Search Results

Search Results Summary
Criteria:
  • Contaminant Type: Pesticides
Select Additional Criteria...
Sort Key:FCSI Identifier (ascending)
Sites Found:143
Alternate Views
Choose an alternate view: Map XML CSV Financials Report
Results View Options

Results by Site Impact

Change results view to: Name and Location Contaminants and Media

FCSI Identifier
Site Name
Status Fiscal Year Classification Highest Step Completed
00000403
SAWMILL BAY/GREAT BEAR LAKE
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00000521
687 - Skeetchestn - 07169 - SKEETCHESTN - 0902171505
Historical review planned. 2022-2023   01 Identify Suspect Sites
00000913
Baldy Hughes
Long term monitoring completed. No further action required. 2018-2019 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
00000928
15 Wing Former Skeet Range
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00000991
Dry Solid Waste Landfill
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
00000994
Pesticide Container Landfill and Asphalt Dump
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
00001327
Sheffield Mills Research Farm
Detailed testing completed. No further action required. 2015-2016 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00001333
Benton Ridge Research Farm
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00001340
Lacombe Research Centre
Detailed testing completed. No further action required. 2013-2014 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00001346
Lethbridge Research Centre
Detailed testing completed. No further action required. 2011-2012 N Not a Priority for Action 05 Detailed Testing Program
00001347
Senator Herve-J.-Michaud Experimental Farm
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00001350
Smithfield Experimental Farm
Confirmatory sampling completed. No further action required. 2011-2012 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00001351
Semiarid Prairie Agricultural Research Centre
Detailed testing completed. No further action required. 2011-2012 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00001352
Regina Research Farm
Detailed testing completed. No further action required. 2015-2016 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00001353
Indian Head Research Farm
Detailed testing completed. Remediation / risk management planned. 2022-2023 3 Low Priority for Action 05 Detailed Testing Program
00001416
Pesticide Rinsate Area
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
00001484
Indian Head
Confirmatory sampling completed. No further action required. 2015-2016 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00001537
Sheffield Mills Research Farm
Detailed testing completed. No further action required. 2015-2016 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00001539
Sheffield Mills Research Farm
Detailed testing completed. No further action required. 2015-2016 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
00001618
Central Experimental Farm
Remediation / risk management completed. No further action required. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
00001632
Kelowna Research Farm
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00001638
Kamloops Range Research Ranch
Detailed testing completed. No further action required. 2016-2017 2 Medium Priority for Action 05 Detailed Testing Program
00001674
Rudy Rosedale Community Pasture
Confirmatory sampling completed. No further action required. 2017-2018 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00001676
Harrow Research and Development Centre
Detailed testing completed. No further action required. 2020-2021 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
00001700
Central Experimental Farm
Remediation / risk management completed. No further action required. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
00002429
Sand Pond National Wildlife Area
Detailed testing completed. Remedial action plan under development. 2023-2024 1 High Priority for Action 06 Classify the site using the CCME National Classification System
00002464
Alaksen National Wildlife Area
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
00002662
Land adjacent to Cranberry Farming Operations
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
00002664
Land adjacent to Cranberry Farming Operations
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
00002701
APEC 5 - Impoundment VI
Initial testing completed. No further action required. 2010-2011   03 Initial Testing Program
00006610
377 - Kinistin Saulteaux Nation - 06561 - KINISTIN 91 - 0602654806
Confirmatory sampling completed. No further action required. 2015-2016 3 Low Priority for Action 09 Confirmatory Sampling and Final Reporting
00006731
375 - Muskeg Lake Cree Nation #102 - 06559 - MUSKEG LAKE CREE NATION 102 - 0602813906
Confirmatory sampling completed. No further action required. 2015-2016 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00006816
555 - Squamish - 07984 - STAWAMUS 24 - 7000035394
Historical review planned. 2022-2023   01 Identify Suspect Sites
00006917
682 - Tahltan - 07655 - TELEGRAPH CREEK 6 - 0903328907
Historical review completed. Initial testing underway. 2022-2023   02 Historical Review
00006918
683 - Iskut - 08363 - ISKUT 6 - 0903329007
Historical review planned. 2022-2023   01 Identify Suspect Sites
00006919
722 - Ulkatcho - 08345 - ULKATCHO 14A - 0903329107
