action required. 1998-1999 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
09407005
25 Yard Range South
Remediation / risk management completed. No further action required. 2014-2015 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
15729007
300 Meter Range (active)
Detailed testing completed. Remediation / risk management planned. 2023-2024 I Insufficient Information 05 Detailed Testing Program
15684001
4 AES Runway Training Pad / ATCO Pipeline
Detailed testing completed. No further action required. 2023-2024 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00024981
4 Wg Canex Gas Station
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00025048
4 Wing Cold Lake Site Wide PFAS
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00024849
4 Wing Fire Hall, Blding 4
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008672
4 Wing Hawk Crash Site - June 10, 2011
Confirmatory sampling completed. No further action required. 2017-2018 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
15684026
4 Wing Landfarm
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00025104
408 Sqn Parking Lot
Historical review planned. 2023-2024   01 Identify Suspect Sites
15680002
42 Radar Squadron (Cold Lake)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
14976042
490 Site - 604 Layout (EPG) Coyote & Rabbit Rds
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00025115
5 CDSB Gagetown PFAS Site-Wide
Historical review planned. 2023-2024   01 Identify Suspect Sites
00025107
5 CRPG - Former Small Arms Range - Port Saunders
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00025106
5 CRPG - Former Small Arms Range - Terra Nova
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00025105
5 CRPG - Rocky Harbour (Cow Head)
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00025113
5 CRPG Former Small Arms Range - Bonavista (Port Rexton)
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00025112
5 CRPG Former Small Arms Range - Hermitage
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00025153
5 CRPG Former Small Arms Range – Black Tickle
Historical review planned. 2023-2024   01 Identify Suspect Sites
00025149
5 CRPG Former Small Arms Range – Cartwright
Historical review planned. 2023-2024   01 Identify Suspect Sites
00025150
5 CRPG Former Small Arms Range – Churchill Falls
Historical review planned. 2023-2024   01 Identify Suspect Sites
00025151
5 CRPG Former Small Arms Range – Port Hope Simpson
Historical review planned. 2023-2024   01 Identify Suspect Sites
00025152
5 CRPG Former Small Arms Range – Red Bay
Historical review planned. 2023-2024   01 Identify Suspect Sites
00025120
5 Wing Goose Bay Dakota Range
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00025117
5 Wing Goose Bay Mosquito Range
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
N7087001
5 Wing Practice Target Area
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
09406002
600 Yard Rifle Range
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008397
7 CFSD - gravel parking lot west of B 236 (West Hill)
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02717085
7 Hangar Floor Drains
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
09406006
75 Yard Small Arms Classification Range
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
14976064
8 Trenches
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
09540012
8 W Fire Fighting Training Area /Hazardous Materials Storage
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
00025016
8 Wing 10 Hangar
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025077
8 Wing Site Wide PFAS
Detailed testing completed. Remedial action plan under development. 2023-2024   06 Classify the site using the CCME National Classification System
00961002
9 Wing 25m Firing Range
Detailed testing completed. Remedial action plan under development. 2023-2024 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00978024
9 Wing B106 Former CANEX site
Detailed testing completed. No further action required. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00978014
9 Wing B107 103 Rescue Unit
Remediation / risk management completed. No further action required. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00978004
9 Wing B109 Wing Fire Hall
Detailed testing completed. No further action required. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00978020
9 Wing B115 Former CANEX Site
Detailed testing completed. No further action required. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00978006
9 Wing B16 Central Heat Plant (CHP)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00978007
9 Wing Bldg 21 POL Pumphouse
Detailed testing completed. No further action required. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00978015
9 Wing FFTA
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025053
9 Wing Gander Site-Wide PFAS
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00008389
9 Wing Heavy Equipment Building Site - Parcel #1
Detailed testing completed. No further action required. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00978002
9 Wing POL Compound
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
04089037
A-14 Water Treament Plant
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
09406019
A12 McNaughton
Initial testing completed. No further action required. 2003-2004   03 Initial Testing Program
00001004
A20 Compound
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
00000969
AA Buildings
Initial testing completed. No further action required. 2018-2019 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025145
Abacus Range
Historical review planned. 2023-2024   01 Identify Suspect Sites
00000990
Abandoned construction landfill
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
09406008
Abandoned Landfill - McNaughton Barracks
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00008349
Abandoned Sewage Treatment Facility(B69/69A)
Initial testing completed. No further action required. 2009-2010 N Not a Priority for Action 03 Initial Testing Program
11048001
Aboveground Fuel Oil Storage Tank (Edenvale)
Initial testing completed. No further action required. 2006-2007   03 Initial Testing Program
11022026
Aboveground storage tank @ O-122
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022024
Aboveground storage tank @ R-24
Initial testing completed. No further action required. 2012-2013   03 Initial Testing Program
11022023
Aboveground storage tank @ R-35
Initial testing completed. No further action required. 2010-2011   03 Initial Testing Program
00008428
Access ramp and docks repairs Montréal Garrison
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
02739007
Active 100m Range - Aldershot
Initial testing completed. No further action required. 2006-2007 2 Medium Priority for Action 03 Initial Testing Program
02739008
Active 600m Range - Aldershot
Detailed testing completed. No further action required. 2014-2015 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
02717007
Active EOD Range - Greenwood
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
02739006
Active Grenade Range - Aldershot
Detailed testing completed. No further action required. 2014-2015 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00008470
Admin and Experimental Complex
Confirmatory sampling completed. No further action required. 2017-2018 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
06294001
Adminstrative Area-Domaine, Lozeau and Bougainville Islands
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
07930004
Aerodrome - West of runway 18-36 
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
05906060
AFFF Heliport
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17431004
AH-1 Albert Head Barracks - West Central Region
Detailed testing completed. No further action required. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00024976
AH-10 Albert Head Energetics Testing & Shoreline Region
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00024982
AH-1d Albert Head Septic Tank & Field
Confirmatory sampling completed. No further action required. 2018-2019 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024983
AH-1g Albert Head Abandoned Grease Trap
Confirmatory sampling completed. No further action required. 2018-2019 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
17431001
AH-4 Albert Head Former 100 yd range
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17431002
AH-5 Albert Head- Grenade Range (Active Site)
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
00024974
AH-7 Albert Head Northwest Power Generation Region
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00024975
AH-8 Albert Head Sewage Lagoon
Detailed testing completed. No further action required. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00024978
AH-9 Albert Head Gun Embankments, Central Uplands Region
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
11022095
Aircraft and Domestic Waste Landfill; Closed
Detailed testing completed. No further action required. 2021-2022 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00000997
Aircraft boneyard-Ghost Squadron
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00000996
Aircraft Fuel Dumping Ground
Detailed testing completed. Remediation / risk management planned. 2023-2024 3 Low Priority for Action 05 Detailed Testing Program
11022009
Aircraft Fuel Storage Facility #2; Former
Remediation / risk management completed. No further action required. 2018-2019 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
10992010
Airfield Mound
Initial testing completed. No further action required. 2004-2005   03 Initial Testing Program
00000952
Airfield No. 1
Long term monitoring completed. No further action required. 2015-2016 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
16568002
ALD- 2 Aldergrove Former Skeet Range
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
16568001
ALD-1 Aldergrove Former Sewage Lagoon
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00024990
ALD-11 Former Bldg 003
Initial testing completed. No further action required. 2021-2022 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024991
ALD-12 Antenna Field
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00024995
ALD-16 Waste Disposal Area
Initial testing completed. No further action required. 2021-2022 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024929
ALD-17 Aldergrove Emergency Generator Tank Spill
Confirmatory sampling completed. No further action required. 2016-2017 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024930
ALD-3 Aldergrove Former CANEX Gas Station
Initial testing completed. No further action required. 2021-2022 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024984
ALD-4 PMQ Heating Oil USTs
Detailed testing completed. No further action required. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00024985
ALD-5 Former Mobile Kitchen
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00024987
ALD-7 Bldg 020 - Power Plant
Initial testing completed. No further action required. 2021-2022 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024988
ALD-8 Bldg 022 - Main Operations
Detailed testing completed. No further action required. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
02739001
Aldershot Landfill/Former Incinerator
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025114
Alert - Unauthorized Firing Range
Historical review planned. 2023-2024   01 Identify Suspect Sites
20247023
Alert 50 Line GP Huts Drainage
Detailed testing completed. No further action required. 2009-2010 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
20247029
Alert Airfield
2023-2024 2 Medium Priority for Action  Confirmatory Sampling and Final Reporting
20247024
Alert Dump # 3
Long term monitoring completed. No further action required. 2017-2018 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
20247006
Alert Main Station
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
20247016
Alert Main Station Landfill
Long term monitoring completed. No further action required. 2017-2018 1 High Priority for Action 10 Long-Term Monitoring (Optional)
20247025
Alert TX Site
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00008490
Alexandra Sm. Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
02739056
Alleged Drum Dump Area - Aldershot
Initial testing completed. No further action required. 2015-2016 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025154
Alma Communications Tower
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008586
Along the Jacques Cartier street - CMR
Historical review planned. 2023-2024   01 Identify Suspect Sites
00000955
Alpha Range
Detailed testing completed. Remediation / risk management planned. 2023-2024 I Insufficient Information 05 Detailed Testing Program
09540010
AMDU Landfill Site
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
03205002
Amherst Armoury (502) - former POL shed
Long term monitoring completed. No further action required. 2019-2020 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
03205001
Amherst Armoury Building (501)
Confirmatory sampling completed. No further action required. 2018-2019 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
03186006
Amherst Rifle Range (5401) - Target Shed
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
03186005
Amherst Rifle Range (5402) - Markers Shelter
Historical review completed. No further action required. 2001-2002 N Not a Priority for Action 02 Historical Review
03186001
Amherst Rifle Range (5403) - Range firing pts, butt stops
Long term monitoring completed. No further action required. 2019-2020 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
03186004
Amherst Rifle Range (5404) - Troop Shelter
Historical review completed. No further action required. 2001-2002 N Not a Priority for Action 02 Historical Review
03186002
Amherst Rifle Range - Clear Cut Area
Confirmatory sampling completed. No further action required. 2007-2008 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
11022038
Amiens Rifle Range
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00008476
Amiens Small Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008686
Ammo dump sector 10
Historical review not required. 2017-2018   01 Identify Suspect Sites
00000917
Ammo incinerator #2
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
00008527
Ammunition Compound Burial Pit
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
10992024
Ammunition Dump
Initial testing completed. No further action required. 2003-2004   03 Initial Testing Program
11022033
Ammunition Dump #1; Former Airforce Facility
Historical review completed. No further action required. 2016-2017   02 Historical Review
11022149
Ammunition Dump #2; Former Army Facility
Historical review completed. No further action required. 2016-2017   02 Historical Review
02717012
AMSE paint shop floor drain, Hangar 4 - Greenwood
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
15531013
AMU Building Parking Lot
Confirmatory sampling completed. No further action required. 2014-2015 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00024837
Anglin's Bay
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
00025127
Apollo Range
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00008480
Ardennes Sm. Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00025124
Area 14A
Historical review planned. 2023-2024   01 Identify Suspect Sites
00024822
Area 21
Historical review planned. 2023-2024   01 Identify Suspect Sites
00008395
Area 9 Former Small Arms Ranges
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
00008396
Area A Former Small Arms Range
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
09540016
Area of Bldg 163 & 201
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00025133
Argus Impact
Historical review planned. 2023-2024   01 Identify Suspect Sites
00024921
Argus Waste Drop Zone
Remediation / risk management completed. No further action required. 2023-2024 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
02717013
Armament Area - Greenwood
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
32057003
Armament Storage Area
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
10992012
Army Firehall #1
Initial testing completed. No further action required. 2004-2005   03 Initial Testing Program
05906016
Arnhem Firing Range
Detailed testing completed. Remediation / risk management planned. 2023-2024 1 High Priority for Action 05 Detailed Testing Program
09407008
Arrowhead Beach
Initial testing completed. No further action required. 1997-1998   03 Initial Testing Program
00024922
Asbestos Disposal Site
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
10992002
Asbestos Landfill
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
15684021
Asbestos Landfill
Confirmatory sampling completed. No further action required. 2017-2018 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
52254001
Ashton Armouries
Initial testing completed. No further action required. 2021-2022   03 Initial Testing Program
15166001
ASU Calgary
Initial testing completed. No further action required. 2009-2010 N Not a Priority for Action 03 Initial Testing Program
16439013
ASU Chilliwack
Detailed testing completed. No further action required. 2010-2011 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00025125
Athéna Range
Historical review planned. 2023-2024   01 Identify Suspect Sites
29757003
Atmosphere simulation (former dump), DRDC-South 
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00008574
Aurora Armoury
Initial testing completed. No further action required. 2018-2019 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024823
Austere Range R9A
Historical review planned. 2023-2024   01 Identify Suspect Sites
00024824
Austere Range R9B
Historical review planned. 2023-2024   01 Identify Suspect Sites
15684030
Auto Hobby Club B168
Initial testing completed. Detailed testing underway. 2023-2024 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
09406015
Auto Hobby Club Bldg C35 McN
Initial testing completed. No further action required. 1998-1999   03 Initial Testing Program
11378006
Auto Hobby Club Building No.57
Confirmatory sampling completed. No further action required. 2016-2017 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
70602004
Auto Hobby Club Former DeHavilland Plant Area (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00024947
B0008 Trench
Historical review planned. 2023-2024   01 Identify Suspect Sites
00024843
B101 - Electrical Mechanical Engineering
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00024964
B126 Refinishing Shop
Historical review planned. 2023-2024   01 Identify Suspect Sites
00024844
B163 - Fire Hall
Initial testing completed. Detailed testing underway. 2023-2024 1 High Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008539
B184-Former APU for Steam Plant
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008584
B216 - Airfield
Initial testing completed. No further action required. 2010-2011   03 Initial Testing Program
09407007
B24 Vimy Hydraulic Hoist
Detailed testing completed. Remedial action plan under development. 2023-2024 I Insufficient Information 06 Classify the site using the CCME National Classification System
00008701
B314 parking lot
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
17970008
B36- WASF and MP Offices
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
17967002
B71 - EGS Building
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
17337002
BA-1 Bay Street Armouries
Confirmatory sampling completed. No further action required. 2017-2018 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00008493
BAF-2
Detailed testing completed. Remediation / risk management planned. 2023-2024 I Insufficient Information 05 Detailed Testing Program
34422006
BAF-3 Brevoort Island LRR
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
34422005
BAF-3 LRR (Brevoort) - Broken Sewage Line
Detailed testing completed. No further action required. 2009-2010 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
34422003
BAF-3 LRR (Brevoort) - Pallet Line - Lower
Confirmatory sampling completed. No further action required. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
69778001
BAF-5 SRR (Resolution Island) - Beside road
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
09540018
Bakers Island
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00000913
Baldy Hughes
Long term monitoring completed. No further action required. 2018-2019 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
00008661
BAR-1, Komakuk Beach
Detailed testing completed. No further action required. 2017-2018 3 Low Priority for Action 05 Detailed Testing Program
34429001
BAR-2 LRR Site, Shingle Point - Under the garage
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008662
BAR-3, Tuktoyaktuk
Detailed testing completed. No further action required. 2017-2018 3 Low Priority for Action 05 Detailed Testing Program
00008663
BAR-4, Nicholson Peninsula
Initial testing completed. No further action required. 2017-2018 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008374
BAR-B, Stokes Point, SRR Site - Beach
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
34452001
BAR-BA3 SRR (Storm Hills, NWTel Parson's Lake) Site Summit
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00008371
BAR-DA1, Liverpool Bay, SRR Site
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
N7081001
BAR-E SRR (Horton River) - Site Summit
Detailed testing completed. No further action required. 2017-2018 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
N7083001
BAR-E SRR (Horton River) - Site Summit
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
02266002
Barrington - GATR Site
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
02267022
Barrington - OPS Site
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
11022071
Base Borden Disposal Range
Remediation / risk management completed. No further action required. 2021-2022 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
05906002
Base building 621 
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00008526
Base POL - B401 Korea Rd
Initial testing completed. No further action required. 2015-2016 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
14976046
Base POL Compound
Detailed testing completed. No further action required. 2015-2016 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
15684008
Base POL Farm
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008488
Batoche Sm. Arms Rifle Rng
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
02717114
Battery Disposal Sump Hangar 8
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024825
Battle Runs 12A and 15A
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
14976001
BATUS P.O.L. Heliport Site
Confirmatory sampling completed. No further action required. 2015-2016 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
14976051
BATUS tank Wask Lagoons Site
Confirmatory sampling completed. No further action required. 2015-2016 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00000970
BB Buildings
Detailed testing completed. No further action required. 2014-2015 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00008557
Beauceville armoury
Remediation / risk management completed. No further action required. 2017-2018 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00008558
Beauport armoury
Detailed testing completed. Remediation / risk management planned. 2023-2024 3 Low Priority for Action 05 Detailed Testing Program
02859056
Bedford Degaussing Range (601) Ind. workshop/garage (B8)
Remediation / risk management completed. No further action required. 2019-2020 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02859039
Bedford Degaussing Range (602) - Paint Locker beside B7
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02859042
Bedford Degaussing Range (603) - B6 Existing Bulk Structure
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02859041
Bedford Degaussing Range (604) B5 Existing Sc. Structure
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02859040
Bedford Degaussing Range (605) B4 Existing Sc. Structure
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02858012
Bedford Degaussing Range (606)- B3 Existing Bulk Structure
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02859048
Bedford Degaussing Range (608) - B9 POL STORAGE CABINET
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02858013
Bedford Degaussing Rng (607)- B1Caretaker Res (Cntrl Bldg)
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02858002
Bedford Rifle Range (702) - POL storage (B46)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02858003
Bedford Rifle Range (703) - Gravel Pit
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
02858004
Bedford Rifle Range (704) - Rifle Range
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02858005
Bedford Rifle Range (705) - Pistol Range
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02858006
Bedford Rifle Range (706) - Office Building (B47)
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02858007
Bedford Rifle Range (707) - Training Building (B14)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
02858018
Bedford Rifle Range (708) - Storage Building (B22)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
02858009
Bedford Rifle Range (709) - Formerly POL Storage (B29)
Remediation / risk management completed. No further action required. 2009-2010 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02858014
Bedford Rifle Range (711) - Septic Tanks
Initial testing completed. No further action required. 2007-2008 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02858015
Bedford Rifle Range (712) - Latrines
Initial testing completed. No further action required. 2002-2003   03 Initial Testing Program
02858016
Bedford Rifle Range (713) - Refuse Disposal Site
Historical review completed. No further action required. 1997-1998 N Not a Priority for Action 02 Historical Review
02858011
Bedford Rifle Range (714) - Former 1940's Infrastructure
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02858017
Bedford Rifle Range (715) - Former UST
Historical review completed. No further action required. 2001-2002   02 Historical Review
02858001
Bedford Rifle Range(701) former pesticide drum disposal area
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02858010
Beford Rifle Range (710) - Former Rifle and Skeet Range
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008588
Behind Kitchen (B155) - Montreal garrison
Historical review not required. 2016-2017   01 Identify Suspect Sites
00025110
Belmont Park
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
16874004
Bessborough Armoury
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
05906010
Biathlon (Myriam-Bédard Centre) 
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
06651001
Big Dump, CEF Farnham
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
17970009
Bld 101 Mobile Support Equipment
Long term monitoring completed. No further action required. 2018-2019 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
17970005
BLD 19 DIAC
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
00978012
Bldg 108 Storage and Maintenance
Confirmatory sampling completed. No further action required. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00978018
Bldg 110 Wing Supply
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00978016
Bldg 116 Guardhouse
Detailed testing completed. No further action required. 2009-2010 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00978003
Bldg 123 Auto Hobby Shop
Confirmatory sampling completed. No further action required. 2016-2017 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00978019
Bldg 125 Former WCE Headquarters
Confirmatory sampling completed. No further action required. 2009-2010 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00978005
Bldg 14 Utilities Power Plant
Confirmatory sampling completed. No further action required. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00978011
Bldg 17 MSE Garage
Remediation / risk management completed. No further action required. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
N7071001
Bldg 187
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00978023
Bldg 19 MSE Stores Quansit Hut
Confirmatory sampling completed. No further action required. 2019-2020 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
09540021
Bldg 242
Initial testing completed. No further action required. 2006-2007   03 Initial Testing Program
09540022
Bldg 272
Initial testing completed. No further action required. 2006-2007 N Not a Priority for Action 03 Initial Testing Program
15531005
Bldg 290 - Lancaster Park
Confirmatory sampling completed. No further action required. 2015-2016 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
09540015
Bldg 3 (S)
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
14976048
Bldg 312 UST (East End)
Confirmatory sampling completed. No further action required. 2010-2011 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00978022
Bldg 36 Curling Club
Remediation / risk management completed. No further action required. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00978013
Bldg 86 Wing Photo
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
15531006
Bldg B-4-Griesbach
Long term monitoring completed. No further action required. 2013-2014 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
02717008
Bldg. 110 Community Centre - Greenwood
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
04089038
Blissville Airport
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00008338
Block 7741 Military Training Area
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
07930020
Bombardier flight simulator - Construction site
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
11022032
Borden Landfill
Detailed testing completed. Remediation / risk management planned. 2023-2024 3 Low Priority for Action 05 Detailed Testing Program
07930018
Bowser maintenance shop - Building 77
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
17451024
BP- 2 Belmont Park Garage G1
Initial testing completed. No further action required. 1995-1996   03 Initial Testing Program
17451008
BP-1 Belmont Park - Former Canex Gas Station at Building 15
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17451023
BP-1b Belmont Park - Former Canex Gas Station at Building 17
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
17451031
BP-3 Belmont Park Personal Vehicle Area
Initial testing completed. No further action required. 1995-1996   03 Initial Testing Program
17451026
BP-4 Belmont Park Garage
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
17451027
BP-5 Belmont Park Garage G-2
Initial testing completed. No further action required. 1995-1996   03 Initial Testing Program
17451028
BP-6 Belmont Park Garages
Initial testing completed. No further action required. 1995-1996   03 Initial Testing Program
00000956
Bravo Range
Initial testing completed. Detailed testing underway. 2023-2024 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024826
Bronze Range (30 lines)
Detailed testing completed. Remediation / risk management planned. 2023-2024 N Not a Priority for Action 05 Detailed Testing Program
17403009
Brothers Island
Initial testing completed. No further action required. 1997-1998   03 Initial Testing Program
05928001
Building 1 - Levis Armoury
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
70602008
Building 100 (Downsview)
Initial testing completed. No further action required. 2001-2002 2 Medium Priority for Action 03 Initial Testing Program
70602007
Building 103 (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00978029
Building 108 Hoist
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
15684011
Building 111
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17970013
Building 118 - Armament HQ
Initial testing completed. No further action required. 2002-2003 N Not a Priority for Action 03 Initial Testing Program
11378009
Building 16 - Former UST location Vehicule refuelling area
Long term monitoring completed. No further action required. 2017-2018 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
15684012
Building 170
Initial testing completed. No further action required. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008451
Building 200
Confirmatory sampling completed. No further action required. 2009-2010 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
15531016
Building 206 and 208
Confirmatory sampling completed. No further action required. 2015-2016 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
14976049
Building 229 (Subsurface Contamination)
Detailed testing completed. No further action required. 2015-2016 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
15531014
Building 305 (APU-TACAN)
Confirmatory sampling completed. No further action required. 2018-2019 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
05906058
Building 310
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
17970010
Building 32 - Roads and Grounds
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
00000936
Building 36
Initial testing completed. No further action required. 2009-2010 N Not a Priority for Action 03 Initial Testing Program
12579002
Building 51
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
12579003
Building 62
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00000959
Building 70 Community Centre
Detailed testing completed. No further action required. 2017-2018 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
15684017
Building 83
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
N7072001
Building A-3
Initial testing completed. No further action required. 2009-2010 3 Low Priority for Action 03 Initial Testing Program
00024845
Building B-12
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00024840
Building B-9
Historical review planned. 2023-2024   01 Identify Suspect Sites
12559002
Building B17
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024894
Building B19
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
12559001
Building C4
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008506
Building E173 extension
Initial testing completed. No further action required. 2010-2011   03 Initial Testing Program
09406017
Building H55 - Defence Research Lab Disposal
Initial testing completed. No further action required. 2006-2007   03 Initial Testing Program
00025156
Building K-45
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
N7073001
Building L-2
Detailed testing completed. No further action required. 2009-2010 N Not a Priority for Action 05 Detailed Testing Program
00024835
Building M-210 Former UST
Detailed testing completed. No further action required. 2016-2017 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00024841
Building Mg2
Historical review planned. 2023-2024   01 Identify Suspect Sites
00024924
Building PC-317
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024925
Building TA-1
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008438
Building VC-028
Detailed testing completed. No further action required. 2011-2012 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
11022014
Bulk Fuel Storage Site; (Demolished O-89)
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
00000978
Bulk POL Compound
Detailed testing completed. No further action required. 2013-2014 3 Low Priority for Action 05 Detailed Testing Program
14121004
Burdick Range
Detailed testing completed. No further action required. 2023-2024 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00008352
Burn Pit (adjacent to Range Warden Compound)
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008691
Burwash CFTA
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025126
Bushlanes
Historical review planned. 2023-2024   01 Identify Suspect Sites
00000971
C Buildings
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
04089024
C7 Hobby Shop
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
04089025
C8 - Waste Oil Leak
Initial testing completed. No further action required. 2003-2004 N Not a Priority for Action 03 Initial Testing Program
00008347
Cadet Camp Landfill & Firing Range
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
07930019
Cadet camp-Former dry material disposal site
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
11022122
CAEN Battle Assault Range
Initial testing completed. No further action required. 2018-2019   03 Initial Testing Program
00024808
Calgary (Former Sarcee Training Area Tract 1 & 2)
Historical review completed. No further action required. 2019-2020   02 Historical Review
00008494
CAM-1A
Detailed testing completed. No further action required. 2017-2018 N Not a Priority for Action 05 Detailed Testing Program
69765001
CAM-2 SRR (Gladman Point) - Site Summit
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00000949
CAM-4 SRR (Pelly Bay, Nunavut Territory)- Site Summit
Remediation / risk management completed. No further action required. 2017-2018 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00008678
CAM-A3A
Initial testing completed. No further action required. 2017-2018 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008495
CAM-B
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00008676
CAM-CB
Initial testing completed. No further action required. 2017-2018 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
69766001
CAM-D SRR (Simpson Lake) - Site Summit
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
70070001
CAM-M LRR (Cambridge Bay, NU - Landfill)
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00024959
CAM-MAIN Hangar Legacy Hydrocarbon Plume
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
06875001
Camp Bouchard, Ex Ammo Dump
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
05906039
Camp Dubé, DEV-1. 
