Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.

2. Process/Procedure

2.1 Entry Criteria

Describe an input's state, an event, or an expired amount of time, which is required before this process or procedure can begin.

Details of Entry Criteria

  • Bullets
  • Bullets

2.2 Process/Procedure Map

Using conventional rules for flowcharting, as referenced in Annex C - Flowcharting Symbols, draw a pictorial presentation of the inputs, activities, sequence, decision points, and outputs within the process/procedure.

Number each activity that has further details in the Activities Table.

2.3 Inputs

Describe the inputs consumed by the activities in the process/procedure.

Input

Detail of Inputs and remarks

Ref.

 
  • Bullets
  • Bullets

Template Reference

 
  •  
 
 
  •  
 

2.4 Activities

Describe the set or web of activities performed as part of this process/procedure.

No.

Activities

Action by

Detail of activities and remarks

Ref.

     
  •  
 
     
  •  
 
     
  •  
 

Field

Description

No.

Refers to number on process/procedure map.

Activities

Refers to name or title in box on process/procedure map (similar but not necessarily identical).

Action by

Functions that perform the activity. Refer to Roles.

Details

Describes main activities such as develop, review, and approve.

Ref.

Reference the elements of the standard being covered by the activity; can also reference other documents such as procedures, guidelines, templates, checklists, training, and tools.

2.5 Outputs

Describe the outputs produced or modified by the activities in this process/procedure.

Output

Detail of Outputs and remarks

Ref.

 
  • Bullets
  • Bullets

Template Reference

 
  •  
 
 
  •  
 
 
  •  
 

2.6 Verification and Validation

Describe the validation activities or checklists to determine if the outputs are usable.

Output Validation

A checklist of the properties that each output must have to validate each deliverable.

Reference

Describe the verification activities or checklists to determine if the outputs are within specification.

Process/procedure Verification

A checklist that reflects the process/procedure flow of each input.

Reference

2.7 Exit Criteria

Describe an output's state (or condition) required before the process or procedure can be declared "complete".

Details of Exit Criteria

  • Bullets
  • Bullets

2.8 Metrics

Process Measures

How this process/procedure is measured to determine its contribution to the business. Will need to compile data, possibly to demonstrate to the organisation the return on the investment from the process improvement

Reference

2.9 Records Control Table

Description
(no. and name)

Storage Location

Filing / Index

Minimum Storage Period

       
       
       
       

Field

Description

Description.

Number or title of the record or form.

Storage Location

Identifies where the item can be found.

Filing / Index

Sequence of the document.

Minimum Storage Period

Amount of time a record or document will be kept once created.

2.10 Controlled Documents Table

Number

Name

Revision Date
(or version)

Owner

       
       

Other columns may be added to the document management table, however, items such as Approvals, and storage can be found on master lists and it is better not to duplicate information (may be contradicting).

As a general rule, a record is something you need, to prove that you have done something, such as a signature, a completed form; a document is used or referenced or filled out like a template for a plan, a training form that is filled in.