Historical review planned. 2022-2023   01 Identify Suspect Sites
00006924
565 - Matsqui First Nation - 08035 - SAHHACUM 1 - 0903341307
Detailed testing completed. Remedial action plan under development. 2022-2023 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00006925
565 - Matsqui First Nation - 08035 - SAHHACUM 1 - 0903341407
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00007004
383 - Pasqua First Nation #79 - 06569 - PASQUA NO. 79 - 0603521008
Confirmatory sampling completed. No further action required. 2011-2012 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
00008347
Cadet Camp Landfill & Firing Range
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00008433
YA-5 Yarrows B - Lot Parking and Roads
Confirmatory sampling completed. No further action required. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008436
YA-4 Yarrows Former Shipyard
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008458
YA-6 Yarrows Consolidatn Area Y-Gate
Confirmatory sampling completed. No further action required. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
00008517
Range Control Trenches
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00008562
Stream draining former DDT site in Farnham
Detailed testing completed. Remedial action plan under development. 2022-2023 1 High Priority for Action 06 Classify the site using the CCME National Classification System
00008612
DY-28 Dockyard Signal Hill Bldg 506 - Fmr Oil & Paint Stores
Initial testing completed. No further action required. 2018-2019   03 Initial Testing Program
00008648
North Bay Former FFTA
Detailed testing completed. No further action required. 2011-2012 2 Medium Priority for Action 05 Detailed Testing Program
00012785
PORT BURWELL(Waterlot - E of Talismen ASTs)
Initial testing completed. No further action required. 2013-2014   03 Initial Testing Program
00013045
Sidney Laboratory
Initial testing completed. No further action required. 2005-2006 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00013047
Sidney Laboratory
Initial testing completed. No further action required. 2005-2006 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00013048
Sidney Laboratory
Initial testing completed. No further action required. 2005-2006 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00013049
Sidney Laboratory
Initial testing completed. No further action required. 2005-2006 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00013152
THORNBURY (Waterlot)
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00016591
PORT BURWELL (Waterlot - Vicinity of Sewage Treatment Plant)
Initial testing completed. No further action required. 2013-2014   03 Initial Testing Program
00023292
Waskesiu Townsite Beaver Ponds
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 05 Detailed Testing Program
00024057
Montreal Road Complex ON
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00024297
Alpine Lakes
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00024432
Port Burwell - Portion of Big Otter Creek and inner harbour of the Port Burwell SCH
Detailed testing completed. No further action required. 2016-2017 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
00024627
221-F01 Dorchester Complex - Farmland
Historical review completed. No further action required. 2011-2012   02 Historical Review
00024658
221-C17 Pesticides associated with F-17
Initial testing completed. No further action required. 2013-2014   03 Initial Testing Program
00024738
441-C09 Frontenac Institution - Manure Composting at Sewage Lagoon
Detailed testing completed. No further action required. 2011-2012 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00024892
15 Wing 25 m Range
Detailed testing completed. No further action required. 2019-2020 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
00024947
B0008 Trench
Historical review planned. 2022-2023   01 Identify Suspect Sites
00024950
15 Wing B87 Former Waste UST
Historical review completed. Initial testing underway. 2022-2023   02 Historical Review
00024991
ALD-12 Antenna Field
Remedial action plan completed. Remediation / risk management underway. 2022-2023 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
00025006
MAT-8 Antenna Towers and Arrays
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
00025091
Training Area C2 Drainage
Detailed testing completed. Remediation / risk management planned. 2022-2023 I Insufficient Information 05 Detailed Testing Program
00025888
602 - ?aqam - 07422 - KOOTENAY 1 - BC04858415
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
00026013
395 - Flying Dust First Nation - 06584 - FLYING DUST FIRST NATION 105 - SK04876417
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
00026386
451-C22 Pittsburgh Greenhouse (PP56 and PP63)
Initial testing completed. No further action required. 2015-2016   03 Initial Testing Program
00027551
Point Pelee Marsh
Detailed testing completed. Remediation / risk management planned. 2022-2023 1 High Priority for Action 05 Detailed Testing Program
00027660
Kenow Fire Impacted Areas
Remedial action plan completed. Remediation / risk management underway. 2022-2023 I Insufficient Information 07 Develop Remediation/Risk Management Strategy
00028062
Maple Creek Irrigation Project
Initial testing completed. Detailed testing underway. 2022-2023 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00028065