Initial testing completed. No further action required. 1993-1994 N Not a Priority for Action 03 Initial Testing Program
15305008
Camp Fish Pond and Area
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
00008356
Camp Hughes
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025158
Camp Petersville
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00025055
Camp Utopia and Ranges
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008382
Canadian Forces Staff College
Initial testing completed. No further action required. 2022-2023   03 Initial Testing Program
12448003
Canadian POL
Long term monitoring completed. No further action required. 2015-2016 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
00025090
Canadian Rang. Pat. Grp. Former Small Arms Range - Channel
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00025087
Canadian Ranger Patrol Group Former Small Arms Range - Burgeo
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
01822018
Canadian Side & Northside
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00008348
CANEX contaminated site
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
02717095
Canex Service Station 8209
Remediation / risk management completed. No further action required. 2009-2010 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
07930008
Canex service station - Building 147
Long term monitoring completed. No further action required. 2012-2013 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
00008345
Car Club - used oil storage
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
15529018
Cardiff Transmitter Site
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
11022137
Carpenter Shopwood Storage Facility; Demolished
Detailed testing completed. No further action required. 2020-2021 3 Low Priority for Action 05 Detailed Testing Program
09596001
Carrying Place north of bldg.
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
09596002
Carrying Place South of Bldg
Initial testing completed. No further action required. 2004-2005   03 Initial Testing Program
00008423
Cartier Square Armoury,Frmr UST,along drill hall Queen E.Dr.
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
11022035
Castle EOD Range
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
05906059
Castor center PHL T-610
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008403
CATC Meaford Skeet Range
Detailed testing completed. No further action required. 2010-2011 N Not a Priority for Action 05 Detailed Testing Program
07089001
Cathcart Armoury
Remediation / risk management completed. No further action required. 2013-2014 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
17966002
CCG Bldg at Seal Bay Tx Site
Initial testing completed. No further action required. 2004-2005   03 Initial Testing Program
14976006
Cdn Abandoned Landfill Site (CAL Site)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
14976018
Cdn Demolished Curling Club B-364
Remediation / risk management completed. No further action required. 2015-2016 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02717010
CE Storage Area - Greenwood
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00008499
Cedar Springs Rifle Range & Danger Area
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00000980
Central Heating Plant
Detailed testing completed. No further action required. 2016-2017 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
11022055
Central Heating Plant #1
Initial testing completed. No further action required. 2006-2007 N Not a Priority for Action 03 Initial Testing Program
11022069
Central Heating Plant #3
Remediation / risk management completed. No further action required. 2021-2022 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
11022135
Central Heating Plant #4; Former Army Facility
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022094
Central Heating Plant #5; Former Airforce Facility
Detailed testing completed. No further action required. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
70602002
Central Heating Plant (Downsview)
Confirmatory sampling completed. No further action required. 2012-2013 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
04089009
Central Heating Plant Fuel Oil Tank
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
08636001
Central Heating Plant in Rockcliffe - Disposed to NCC
Confirmatory sampling completed. No further action required. 2014-2015 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
15684039
Central Heating Plant Investigation
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
07930011
Central Heating Plant 
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
07221020
Central thermal retaining wall, Bldg 37 Montreal Garrison 
Confirmatory sampling completed. No further action required. 2014-2015 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00025054
CF Ammunition Depot Bedford Site-Wide PFAS
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
N7093001
CF-18 Crash Site - A/C 188745 (Aug. 05)
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008538
CF18 Crash Site on AB Gov Land
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
11022028
CFAD Angus Site at 2nd St. and Ismailia Rd.
Detailed testing completed. No further action required. 2018-2019 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
02859001
CFAD Bedford (801) - Ridge Landfill
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859003
CFAD Bedford (803) - Former Landfill (West of B162)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859004
CFAD Bedford (804) - Torpedo Dye Disposal Area - East B75
Long term monitoring completed. No further action required. 2013-2014 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
02859049
CFAD Bedford (805) - Pump House with AST (B192)
Initial testing completed. No further action required. 2009-2010 N Not a Priority for Action 03 Initial Testing Program
02859006
CFAD Bedford (806) - Sewage Treatment Plant
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02859007
CFAD Bedford (807) - BCE Storage Yard
Initial testing completed. No further action required. 2002-2003   03 Initial Testing Program
02859008
CFAD Bedford (808) - Railcar off loading plat & B191
Initial testing completed. No further action required. 2003-2004   03 Initial Testing Program
02859029
CFAD Bedford (809) - Otto Fuel Storage B203
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859009
CFAD Bedford (810) - Otto Fuelling & Defuelling B48
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859010
CFAD Bedford (811) - Former UST's, BM 95 & BM 47*
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859011
CFAD Bedford (812) - Otto Fuel Waste Burning Area BD220
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859012
CFAD Bedford (813) - B157, B158, B33*
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
02859014
CFAD Bedford (815) - Central Heating Plant (B190)
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859015
CFAD Bedford (816) - Ammunition Disposal Furnace (BD188)
Initial testing completed. No further action required. 2009-2010 N Not a Priority for Action 03 Initial Testing Program
02859016
CFAD Bedford (817) - Former Transformer Huts*
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
02859017
CFAD Bedford (818) - Otto Fuel Storage (BD164)
Initial testing completed. No further action required. 2002-2003 N Not a Priority for Action 03 Initial Testing Program
02859018
CFAD Bedford (819) - Existing Jetty
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859019
CFAD Bedford (820) - Former Landfill near B206
Long term monitoring completed. No further action required. 2017-2018 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
02859020
CFAD Bedford (821) - Existing Jetty -NN at Wrent Point
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
02859021
CFAD Bedford (822) - Buildings BD169-BD178, BD182 &BD183
Confirmatory sampling completed. No further action required. 2016-2017 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02859022
CFAD Bedford (823) - POL Storage Building (BD27)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
02859023
CFAD Bedford (824) - Former Heating Plant (B140)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859024
CFAD Bedford (825) - Former Maintenance Garage
Initial testing completed. No further action required. 2016-2017 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02859025
CFAD Bedford (826) - Former Maintenance Area, Labs
Confirmatory sampling completed. No further action required. 2016-2017 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02859026
CFAD Bedford (827) - Former Metal Scrap Yard
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859027
CFAD Bedford (828) - Former Location of Buildings 47 &48
Initial testing completed. No further action required. 2009-2010 N Not a Priority for Action 03 Initial Testing Program
02859028
CFAD Bedford (829) - Camera Hut (BD44)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
02859051
CFAD Bedford (831) - Open well NE of B146
Remediation / risk management completed. No further action required. 2009-2010 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02859052
CFAD Bedford (832), Asbestos pipe on access road B79/107/109
Remediation / risk management completed. No further action required. 2009-2010 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02859032
CFAD East-side property (7403) - Area North of Highway 7
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
04569002
CFAD Renous
Long term monitoring completed. No further action required. 2023-2024 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
02859033
CFAD UXO Impacted Area (830) - Rent Point explosion
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
N7057001
CFB Chatham
Confirmatory sampling completed. No further action required. 2021-2022 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00025042
CFB Edmonton Site-Wide PFAS
Detailed testing completed. Remediation / risk management planned. 2023-2024 1 High Priority for Action 05 Detailed Testing Program
00008408
CFB Gagetown
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00008335
CFB Petawawa RTA - Area 8 (Demolition Range)
2023-2024 1 High Priority for Action  Develop Remediation/Risk Management Strategy
00008420
CFB Petawawa RTA - Old Grenade Range
Long term monitoring completed. No further action required. 2018-2019 1 High Priority for Action 10 Long-Term Monitoring (Optional)
13664001
CFB Sask. - Boggy Creek Transmitter
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02863001
CFB Shearwater (201) - Landfill 6 - Airfield
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863002
CFB Shearwater (202) - EOD Disposal Area (DIPM site)
Confirmatory sampling completed. No further action required. 2016-2017 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863003
CFB Shearwater (203) - Incinerator/Fill Site (DIPM Site)
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
02863004
CFB Shearwater (204A) - Former Mobile Asphalt Plant
Remediation / risk management completed. No further action required. 2019-2020 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02863053
CFB Shearwater (204B) - Former Heavy Equipment Compound
Long term monitoring completed. No further action required. 2019-2020 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
00008673
CFB Shearwater (204C) - Former Arrestor Gears
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02863054
CFB Shearwater (205) - Ammunition Compound
Remediation / risk management completed. No further action required. 2019-2020 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
02863008
CFB Shearwater (208) - Former Maintenance Hangar
Long term monitoring completed. No further action required. 2019-2020 1 High Priority for Action 10 Long-Term Monitoring (Optional)
02863011
CFB Shearwater (211) - Landfill 1
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02863012
CFB Shearwater (212) - Landfill 2
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863013
CFB Shearwater (213) - Landfill 3
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863014
CFB Shearwater (214) - Landfill 4
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863016
CFB Shearwater (216) - Fill Area West of Alpha Taxiway
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863018
CFB Shearwater (218) - Suspect Burn Pit No 1
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863019
CFB Shearwater (219) - Suspect Burn Pit No 2/Coal Storage
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
02863040
CFB Shearwater (240) - West Hangar Line, Fmr UST at B15
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863041
CFB Shearwater (241) - East Hangar Line and Ramp Area
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863042
CFB Shearwater (242) - Hangar 3 and Annex
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863056
CFB Shearwater (244) - AVGAS Pipeline
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
02863057
CFB Shearwater (245) - Hanger F
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863058
CFB Shearwater (246) - Airfield Bunkers
Remediation / risk management completed. No further action required. 2009-2010 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00008449
CFB Shilo: Demolition Range
Detailed testing completed. Remediation / risk management planned. 2023-2024 N Not a Priority for Action 05 Detailed Testing Program
00008566
CFB Suffield RTA Characterisation
Historical review planned. 2023-2024   01 Identify Suspect Sites
00025044
CFB Suffield Site-Wide PFAS
Historical review planned. 2023-2024   01 Identify Suspect Sites
00025021
CFHA - 1 Dunn Cresecent, Oromocto, NB
Remediation / risk management completed. No further action required. 2020-2021 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00025057
CFHA - 10 Armstrong Court, Oromocto, NB
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024900
CFHA - 109 St. John Avenue
Confirmatory sampling completed. No further action required. 2017-2018 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00024943
CFHA - 11 Comox Street
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00024881
CFHA - 111 St. John Avenue
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024936
CFHA - 119 St. Lawrence Avenue
Initial testing completed. No further action required. 2020-2021 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024937
CFHA - 125 St. Lawrence Avenue
Initial testing completed. No further action required. 2020-2021 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025035
CFHA - 127 St. Lawrence Av.
Remediation / risk management completed. No further action required. 2020-2021 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00024880
CFHA - 128 Miramichi Road
Initial testing completed. No further action required. 2016-2017   03 Initial Testing Program
00024908
CFHA - 13 Comox Street
Remediation / risk management completed. No further action required. 2017-2018 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00024944
CFHA - 13 McElroy Crescent
Confirmatory sampling completed. No further action required. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00025084
CFHA - 134 St. John Avenue, Oromocto, NB
Remediation / risk management completed. No further action required. 2021-2022 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00025026
CFHA - 14 McElroy Crescent, Oromocto, NB
Confirmatory sampling completed. No further action required. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00024897
CFHA - 14 Pomona Avenue
Initial testing completed. No further action required. 2017-2018 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024882
CFHA - 140 St. John Avenue
Confirmatory sampling completed. No further action required. 2016-2017 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024938
CFHA - 145 Wilmot Circle
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00024831
CFHA - 149 Wilmot Circle
Remediation / risk management completed. No further action required. 2016-2017 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00025025
CFHA - 15 McElroy Crescent, Oromocto, NB
Confirmatory sampling completed. No further action required. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00024939
CFHA - 155 St. Lawrence Avenue
Remediation / risk management completed. No further action required. 2020-2021 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00024940
CFHA - 157, 159, 161, 163, 165, 167 St. Lawrence Avenue
Confirmatory sampling completed. No further action required. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00025024
CFHA - 16 McElroy Crescent, Oromocto, NB
Confirmatory sampling completed. No further action required. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00024832
CFHA - 165-167 St. John Ave
Detailed testing completed. No further action required. 2016-2017 N Not a Priority for Action 05 Detailed Testing Program
00024945
CFHA - 17 McElroy Crescent
Confirmatory sampling completed. No further action required. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00025023
CFHA - 18 McElroy Crescent, Oromocto, NB
Confirmatory sampling completed. No further action required. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00025097
CFHA - 191 St. Lawrence Avenue, Oromocto
Confirmatory sampling completed. No further action required. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024898
CFHA - 20 Clark Street
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00025098
CFHA - 20 Oneida Street, Oromocto
Confirmatory sampling completed. No further action required. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024883
CFHA - 203 MacKenzie Avenue
Confirmatory sampling completed. No further action required. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024970
CFHA - 22 Comox Street
Confirmatory sampling completed. No further action required. 2018-2019 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024968
CFHA - 22 Cowichan Drive
Confirmatory sampling completed. No further action required. 2018-2019 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024828
CFHA - 22 Restigouche Road North
Confirmatory sampling completed. No further action required. 2016-2017 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008704
CFHA - 23 Clark St
Detailed testing completed. No further action required. 2016-2017 N Not a Priority for Action 05 Detailed Testing Program
00024907
CFHA - 236 Mackenzie Avenue
Remediation / risk management completed. No further action required. 2017-2018 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00025102
CFHA - 24 Comox Street, Oromocto
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00024805
CFHA - 24 Sarcee Crescent
Detailed testing completed. No further action required. 2016-2017 N Not a Priority for Action 05 Detailed Testing Program
00024966
CFHA - 25 Comox Street
Confirmatory sampling completed. No further action required. 2018-2019 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00025058
CFHA - 28 Comox Street, Oromocto, NB
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00008702
CFHA - 29 Bennett Road
Detailed testing completed. No further action required. 2016-2017 N Not a Priority for Action 05 Detailed Testing Program
00008703
CFHA - 29 Clark St
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00025059
CFHA - 29 Shirley Court, Oromocto, NB
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00025022
CFHA - 29-31 Bonar Law Av, Oromocto, NB
Remediation / risk management completed. No further action required. 2021-2022 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00024884
CFHA - 3 Laurier Drive
Confirmatory sampling completed. No further action required. 2017-2018 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00024885
CFHA - 30 Tweedsmuir Court
Detailed testing completed. No further action required. 2016-2017 N Not a Priority for Action 05 Detailed Testing Program
00024971
CFHA - 36 Restigouche Road
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024967
CFHA - 4 Clark Street
Confirmatory sampling completed. No further action required. 2018-2019 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024886
CFHA - 41 Mohawk Street
Initial testing completed. No further action required. 2016-2017   03 Initial Testing Program
00024895
CFHA - 42 Inchby Drive
Confirmatory sampling completed. No further action required. 2016-2017 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00025034
CFHA - 45 Comox Street
Initial testing completed. No further action required. 2020-2021 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025109
CFHA - 48 Carleton Street, Oromocto
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00025099
CFHA - 48 Dakota Drive, Oromocto
Confirmatory sampling completed. No further action required. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00025093
CFHA - 48 Inchby Drive, Oromocto, NB
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00024941
CFHA - 5 Carleton Street
Confirmatory sampling completed. No further action required. 2018-2019 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024833
CFHA - 5 Oneida
Confirmatory sampling completed. No further action required. 2016-2017 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00025060
CFHA - 50 Dakota Drive, Oromocto, NB
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00024829
CFHA - 51 Dakota Drive
Confirmatory sampling completed. No further action required. 2016-2017 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024830
CFHA - 55 Dakota Drive
Historical review not required. 2016-2017   01 Identify Suspect Sites
00024896
CFHA - 57 Mohawk Street
Remediation / risk management completed. No further action required. 2020-2021 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00024887
CFHA - 58 Mohawk Street
Initial testing completed. No further action required. 2016-2017   03 Initial Testing Program
00024946
CFHA - 59 Mohawk
Remediation / risk management completed. No further action required. 2020-2021 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00025061
CFHA - 59 Restigouche Road, Oromocto, NB
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00025085
CFHA - 6 McElroy Crescent, Oromocto, NB
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00025027
CFHA - 6-10 Fowlers Court, Oromocto, NB
Confirmatory sampling completed. No further action required. 2021-2022 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00025028
CFHA - 6-7 Dunn Court, Oromocto, NB
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00024888
CFHA - 61-63 Mohawk Street
Historical review not required. 2020-2021   01 Identify Suspect Sites
00024910
CFHA - 66 Maclaren Drive
Remediation / risk management completed. No further action required. 2017-2018 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00024969
CFHA - 7 Dakota Drive
Confirmatory sampling completed. No further action required. 2018-2019 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008705
CFHA - 72,74,76,78 Assiniboine St
Detailed testing completed. No further action required. 2016-2017 N Not a Priority for Action 05 Detailed Testing Program
00024879
CFHA - 81 Miramichi Road
Confirmatory sampling completed. No further action required. 2016-2017 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008699
CFHA - 85-87 Restigouche Road
Initial testing completed. No further action required. 2016-2017   03 Initial Testing Program
00024889
CFHA - 9 Cowichan Drive
Confirmatory sampling completed. No further action required. 2016-2017 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024899
CFHA - 97 St. Lawrence Avenue
Confirmatory sampling completed. No further action required. 2021-2022 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00024911
CFHA - 99 St. Lawrence Avenue
Confirmatory sampling completed. No further action required. 2021-2022 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00025094
CFHA - Huron Street, Oromocto
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00025122
CFHA – 76 MacLaren Drive, Oromocto
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00025083
CFHA – 9-11 Oneida Street, Oromocto, NB
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00008431
CFRB Hamilton/HMCS Star
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008570
CFRC (City Centre)
Historical review not required. 2010-2011   01 Identify Suspect Sites
00008573
CFRC (John Street)
Historical review not required. 2011-2012   01 Identify Suspect Sites
00008571
CFRC (Yonge Street)
Historical review not required. 2011-2012   01 Identify Suspect Sites
02267011
CFS Barrington
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00961001
CFS Leitrim Sludge Pits(Disposal Area)
Detailed testing completed. No further action required. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00008388
CFS Leitrim South Drainage Ditch
Detailed testing completed. No further action required. 2015-2016 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00000937
CFS Leitrim, Former UST site between buildings #250D & #138
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02677001
CFS Mill Cove (2701) - Antenna Field
Initial testing completed. No further action required. 2000-2001 N Not a Priority for Action 03 Initial Testing Program
02677002
CFS Mill Cove (2702) - Older POL Shed
Initial testing completed. No further action required. 2000-2001 N Not a Priority for Action 03 Initial Testing Program
02677004
CFS Mill Cove (2703) - Reciever/Control Building (AST)
Initial testing completed. No further action required. 2022-2023   03 Initial Testing Program
08132001
CFS Moisie OPS, TX, GATR Sites
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
00273001
CFS ST John's (4710) - Cambrai Rifle Range
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00418002
CFS St John's (4801) - 200 Compound
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00348002
CFS St John's (5110) - Parkers Pond Transmitter Site
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
32044001
CFS St Johns (4910) - Southside Road Tank Farm
Remediation / risk management completed. No further action required. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
32044002
CFS St Johns (5210) - Shea Height's Tank Farm
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
29763002
CFS St Johns(5010) - Emerald Vale Training Centre
Initial testing completed. No further action required. 2000-2001   03 Initial Testing Program
03660004
CFS Sydney - FPS Radar Site (1703) - Former PCB Storage
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
03660006
CFS Sydney FPS Radar Site (1705) Former Furnace Oil Tank B57
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
03660007
CFS Sydney FPS Radar Site (1706) Former Furnace Oil Tank B50
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
03660005
CFS Sydney FPS Radar Site(1704) Former Furnace Oil Tank (B1)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
03660002
CFS Sydney- FPS Radar Site (1701)- Scrap Stg Compound
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
58321008
CFSU Uplands Alert Road former Dump
Initial testing completed. No further action required. 2004-2005 N Not a Priority for Action 03 Initial Testing Program
00008426
CFSU(O) Leitrim, PWGSC Office Area, Building 251.
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
08636002
CFSU(O) Rockcliffe PMQ Trailer Storage Compound
Detailed testing completed. No further action required. 2009-2010 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
58321005
CFSU(O) Uplands PMQ Trailer Storage Compound
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
10642001
Chatham Armoury
Initial testing completed. No further action required. 2009-2010 N Not a Priority for Action 03 Initial Testing Program
11022088
Chemical Storage Area #1; Former (HS-6)
Remediation / risk management completed. No further action required. 2020-2021 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
11022021
Chemical Storage Area #3, Former
Detailed testing completed. No further action required. 2021-2022 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00025123
Chilliwack Range
Historical review planned. 2023-2024   01 Identify Suspect Sites
11022158
Circled Pine Maint. Shed, B O-138: Fuel Storage & Septic bed
Initial testing completed. No further action required. 2010-2011   03 Initial Testing Program
14121003
Classification Range
Historical review completed. No further action required. 2006-2007 3 Low Priority for Action 02 Historical Review
00008406
CMR Chapel
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008576
CN Tower (301 Front Street)
Historical review not required. 2011-2012   01 Identify Suspect Sites
11022140
Coal Compound; Former (NW of CFAD 52)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022075
Coal Storage #2
Long term monitoring completed. No further action required. 2021-2022 1 High Priority for Action 10 Long-Term Monitoring (Optional)
11022066
Coal Storage Area #1
Remediation / risk management completed. No further action required. 2021-2022 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
11022005
Coal Storage Area #3; Former
Long term monitoring completed. No further action required. 2021-2022 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
17451025
COL 2 Colwood- Dredgate Disposal Site
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
17451013
COL 4 Colwood Fire Fighting Training Area
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00008443
Col Sherman Armoury
Initial testing completed. No further action required. 2011-2012   03 Initial Testing Program
17451020
COL-10 Colwood Pipline South West of Bldg 220
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
17451017
COL-11 Colwood Mooring Depot
Confirmatory sampling completed. No further action required. 2019-2020 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17451011
COL-12 Colwood Former Contaminated Soil Storage Area
Confirmatory sampling completed. No further action required. 2020-2021 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
17451003
COL-13 Colwood Fleet Diving Unit
Confirmatory sampling completed. No further action required. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17451004
COL-14 Colwood Supply Area Bldg 93 & 112
Detailed testing completed. Remedial action plan under development. 2023-2024 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
17451012
COL-15 Colwood Yew Point - Former Dredgate/Soil Storage
Confirmatory sampling completed. No further action required. 2015-2016 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17451005
COL-16 Colwood Supply Area Building 66A
Detailed testing completed. Remedial action plan under development. 2023-2024 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
17451006
COL-17 Colwood D Jetty
Remediation / risk management completed. No further action required. 2019-2020 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
17451021
COL-18 Colwood Historical Dump Site
Long term monitoring completed. No further action required. 2018-2019 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
00008437
COL-19 Colwood Former Sullage Site
Confirmatory sampling completed. No further action required. 2019-2020 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17451001
COL-1a Colwood-Supply Area Northern Incinerator
Initial testing completed. No further action required. 2009-2010 N Not a Priority for Action 03 Initial Testing Program
17451002
COL-1B-1L Colwood Supply Area Bunkers 44, 45 & 48
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008530
COL-20 Colwood F-Jetty Intertidal&Prkg Lot
Confirmatory sampling completed. No further action required. 2019-2020 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00008641
COL-23 Colwood Bunker 8
Initial testing completed. No further action required. 2019-2020   03 Initial Testing Program
00008643
COL-25 Colwood Bank of Storm Water Management Ponds
Detailed testing completed. No further action required. 2021-2022 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008644
COL-26 Colwood Section of Wilfert Rd near F-Jetty
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008645
COL-27 Colwood Laydown Area near Bldg 205
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00008647
COL-29 Colwood Vehicle Compound
Detailed testing completed. No further action required. 2018-2019 N Not a Priority for Action 05 Detailed Testing Program
17451014
COL-3 Colwood Interim Storage Facility
Confirmatory sampling completed. No further action required. 2009-2010 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008649
COL-30 Colwood Joe’s Creek East of Wilfert Rd
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008650
COL-31 Colwood Bldg 65
Detailed testing completed. Remedial action plan under development. 2023-2024 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00008651
COL-32 Colwood Bunker 37 and Propane ASTs
Historical review completed. No further action required. 2019-2020   02 Historical Review
00008652
COL-33 Colwood Bunkers 34, 35 and 36
Initial testing completed. No further action required. 2017-2018   03 Initial Testing Program
00008653
COL-34 Colwood Aggregate Storage Yard (Active Site)
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008654
COL-35 Colwood Historical Waste West of Bldg 85
Historical review completed. No further action required. 2019-2020   02 Historical Review
00008655
COL-36 Colwood Helicopter Pad and Parking Lot
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00008656
COL-37 Colwood Smart Island
Detailed testing completed. No further action required. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00008657
COL-38 Colwood McCarthy Island
Detailed testing completed. No further action required. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00008658
COL-39 Colwood Storage Supply Warehouse and Parking Lot
Historical review completed. No further action required. 2019-2020   02 Historical Review
00008659
COL-40 Colwood North Western Bank of Dunn's Nook
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00008660
COL-41 Colwood Roads
Historical review completed. No further action required. 2020-2021   02 Historical Review
00008697
COL-42 Colwood
Confirmatory sampling completed. No further action required. 2017-2018 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00008698
COL-43 Colwood
Confirmatory sampling completed. No further action required. 2019-2020 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
17451015
COL-5 Colwood Former Tank Farm
Confirmatory sampling completed. No further action required. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
17451010
COL-6 Colwood- Fuel Oil Depot- (Golder IEE Site ''C'')
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
17451016
COL-7 Colwood Shoreline - Lower Pipeline
Long term monitoring completed. No further action required. 2013-2014 1 High Priority for Action 10 Long-Term Monitoring (Optional)
17451007
COL-8a Colwood Former OWWTP
Confirmatory sampling completed. No further action required. 2019-2020 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
17451022
COL-8b Colwood Former Tarpits
Confirmatory sampling completed. No further action required. 2019-2020 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
17451018
COL-9 Colwood- FOD Fmr Sullage Line- (Golder IEE Site I)
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024819
COL-FOD Colwood Former Fuel Oil Depot (FOD) North Area
Remediation / risk management completed. No further action required. 2021-2022 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
00008461
Combat area route 1A - RTA
Initial testing completed. No further action required. 2013-2014   03 Initial Testing Program
00978009
Combined Outfalls - 1,2 & 3 & Drainage Ditch by FFTA
Remediation / risk management completed. No further action required. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
17970012
Comox FFTA (non-PFAS)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00024891
Conair Crash 2015
Confirmatory sampling completed. No further action required. 2015-2016 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
08598001
Connaught Range Primary Training Centre - Bldgs 142 & 143
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
08598007
Connaught Range Primary Training Centre - Building 36
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
08598006
Connaught Range Primary Training Centre Former Landfill Site
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
08598005
Connaught Range Primary Training Ctre Former Transport Comp.
Confirmatory sampling completed. No further action required. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008425
Connaught Ranges Range Butt Stop Stockpile
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
08598002
Connaught Rnge Primary Trng Ctre,Various Former Supply Wells
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
00000940
Connaught Rnge Primary Trng Ctre- 35 Shirley Blvd, B34 AST
Detailed testing completed. No further action required. 2023-2024   05 Detailed Testing Program
00008700
Connaught Skeet Range
Detailed testing completed. Remedial action plan under development. 2023-2024   06 Classify the site using the CCME National Classification System
15305004
Constructed Fire Training Area
Remediation / risk management completed. No further action required. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
70602005
Construction Engineering Section (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008380
Construction of B150 Annex St-Jean Garrison
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008377
Construction of CSC building Montréal
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
00008465
Construction of hospital-St-Jean Garrison
Initial testing completed. No further action required. 2016-2017   03 Initial Testing Program
00008696
Construction of new sleeping quarters - St-Hubert
Initial testing completed. No further action required. 2016-2017   03 Initial Testing Program
11022154
Construction Waste Landfill #1; Closed
Detailed testing completed. No further action required. 2022-2023 2 Medium Priority for Action 05 Detailed Testing Program
11022011
Construction Waste Landfill #2; Active
Detailed testing completed. No further action required. 2013-2014 2 Medium Priority for Action 05 Detailed Testing Program
11022006
Construction Waste Landfill #4; Closed
Detailed testing completed. No further action required. 2021-2022 3 Low Priority for Action 05 Detailed Testing Program
00024963
Contamination from Maintenance Buildings 231 & 233
Historical review planned. 2023-2024   01 Identify Suspect Sites
00912001
Corner Brook Armoury
Detailed testing completed. No further action required. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
N7058001
Cornwallis
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
N7003001
Cornwallis
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
09406005
Correctional Services Canada Small Arms Range
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008332
CPR Lakes
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00024878
Cratère Training Range
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
03660003
CRS Sydney - FPS Radar Site (1702) - Radar Building B55
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
00025063
Curtis Road Reservoir
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00000972
D Buildings
Initial testing completed. No further action required. 2010-2011   03 Initial Testing Program
00008575
DCCCA Warehouse
Historical review not required. 2018-2019   01 Identify Suspect Sites
03044001
DCD School (901) - Former USTs at Bldg B1
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
03044002
DCD School (902) - AST at B3
Long term monitoring completed. No further action required. 2013-2014 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
03044014
DCD School (903) - AST at B6
Long term monitoring completed. No further action required. 2014-2015 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
03044004
DCD School (904) - Possible Former Greenhouse
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
03044005
DCD School (905) - POL compound
Detailed testing completed. No further action required. 2010-2011 1 High Priority for Action 05 Detailed Testing Program
03044006
DCD School (906) - Upper Garage
Confirmatory sampling completed. No further action required. 2009-2010 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
03044007
DCD School (907) - Fire Fighting Training Area
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
03044008
DCD School (908) - Contaminated Spoil Fill Area
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
03044009
DCD School (909) - Creek, Lagoon and Beach
Confirmatory sampling completed. No further action required. 2019-2020 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
03044010
DCD School (910) - Former Ordnance Demolition Area
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
03044011
DCD School (911) - Construction Debris Site
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00008427
DCD School (912) - Gravel Entrance Parking Lot
Initial testing completed. No further action required. 2010-2011 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
03144002
Debert Rifle Range
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
03144001
Debert Rifle Range (1201) - Rifle/Pistol Range
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
32057002
Demolition Area
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02739010
Demolition Range - Aldershot
Initial testing completed. No further action required. 2006-2007 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
06651003
Demolition site, CEF Farnham
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
11022087
Demolition Waste Dump
Remediation / risk management completed. No further action required. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
11022114
Demolition Waste Dump
Initial testing completed. No further action required. 2010-2011   03 Initial Testing Program
00008387
Denison Armoury
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00024872
DEV-2 MAG
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
C7024001
DEW Line FOX-4 Cape Hooper
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7015001
DEW Line - PIN-4 Byron Bay
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7025001
DEW Line-FOX-5 Broughton Island
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7008001
DEW-Line - BAR-2 Shingle Point
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7009001
DEW-Line - BAR-3 Tuktoyaktuk
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7010001
DEW-Line - BAR-4 Nicholson Peninsula
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7017001
DEW-Line - CAM-1 Jenny Lind Island
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7027001
DEW-Line - CAM-3 Shepherd Bay
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7019001
DEW-Line - CAM-4 Pelly Bay
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7020001
DEW-Line - CAM-5 Mackar Inlet
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7014001
DEW-Line - CAM-M Cambridge Bay
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7026001
DEW-Line - DYE-M Cape Dyer
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7023001
DEW-Line - FOX-3 Dewar Lakes
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7021001
DEW-Line - FOX-M Hall Beach
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7012001
DEW-Line - PIN-1 Clinton Point
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7013001
DEW-Line - PIN-2 Cape Young
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
C7016001
DEW-Line - PIN-3 Lady Franklin Point
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7011001
DEW-Line - PIN-M Cape Parry
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7018001
DEW-Line CAM-2 Gladman Point
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7022001
DEW-Line-FOX-2 Longstaff Bluff
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C7007001
DEW-Line: BAR-1 Komakuk Beach
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00008486
Dieppe Small Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
05906042
Dieppe former firing ranges
Long term monitoring completed. No further action required. 2013-2014 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
00025138
Dingee Wood
Historical review planned. 2023-2024   01 Identify Suspect Sites
00418001
Disposed - 20 Amherst Heights (6101) - AST at PMQ
Historical review completed. No further action required. 1996-1997 N Not a Priority for Action 02 Historical Review
00000957
Disposed - Ahern Avenue (302) - Building 3
Initial testing completed. No further action required. 2011-2012 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000924
Disposed - Brit Prop No 4 Site 14 (6302) - Boiler House
Historical review completed. No further action required. 1999-2000   02 Historical Review
02863015
Disposed - CFB Shearwater (215) - Landfill 5
Long term monitoring completed. No further action required. 2013-2014 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
00418003
Disposed - CFS St John's (4802) - 300 Compound.
Confirmatory sampling completed. No further action required. 2014-2015 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00418004
Disposed - CFS St John's (4803) - B815
Initial testing completed. No further action required. 2019-2020 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00418005
Disposed - CFS St John's (4804) - 400 & 500 Compounds - PMQs
Initial testing completed. No further action required. 2019-2020 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02559001
Disposed - Digby (9101) - Victoria Beach
Historical review completed. No further action required. 1999-2000 N Not a Priority for Action 02 Historical Review
03148001
Disposed - Folly Lake (1601) Control Building/Radar Facility
Initial testing completed. No further action required. 2006-2007 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
03148002
Disposed - Folly Lake (1602) - Garage/POL Building
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
C7028001
Disposed - Former CFB Chiliwack Sandbast area
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
C7029001
Disposed - Former CFB Chilliwack
Long term monitoring completed. No further action required. 2013-2014 1 High Priority for Action 10 Long-Term Monitoring (Optional)
N7091001
Disposed - Mason St Garage (2403) - Maintenance Garage (B1)
Remediation / risk management completed. No further action required. 2012-2013 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
N7092001
Disposed - Mason St Garage (2404) - Office Storage Building
Detailed testing completed. No further action required. 2019-2020 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
N7089001
Disposed - Mason St. Garage (2401) - Former POL/Storage Area
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
00008361
Disposed - Mississauga Armoury
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02921001
Disposed - South & Harvey St (3501) - Main Marcom Building
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
03011008
Disposed - Water Lots, Shannon Park (9904)
Confirmatory sampling completed. No further action required. 2014-2015 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02907002
Disposed - Willow Park (4322) - Paint Shop (EY7)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02907004
Disposed - Willow Park (4324) - CE Stores (EY3)*
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02907005
Disposed - Willow Park (4325) - CE Production Centre (EY5)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
32039003
Disposed -British Prop. No1,Site 5(6203)-Former Machine Shop
Initial testing completed. No further action required. 2019-2020 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
32039002
Disposed -British Prop.No1,Site5 (6202)Yard/fill area,tanks.