Maple Creek Irrigation Project
Initial testing completed. Detailed testing underway. 2022-2023 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
00028124
Rideau Falls Dam & Central Heating NRC (Plant Site)
Suspected site   2 Medium Priority for Action  
00342001
Atlantic Cool Climate Crop Research Centre
Detailed testing completed. No further action required. 2015-2016 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
01822018
Canadian Side & Northside
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
01822076
Main Base and Civil Aviation Area
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
01822085
Upper Tank Farm - Fuel Recovery Site (UTF 4000 Series)
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
01822087
South Escarpment Landfills (SES 1000 Series)
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
01822094
Lower Tank Farm (LTF 2000 Series)
Remedial action plan completed. Remediation / risk management underway. 2022-2023 1 High Priority for Action 07 Develop Remediation/Risk Management Strategy
02087001
Cavendish Maintenance Compound
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
02731002
The Atlantic Food and Horticulture Research Centre
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
02739001
Aldershot Landfill/Former Incinerator
Initial testing completed. Detailed testing underway. 2022-2023 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02739002
Mill Pond and Sewage Lagoons - Aldershot
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
02739055
Peach Lake - Aldershot
Detailed testing completed. No further action required. 2009-2010 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
02739056
Alleged Drum Dump Area - Aldershot
Initial testing completed. No further action required. 2015-2016 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
02863011
CFB Shearwater (211) - Landfill 1
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
02863054
CFB Shearwater (205) - Ammunition Compound
Remediation / risk management completed. No further action required. 2019-2020 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
02919032
Water Lots (9908) - Dockyard
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
04454002
Senator Herve-J.-Michaud Experimental Farm
Initial testing completed. No further action required. 2011-2012   03 Initial Testing Program
04667006
Potato Research Centre
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
04716001
Benton Ridge Research Farm
Remediation / risk management completed. No further action required. 2013-2014 N Not a Priority for Action 08 Implement Remediation/Risk Management Strategy
05053010
674 - Lax Kw'alaams - 07770 - LAX KW'ALAAMS 1 - 7000017394
Initial testing completed. Detailed testing underway. 2022-2023 1 High Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
05058003
464 - Cold Lake First Nations - 06712 - COLD LAKE 149 / 7000012494
Detailed testing completed. Remediation / risk management planned. 2022-2023 2 Medium Priority for Action 05 Detailed Testing Program
05088005
555 - Squamish - 07968 - SEYMOUR CREEK 2 - 7000081896
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
05088013
555 - Squamish - 07968 - SEYMOUR CREEK 2 - 7000035794
Historical review not required. 2014-2015   01 Identify Suspect Sites
05116003
435 - Blood - 06645 - BLOOD 148 - 6000027997
Historical review completed. Initial testing underway. 2022-2023   02 Historical Review
07304002
Sainte-Clothilde Research Farm
Long term monitoring completed. No further action required. 2021-2022 3 Low Priority for Action 10 Long-Term Monitoring (Optional)
08625001
Central Experimental Farm
Detailed testing completed. No further action required. 2014-2015 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
09540010
AMDU Landfill Site
Remedial action plan completed. Remediation / risk management underway. 2022-2023 2 Medium Priority for Action 07 Develop Remediation/Risk Management Strategy
09609003
Smithfield Research Farm
Detailed testing completed. No further action required. 2011-2012 N Not a Priority for Action 07 Develop Remediation/Risk Management Strategy
09609004
Smithfield Research Farm
Confirmatory sampling completed. No further action required. 2011-2012 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
10667001
Camp Henry
Remediation / risk management completed. No further action required. 2013-2014 3 Low Priority for Action 08 Implement Remediation/Risk Management Strategy
10667002
Maintenance Compound
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
10829001
Stony Point (fmr Camp Ipperwash)
Detailed testing completed. Remedial action plan under development. 2022-2023 1 High Priority for Action 06 Classify the site using the CCME National Classification System
10992025
Potential Herbicide Barrels Burial Site
Initial testing completed. No further action required. 2009-2010   03 Initial Testing Program
11022086
Fumigation Block ; Former (O-114)
Initial testing completed. No further action required. 2020-2021 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
11994001
NIPIGON (Waterlot)
Initial testing completed. No further action required. 2012-2013 I Insufficient Information 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
12290001
ARNPRIOR (Waterlot Nearshore)
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
13663008