Initial testing completed. No further action required. 2019-2020 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00418006
Disposed -CFS St John's(4805) Lower Compound -Motor Storage
Initial testing completed. No further action required. 2019-2020 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
03044015
Disposed -Sandwich Pt.(7301) Fmr Pump house-AST/Transformer
Long term monitoring completed. No further action required. 2014-2015 1 High Priority for Action 10 Long-Term Monitoring (Optional)
00000923
Disposed Brit Prop No 4 Site 14 (6301) West Side of Property
Historical review completed. No further action required. 1999-2000 N Not a Priority for Action 02 Historical Review
02907001
Disposed Willow Pk (4321) Frmr Heating Plant (EY4 CE Supply)
Confirmatory sampling completed. No further action required. 2019-2020 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
N7090001
Disposed- Mason St.Garage (2402) Former Diesel UST & Pump
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
32039001
Disposed-British Prop.No1, Site 5(6201)Garage/waste oil tank
Initial testing completed. No further action required. 2019-2020 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
32041001
Disposed-British Prop.No4,Site15 (6303)E side pop/bulk tanks
Confirmatory sampling completed. No further action required. 2019-2020 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02863009
Disposed: Shearwater (209) - Coast Guard Assigned Property
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02859057
Disposed:Bedford Degauss Rnge(7701),Naval Reserve Tufts Cove
Historical review completed. No further action required. 1999-2000 N Not a Priority for Action 02 Historical Review
70069013
DND - Eureka - New Grey Water Outfall
Remediation / risk management completed. No further action required. 2017-2018 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00025121
DND Colwood - PFAS Sitewide
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00025162
DND Rocky Point – PFAS Sitewide
Historical review planned. 2023-2024   01 Identify Suspect Sites
02919001
Dockyard (1001) - CE Office and Shops (D2)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919002
Dockyard (1002) - Boat Shed (D5)
Initial testing completed. No further action required. 2007-2008   03 Initial Testing Program
02919003
Dockyard (1003) - Rectifier House (D74)
Initial testing completed. No further action required. 2000-2001 3 Low Priority for Action 03 Initial Testing Program
02919004
Dockyard (1004) - Mainguy Building (D201)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02919005
Dockyard (1005) - PMQ's and Garage (D77, D78, D79 & D81)
Remediation / risk management completed. No further action required. 2014-2015 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02919006
Dockyard (1006) - Pollution Control DREA (D17)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02919007
Dockyard (1007) - Sheet metal & Refrig. Shops (D19)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02919008
Dockyard (1008) - SRU Building Bosuns Shops (D125)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02919009
Dockyard (1009) - Base Exchange (D82)
Initial testing completed. No further action required. 2000-2001   03 Initial Testing Program
02919010
Dockyard (1010) - Electronics Shop (D20)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02919011
Dockyard (1011) - Inflammable Stores (D57)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919012
Dockyard (1012) - Base Fire Hall (D196)
Initial testing completed. No further action required. 2000-2001   03 Initial Testing Program
02919013
Dockyard (1013) - Base Supply (D40 and D155)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919014
Dockyard (1014) - Main Base Supply (D206)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919015
Dockyard (1015) - Underwater Repair building (D53)
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02919016
Dockyard (1016) - Central Heating Plant (D62)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919017
Dockyard (1017) - Outside Fitters and Machine Shop (D108)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919018
Dockyard (1018) - Base Supply (D66)
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02919019
Dockyard (1019) - Packing and Preservation Bldg (D67)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919020
Dockyard (1020) - SRU Main Building (D200)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919021
Dockyard (1021) - Submarine Shelter (D170)
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02919022
Dockyard (1022) - Oil Waste water Treatment
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02919023
Dockyard (1023) - Corrosion Prevention & Sub Squadron
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919024
Dockyard (1024) - FMG and SRU (D166)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919025
Dockyard (1025) - Shipwrights Shop (D174)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919026
Dockyard (1026) - Base Transport (D172)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02919028
Dockyard (1028) - HazMat Facility (D207)
Initial testing completed. No further action required. 2002-2003   03 Initial Testing Program
02919029
Dockyard (1029) - Rectifier Building (D47)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919030
Dockyard (1030) - Maritime Command Headquarters (D14)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919031
Dockyard (1031) - Transformers East of Building D14
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02919046
Dockyard (1032) - Fomer CN Rail Line btwn parking & building
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919041
Dockyard (1033) - Former B122 and 60
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919047
Dockyard (1034) - Former D7
Remediation / risk management completed. No further action required. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02919035
Dockyard (1035) - Former D15
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919048
Dockyard (1036) - Former D17
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919036
Dockyard (1037) - Former D19
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919039
Dockyard (1038) - Former D88
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919037
Dockyard (1039) - Former D95
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919040
Dockyard (1040) - Former D20
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919049
Dockyard (1041) - Fomer D49
Remediation / risk management completed. No further action required. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02919042
Dockyard (1042) - Former D159
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919050
Dockyard (1043) - Former D59
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919043
Dockyard (1044) - Former D127
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919044
Dockyard (1045) - Former D109
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919045
Dockyard (1046) - Former D63
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919038
Dockyard (1047) - Former D71
Historical review completed. No further action required. 2000-2001 N Not a Priority for Action 02 Historical Review
03009015
Dockyard Annex (1101) - Hazardous Storage Area (W45)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
03009008
Dockyard Annex (1110) - Silica Sand Blast (W61)
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
03009022
Dockyard Annex (1117) - W53 Garage
Remediation / risk management completed. No further action required. 2009-2010 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
03009023
Dockyard Annex (1118) - W54 Residence
Remediation / risk management completed. No further action required. 2009-2010 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
N7075001
Dome Mountain, RCAF and Camp Sites (5 W)
Detailed testing completed. Remedial action plan under development. 2023-2024 1 High Priority for Action 06 Classify the site using the CCME National Classification System
11022031
Domestic Landfill #2
Remediation / risk management completed. No further action required. 2013-2014 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
11022081
Domestic Waste Landfill #4; Closed
Remediation / risk management completed. No further action required. 2021-2022 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
11022018
Domestic/Industrial Waste Landfill #3; Closed
Remediation / risk management completed. No further action required. 2021-2022 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00008424
Dow's Lake Armoury and Drill Hall
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
70602019
Downsview Closure
Confirmatory sampling completed. No further action required. 2013-2014 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00008518
Drake Wood Trench
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
03013004
DRDC (1408) - Waste solvent dumping (East of building 2)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008501
DRDC Pile at Landfarm
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008340
DRDC Transport Facility Site (CFB Suffield site)
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
14976044
DRES 155mm Gun Tower - EPG
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
14976011
DRES 25 Pounder Gun Tower - EPG
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
14976054
DRES 490 Inner Compound Building area
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
14976013
DRES 490 West Area (EPG) Coyote & Rabbit RDS (DRES site 6a)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
14976058
DRES Cameron Center
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
14976055
DRES Chemical Mixing Dumpsite
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
14976008
DRES Low Radioactive Waste Burial Site - EPG
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
14976014
DRES Radioactive Liquid Spill(Near Fraggle Rock)-AtomicVault
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
14976057
DRES Range and Accuracy Layout
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
14976056
DRES Willis Center Trench
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
14976016
DRES Willis Centre - EPG
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00961004
Drum Area West of Leitrim
Confirmatory sampling completed. No further action required. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00025134
Drummond Demolition Range
Historical review planned. 2023-2024   01 Identify Suspect Sites
15684013
Dry Cleaning
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
29757002
Dry material (former dump for), DRDC-South 
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
29757008
Dry material 2,500 m (former dump for), DRDC-Trials
Detailed testing completed. No further action required. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00000991
Dry Solid Waste Landfill
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00008516
Dugway Burn Site
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00000995
Dump by Tracks
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
15305006
Dump on Shore of Bushy Head Lake
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00000986
Dump Site Adjacent to Ottawa River (south-east of Heliport)
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
00008339
Dundurn B155
Initial testing completed. Detailed testing underway. 2023-2024 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
14121001
Dundurn Burn Dump
Remediation / risk management completed. No further action required. 2022-2023 I Insufficient Information 08 Implement Remediation/Risk Management Strategy
14121005
Dundurn Demolition Area
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008528
Dundurn FFTA
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00024864
Dundurn Fire Hall
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00025056
Dundurn Hardstand 6 Site
Initial testing completed. No further action required. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025103
Dundurn PFAS Sitewide
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00024874
Dundurn Rail Spur Line
Initial testing completed. No further action required. 2019-2020   03 Initial Testing Program
00025116
Dundurn Range & Training Area
Historical review planned. 2023-2024   01 Identify Suspect Sites
00008407
Dunnage Pit
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02717117
Dwight Ross School
Initial testing completed. No further action required. 2009-2010 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024809
DY-10 Dockyard Signal Hill Building 575 & Surrounding Area
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00008597
DY-11 Dockyard RL/PL Shoreline Fill West of Bldg 109
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008598
DY-12 Dockyard RL/PL Shoreline Fill South of Bldg 106
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008599
DY-13 Dockyard RL/PL Former MARPAC Garage - Bldg 102
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008600
DY-14 Dockyard RL/PL Sea Trng Bldg38, Bldg260 Frmr Ash Dump
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008601
DY-15 Dockyard IL Bldg 36&266 Frmr Heat Plnt/VehicleService
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008633
DY-16 Dockyard IL Dry Dock - Former subsite DY-4h
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008634
DY-17 Dockyard IL FMF CB Eng Bldg 49, Frmr subsite DY-4f
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008602
DY-18 Dockyard IL Bldg 27 - Former Coal Stores
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008603
DY-19 Dockyard IL Gym- Former Fuel Shed
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17403004
DY-1a-ad Dockyard Northwest Region
Confirmatory sampling completed. No further action required. 2017-2018 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17403001
DY-1AA Dockyard HQ Bldg 100
Remediation / risk management completed. No further action required. 2017-2018 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
17403007
DY-1AG Dockyard B Jetty Fill
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17403002
DY-2 Dockyard SW Shoreline B9-Former Firing Range & Landfill
Confirmatory sampling completed. No further action required. 2017-2018 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008604
DY-20 Dockyard IL Fire Prevent Branch Frmr UST Bldg 11&188
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008605
DY-21 Dockyard IL Shoreline West of Bldg 218
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008606
DY-22 Dockyard IL Bldg 20 & 21 Former Paint/Oil Stores & UST
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008607
DY-23 Dockyard IL Boundary Rd - Former Metallurgy Lab
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008608
DY-24 Dockyard RL/PL PMQ Residences
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008609
DY-25 Dockyard IL Bldg 199
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008610
DY-26 Dockyard RL/PL Bldg 199 A-C - Former POL Storage
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008611
DY-27 Dockyard Signal Hill Current Fuelling Facility
Initial testing completed. No further action required. 2018-2019   03 Initial Testing Program
00008612
DY-28 Dockyard Signal Hill Bldg 506 - Fmr Oil & Paint Stores
Initial testing completed. No further action required. 2018-2019   03 Initial Testing Program
00008613
DY-29 Dockyard Signal Hill Bldg 504 Fmr Mechanic Repair Shop
Initial testing completed. No further action required. 2018-2019   03 Initial Testing Program
17404001
DY-3 Dockyard Signal Hill Hood Bldg & Parking Lot
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008614
DY-30 Dockyard Signal Hill Bldg 516 - Former Garage
Confirmatory sampling completed. No further action required. 2021-2022 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00008615
DY-31 Dockyard Signal Hill Fmr Fuelling Facility Canteen Rd
Confirmatory sampling completed. No further action required. 2021-2022 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00008593
DY-32 Dockyard Signal Hill Off. Mess & Prk Lot E of Bldg 520
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00025019
DY-33 Signal Hill
Detailed testing completed. No further action required. 2021-2022 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
17403003
DY-4 Dockyard FMF Consolidation
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
17403005
DY-5 Dockyard Bldg 209 - Fmr CHP UST
Detailed testing completed. No further action required. 2017-2018 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
17404003
DY-6 Dockyard Lyall St. Canex Station
Confirmatory sampling completed. No further action required. 2021-2022 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17403010
DY-7 Dockyard South Coast Shoreline
Detailed testing completed. No further action required. 2017-2018 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008591
DY-8 Dockyard IL Bldg 8 - Former HAZMAT Storage Area
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008592
DY-9 Dockyard South of Bldg 101
Initial testing completed. No further action required. 2017-2018 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025032
DY-RL Signal Hill frmr PMQ ASTs
Initial testing completed. No further action required. 2019-2020   03 Initial Testing Program
58328001
DYE-M LRR (Cape Dyer) - Beach POL Storage Area
Confirmatory sampling completed. No further action required. 2015-2016 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
09406024
E-32 UST
Initial testing completed. No further action required. 2003-2004   03 Initial Testing Program
00008532
E20 - Garage Vernon Military Camp
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
09406021
E30
Initial testing completed. No further action required. 2003-2004   03 Initial Testing Program
14976063
Eagle Site - Contaminated Slew BATUS Tank Incident (WAD A)
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00008519
Easy Lake Site
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
70069006
EC Eureka - Sewage Lagoon
Detailed testing completed. No further action required. 2015-2016 1 High Priority for Action 06 Classify the site using the CCME National Classification System
11048112
Edenvale Airfield
Remediation / risk management completed. No further action required. 2009-2010 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00025130
Edmonton - Small Arms Range
Historical review planned. 2023-2024   01 Identify Suspect Sites
00025037
Embankment - Hammer Head 36
Historical review planned. 2023-2024   01 Identify Suspect Sites
09540005
EME Shop, Bldg 113 and Skeet Range
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
11022015
Emergency Generator Fuel Storage Site; Existing
Initial testing completed. No further action required. 2018-2019 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008685
Encroachment SE Corner of Wainwright RTA
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
12448006
Engine Repair & Testing Facility - Q115
Long term monitoring completed. No further action required. 2015-2016 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
02717086
Engine Test Cell
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
11022156
Engine Test Site; Former
Initial testing completed. No further action required. 2016-2017 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
07070005
Enlargement of LAV III testing ramp at 202 WKP
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00025135
Enniskillen Range
Historical review planned. 2023-2024   01 Identify Suspect Sites
00008587
Entry barrier of Jacques Cartier Street - CMR
Historical review planned. 2023-2024   01 Identify Suspect Sites
29757010
Entry route ditch DRDC-South (drain SNC TEC/DRDC-South) 
Remediation / risk management completed. No further action required. 2013-2014 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
17403011
ESQ-1 - Esquimalt Harbour
Detailed testing completed. Remediation / risk management planned. 2023-2024 1 High Priority for Action 05 Detailed Testing Program
00008572
Etobicoke Armoury
Historical review completed. No further action required. 2016-2017   02 Historical Review
70069009
Eureka (Hist review cont sites)
Historical review completed. No further action required. 2006-2007   02 Historical Review
70069003
Eureka (Soil sampling)
Historical review completed. No further action required. 2006-2007   02 Historical Review
70069005
Eureka - East Airstrip Landfill
Detailed testing completed. No further action required. 2016-2017 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
70069014
Eureka - North Airstrip Apron
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70069015
Eureka - South Airstrip Dump
Detailed testing completed. No further action required. 2016-2017 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
70069010
Eureka - West Airstrip Landfill
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
00008475
Expension of prkg lot at H104 St-Jean Garrison
Remediation / risk management completed. No further action required. 2013-2014 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00008474
Extension of Gymnasium St-Jean Garrison
Initial testing completed. No further action required. 2016-2017   03 Initial Testing Program
00008473
Extension of Kitchen at Mega
Initial testing completed. No further action required. 2011-2012   03 Initial Testing Program
00008507
Extension of kitchen in Farnham
Initial testing completed. No further action required. 2010-2011   03 Initial Testing Program
15730005
F-18 A/C Site
Remedial action plan completed. Remediation / risk management underway. 2023-2024 I Insufficient Information 07 Develop Remediation/Risk Management Strategy
00025157
F-Lines
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
06972002
Farnham Range &Training area - Soil dumping on federal land
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
06651005
Farnham, Garage E-1 Prkg
Remediation / risk management completed. No further action required. 2013-2014 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
52106002
Fergusons Cove (1501) - Sound Range Building
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
11378007
FETA (North Bay)
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
09445003
FF6 Normandy Hall
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
07930007
FFTA & PFAS Bagotville
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
11378008
FFTA (North Bay)
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
09406018
Fire Fighting Training Area
Initial testing completed. No further action required. 2012-2013   03 Initial Testing Program
N7070001
Fire Fighting Training Area
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00024903
Fire Fighting Training Area
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
11022039
Fire Fighting Training Area #1
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00024952
Fire Fighting Training Area #2
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
70602003
Fire Fighting Training Area (Downsview)
Confirmatory sampling completed. No further action required. 2012-2013 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
04089008
Fire Fighting Training Area and Adjacent Swamp
2023-2024 2 Medium Priority for Action  Confirmatory Sampling and Final Reporting
00000984
Fire Fighting Training Areas
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
04089012
Fire Hall
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024856
Fire Hall, Building 19
Detailed testing completed. Remedial action plan under development. 2023-2024 1 High Priority for Action 06 Classify the site using the CCME National Classification System
00024846
Fire Hall, Building 85
Detailed testing completed. Remedial action plan under development. 2023-2024 1 High Priority for Action 06 Classify the site using the CCME National Classification System
00024854
Fire Pumps SW of H6
Detailed testing completed. No further action required. 2019-2020 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
06651004
Fire Range P12/P13,CEF Farnham
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
15684009
Firefighter Training Area
2023-2024 1 High Priority for Action  Confirmatory Sampling and Final Reporting
11048113
Firefighter Training Pit ; Former (Edenvale)
Historical review completed. No further action required. 2001-2002 N Not a Priority for Action 02 Historical Review
11022045
Firehall #1
Initial testing completed. No further action required. 2016-2017 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022046
Firehall #2
Initial testing completed. No further action required. 2011-2012   03 Initial Testing Program
11022148
Firehall #3; Former Army Facility
Initial testing completed. No further action required. 2016-2017 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022083
Firehall #4 (Former Airforce Facility)
Long term monitoring completed. No further action required. 2018-2019 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
00000926
Firing range A in St-Bruno
Detailed testing completed. No further action required. 2012-2013 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00000967
Firing range B in St-Bruno
Confirmatory sampling completed. No further action required. 2012-2013 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008444
Firing range St-Jean Garrison
Initial testing completed. No further action required. 2017-2018   03 Initial Testing Program
00008402
Firing range(Centre de biathlon Myriam-Bedard)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008399
Fitness trail
Remediation / risk management completed. No further action required. 2012-2013 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00008479
Flanders Sm. Arms Rifle Range
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
20612001
Float Dock 440 Sqn Yellowknife
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
00008467
FOB Atlantic dump
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024847
FOL - Maintenance Transport Shop, 76
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
69968001
FOL IQALUIT - Nose dock hangar (T-325)
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 I Insufficient Information 08 Implement Remediation/Risk Management Strategy
05906011
Forest Station 
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
02739011
Former 500yd Range - Aldershot
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
07930013
Former 161 kV electrical substation - Building 111
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00025018
Former above ground tank B117
Historical review planned. 2023-2024   01 Identify Suspect Sites
00008502
Former Air Field
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
00024813
Former Air Traffic Tower Septic Field
Historical review not required. 2013-2014   01 Identify Suspect Sites
00025041
Former Airport Road
Historical review planned. 2023-2024   01 Identify Suspect Sites
00008543
Former Ammo Dump, Bernatchez Rd.
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
07930021
Former B-244 APU location 
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00024806
Former B164/79 and via Venus
Confirmatory sampling completed. No further action required. 2015-2016 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
29757015
Former boiler room (bldg 241), DRDC-South 
Confirmatory sampling completed. No further action required. 2017-2018 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602009
Former building 102 (Downsview)
Initial testing completed. No further action required. 2001-2002 2 Medium Priority for Action 03 Initial Testing Program
70602017
Former Building 115 (Downsview)
Initial testing completed. No further action required. 2001-2002 2 Medium Priority for Action 03 Initial Testing Program
07070002
Former Building 12
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602018
Former building 131 (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02739014
Former Building 37 Aldershot
Detailed testing completed. Remedial action plan under development. 2023-2024 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00024912
Former Building B6
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024926
Former Building K-35
Historical review planned. 2023-2024   01 Identify Suspect Sites
70602010
Former Bunker 'C' DeHavilland Plant Area (Downsview)
Initial testing completed. No further action required. 2001-2002 2 Medium Priority for Action 03 Initial Testing Program
00000931
Former CANEX
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
58321003
Former Central Heating Plant (Building 309), Uplands
Confirmatory sampling completed. No further action required. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
N7096001
Former CFS Moisie - Site Admin
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
N7095001
Former CFS Sydney
Confirmatory sampling completed. No further action required. 2020-2021 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00008671
Former CFS Sydney, NS, Pinetree Landfill
Confirmatory sampling completed. No further action required. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
07930016
Former demolition centre for explosives - Former EOD
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008684
Former Demolition Range
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00000912
Former Disposal Area, South of Water Tower, Shirleys Bay
Remediation / risk management completed. No further action required. 2013-2014 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00024836
Former Ditch at 9 Hangar
Initial testing completed. No further action required. 2016-2017 N Not a Priority for Action 03 Initial Testing Program
05906047
Former dump Château Road
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00978001
Former Dump Site
Confirmatory sampling completed. No further action required. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02739026
Former EME Vehicle Maintenance Garage and Sewer - Aldershot
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
05906006
Former Firefighter Training Area 
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
15305009
Former Firing Range 7
Initial testing completed. No further action required. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008513
Former firing range G
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
00008512
Former firing range G1
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008515
former firing range G3
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008510
Former firing range Marker Shelter (1000m)
Initial testing completed. No further action required. 2016-2017   03 Initial Testing Program
00008509
Former firing range Marker shelter (1750 m)
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00008556
Former firing range P
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00008508
Former firing range Verrières
Initial testing completed. No further action required. 2013-2014   03 Initial Testing Program
00008455
Former firing rng Stoney Ridge
Initial testing completed. No further action required. 2013-2014   03 Initial Testing Program
29757016
Former Firing Temp for SNC Tec site (ZIP 1), Donnacona Block
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
29757017
Former firing temp formed by Donnacona Block (ZIP 2) 
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000945
Former fuel Jettisoning area
Initial testing completed. No further action required. 2009-2010 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02739003
Former Garage (B46) and Septic Tank Area - Aldershot
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
06679002
Former Garage and service station, ASU St-Jean 
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00024961
Former Gas Station
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008683
Former Grenade Range
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00008511
former grenade range Château F
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008514
Former grenade range F
Initial testing completed. No further action required. 2016-2017   03 Initial Testing Program
02717103
Former Hangar 1
Confirmatory sampling completed. No further action required. 2017-2018 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
11378004
Former Heating Plant
Confirmatory sampling completed. No further action required. 2019-2020 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
29757020
Former Impact Area (rebound/ricochet) Donnacona Blck(ZIP 5) 
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
05906008
Former Jean-Brillant Snow Dump 
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
00008491
Former landfill north of 195 Ave
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
07930006
Former landfill site
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
70602001
Former No.1 Canadian Forces Supply Depot (Downsview)
Initial testing completed. No further action required. 2001-2002 2 Medium Priority for Action 03 Initial Testing Program
29757019
Former OB and Grenades Area, South DRDC
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00024962
Former PCB Storage Area
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
02739004
Former Photo Lab (B95) - Aldershot
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
05906009
Former Place Vanier Snow Dump 
Initial testing completed. No further action required. 2013-2014   03 Initial Testing Program
70602015
Former POL Compound Building 107 (Downsview)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
16876004
Former POL Storage Site at HMCS Discovery
Confirmatory sampling completed. No further action required. 2013-2014 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
00008565
Former POL/JTFW Site
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
16749001
Former RCAF Transmitter Site (Richmond)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
N7060001
Former Red Route Dump
Initial testing completed. No further action required. 2023-2024   03 Initial Testing Program
29793001
Former Red Route Dump East Site
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
02739022
Former Revolver Range - Aldershot
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
70602006
Former Sewage Treatment Plant (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
07930014
Former sewage treatment plant - Building 118 
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
06477001
Former Shawinigan Armoury
Remediation / risk management completed. No further action required. 2013-2014 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
15531015
Former Shell Station CANEX
Long term monitoring completed. No further action required. 2013-2014 1 High Priority for Action 10 Long-Term Monitoring (Optional)
00008421
Former Shilo Landfarm
Confirmatory sampling completed. No further action required. 2017-2018 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00008337
Former skeet range
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02717125
Former Skeet Ranges
Remediation / risk management completed. No further action required. 2014-2015 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02717002
Former Sludge Pit Adjacent Golf Course - Greenwood
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02717001
Former Sludge Pit Runway 26 - Greenwood
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00008447
Former small arm firing range G1-G2
Initial testing completed. No further action required. 2013-2014   03 Initial Testing Program
00008456
former small arm range ''I''
Initial testing completed. No further action required. 2017-2018   03 Initial Testing Program
00008441
former small arm range Caen
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
00008453
Former small arm range Falaise
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008440
Former Small Arm Range Hochwald
Confirmatory sampling completed. No further action required. 2017-2018 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008442
Former Small Arm Range Reichwald
Confirmatory sampling completed. No further action required. 2017-2018 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008439
Former Small Arm Range Xanten
Confirmatory sampling completed. No further action required. 2017-2018 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00025047
Former Small Arms Incinerator
Historical review planned. 2023-2024   01 Identify Suspect Sites
29757022
Former stop-butt for building 235, DRDC-South 
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
29757011
Former stop-butt, bldg 321 (S8-1), DRDC-South 
Confirmatory sampling completed. No further action required. 2015-2016 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
29757013
Former stop-butt, bldg 342 (S9-1), DRDC-South 
Confirmatory sampling completed. No further action required. 2015-2016 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
29757018
Former stop-butt, DRDC-South (ZIP 3) 
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
29757012
Former stop-butts 341-316, DRDC-South (S14) 
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
06680001
Former T-22 Reservoir, Fort St-Jean Campus
Remediation / risk management completed. No further action required. 2017-2018 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
02717129
Former Tank Location Hangar 2
Initial testing completed. No further action required. 2002-2003   03 Initial Testing Program
00008401
Former Tank Parking Area - Bivy 9
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
00025062
Former Underground Tank B215
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024839
Former UST, Former B153
Initial testing completed. No further action required. 2014-2015   03 Initial Testing Program
58321010
Former USTs at the PMQs at Uplands
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
70602016
Former USTs Building 107 (Downsview)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02739030
Former Vehicle Compound (B140) Aldershot
Detailed testing completed. No further action required. 2011-2012 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00025040
Former Voodoo Engine Test Site
Historical review planned. 2023-2024   01 Identify Suspect Sites
29757023
Former waste demolition and dump site (N4-1), DRDC-North 
Detailed testing completed. No further action required. 2011-2012 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00008366
Former WTEL/WCE Band Bldg (B46/47) & Pistal Range
Confirmatory sampling completed. No further action required. 2021-2022 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
09445002
Fort Frontenac Courtyard
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
09445001
Fort Frontenac Water Lots
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
09407009
Fort Henry Heights R3, R4
Long term monitoring completed. No further action required. 2013-2014 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
00008384
Fort York //
Detailed testing completed. No further action required. 2017-2018 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008497
FOX-1
Detailed testing completed. Remediation / risk management planned. 2023-2024 I Insufficient Information 05 Detailed Testing Program
00008667
FOX-2, Longstaff Bluff
Initial testing completed. No further action required. 2017-2018 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024931
FOX-3 Dewar Lakes, Nunavut
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00008668
FOX-4, Cape Hooper
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00008669
FOX-5, Broughton Island
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00008498
FOX-A
Detailed testing completed. Remediation / risk management planned. 2023-2024 I Insufficient Information 05 Detailed Testing Program
69775001
FOX-B SRR (Nadluardjuk Lake) - North-West of site summit
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00008675
FOX-CA
Detailed testing completed. No further action required. 2017-2018 3 Low Priority for Action 05 Detailed Testing Program
70019001
FOX-M LRR (Hall Beach, NU - Landfill)
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00000968
Fox-M Radar Site, Hall Beach - Armco Building
Remediation / risk management completed. No further action required. 2012-2013 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00024958
FOX-MAIN Hydrocarbon Plume
Initial testing completed. Detailed testing underway. 2023-2024 1 High Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022121
Foxfield Battle Assault Range
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
03013010
Fuel Lines fr Bunker AST to French Cable Wharf (1404)
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
00024869
Fuel Oil Spill 13 Hgr
Detailed testing completed. Remedial action plan under development. 2023-2024 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
11022086
Fumigation Block ; Former (O-114)
Initial testing completed. No further action required. 2020-2021 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022082
Garage #17 (Former)
Remediation / risk management completed. No further action required. 2020-2021 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
11022138
Garage #1; Existing (O-155)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022131
Garage #16 Demolished
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
11022057
Garage #2
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022058
Garage #3
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022059
Garage #4
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022060
Garage #5
Detailed testing completed. No further action required. 2020-2021 N Not a Priority for Action 05 Detailed Testing Program
11022064
Garage #6
Remediation / risk management completed. No further action required. 2016-2017 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
11022065
Garage #7
Detailed testing completed. No further action required. 2020-2021 3 Low Priority for Action 05 Detailed Testing Program
11022077
Garage #8 Demolished
Detailed testing completed. No further action required. 2020-2021 N Not a Priority for Action 05 Detailed Testing Program
00008369
Garage Construction LAV III
Confirmatory sampling completed. No further action required. 2012-2013 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
10992007
Garrison Area Refuelling Facility
Long term monitoring completed. No further action required. 2016-2017 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
10992001
Garrison Landfilll; Closed
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00025095
Garrison Petawawa
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00025074
Garrison Phase I ESA
Historical review planned. 2023-2024   01 Identify Suspect Sites
00000983
Garrison Training Areas
Historical review not required. 2016-2017   01 Identify Suspect Sites
00008358
General Sir Arthur Currie Bldg
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
16506002
General Vokes Range
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00024973
Generator new location B244
Historical review planned. 2023-2024   01 Identify Suspect Sites
00001008
Ghost River Cadet Camp
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
03690001
Glace Bay Armoury (1801) - Armoury (B1)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03690002
Glace Bay Armoury (1802) - POL Storage
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
03690003
Glace Bay Armoury (1803) - South Fence (Naphtha)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
00008536
Gloucester Small Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2023-2024 1 High Priority for Action 06 Classify the site using the CCME National Classification System
00000989
Golf Course - landfill
Initial testing completed. No further action required. 2015-2016 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
58322001
Golf Course Maintenance Compound (401), CFB Ottawa (south)
Long term monitoring completed. No further action required. 2023-2024 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
00025030
Goose Bay Site Wide PFAS
Detailed testing completed. Remediation / risk management planned. 2023-2024 1 High Priority for Action 05 Detailed Testing Program
09406007
Gore Training Area - Low Growth Region
Initial testing completed. No further action required. 2006-2007   03 Initial Testing Program
30872002
Grand Falls Armoury
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
01008001
Grand Falls Armoury Former UST Location
Remediation / risk management completed. No further action required. 2015-2016 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
01008002
Grand Falls Armoury POL Drum Storage Area
Remediation / risk management completed. No further action required. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02561001
Granville Range-Granville Ferry
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
70602014
Gravel Parking Lot Construction Eng. Section (Downsview)
Initial testing completed. No further action required. 2001-2002 2 Medium Priority for Action 03 Initial Testing Program
03146001
Great Village Transmitter Site (2001) - Existing AST
Confirmatory sampling completed. No further action required. 2014-2015 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00008577
Grenade Range (Area A)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
N7069001
Griesbach Barracks
Confirmatory sampling completed. No further action required. 2014-2015 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
05906001
Ground of building 622 (DEV-6) 
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00024954
Groundwater Recirculation Discharge Station Aerodome (254)
Initial testing completed. Detailed testing underway. 2023-2024   04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008368
Groundwater-monitoring perimeter - DND RTA/Shannon limit
Initial testing completed. No further action required. 2017-2018   03 Initial Testing Program
00024904
Guelph Armoury
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022153
Gun Emplacement
Initial testing completed. No further action required. 2018-2019 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000973
H Buildings
Historical review completed. No further action required. 2009-2010   02 Historical Review
04089027
H14 - HQ
Remediation / risk management completed. No further action required. 2013-2014 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02914001
Halifax Armoury Building (2201) - Main Armoury Building
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
10992014
Hangar #1
Initial testing completed. No further action required. 1998-1999   03 Initial Testing Program
00000919
Hangar 10 local 151 drilling in floor of an old shop
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
17967001
Hangar 14
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
11022152
Hangar 17 POL Compound
Initial testing completed. No further action required. 2016-2017 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
06710002
Hangar 3, Bottemless drain St-Hubert Complex
Remediation / risk management completed. No further action required. 2013-2014 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
06710003
Hangar 3,Wash Bay,Complexe St-Hubert
Remediation / risk management completed. No further action required. 2013-2014 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00000934
Hangar 4
Detailed testing completed. No further action required. 2017-2018 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00024810
Hangar 5 & 6
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
02717015
Hangar 5 - Greenwood
Remediation / risk management completed. No further action required. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02717131
Hangar 9, Former Tank 33
Historical review completed. No further action required. 2002-2003   02 Historical Review
00008341
Hangar Line Complex
Detailed testing completed. No further action required. 2018-2019 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
02860001
Hartlen Point (5543) - Former Boiler House
Detailed testing completed. No further action required. 2017-2018 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
02860003
Hartlen Point (5544) - B154 Former Radar OPS Building
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02860004
Hartlen Point (5545) - Former Ash Pit at old Club House
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02860005
Hartlen Point (5546) - Former POL
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
02860002
Hartlen Point (5547) - Former POL Burn Pit
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02860006
Hartlen Point (5548) - Possible Former Dump
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
02860007
Hartlen Point (5549) - Pond (disposal area)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
02860008
Hartlen Point (5550) - Former Beacon/Explosives Area
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
02860009
Hartlen Point (5551) - B151 TACAN Building
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
02860010
Hartlen Point (5552) - B152 YAW Beacon
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
02860011
Hartlen Point (5553) - Former Golf Course Building
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
02860012
Hartlen Point (5554) - (B156 Old Work Shop)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02860013
Hartlen Point (5555) - B153 Old Proshop/Maintenance Bldg
Remediation / risk management completed. No further action required. 2012-2013 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02860014
Hartlen Point (5556) - Former Burn Pit
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
32743001
Harvey Barracks - Entire Barracks and Practice Areas
Confirmatory sampling completed. No further action required. 2013-2014 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00008472
HD-4 Extension
Initial testing completed. No further action required. 2016-2017   03 Initial Testing Program
12578001
Headingly Transmitter Site
Confirmatory sampling completed. No further action required. 2019-2020 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02717083
Heavy Machinery Practice Area
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00000979
Heliport
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
00025155
Heliport Gagetown (L4/32)
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
04089013
Heliport-403 Squadron (Bldg L10)
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00025137
Hersey Impact
Historical review planned. 2023-2024   01 Identify Suspect Sites
17970001
High Speed Refueling Compound
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00024893
Highway 26
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
00024814
Historic Annual ARFFV Testing Area, Hotel Taxiway
Initial testing completed. No further action required. 2017-2018   03 Initial Testing Program
00025108
HMC Dockyard Halifax PFAS Sitewide
Historical review planned. 2023-2024   01 Identify Suspect Sites
69920001
HMCS Champlain - Chicoutimi Naval Reserve
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
33270001
HMCS Gloucester
Confirmatory sampling completed. No further action required. 2015-2016 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00000925
HMCS Jolliet-Sept-Iles naval reserve
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
10885002
HMCS Prevost Armoury
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
10885001
HMCS Prevost Marina
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
57398001
HMCS Radisson, disposal field
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
00008360
HMCS York
Detailed testing completed. No further action required. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
04089018
Hoist Hydraulic Oil Leakage Site (K6 + others)
Initial testing completed. No further action required. 2002-2003 N Not a Priority for Action 03 Initial Testing Program
05906038
Home base, bldg 311, ACI-311 
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
05906037
Home base, lift - bldg 110
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
02717116
Hornell Centre Day Tank
Remediation / risk management completed. No further action required. 2016-2017 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00008579
Howsam Impact Site (Area B)
Historical review planned. 2023-2024   01 Identify Suspect Sites
00008363
HRR-1 Heals Rifle Range 400yd & Beyond
Detailed testing completed. Remedial action plan under development. 2023-2024 1 High Priority for Action 06 Classify the site using the CCME National Classification System
17178003
HRR-2 Heals Rifle Range Former Grenade & Trap Shooting Range
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
17178004
HRR-3d Heals Rifle Range Former Incinerator
Confirmatory sampling completed. No further action required. 2021-2022 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17178005
HRR-4 Heals Rifle Range Former Bunkers
Detailed testing completed. No further action required. 2020-2021 N Not a Priority for Action 05 Detailed Testing Program
00025012
HRR-5 Heals Rifle Range Main Compound Training Area
Remedial action plan completed. Remediation / risk management underway. 2023-2024 I Insufficient Information 07 Develop Remediation/Risk Management Strategy
00025013
HRR-6 Heals Rifle Range Bldg 1061 Former POL Compound
Initial testing completed. No further action required. 2020-2021   03 Initial Testing Program
00025029
HRR-7 Heals Rifle Range Soil Storage Near Pistol Range
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00025014
HRR-8 Heals Rifle Range Former 400-1000 yrd Range
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00025079
HRR-9 HEALS RIFLE RANGE 100 yd PISTOL RANGE & Beyond (Active
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
07604001
Hull Armoury Vehicle Compound
Detailed testing completed. No further action required. 2009-2010 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
58321001
Hunt Club Road Pinestand Property, Ottawa Airport
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
01822043
Hydrant Area Fuel Plumes (HYD9010)
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
06679001
Hydraulic elevator H-101, ASU St-Jean 
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00008695
Improvement of roads 2A, 2AA, 2B-1 et 4F Farnham
Initial testing completed. No further action required. 2011-2012   03 Initial Testing Program
12439001
Inactive Landfill
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
11022134
Incinerator #2 (Former)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
12448002
Incinerator Site
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
07221021
Indoor Firing Range L-123, ASU LP 
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
11022052
Indoor Rifle Range #1
Detailed testing completed. No further action required. 2011-2012 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
11022067
Indoor Rifle Range #3
Initial testing completed. No further action required. 2011-2012   03 Initial Testing Program
11054002
Indoor Rifle Range #4; Existing - Closed
Historical review completed. No further action required. 2004-2005 N Not a Priority for Action 02 Historical Review
10997002
Indoor Rifle Range #5; Existing - Closed
Historical review completed. No further action required. 2021-2022   02 Historical Review
04089023
Indoor Tank Wash and Lagoon
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17405002
Inskip Island
Initial testing completed. No further action required. 2020-2021   03 Initial Testing Program
00008378
Installation of an APU at building L-193
Detailed testing completed. No further action required. 2013-2014 I Insufficient Information 07 Develop Remediation/Risk Management Strategy
00008430
Jenner Road Trench - Gate 6A
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
16861001
Jericho Beach
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
06710001
Jet-Fuel canalisation, Complexe St-Hubert
Remediation / risk management completed. No further action required. 2013-2014 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
15730002
Jimmy Lake Range
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
00024951
John Foote Armoury
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025038
Juliette Tank
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
04089017
K29 POL Storage Site
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
04089006
K41 POL Storage Site
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
04089016
K43 POL Storage Site
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
04089015
K44 POL Storage Site
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
04089014
K56 POL Storage Site
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
04089036
K8
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
00025096
Kamloops Crash - May 2020
Confirmatory sampling completed. No further action required. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00024948
Kapyong Site
Confirmatory sampling completed. No further action required. 2023-2024   09 Confirmatory Sampling and Final Reporting
00001007
Kipp Rifle Range
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00000974
L Buildings
Historical review not required. 2009-2010   01 Identify Suspect Sites
07221005
L-10 South, ASU LP 
Remediation / risk management completed. No further action required. 2013-2014 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00008372
LAB-1, Cape Kakkiviak, SRR Site
Initial testing completed. No further action required. 2017-2018 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
69610006
LAB-2 LRR (Saglek, Labrador) Old Airstrip Building
Remediation / risk management completed. No further action required. 2009-2010 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
69610003
LAB-2 LRR (Saglek, Labrador) Sealift Beach Area
Long term monitoring completed. No further action required. 2013-2014 1 High Priority for Action 10 Long-Term Monitoring (Optional)
69610001
LAB-2 LRR Site (Saglek, Labrador) Staging Area
Long term monitoring completed. No further action required. 2013-2014 1 High Priority for Action 10 Long-Term Monitoring (Optional)
69613001
LAB-3 SRR (Cape Kiglapait) Summit
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008373
LAB-5, Tukialik Bay, SRR Site
Historical review planned. 2023-2024   01 Identify Suspect Sites
00008674
LAB-6
Initial testing completed. No further action required. 2017-2018 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
06012001
Lac-Mégantic Armoury, RES-1. 
Long term monitoring completed. No further action required. 2011-2012 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
06012002
Lac-Mégantic Armoury, RES-2 and 3. 