Regina Research Farm
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
13749001
PFRA - Indian Head - Shelterbelt Centre
Confirmatory sampling completed. No further action required. 2015-2016 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
13749002
Indian Head Shelterbelt Centre
Remediation / risk management completed. No further action required. 2016-2017 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
13854002
Semiarid Prairie Agricultural Research Centre
Detailed testing completed. Remedial action plan under development. 2022-2023 3 Low Priority for Action 06 Classify the site using the CCME National Classification System
14567001
Commercial Property at Block 5 Lot 8, Waskesiu Townsite
Initial testing completed. No further action required. 2013-2014 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
14567003
Main Compound Fuel Storage
Confirmatory sampling completed. No further action required. 2013-2014 N Not a Priority for Action 09 Confirmatory Sampling and Final Reporting
14567009
Salt Shed
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
14567010
Waskesiu Breakwater
Detailed testing completed. No further action required. 2013-2014 N Not a Priority for Action 05 Detailed Testing Program
14976008
DRES Low Radioactive Waste Burial Site - EPG
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15305006
Dump on Shore of Bushy Head Lake
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 2 Medium Priority for Action 08 Implement Remediation/Risk Management Strategy
15404005
Niblock Pit
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
15684031
Landfill Site 7
Initial testing completed. No further action required. 2017-2018 3 Low Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
15684038
Landfill Site 1
Detailed testing completed. Remedial action plan under development. 2022-2023 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
16479022
Pacific Agri-Food Research Centre (Agassiz)
Detailed testing completed. No further action required. 2011-2012 N Not a Priority for Action 06 Classify the site using the CCME National Classification System
17410007
Esquimalt Graving Dock Waterlot - AEC's 11,15
Remediation / risk management completed. Confirmatory sampling underway. 2022-2023 1 High Priority for Action 08 Implement Remediation/Risk Management Strategy
19118012
291 - Rolling River - 06410 - ROLLING RIVER INDIAN RESERVE NO. 67 - 4000042901
Long term monitoring completed. No further action required. 2010-2011 2 Medium Priority for Action 10 Long-Term Monitoring (Optional)
20033001
Stokes Point
Confirmatory sampling completed. No further action required. 2013-2014 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
29793001
Former Red Route Dump East Site
Detailed testing completed. Remediation / risk management planned. 2022-2023 2 Medium Priority for Action 05 Detailed Testing Program
30048001
BRONTE (OAKVILLE) (Sediment-Southeast Portion of W
Initial testing completed. Detailed testing underway. 2022-2023 N Not a Priority for Action 04 Pre-Classify contaminated site using the CCME National Classification System (optional)
36304003
Harrington Farm
Detailed testing completed. No further action required. 2016-2017 3 Low Priority for Action 07 Develop Remediation/Risk Management Strategy
36347001
MISSISSAUGA (LAKEFRONT PROMENADE PARK) (Waterlot)
Detailed testing completed. No further action required. 2017-2018 2 Medium Priority for Action 06 Classify the site using the CCME National Classification System
54050001
Spadina Quay Marina
Long term monitoring completed. No further action required. 2016-2017 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
70679001
Portland Slip
Long term monitoring completed. No further action required. 2016-2017 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
70680001
Spadina Slip
Long term monitoring completed. No further action required. 2016-2017 N Not a Priority for Action 10 Long-Term Monitoring (Optional)
C1003001
CAM E - KEITH BAY
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C1040001
PIN D - Ross Point
Confirmatory sampling completed. Long term monitoring underway. 2022-2023 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
C1057001
Kittigazuit Bay
Confirmatory sampling completed. No further action required. 2011-2012 2 Medium Priority for Action 09 Confirmatory Sampling and Final Reporting
C2501001
Snag Airstrip
Confirmatory sampling completed. No further action required. 2011-2012 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
C2502001
Peel and Caribou Rivers
Long term monitoring completed. No further action required. 2011-2012 1 High Priority for Action 10 Long-Term Monitoring (Optional)
N0025002
Escarpment Landfill (historic)
Long term monitoring completed. No further action required. 2011-2012 I Insufficient Information 10 Long-Term Monitoring (Optional)
N0281007
Drums in Watson Lake - APEC 5
Confirmatory sampling completed. No further action required. 2022-2023 1 High Priority for Action 09 Confirmatory Sampling and Final Reporting
N7060001
Former Red Route Dump
Initial testing completed. Detailed testing underway. 2022-2023   03 Initial Testing Program
N7075001
Dome Mountain, RCAF and Camp Sites (5 W)
Detailed testing completed. Remedial action plan under development. 2022-2023 1 High Priority for Action 06 Classify the site using the CCME National Classification System