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
11048074
Lagoons (Edenvale)
Initial testing completed. No further action required. 2006-2007 N Not a Priority for Action 03 Initial Testing Program
00008346
Lancaster crash site (1952) - Laurentides Park
Historical review planned. 2023-2024   01 Identify Suspect Sites
05906061
Land adjacent to the former well P-2 
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
18705001
Land Parcel at VACC
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
07930012
Landfarming site 
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00000966
Landfill behind stop butt A and B in St-Bruno
Confirmatory sampling completed. No further action required. 2012-2013 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
15684038
Landfill Site 1
Detailed testing completed. No further action required. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
15684032
Landfill Site 17
Confirmatory sampling completed. No further action required. 2016-2017 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
15684033
Landfill Site 19
Initial testing completed. No further action required. 2021-2022   03 Initial Testing Program
15684034
Landfill Site 20
Historical review completed. No further action required. 2016-2017   02 Historical Review
15729008
Landfill Site 28
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15729009
Landfill Site 29
Initial testing completed. No further action required. 2023-2024 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15729010
Landfill Site 30
Historical review completed. No further action required. 2016-2017   02 Historical Review
14876004
Landfill Site 31
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
14876005
Landfill Site 32
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15730004
Landfill Site 33
Initial testing completed. No further action required. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
14876001
Landfill Site 34
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
14876002
Landfill Site 35
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
14876003
Landfill Site 36
Historical review completed. No further action required. 2016-2017   02 Historical Review
15684035
Landfill Site 5
Initial testing completed. No further action required. 2016-2017 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15684036
Landfill Site 6
Initial testing completed. No further action required. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15684031
Landfill Site 7
Initial testing completed. No further action required. 2017-2018 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15684037
Landfill Site 8 (A/C Burial Site)
Initial testing completed. Detailed testing underway. 2023-2024 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022150
Landfill; Former (Current Skateboard Park)
Detailed testing completed. No further action required. 2018-2019 3 Low Priority for Action 05 Detailed Testing Program
00000988
Landfills:locations not confirmed(Sites 6,7,9)
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
11022044
Langemark Range
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
00008484
Langemark Sm. Arms Rifle Rng
Detailed testing completed. No further action required. 2011-2012 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00025139
Lawfield Impact
Historical review planned. 2023-2024   01 Identify Suspect Sites
09540037
Lawn Area
Initial testing completed. No further action required. 2009-2010 N Not a Priority for Action 03 Initial Testing Program
00008379
Layout of a salt shelter
Remediation / risk management completed. No further action required. 2012-2013 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
11022124
Le Cateau Battle Assault Range
Confirmatory sampling completed. No further action required. 2018-2019 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
05906041
Le RHIN former demolition area
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00961005
Leitrim Lagoon and Outfall (North Drainage Ditch)
Confirmatory sampling completed. No further action required. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00008537
Lethbridge Airport CF18 Crash Site
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
N7009001
LG2 RAF Crash Site (1996) (CRA13030)
Historical review completed. No further action required. 2007-2008   02 Historical Review
00000987
Liquid Waste Dump
Initial testing completed. No further action required. 2015-2016 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022113
Lisle Road
Historical review completed. No further action required. 2016-2017   02 Historical Review
00008404
Little Dam
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
07221003
Loading platform, L-3 North, ASU LP 
Historical review completed. No further action required. 2016-2017   02 Historical Review
07221001
Longue Pointe Soil Clean-up
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
20247043
Lower Dumbell Lake
Confirmatory sampling completed. No further action required. 2014-2015 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
01822094
Lower Tank Farm (LTF 2000 Series)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
17970004
Lower Tankfarm
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
00008393
LST 209 deep ocean disposal site
Initial testing completed. No further action required. 2010-2011 I Insufficient Information 03 Initial Testing Program
00000975
M / P Buildings
Historical review completed. No further action required. 2014-2015   02 Historical Review
19341001
MA-1 Masset Rifle Range
Remediation / risk management completed. No further action required. 2020-2021 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
00008529
MA-1a Masset Skeet Range
Long term monitoring completed. No further action required. 2023-2024 1 High Priority for Action 10 Long-Term Monitoring (Optional)
00024956
MA-2 Masset Golf Course Parking & Maintenance Bldg
Detailed testing completed. No further action required. 2021-2022 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00024955
MA-3 Masset Former Operation Centre
Detailed testing completed. Remediation / risk management planned. 2023-2024 3 Low Priority for Action 05 Detailed Testing Program
00024957
MA-4 Masset Radio Communications Center
Detailed testing completed. No further action required. 2023-2024 I Insufficient Information 05 Detailed Testing Program
02717006
MADD Shack Dump Area-Greenwood
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
01822076
Main Base and Civil Aviation Area
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
34187001
Main camp Gravel Area-Cloud Lake Cadet Camp
Historical review completed. No further action required. 2002-2003 N Not a Priority for Action 02 Historical Review
N7077001
Main Gate & Hamilton River Road Plume (UPL 16000 series) 5W
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
29757021
Main trail, Donnacona Block (ZIP 6) 
Detailed testing completed. No further action required. 2017-2018 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
10992003
Maintenance Garage
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
34337001
MAL-1 HMCS Malahat
Confirmatory sampling completed. No further action required. 2017-2018 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
07930017
Marsh - North of highway 170 
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
03138001
Masstown (2501) - Receiver Building
Historical review completed. No further action required. 2001-2002   02 Historical Review
03138002
Masstown (2502) - Antenna Field
Historical review completed. No further action required. 1999-2000 N Not a Priority for Action 02 Historical Review
00025008
MAT-10 Northwest corner of the property
Initial testing completed. No further action required. 2021-2022 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025009
MAT-11 Main Operations Complex
Detailed testing completed. No further action required. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025000
MAT-2 PMQ Heating Oil USTs
Detailed testing completed. No further action required. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025004
MAT-6 Sewage Treatment Facility
Detailed testing completed. No further action required. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025005
MAT-7 Former Septic Field
Confirmatory sampling completed. No further action required. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00025006
MAT-8 Antenna Towers and Arrays
Detailed testing completed. No further action required. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025007
MAT-9 Former building complex
Detailed testing completed. No further action required. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00008560
Matane Armoury
Long term monitoring completed. No further action required. 2017-2018 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
17451029
Mc Carthy Island
Initial testing completed. No further action required. 1996-1997   03 Initial Testing Program
09406026
MCN A21 Central Heating Plant
Initial testing completed. No further action required. 1997-1998   03 Initial Testing Program
09406023
MCN D-36
Initial testing completed. No further action required. 1997-1998 N Not a Priority for Action 03 Initial Testing Program
02865001
McNabs Island (2601) - POL Stores (B4)
Remediation / risk management completed. No further action required. 2003-2004 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02865002
McNabs Island (2602) - Flammable Stores Building (B5)
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02865003
McNabs Island (2603) - APU/Generator Hut (B8)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02865004
McNabs Island (2604) - Residence and AST (B10)
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02865005
McNabs Island (2605) - Solid Waste Area
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
02739012
Meadowview Landfill - Aldershot
Long term monitoring completed. No further action required. 2017-2018 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
00025128
Meaford - Area 3 Small Arms Range
Historical review planned. 2023-2024   01 Identify Suspect Sites
00025148
Meaford Main Impact Area (MIA)
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00025017
Mech Eng Fuel Spill R75/R69
Long term monitoring completed. No further action required. 2022-2023 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
07221019
Mechanical Workshop L-3 North, ASU LP 
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
07221002
Mechanical Workshop, L-3, ASU Longue-Pointe South
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
00008559
Megantic Lake Armoury
Confirmatory sampling completed. Long term monitoring underway. 2023-2024   09 Confirmatory Sampling and Final Reporting
02884001
Melville Island (5901) - Marina Storage (B1)
Remediation / risk management completed. No further action required. 2019-2020 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02884002
Melville Island (5902) - Old Ice House (B2)
Remediation / risk management completed. No further action required. 2019-2020 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02884003
Melville Island (5903) - Clubhouse (B4)
Remediation / risk management completed. No further action required. 2019-2020 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02884004
Melville Island (5904) - Marina Storage (B6)
Remediation / risk management completed. No further action required. 2019-2020 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02884005
Melville Island (5905) - Bubbler Shed (B7)
Detailed testing completed. No further action required. 2019-2020 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
02884006
Melville Island (5906) - Workshop (B8)
Detailed testing completed. No further action required. 2019-2020 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
02884007
Melville Island (5907) - Former Chapel Site (B10)
Detailed testing completed. No further action required. 2019-2020 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
02884008
Melville Island (5908) - Boat Storage/Parking Lot Site
Detailed testing completed. No further action required. 2019-2020 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
02884009
Melville Island (5909) - Marina Railway Site
Detailed testing completed. No further action required. 2019-2020 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
02884010
Melville Island (5910) - Fuel Storage/Dispensing Area
Confirmatory sampling completed. No further action required. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02884011
Melville Island (5911) - Cradle Yard
Confirmatory sampling completed. No further action required. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02884012
Melville Island (5912) - Mooring Field
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
02884013
Melville Island (5913) - Causeway
Initial testing completed. No further action required. 2000-2001 N Not a Priority for Action 03 Initial Testing Program
00000939
Metal Dump
Remediation / risk management completed. No further action required. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00001005
Mewata Armoury
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
17430001
MH-1 Mary Hill Machine Shop Area
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17430006
MH-2 Mary Hill Former Rocket Range
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
17430002
MH-3 Mary Hill Former Rifle Range Area
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17430004
MH-4 Mary Hill Battery
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025045
MH-5 MARY HILL FORTIFICATION LANDFILL
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025046
MH-6 MARY HILL SEARCHLIGHT AND POWERHOUSE (MH-1027)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025064
MH-7 MARY HILL FORMER NW BURN SITE
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00025111
MH-8 – Former Military Infrastructure and Activities (RL/PL)
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00025160
MH-9 – Former Military Infrastructure and Activities (IL)
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
09540009
Middleton Park Landfill Site
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008520
Mile Square
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00025159
Military History Museum Gagetown
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025143
Mill Hill, NB
Historical review planned. 2023-2024   01 Identify Suspect Sites
02739002
Mill Pond and Sewage Lagoons - Aldershot
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
11022043
Mons Rifle Range
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
04089007
Mons Small Arms Rifle Range
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
05647014
Montmagny Armoury
Detailed testing completed. Remediation / risk management planned. 2023-2024 N Not a Priority for Action 05 Detailed Testing Program
00008694
Montreal soccer pitch
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
06872002
Moras Island
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
06294002
Moras Island, Cadet camp
Detailed testing completed. No further action required. 2011-2012 I Insufficient Information 06 Classify the site using the CCME National Classification System
06872024
Moras Island, Former disposal sites
Detailed testing completed. No further action required. 2011-2012 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
06872011
Moras Island, Pumping station 
Detailed testing completed. No further action required. 2011-2012 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00008383
Mosley Street Armoury
Initial testing completed. No further action required. 2014-2015 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008381
Moss Park Armoury
Detailed testing completed. No further action required. 2017-2018 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
05613001
Mount Apica - north slope
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
69814001
Mount Bourbeau - Former Chibougamau radar station
Confirmatory sampling completed. No further action required. 2013-2014 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
11937001
Mount McKay Range
Confirmatory sampling completed. No further action required. 2013-2014 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
00025142
Mountain Impact
Historical review planned. 2023-2024   01 Identify Suspect Sites
34476001
Mountain View - Outer Landfill Site
Detailed testing completed. No further action required. 2017-2018 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
17968002
MQ 48 Cedar Crescent
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
17968001
MQ 79 Elm Street
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
34476004
Mtn View - Inner Landfill Site
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00008376
Multipurpose runway Montreal Garrison north side
Confirmatory sampling completed. No further action required. 2012-2013 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
11022036
Mustard Gas Site #1
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
11022010
Mustard Gas Site #2; Former
Detailed testing completed. No further action required. 2018-2019 N Not a Priority for Action 05 Detailed Testing Program
00000942
N Fuel Cache Site, Cartwright Labrador (Cartwright Airport)
Initial testing completed. No further action required. 2013-2014 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00001002
N118 Compound
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
00000965
NAD-1 Naden Jr NCM
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
17406002
NAD-1 Naden Training Area
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
00008616
NAD-10 Naden South - East of Admirals
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00008621
NAD-15 Naden North PMQ Housing
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008622
NAD-16 Naden North Playing Fields
Detailed testing completed. No further action required. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008596
NAD-9 Naden North Southeast Bldg 97
Detailed testing completed. No further action required. 2021-2022 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00016474
Nanisivik (Strathcona Sound) (3rd party assessed)
Detailed testing completed. No further action required. 2016-2017 I Insufficient Information 07 Develop Remediation/Risk Management Strategy
02859046
Navy Island (7501)
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00008541
New ATESS Refinishing Shop
Detailed testing completed. Remedial action plan under development. 2023-2024 1 High Priority for Action 06 Classify the site using the CCME National Classification System
07930015
New destruction centre for explosives - New EOD
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
03288003
New Glasgow Armoury (2901) - Armoury Buidling
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03288004
New Glasgow Armoury (2902) - POL Storage Building
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
69813001
New Glasgow Armoury (7101) - Vac Lot Proposed Armoury Site
Initial testing completed. No further action required. 2000-2001   03 Initial Testing Program
03288006
New Glasgow Armoury - Military Parking (9302)
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
03288005
New Glasgow Military Parking (9301) - Coal Ash Disposal Area
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
05906062
New Snow Dump (Camp Vimy) 
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
06953001
New Storage Area in Back of the Building
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
17008001
New Westminster Armoury
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02762001
Newport Corner (3101) - Comp. Tech. Building (B9)
Confirmatory sampling completed. No further action required. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02762002
Newport Corner (3102) - POL Stores (B32) and UST
Long term monitoring completed. No further action required. 2017-2018 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
02762003
Newport Corner (3103) - Maintenance Garage (B13)
Initial testing completed. No further action required. 2000-2001   03 Initial Testing Program
02762004
Newport Corner (3104) - Power Plant
Confirmatory sampling completed. No further action required. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02762005
Newport Corner (3105) - Swimming Pool House (B36)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
02762006
Newport Corner (3106) - Septic Tile Field near B9 & B13
Remediation / risk management completed. No further action required. 2009-2010 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02762007
Newport Corner (3107) - Former Dumping Area
Initial testing completed. No further action required. 2000-2001 N Not a Priority for Action 03 Initial Testing Program
02762008
Newport Corner (3108) - Antenna Towers (3)
Initial testing completed. No further action required. 2000-2001 N Not a Priority for Action 03 Initial Testing Program
02762010
Newport Corner (3109) - Former Incinerator Hut
Initial testing completed. No further action required. 2000-2001 N Not a Priority for Action 03 Initial Testing Program
02762009
Newport Corner (3110) - Sewage Treatment Plant (package)
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02762011
Newport Corner (3111) - Retaining Wall in Stream
Remediation / risk management completed. No further action required. 2000-2001 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02762012
Newport Corner (3112) - PMQ #6 -Fuel Tank Rupture
Detailed testing completed. No further action required. 2013-2014 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
10626002
Niagara-on-the-lake Rifle Range
Confirmatory sampling completed. No further action required. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00024838
Niagara-on-the-Lake Tank Training Area
Detailed testing completed. No further action required. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00024979
NMC Bunker Nanaimo Military Camp
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008648
North Bay Former FFTA
Detailed testing completed. No further action required. 2011-2012 2 Medium Priority for Action 05 Detailed Testing Program
00024905
North Bay Former UST
Initial testing completed. No further action required. 2018-2019   03 Initial Testing Program
00025020
North Bay POL Shed Site
Historical review not required. 2019-2020   01 Identify Suspect Sites
09540008
North Canex Bldg 98
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
00000950
North Dumpsite
Confirmatory sampling completed. No further action required. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00001006
North East Armoury
Initial testing completed. No further action required. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
09540032
North of Bldg 1
Initial testing completed. No further action required. 2004-2005   03 Initial Testing Program
29757024
North Outfall, DRDC-North 
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00008405
North redoubt CMR St-Jean
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
03760004
North Sydney Armoury (3001) - B32
Initial testing completed. No further action required. 1999-2000 N Not a Priority for Action 03 Initial Testing Program
N7084001
North Sydney Armoury (3002) - B35
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
N7021001
Northern Fuel Cache - Mary's Harbor
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
N7068001
Northern Fuel Cache Site - Argentia
Initial testing completed. No further action required. 2017-2018 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
N7041001
Northern Fuel Cache Site - Border Beacon
Detailed testing completed. No further action required. 2014-2015 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
N7019001
Northern Fuel Cache Site - Cartwright (Chopper Pad site)
Initial testing completed. Detailed testing underway. 2023-2024 1 High Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
N7020001
Northern Fuel Cache Site - Hopedale
Initial testing completed. No further action required. 2013-2014 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
N7023001
Northern Fuel Cache Site - Lake Harbour Nunavut
Initial testing completed. No further action required. 2017-2018 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
N7022001
Northern Fuel Cache Site - Nain
Detailed testing completed. No further action required. 2017-2018 2 Medium Priority for Action 05 Detailed Testing Program
N7024001
Northern Fuel Cache Site - Quaqtaq
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
34430001
Northern Fuel Cache Site - Resolution Island
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
N7079001
Northern Fuel Cache Site Eon Lake
Initial testing completed. No further action required. 2002-2003 N Not a Priority for Action 03 Initial Testing Program
09540001
Northwest Bldg 110
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
09540002
Northwest Bldg 52
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
09540033
Northwest of Bldg 65
Initial testing completed. No further action required. 2004-2005   03 Initial Testing Program
17591003
NRR- 2 Nanaimo Rifle Range- Small Dump Site
Initial testing completed. No further action required. 2020-2021   03 Initial Testing Program
00008364
NRR-1A Nanaimo Rifle Range 600 yd & Beyond
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025080
NRR-1C Nanaimo Rifle Range 25m Pistol Range & Beyond ACTIVE
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
17591004
NRR-4 Nanaimo Rifle Range Dump Site
Confirmatory sampling completed. No further action required. 2020-2021 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
11022157
O-5 Impacted Fill
Initial testing completed. No further action required. 2011-2012 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008482
Old Amiens Small Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
15305007
Old Ammo Incinerator site
Long term monitoring completed. No further action required. 2010-2011 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
00025131
Old Castle Grenade Range
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00000992
Old Dump Site
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
00978028
Old Entrance / Guardhouse
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008542
Old garage at building B32
Initial testing completed. No further action required. 2011-2012   03 Initial Testing Program
15684010
Old Imperial Oil Service Station
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00000993
Old Landfill Site ( Area M)
Initial testing completed. No further action required. 2018-2019 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008483
Old Mons Small Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
N7074001
Old Navy Site - Old Landfill
Remediation / risk management completed. No further action required. 2013-2014 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00980001
Old Navy Site - Operations Site
Detailed testing completed. No further action required. 2009-2010 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00980012
Old Navy Site - Shooting Range
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
00000922
Old Railhead Site at 8 Wing/CFB Trenton
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
00008485
Old Reichwald SmArms Rifle Rng
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
11347007
Old Rifle Range / Biathlon Range
Confirmatory sampling completed. No further action required. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00008422
Old St-Maurice firing range (17 acres portion)
Confirmatory sampling completed. No further action required. 2012-2013 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
00025144
Old Summerside EOD Range, PEI
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00961003
OLD UST/POL Shed CFS Leitrim
Confirmatory sampling completed. No further action required. 2022-2023 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008471
Old UXO destructn site St-Maurice Proof rng
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
00008481
Old Vimy Sm. Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
02717105
Operation Area Soils & GW (11 Hgr)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008343
OPSEE Training Area
Confirmatory sampling completed. No further action required. 2012-2013 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02861002
Osborne Head (5657) - Operations Building B301
Detailed testing completed. No further action required. 2017-2018 N Not a Priority for Action 05 Detailed Testing Program
02861003
Osborne Head (5658) - B301 Septic Field
Initial testing completed. No further action required. 2000-2001   03 Initial Testing Program
02861004
Osborne Head (5659) - B302/POL Shed
Initial testing completed. No further action required. 2000-2001   03 Initial Testing Program
02861005
Osborne Head (5660) - B303 Fire Pump House
Initial testing completed. No further action required. 2000-2001   03 Initial Testing Program
02861006
Osborne Head (5661) - B304 Garage
Initial testing completed. No further action required. 2000-2001   03 Initial Testing Program
02861007
Osborne Head (5662) - Explosives Demolition
Initial testing completed. No further action required. 2000-2001   03 Initial Testing Program
02861008
Osborne Head (5663) - Former Transformer Site
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
02863050
Osborne Head (5664) - Mine Disposal Site
Initial testing completed. No further action required. 2007-2008   03 Initial Testing Program
02863051
Osborne Head (5665) - Former Radar Site
Initial testing completed. No further action required. 2000-2001   03 Initial Testing Program
02861001
Osborne Head (5666) - Potential Landfill
Initial testing completed. No further action required. 1999-2000 N Not a Priority for Action 03 Initial Testing Program
00008386
Oshawa Airport
Initial testing completed. No further action required. 2011-2012   03 Initial Testing Program
00008359
Oshawa Armoury
Initial testing completed. No further action required. 2019-2020 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022050
Outdoor Armoured Vehicle Prking Area
Detailed testing completed. No further action required. 2018-2019 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
07221006
Outdoor Firing Range L-139, ASU LP 
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
05906012
P-5 area
Historical review completed. No further action required. 2017-2018   02 Historical Review
00008567
PA Warehouse
Historical review not required. 2018-2019   01 Identify Suspect Sites
30333001
PA-1 Port Alberni Armoury
Long term monitoring completed. No further action required. 2013-2014 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
11022040
Paint Shop #1
Initial testing completed. No further action required. 2018-2019   03 Initial Testing Program
11022073
Paint Shop #2
Initial testing completed. No further action required. 2018-2019   03 Initial Testing Program
00024827
Palladium Range
Detailed testing completed. Remediation / risk management planned. 2023-2024 N Not a Priority for Action 05 Detailed Testing Program
00008452
Parc Lemay (former dump)
Confirmatory sampling completed. No further action required. 2017-2018 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00348003
Parker's Pond Radio Site (5111) - Antenna Site (Herbicides)
Initial testing completed. No further action required. 1998-1999   03 Initial Testing Program
07221007
Parking - South Section (Notre Dame) ASU LP 
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
07221004
Parking at south L-6, ASU LP 
Remediation / risk management completed. No further action required. 2013-2014 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00008636
Past Landfill activities (A2)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008638
Past landfill activities (zone D)
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00008637
Past landfill activities - C
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
N7048001
Pat Bay Former POLCompound
Long term monitoring completed. No further action required. 2013-2014 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
17132001
PB-1 Pat Bay Septic Tank Location
Historical review completed. No further action required. 1995-1996   02 Historical Review
17132004
PB-2 Pat Bay Hangar 17 Area
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17132003
PB-4 Pat Bay Fmr Asphalt Plnt previously on Victoria Airport
Initial testing completed. No further action required. 2002-2003 2 Medium Priority for Action 03 Initial Testing Program
00025031
PB-5 Pat Bay hangar wash pad
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00025033
PB-6: Pat Bay Hanger 17 fmr POL Shed/UST
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025078
PB-7 PAT BAY CONTAMINATION FROM OFFSITE ASTs/USTs
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00000985
PCP Ammo Box (Former Ammo Box Dump)
Initial testing completed. No further action required. 2012-2013   03 Initial Testing Program
02739055
Peach Lake - Aldershot
Detailed testing completed. No further action required. 2009-2010 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
N7054001
Penhold
Initial testing completed. No further action required. 2006-2007   03 Initial Testing Program
29757026
Perchlorate (administrative sector) 
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00000994
Pesticide Container Landfill and Asphalt Dump
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
00025147
Petawawa - Area 9
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00025146
Petawawa Main Impact Area (MIA)
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00000982
Petawawa Research Forest
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
11347008
Petawawa RTA
Detailed testing completed. No further action required. 2011-2012 N Not a Priority for Action 05 Detailed Testing Program
00008635
Petit Desert range
Historical review planned. 2023-2024   01 Identify Suspect Sites
11022068
Petroleum Contaminated Soil Pile
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00024873
PHL-260
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00008353
Pickled Sand Storage Site
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
03268001
Pictou Armoury (3201) - Old Armoury Building (B1)
Initial testing completed. No further action required. 2000-2001 N Not a Priority for Action 03 Initial Testing Program
03268002
Pictou Armoury (3202) - Old POL Storage Shed (B2)
Initial testing completed. No further action required. 2000-2001 N Not a Priority for Action 03 Initial Testing Program
03268003
Pictou Armoury (3204) - Maintenance
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
32046002
Pier 26 (5301) - British Property Site 7c (Cabot Boatshed)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
32047002
Pier 27 (5302) - Brit. Prop. Site 7c
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
37203001
Pierce Creek Training Area/Landfill
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008664
PIN-1BD, Keats Point
Initial testing completed. No further action required. 2017-2018 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008550
PIN-1BG Croker River
Initial testing completed. No further action required. 2017-2018   03 Initial Testing Program
34446001
PIN-1BG SRR (Croker River) - Site Summit
Remediation / risk management completed. No further action required. 2012-2013 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00008682
PIN-2A
Initial testing completed. No further action required. 2017-2018 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
70002001
PIN-3 LRR, Lady Franklin Point - Site Summit
Confirmatory sampling completed. No further action required. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00008681
PIN-CB
Initial testing completed. No further action required. 2017-2018 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008680
PIN-DA
Initial testing completed. No further action required. 2017-2018 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008679
PIN-EB
Initial testing completed. No further action required. 2017-2018   03 Initial Testing Program
00008391
Pine Street Armoury
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
58321002
Pipeline (near Tank Farm), 7 Wing CFB Ottawa
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
06651006
Pistol Range, CEF Farnham
Remediation / risk management completed. No further action required. 2013-2014 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
70602011
Plant 1 Former DeHavilland Plant Area (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602012
Plant 2 Former DeHavilland Plant Area (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
70602013
Plant 3 Former DeHavilland Plant Area (Downsview)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
29757009
Plateau (demolition site), DRDC-Trials 
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00025092
PLER Metal Dump
Historical review planned. 2023-2024   01 Identify Suspect Sites
15730001
PLER POL
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00024817
PLER Site Release
Confirmatory sampling completed. No further action required. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024890
PLER Spill 2015
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
04089021
PMQ (14 Hazen Cres.)
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
04089022
PMQ (203 MacKenzie Av.)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
04089019
PMQ (6/8 Venoit St)
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
04089020
PMQ (85/87 Restigouche Rd.)
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
07070001
PMQ 33 Fort St-Jean
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
05751001
PMQ Old Quebec City
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
06972001
Pointe-Picard Marina - Marine sediments
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
07930009
POL tank farm
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
05906017
POL (cadets/gliders) 
Detailed testing completed. No further action required. 2009-2010 N Not a Priority for Action 05 Detailed Testing Program
04089001
POL Compound
2023-2024 1 High Priority for Action  Confirmatory Sampling and Final Reporting
00000932
POL Compound
Initial testing completed. No further action required. 2017-2018 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
09540020
POL Compound - area of removed tanks
Remediation / risk management completed. No further action required. 2023-2024 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
02717004
POL Compound - Greenwood
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00978008
POL Compound Contaminated Soil Pile
Detailed testing completed. No further action required. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
09540036
POL Pipeline
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02717087
POL Refuelling Area
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
04089011
POL Service Area - K20
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
11022025
POL Shed @ E-182
Historical review not required. 2001-2002   01 Identify Suspect Sites
09406014
POL Storage Bldg A18 McN
Initial testing completed. No further action required. 2003-2004   03 Initial Testing Program
11054001
POL Storage Shed #1; Existing
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
10997001
POL Storage Shed #2; Existing
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
11022096
POL Storage Shed; E-184
Detailed testing completed. No further action required. 2021-2022 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
29757004
Pole park, DRDC-North 
Detailed testing completed. No further action required. 2010-2011 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00025036
Pond Site B225
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
N7086001
Possible Landfill Sites (Penhold)
Detailed testing completed. No further action required. 2009-2010 3 Low Priority for Action 05 Detailed Testing Program
10992025
Potential Herbicide Barrels Burial Site
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
18976001
Power Plant at Det Holberg
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
36185001
Present Skeet Range
Initial testing completed. No further action required. 2015-2016 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000998
Prince Albert Rifle Range
Initial testing completed. No further action required. 2014-2015 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
N7047001
Prince Rupert Tank Farm
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
09586002
Pt Petre - Previous artillery range
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
06651002
Pump Area, CEF Farnham
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
00008583
Putting drain arnd bldg L-42
Historical review not required. 2010-2011   01 Identify Suspect Sites
00001003
Q Line POL Compound
Initial testing completed. No further action required. 2011-2012   03 Initial Testing Program
00008544
Quarter project-St-Jean garr
Initial testing completed. No further action required. 2016-2017   03 Initial Testing Program
00008457
Quebec Citadel
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11347006
R101 Canex Garage
Confirmatory sampling completed. No further action required. 2009-2010 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
09407006
R26 Fort Henry Heights Dump site
Initial testing completed. No further action required. 2014-2015   03 Initial Testing Program
02916001
RA Park (3301) - Officers Mess (RA1)
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
02916002
RA Park (3302) - Office Facility (RA2)
Long term monitoring completed. No further action required. 2022-2023 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
00024972
Radar PAR
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
15305010
Range #1
Initial testing completed. No further action required. 2015-2016 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000953
Range 16 UXO/Scrap pile
Historical review planned. 2023-2024   01 Identify Suspect Sites
00008354
Range and Training Area
Initial testing completed. No further action required. 2016-2017   03 Initial Testing Program
00008460
Range and training Area Characterization - NOT A CS
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00008517
Range Control Trenches
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
07070003
Range- Old Vehicule (behind range A-B)
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
05906005
Ravenna Lake and River
Initial testing completed. No further action required. 2013-2014   03 Initial Testing Program
02717118
RC Gordon School
Initial testing completed. No further action required. 2002-2003   03 Initial Testing Program
00008568
RCSU Warehouse
Historical review not required. 2016-2017   01 Identify Suspect Sites
00008563
Rebuilding of our underground infrastructure CMR-St-Jean
Detailed testing completed. No further action required. 2016-2017 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
15335001
Red Deer Armoury
Remediation / risk management completed. No further action required. 2013-2014 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
10992004
Refueling Facility 1
Initial testing completed. No further action required. 1997-1998   03 Initial Testing Program
14976047
Refueling Point (Base POL)
Confirmatory sampling completed. No further action required. 2010-2011 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
10992006
Refuelling Facility 2
Remediation / risk management completed. No further action required. 2019-2020 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
17970003
Refuelling Vehicle Compound near B-100
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008477
Reichwald Sm. Arms Rifle Rng
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00024871
RES-1 MAG
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00000911
Residential Housing Units Fort Henry Heights
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
11022092
Retail Gas Station #2; Former P-134 (CANEX/Shell)
Long term monitoring completed. No further action required. 2021-2022 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
11022016
Retail Gasoline Station #1; Former (A-179)
Initial testing completed. No further action required. 2016-2017 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
12439002
Rifle Range 1
Historical review planned. 2023-2024   01 Identify Suspect Sites
12439006
Rifle Range 2
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
12439007
Rifle Range 3 (small arms)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
12439008
Rifle Range 4
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00000938
Rifle range, Former cadet camp, Falardeau
Confirmatory sampling completed. No further action required. 2017-2018 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
05441001
Rimouski Armoury
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
58520002
Rimouski Naval Reserve, boathouse
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
58520001
Rimouski Naval Reserve, Montée Industrielle street
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
15529002
Riverbend Receiver Site
Confirmatory sampling completed. No further action required. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
05906036
Rivière-du-loup Armoury, Thériault Boulevard
Initial testing completed. Detailed testing underway. 2023-2024 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008545
Road East of gate 9
Initial testing completed. No further action required. 2011-2012   03 Initial Testing Program
00024953
Roads and Grounds Storage Yard
Historical review planned. 2023-2024   01 Identify Suspect Sites
10992016
Roadways
Initial testing completed. No further action required. 2003-2004   03 Initial Testing Program
11022119
Rocket Launcher Range
Confirmatory sampling completed. No further action required. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02739013
Rocket Range
Initial testing completed. No further action required. 2006-2007   03 Initial Testing Program
00025140
Rockwell Impact
Historical review planned. 2023-2024   01 Identify Suspect Sites
11022001
Roundel EOD Range
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00008689
Rouyn-Noranda Armoury
Initial testing completed. No further action required. 2017-2018   03 Initial Testing Program
00008690
Rouyn-Noranda Armoury - parking and POL & Hazmat storage
Initial testing completed. No further action required. 2017-2018   03 Initial Testing Program
06680004
Royal Military College, Former reservoir T20 (building 102)
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
17452006
Royal Roads University RRU-6
Remediation / risk management completed. No further action required. 2022-2023 I Insufficient Information 08 Implement Remediation/Risk Management Strategy
17432001
RP-1 Rocky Point CFAD Active Propellant Burn Area
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00008626
RP-10 Rocky Point Bldg 36A Steam-out Hut- Former/Current AST
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00008627
RP-11 Rocky Point Former Boat Shed & Fuel Storage
Remediation / risk management completed. No further action required. 2021-2022 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00008628
RP-12 Rocky Point Vehicle Maintenance Garage
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00008629
RP-13 Rocky Point Former USTs at Private Married Quarters
Confirmatory sampling completed. No further action required. 2017-2018 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008630
RP-14 Rocky Point Former Landfill Adjacent to Pedder Bay
Confirmatory sampling completed. No further action required. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008631
RP-15 Rocky Point Whirl Bay
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008632
RP-16 Rocky Point Pedder Bay Boat Jetty at Mason Point
Remediation / risk management completed. No further action required. 2021-2022 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
17432004
RP-2a Rocky Point Active Explosive Ordnance Disposal
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
17432010
RP-2b Rocky Point Former Landfill B
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
17432011
RP-3ad Rocky Point Small Arms Slag Dump Former Landfills
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
17432005
RP-3b Rocky Point Former Small Arms Incinerator
Confirmatory sampling completed. No further action required. 2021-2022 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00024949
RP-3c Rocky Point White Phosphorus Active Disposal Area
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008625
RP-4 Rocky Point Bentinck Island Active Site
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
17432009
RP-5 Rocky Point Paper Incinerator
Initial testing completed. No further action required. 1995-1996   03 Initial Testing Program
17432002
RP-6 Rocky Point CFAD Oily Waste Incinerator
Remediation / risk management completed. No further action required. 2015-2016 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
17432007
RP-7 Rocky Point Area A Helgesen Point Former Landfill
Confirmatory sampling completed. No further action required. 2018-2019 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17432003
RP-8 Rocky Point Fire Break - Former Burning Slab
Detailed testing completed. No further action required. 2014-2015 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
17432008
RP-9 Rocky Point CFAD
Initial testing completed. No further action required. 2002-2003   03 Initial Testing Program
17452001
RRU-1 Royal Roads University Former 25 Yd Range
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
17452010
RRU-10 Royal Roads University Former Ash Disposal Area
Long term monitoring completed. No further action required. 2013-2014 1 High Priority for Action 10 Long-Term Monitoring (Optional)
17452011
RRU-11 Royal Roads University-Lagoon Former Landfill
Long term monitoring completed. No further action required. 2013-2014 1 High Priority for Action 10 Long-Term Monitoring (Optional)
17452012
RRU-12 Royal Roads University Former Skeet Range
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00008434
RRU-13 Royal Roads University YM/YWCA Pool Bldg No.22A
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17452013
RRU-13 Royal Roads University-Fmr UST Pool Bldg
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00008390
RRU-14 Royal Roads Asphalt Dump & Former Septic Field
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00025072
RRU-15 Boathouse Construction Soil Containment Cell
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
17452002
RRU-2 Royal Roads University- Small Lakes Area
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
17452014
RRU-3 Royal Roads University Boathouse Area
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
17452004
RRU-4 Royal Roads University- Former Landfill
Remediation / risk management completed. No further action required. 2017-2018 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
17452005
RRU-5 Royal Roads University- Former Gravel Pit
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
17452007
RRU-7 Royal Roads University Abandoned Concrete Tank
Confirmatory sampling completed. No further action required. 2013-2014 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
17452008
RRU-8 Royal Roads University Dunsmuir Bottle Dump
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
17452009
RRU-9 Royal Roads University Sewerline allignment
Initial testing completed. No further action required. 2020-2021   03 Initial Testing Program
00008450
RTA Burial Pit
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00008468
S.DRDC-other former firing rngs
Detailed testing completed. No further action required. 2023-2024 3 Low Priority for Action 05 Detailed Testing Program
15531009
SAC Site
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
N7040001
Saglek Bay Sediments
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
22495001
Saguenay Armoury pipe between buildings 282 and 283#
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008489
Salisbury Sm. Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2023-2024 1 High Priority for Action 06 Classify the site using the CCME National Classification System
16439011
Salmon Arm Training Area
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
04089039
Salt and Sand Sheds
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
11022017
Salvage Yard; Former
Long term monitoring completed. No further action required. 2018-2019 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
09406013
Sand and Salt Storage Bldg C40 McN
Initial testing completed. No further action required. 2002-2003   03 Initial Testing Program
09406012
Sand and Salt Storage bldg E32 McN
Initial testing completed. No further action required. 2003-2004   03 Initial Testing Program
03044016
Sandwich Point (7302) - Transformer (Water Pump Sta.)
Initial testing completed. No further action required. 2014-2015 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11848001
SAULT STE MARIE ARMOURY
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008362
Scarborough Armoury
Initial testing completed. No further action required. 2016-2017 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00978027
Scrap Compound / Supply Storage Area
Detailed testing completed. No further action required. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
16872001
Seaforth Armoury
Initial testing completed. No further action required. 2011-2012 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
17966001
Seal Bay Transmitter Site
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008687
Sector 2
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00008582
Sector 6 demolition site
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
29757005
Sector for bldg 307, DRDC-Trials
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
06872038
Sector OP-1 to OP-6
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
07221018
Sector Slag Studies, ASU LP
Remediation / risk management completed. No further action required. 2011-2012 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
11022049
Septic System #1
Initial testing completed. No further action required. 2021-2022 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022155
Septic System #2-CFAD
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022076
Septic System #3
Remediation / risk management completed. No further action required. 2018-2019 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
11022133
Septic System #4; Existing (CFAD 207)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022143
Septic System #5; Existing (CFAD 38)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
14976062
Serial 19 Trenches (WAD Site B)
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
12448001
Sewage Lagoon
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
10992009
Sewage Lagoons
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
20247042
Sewage Outfall
Long term monitoring completed. No further action required. 2017-2018 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
11022002
Sewage Sludge Drying Beds; Existing
Detailed testing completed. No further action required. 2018-2019 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
11022034
Sewage Sludge Ponds #1
Detailed testing completed. No further action required. 2018-2019 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
02717073
Sewage Treatment Plant POL Storage
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
03011005
Shannon Park (3405) - Former Storage Building (B5)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
03011001
Shannon Park (3401) - Central Heating Plant (B4)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03011002
Shannon Park (3402) - Fmr POL Storage Behind (B2)
Remediation / risk management completed. No further action required. 2014-2015 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
03011003
Shannon Park (3403) - Snow Stockpile area, behind (B4)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
03011004
Shannon Park (3404) - Swimming Pool (B10)
Historical review completed. No further action required. 2001-2002   02 Historical Review
03011006
Shannon Park (3406) - Skating Rink (B20)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
03011007
Shannon Park (3407) - Former Location of Storage (B7)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
03011009
Shannon Park (3408) -CHP Ash Disposal
Remediation / risk management completed. No further action required. 2014-2015 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
03011011
Shannon Park (3409) - Fill Area, Rink
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
03011010
Shannon Park (3410) - Residential Area
Remediation / risk management completed. No further action required. 2014-2015 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
15730003
Shaver River Range
Detailed testing completed. Remediation / risk management planned. 2023-2024 I Insufficient Information 05 Detailed Testing Program
02863006
Shearwater (206) Former Barrel site HH (DIPM Site)
Confirmatory sampling completed. No further action required. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02863010
Shearwater (210) - Fire Fighting Training Area
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863017
Shearwater (217) - Engine Run Up Area (DIPM Site)
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863020
Shearwater (220) - Fill Area South of Hangar H
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863021
Shearwater (221) - Lower Fuel Compound and Firing Range
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863022
Shearwater (222A): Former POL (D) & UST (S) at bldg 212 & HY
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863023
Shearwater (223) - Building 4 and H (POL)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863024
Shearwater (224): Canex Garage (132), Former Firehall & UST
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
02863026
Shearwater (226) C. Heating Plant (56) & Fuel (rail) Comp.
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863060
Shearwater (243), Buried Lines Connect. Fmr Fuel Tank Farm
Historical review completed. No further action required. 2001-2002 N Not a Priority for Action 02 Historical Review
00024811
Shearwater (247) Abandoned Transformer Shed
Confirmatory sampling completed. No further action required. 2016-2017 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863061
Shearwater - PMQs, Former Brick Yard (Hornsby's) (234B)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00024918
Shearwater Aircraft Burn Area (Site 252)
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024914
Shearwater CC-144B Challenger Crash Site (Site 249)
Detailed testing completed. Remedial action plan under development. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00024917
Shearwater FFTA (Alpha Taxiway) (Site 250)
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024913
Shearwater Fire Hall Storage Shed (SH40) (Site 253)
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00024915
Shearwater Former FFTA (North Delta Taxiway) (Site 251)
Detailed testing completed. Remediation / risk management planned. 2023-2024 2 Medium Priority for Action 05 Detailed Testing Program
00024920
Shearwater Sea King Crash Site (Site 248)
Historical review planned. 2023-2024   01 Identify Suspect Sites
02863027
Shearwater(227) -Former CHP, Bowser Cleaning (71) & POL (87)
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
02863028
Shearwater(228)-B9(Fmr Firehall,Tender Gar)Crown AssetsB70
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02863029
Shearwater(229)-Upr Fuel Cmpnd,Upgradient Dmpg Area
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02863030
Shearwater(230)-Bldg31,31A,31B,32(Mobl Spprt Maint)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863031
Shearwater(231)-W.Property Boundary
Initial testing completed. No further action required. 2000-2001 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02863033
Shearwater(233)-Fmr MT Garage(BJ)Adjcnt Trnsfrmr Substn
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863034
Shearwater(234A)-PMQs, Former Brick Yd(Hornsby's)
Long term monitoring completed. No further action required. 2012-2013 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
02863035
Shearwater(235)-Frm Centrl Htg Plnt(G)Trnsfrmr Vault
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02863052
Shearwater(236)-Frm UST Loc(WWII)Bravo Taxiwy
Initial testing completed. No further action required. 2014-2015 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02863038
Shearwater(238)-Morris Lake Outfall&Former UST at B54
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
02863039
Shearwater(239)-Former Transformer Site(Railway Spot)
Initial testing completed. No further action required. 2000-2001 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025141
Sheriff Lake
Historical review planned. 2023-2024   01 Identify Suspect Sites
00025129
Shilo Main Impact Area (MIA)
Historical review planned. 2023-2024   01 Identify Suspect Sites
04089010
Shirley Rd. Dump
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
11022047
Simulated Mine Area
Initial testing completed. No further action required. 2016-2017 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022100
Sink Pit # 3; Former
Detailed testing completed. No further action required. 2011-2012 2 Medium Priority for Action 05 Detailed Testing Program
11022098
Sink Pit #1; Former
Detailed testing completed. No further action required. 2011-2012 2 Medium Priority for Action 05 Detailed Testing Program
11022099
Sink Pit #2; Former
Detailed testing completed. No further action required. 2011-2012 2 Medium Priority for Action 05 Detailed Testing Program
15531008
Site CATS- Tank Farm Demolition
Confirmatory sampling completed. No further action required. 2013-2014 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
15684018
Skeet Range
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008351
Skeet Range
Confirmatory sampling completed. No further action required. 2015-2016 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00001001
Skeet Range
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00008413
Skeet Range
Initial testing completed. No further action required. 2009-2010 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
16506001
Slesse Demolition Range
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
11022097
Small Ammunition Disposal Area; Former
Initial testing completed. No further action required. 2021-2022   03 Initial Testing Program
14121002
Small Arms Ammunition Destruction Complex
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
15684015
Small Arms Range
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
29757001
Small calibre (Former dump), DRDC-South 
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
06651007
Small Dump, CEF Farnham
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
17451030
Smart Island
Initial testing completed. No further action required. 1996-1997   03 Initial Testing Program
11378003
Snow Dump
Confirmatory sampling completed. No further action required. 2010-2011 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
11022054
Soap Plant; Former
Remediation / risk management completed. No further action required. 2016-2017 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
07070004
Soil assessment building 166
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
11022027
Soil Remediation Landfarm
Remediation / risk management completed. No further action required. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
09406001
Soil remediation Site/Abandoned Landfill, Gore Training Area
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008478
Somme Small Arms Rifle Range
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00024842
South Boundary Demolition Range
Historical review planned. 2023-2024   01 Identify Suspect Sites
00008469
South Complex
Detailed testing completed. No further action required. 2023-2024 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
01822087
South Escarpment Landfills (SES 1000 Series)
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
00008429
South Escarpment Stillwaters (SES 1100 series)
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
29757014
South Outfall, DRDC-South 
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00008342
South PMQ Area
Initial testing completed. No further action required. 2009-2010 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008463
South redoubt RMC St-Jean
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00024960
South RV Compound and P-151 Compound Area
Detailed testing completed. Remediation / risk management planned. 2023-2024 3 Low Priority for Action 05 Detailed Testing Program
32771001
Springhill Armoury (3601) - Armoury Building
Long term monitoring completed. No further action required. 2017-2018 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
12577001
St-Charles Range
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
07156001
St-Grégoire Armoury
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
06710018
St-Hubert
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
06710017
St-Hubert, Hangar 3, hydraulic elevators 
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
06710016
St-Hubert, playing field, reservoir T-40 
Remedial action plan completed. Remediation / risk management underway. 2023-2024 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
06679006
St-Jean Garrison, Outdoor firing range 
Historical review completed. No further action required. 2017-2018   02 Historical Review
06679008
St-Jean Garrison, POL 124 
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
06679009
St-Jean Garrson, Used snow site (2B) 
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
06679007
St-Jean Garrson, Used snow site near H104 (2A) 
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
05750001
St-Malo Armoury
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
06872001
St-Maurice training sector (Firing range) 
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00024807
St. Hubert Legacy Site
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
N7056001
St. Pierre Lake Range - CYR 606
Confirmatory sampling completed. No further action required. 2006-2007 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02920001
Stadacona (3701) - Heating Plant (S11)
Confirmatory sampling completed. No further action required. 2019-2020 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02920002
Stadacona (3702) - Diesel Shop (S88)
Initial testing completed. No further action required. 2000-2001   03 Initial Testing Program
02920003
Stadacona (3703) - Protestant & RC Chapel (S7)
Initial testing completed. No further action required. 2000-2001   03 Initial Testing Program
02920004
Stadacona (3704) - Pump House (S41)
Historical review completed. No further action required. 2000-2001   02 Historical Review
02920005
Stadacona (3705) - CE Production Centre (S30)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02920007
Stadacona (3707) - CFIC Building (S89)
Confirmatory sampling completed. No further action required. 2022-2023 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02920009
Stadacona (3708) - Gardens - rear of Bldg S52(Admiral's Res)
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02920011
Stadacona (7601) - Queens Printer Bulding S93 EPRINTIT
Historical review completed. No further action required. 2001-2002 N Not a Priority for Action 02 Historical Review
02920012
Stadacona (7602) - Queens Printer Bldg S93 Trident Offices
Historical review completed. No further action required. 2001-2002 N Not a Priority for Action 02 Historical Review
02920013
Stadacona (7603) - Queens Printer Bldf S93 Tattoo Off./Stge
Historical review completed. No further action required. 2001-2002 N Not a Priority for Action 02 Historical Review
02920014
Stadacona (7604) - Queens Printer Bldg S93 Furn./Coal chute
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02920010
Stadacona Gym (3710) - Former UST
Confirmatory sampling completed. No further action required. 2007-2008 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
04089028
Static Range Impact Area
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
N7078001
Stephenville Armoury
Detailed testing completed. No further action required. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
10829001
Stony Point (fmr Camp Ipperwash)
Detailed testing completed. Remedial action plan under development. 2023-2024 1 High Priority for Action 06 Classify the site using the CCME National Classification System
29757025
Stop-butts 207 and 211, DRDC-South (S6) 
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
12448005
Storm Sewer Outfall
Detailed testing completed. No further action required. 2017-2018 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00008562
Stream draining former DDT site in Farnham
Detailed testing completed. Remedial action plan under development. 2023-2024 1 High Priority for Action 06 Classify the site using the CCME National Classification System
00008448
Sudbury Armoury
Detailed testing completed. No further action required. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00000941
Suffield Experimental Proving Ground (EPG) Project
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
02193002
Summerside Armoury
Confirmatory sampling completed. No further action required. 2012-2013 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
01822086
Survival Tank Farm (STF 3000 Series)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00008535
Sussex Small Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2023-2024 1 High Priority for Action 06 Classify the site using the CCME National Classification System
03662001
Sydney Rifle Range (3801) - Rifle Range
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
15684020
TAC POL Farm
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02717097
Tank 55 Canex Station
Initial testing completed. No further action required. 2008-2009   03 Initial Testing Program
02717092
Tank 56 MP Guardhouse
Remediation / risk management completed. No further action required. 2014-2015 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
10992013
Tank Parking Area
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
00024834
Tanks K1090 and K 1091 near Building 102
Detailed testing completed. Remediation / risk management planned. 2023-2024 N Not a Priority for Action 05 Detailed Testing Program
00008585
Tarmac - St-Hubert
Historical review not required. 2010-2011   01 Identify Suspect Sites
00025039
Tarmac H7
Historical review planned. 2023-2024   01 Identify Suspect Sites
00025101
TCE au site du QRA
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
10868001
TCE Contamination - Highbury Complex
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
29757007
TCE Contamination- Valcartier
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
02739053
Tent City Areas
Historical review completed. No further action required. 2006-2007   02 Historical Review
00008692
Termoli impact area
Historical review planned. 2023-2024   01 Identify Suspect Sites
00008505
Test banch building 15
Remediation / risk management completed. No further action required. 2013-2014 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00008688
Timmins Armoury
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
00008569
TMFRC
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
11022129
Toboggan Hill
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
00008385
Todd Road Armoury
Initial testing completed. No further action required. 2011-2012   03 Initial Testing Program
00024821
Toronto Training Area
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
N7002001
Tracadie
Confirmatory sampling completed. No further action required. 2013-2014 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
69735001
Trail - Casino Ranges
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
58374001
Trail Stoney Creek Training & Demolition Area
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008357
Training Area Borrow Pit
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00025091
Training Area C2 Drainage
Detailed testing completed. Remediation / risk management planned. 2023-2024 I Insufficient Information 05 Detailed Testing Program
05906057
Training areas, BATOCHE firing range
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
05906052
Training areas, BOFFIN firing range
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
05906056
Training areas, CAMBRAI firing range
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
05906044
Training areas, former CARPIQUET firing range
Remedial action plan completed. Remediation / risk management underway. 2023-2024 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
05906045
Training areas, former hunting and fishing club
Long term monitoring completed. No further action required. 2012-2013 I Insufficient Information 10 Long-Term Monitoring (Optional)
05906054
Training areas, LIRI Impact
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
05906048
Training areas, NICOSIE/FAMAGUSTA firing range
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
05906046
Training areas, NORMANDIE firing range
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
05906049
Training areas, ORTONA firing range
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
05906043
Training areas, Rivière-aux-Pins small former dumps
Initial testing completed. No further action required. 2013-2014 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
05906053
Training areas, TERMOLI firing range
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
05906051
Training areas, TROIS-RIVIÈRES firing range
Historical review completed. Initial testing underway. 2023-2024   02 Historical Review
05906040
Training sector, ''AP'' and ''TE'' impact area 
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
10992011
Transformer Storage
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
11022003
Transformer Substation #1; Former
Detailed testing completed. No further action required. 2020-2021 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
11022136
Transformer Substation #2 ; Former
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
02714002
Transmitter Site
Initial testing completed. No further action required. 2002-2003 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00025088
Transport Fleet Compound (O-95)
Detailed testing completed. Remediation / risk management planned. 2023-2024 I Insufficient Information 05 Detailed Testing Program
00024850
Transport Office (former EME shop), Blding 5
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008561
Trois-Rivières Armoury
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008523
Troy Armoury - Maintenance Building
Initial testing completed. No further action required. 2018-2019   03 Initial Testing Program
03130001
Truro Armoury (4001) - Armoury Building (B1)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
03130003
Truro Armoury (4003) - Indoor Rifle Range
Initial testing completed. No further action required. 2000-2001   03 Initial Testing Program
03130005
Truro Armoury (4004) - Former POL Storage Locations
Detailed testing completed. No further action required. 2009-2010 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
09406027
Two USTs, Pipeline and Valve Pits
Long term monitoring completed. No further action required. 2017-2018 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
11022019
Underground Fuel Oil Tank #1; Former; CFAD 207
Detailed testing completed. No further action required. 2021-2022 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
11022020
Underground Fuel Tank #2; Former; CFAD 52
Initial testing completed. No further action required. 2010-2011   03 Initial Testing Program
00008398
Underground infrastructure replacement - Montréal Garrison
Initial testing completed. No further action required. 2016-2017   03 Initial Testing Program
00008540
Underground services M1&M70-St-Hubert
Detailed testing completed. No further action required. 2016-2017 N Not a Priority for Action 05 Detailed Testing Program
02739040
Unidentified Range 1 & 2
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
58321006
Uplands - decommissioned oil filled high voltage cables
Confirmatory sampling completed. No further action required. 2016-2017 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
58321007
Uplands Bldg 329 (Bell Building) Former UST
Long term monitoring completed. No further action required. 2013-2014 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
58321011
Uplands Former Tank Farm
Confirmatory sampling completed. No further action required. 2013-2014 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
58321004
Uplands Marina, CFSU Ottawa
Long term monitoring completed. No further action required. 2013-2014 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
00008334
Uplands Marina, CFSU(O)
Confirmatory sampling completed. No further action required. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
58321009
Uplands Self-Help Housing Maintenance Compound
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
70011001
Upper Indian Pond Firing Range
Confirmatory sampling completed. No further action required. 2014-2015 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
01822085
Upper Tank Farm - Fuel Recovery Site (UTF 4000 Series)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
17970014
Upper Tankfarm
Initial testing completed. Detailed testing underway. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
07221008
Used snow sites, ASU LP 
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02717099
UST #40 B-125 Water Pumphouse
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02739027
UST Building 209 - Aldershot
Detailed testing completed. No further action required. 2013-2014 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
02717101
UST West of Hangar 10
Remediation / risk management completed. No further action required. 2013-2014 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00024919
Utilily poles storage
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
00024996
VA-3 Vehicle Service Bay (Rooms 92, 93,94, 95)
Initial testing completed. No further action required. 2021-2022   03 Initial Testing Program
00024997
VA-4 Former 9,092 Litre UST
Initial testing completed. No further action required. 2021-2022   03 Initial Testing Program
00024998
VA-5 Former Armourers Workshop and Ammunition Vault
Historical review completed. No further action required. 2021-2022   02 Historical Review
00024999
VA-6 Three fueling tanks and the gas dock
Initial testing completed. No further action required. 2023-2024 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
05906063
Valcartier Area - Historical Study
Historical review completed. No further action required. 2009-2010   02 Historical Review
05906064
Valcartier Area - Surface water
Remediation / risk management completed. No further action required. 2013-2014 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
00008367
Valcartier Garrison Area - Assesment of former firing ranges
Historical review completed. No further action required. 2016-2017   02 Historical Review
00000958
Various around Base, screening point for Phase 2&3
Historical review completed. No further action required. 2006-2007   02 Historical Review
00008350
Various Fort St-Jean sites
Initial testing completed. No further action required. 2016-2017   03 Initial Testing Program
00008410
Various sites around the Garrison - Phase I/II ESA
Initial testing completed. No further action required. 2010-2011 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02717145
Various Wet Sumps
Historical review completed. No further action required. 2002-2003   02 Historical Review
05906050
VAUCELLES firing range
Detailed testing completed. No further action required. 2017-2018 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00024980
VC-301
Initial testing completed. Detailed testing underway. 2023-2024   03 Initial Testing Program
11022051
Vehicle Maintenance Area
Initial testing completed. No further action required. 2018-2019 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022139
Vehicle Recovery Site
Detailed testing completed. No further action required. 2022-2023 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
11022012
Vehicle Refuelling Facility #1; Former (P-52)
Detailed testing completed. No further action required. 2018-2019 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
11022048
Vehicle Refuelling Facility #2
Detailed testing completed. No further action required. 2018-2019 3 Low Priority for Action 05 Detailed Testing Program
12448004
Vehicle Wash Q Lines (8209)
Confirmatory sampling completed. No further action required. 2015-2016 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00025136
Verdun & Marnes Grenade Range Complex
Historical review planned. 2023-2024   01 Identify Suspect Sites
18704002
Vernon Mt Commonage 300m Rifle Range
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00000951
Vernonburg UXO/Scrap pile
Historical review planned. 2023-2024   01 Identify Suspect Sites
34337002
VIC-1 HMCS Malahat Waterlot
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008365
VIC-2 Work Point Waterlot
Detailed testing completed. No further action required. 2017-2018 2 Medium Priority for Action 05 Detailed Testing Program
03708001
Victoria Park (4101) - Headquarters Building (B8)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03708002
Victoria Park (4102) - Quarter Masters Stores (B35)
Initial testing completed. No further action required. 1999-2000   03 Initial Testing Program
03708003
Victoria Park (4103) - Heating Plant (B11)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03708004
Victoria Park (4104) - Former Maintenance Garage (B34)
Initial testing completed. No further action required. 1999-2000 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
03708005
Victoria Park (4105) - Former Garage B27
Initial testing completed. No further action required. 1999-2000   03 Initial Testing Program
11022042
Vimy Rifle Range
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008487
Vimy Small Arms Rifle Range
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00025043
Wainwright Site-Wide PFAS
Detailed testing completed. Remediation / risk management planned. 2023-2024 1 High Priority for Action 05 Detailed Testing Program
33263001
Walkley/Holland POL Storage Area
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008464
Wash baie - Farnham
Historical review not required. 2010-2011   01 Identify Suspect Sites
00008564
Water filtration plnt of city in CMR St-Jean
Detailed testing completed. Remediation / risk management planned. 2023-2024 N Not a Priority for Action 05 Detailed Testing Program
02859055
Water Lots (9901) CFAD Bedford
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02865006
Water Lots (9903), Bedford Degaussing Range
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03010001
Water Lots (9906), French Cable Warf
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03009024
Water Lots (9907), Dockyard Annex
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02919032
Water Lots (9908) - Dockyard
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02865007
Water Lots (9909), McNabs Island
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02863059
Water Lots (9910), Shearwater
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02913001
Water Lots (9911) - HMCS Scotian
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
36056001
Water Lots (9912), Navy Buoys
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03013009
Water Lots (9913), DREA Accoustic Barge
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
52107001
Water lots(9905),Harbour Front (Naval staff house)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
11022037
Waterloo Research Area #1 (Sand Pit Area)
Initial testing completed. No further action required. 2018-2019 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11022070
Waterloo Research Area #2 (Forested Area)
Initial testing completed. No further action required. 2018-2019 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008409
Wellington Anti-Tank Range
Remedial action plan completed. Remediation / risk management underway. 2023-2024 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00000916
West Chezzetcook (6401) - Control Tower
Historical review completed. No further action required. 2001-2002 N Not a Priority for Action 02 Historical Review
03042001
West Chezzetcook Bombing Range (5769)
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
11022041
West Grenade Range
Remediation / risk management completed. No further action required. 2022-2023 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
00025050
West of 1 Field Ambulance Building
Initial testing completed. Detailed testing underway. 2023-2024 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
09540017
West of Bldg 51
Initial testing completed. No further action required. 2008-2009   03 Initial Testing Program
11022079
Wheeled Vehicle Hangar #3, Former (Bldg E-140)
Remediation / risk management completed. No further action required. 2014-2015 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
15305003
White Route POL Compound
Confirmatory sampling completed. No further action required. 2015-2016 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02918021
Willow Park (4301) - Base Maintenance HQ & Shops (WL1)
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02918001
Willow Park (4302) - Base Maintenance Shops (WL2)
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02918002
Willow Park (4303) - Base Maintenance Shops (WL3)
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02918004
Willow Park (4305) - Base Maintenance Shop (WL9)
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02918005
Willow Park (4306) - Utilities Shed (WL15) & Former WL34*
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02918006
Willow Park (4307) - Former Service Station (WL23)
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02918007
Willow Park (4308) - Outdoor POL Storage Area (Fmr WL24)
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02918008
Willow Park (4309) - Former Radioactive Pit (Fmr WL27)
Confirmatory sampling completed. No further action required. 2019-2020 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02918010
Willow Park (4311) - Canex (WL30)
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02918011
Willow Park (4312) - RCCS Garage (WL31)
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02918012
Willow Park (4313) - POL Shed (WL33)
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02918013
Willow Park (4314) - Vehicle Paint Shop (WL34)
Confirmatory sampling completed. No further action required. 2018-2019 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02918014
Willow Park (4315) - Outdoor Coiled Wire Storage area
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02918015
Willow Park (4316) - Former Outdoor Bulk POL Storage WL39*
Confirmatory sampling completed. No further action required. 2018-2019 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02918017
Willow Park (4318) - Suspect Fmr Grease/Oil Pit (WL17)
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02918018
Willow Park (4319) - Vehicle Maintenance Garage WL22
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
02918022
Willow Park (4320) - Salt Dome (WL36)
Confirmatory sampling completed. No further action required. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00008521
Willow Park (4327) - TEME North Site
Remedial action plan completed. Remediation / risk management underway. 2023-2024 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00008522
Willow Park (4328) - Armoury South Site
Detailed testing completed. Remediation / risk management planned. 2023-2024 I Insufficient Information 05 Detailed Testing Program
02907006
Willow Park POL Stores (4323)
Initial testing completed. No further action required. 2001-2002   03 Initial Testing Program
57358001
Windsor Armoury (4401) - Reserve Armoury
Remediation / risk management completed. No further action required. 2009-2010 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
57358002
Windsor Armoury (4402) - Original Reserve Armoury
Confirmatory sampling completed. No further action required. 2009-2010 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
03002002
Windsor Park (4501) - CHP (WP62) & POL Shed (WP58)
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
03002001
Windsor Park (4502) - Auto Hobby Club WP 87
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
03002004
Windsor Park (4503) - Former Heating Plant (WP45)
Initial testing completed. No further action required. 2000-2001 N Not a Priority for Action 03 Initial Testing Program
03002005
Windsor Park (4504) - Military Police (WP92)
Initial testing completed. No further action required. 2000-2001   03 Initial Testing Program
03002006
Windsor Park (4505) - PMQ Barracks
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
03002007
Windsor Park (4506) - Former Gas Chamber (WP49)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
03002009
Windsor Park (4508) - Former Rifle Range (WP11 & WP30)
Initial testing completed. No further action required. 2017-2018 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
03002012
Windsor Park (4509) - PMQ's (WP4, WP5 & WP9 - WP12)
Initial testing completed. No further action required. 2011-2012 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
03002011
Windsor Park (4510) - School Property (fmr WP42)
Initial testing completed. No further action required. 2000-2001 N Not a Priority for Action 03 Initial Testing Program
03002010
Windsor Park (4511) - UST Site WP90
Confirmatory sampling completed. No further action required. 2007-2008 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
03002008
Windsor Park - Former RCE Garage (4507)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
00008500
Winona Rifle Range
Initial testing completed. Detailed testing underway. 2023-2024 2 Medium Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
10869001
Wolseley Barracks
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00001000
Wood Hobby Club Site
Confirmatory sampling completed. No further action required. 2016-2017 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008578
Wood Tower Gun Site (Area 2)
Initial testing completed. No further action required. 2015-2016 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00008446
Woodland at NE.corner of Dugas&Jean-Brillant
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
11022145
Workshop #1; Former CFAD 151
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
11022102
Workshop #2; Former (CFAD 151)
Detailed testing completed. No further action required. 2022-2023 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
11022146
Workshop #3; Former (CFAD 200)
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 03 Initial Testing Program
16876005
Workshop NE Corner of Building 21 at HMCS Discovery
Confirmatory sampling completed. No further action required. 2013-2014 I Insufficient Information 09 Confirmatory Sampling and Final Reporting
17402005
WP-1 Work Point Vehicle Maintenance Compound IL/CL
Confirmatory sampling completed. No further action required. 2019-2020 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008693
WP-11 Work Point Former USTs at PMQs
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00024933
WP-12 Work Point Hazardous Materials Storage Building 1126
Initial testing completed. No further action required. 2016-2017   03 Initial Testing Program
00025075
WP-13 Work Point Road Filll Near CRDD WWTP
Historical review not required. 2023-2024   01 Identify Suspect Sites
17402006
WP-2 Work Point Golf Hill RL/PL
Remediation / risk management completed. No further action required. 2019-2020 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
17402008
WP-3abce Work Point Macaulay Point Park Fill RL/PL
Remediation / risk management completed. No further action required. 2021-2022 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00024932
WP-3d Work Point Former Outdoor 25 Yard Firing Range
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
17402002
WP-4a-j Work Point Northeast Region IL/CL
Detailed testing completed. No further action required. 2020-2021 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008580
WP-4k Work Point Boat Club IL/CL
Remediation / risk management completed. No further action required. 2019-2020 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
17402011
WP-4l Work Point Former CANEX Gas Station
Detailed testing completed. No further action required. 2009-2010 N Not a Priority for Action 05 Detailed Testing Program
17402009
WP-4n Work Point Dry Storage Area
Detailed testing completed. Remedial action plan under development. 2023-2024 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
17402003
WP-5 Work Point Southeast Region PMQ 1131 & 1134 RL/PL
Confirmatory sampling completed. No further action required. 2019-2020 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
17402004
WP-6abcd Work Point Playing Fields Fill IL/CL
Detailed testing completed. No further action required. 2021-2022 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
56482008
Wrangle Bay (site 8)
Initial testing completed. No further action required. 2014-2015 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02859005
Wrights Cove (8601) - Former Above Ground Fuel Lines
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02859054
Wrights Cove (8602) - CN Rail Tracks/Building
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02859036
Wrights Cove (8603) - Two suspected dump areas
Confirmatory sampling completed. No further action required. 2018-2019 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02859034
Wrights Cove (8604) - Pond disposal area
Long term monitoring completed. No further action required. 2017-2018 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
02859038
Wrights Cove (8605) - Two infilled areas
Confirmatory sampling completed. No further action required. 2017-2018 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
02859035
Wrights Cove (8606) - Storm Drain
Confirmatory sampling completed. No further action required. 2017-2018 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
02859053
Wrights Cove (8607) - Upgradient Industrial Area
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
02859050
Wrights Cove (8608) - National Gypsum Leased property
Remediation / risk management completed. Confirmatory sampling underway. 2023-2024 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
15305005
WW II Garbage Dump
Remediation / risk management completed. No further action required. 2015-2016 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
15531007
X-depot Ammo Dump
Confirmatory sampling completed. No further action required. 2015-2016 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008355
Xanten,Reichwald,Hochwald former butts, Ass& R of cont soils
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00000976
Y Buildings
Initial testing completed. No further action required. 2010-2011   03 Initial Testing Program
17404004
YA-1 Yarrows Former Hazardous Waste Containment Facility
Confirmatory sampling completed. No further action required. 2020-2021 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
17404005
YA-2 Yarrows Small Boat Float
Confirmatory sampling completed. No further action required. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
00008435
YA-3 - Yarrows Building 591
Detailed testing completed. No further action required. 2021-2022 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00008436
YA-4 Yarrows Former Shipyard
Confirmatory sampling completed. Long term monitoring underway. 2023-2024 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008433
YA-5 Yarrows B - Lot Parking and Roads
Confirmatory sampling completed. No further action required. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008458
YA-6 Yarrows Consolidatn Area Y-Gate
Confirmatory sampling completed. No further action required. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00000981
Yacht Club
Historical review not required. 2016-2017   01 Identify Suspect Sites
00000914
Yorkton
Initial testing completed. No further action required. 2001-2002 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00000977
Z Buildings
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program