Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.
Supplementary Information (Tables)
Strategic Outcome: The Government
Program Activity: Governance and Institutions of Government
Name of Transfer Payment Program: Transfer payments for Governance and Institutions of Government
Start date: N/A
End date: ongoing
Description: The efforts related to this program activity assist in achieving social and economic vibrancy in First Nation and Inuit communities. It supports individual community and aggregate based governments and governance systems by assisting them establishing effective governance and associated capacities, processes and mechanisms (such as by-law making authority, election processes). Particularly, support is provided to First Nation and Inuit governments as well as their respective institutions of government. These institutions include but are not limited to those that provide services in the areas of governance, land claim organizations and professional associations.
Expected results:
Forecast Spending 2009-10 |
Planned Spending 2010-11 |
Planned Spending 2011-12 |
Planned Spending 2012-13 |
|
---|---|---|---|---|
Total grants | 319.7 | 407.5 | 437.2 | 438.7 |
Total contributions | 319.1 | 239.1 | 236.0 | 236.0 |
Total Transfer payments | 638.8 | 646.7 | 673.1 | 674.7 |
Summary of the 3 Year Plan: INAC's Departmental Plan for Transfer Payment Programs
Strategic Outcome: The Government
Program Activity: Co-operative Relationships
Name of Transfer Payment Program: Transfer payments for Co-operative Relationships
Start date: N/A
End date: ongoing
Description: This program activity addresses constitutional and historic obligations, reduce conflict through negotiation and enable all parties to work together toward reconciliation. Co-operative Relationships are about mutual respect. They establish an atmosphere of trust, accountability and respectful partnerships among governments, First Nations and Inuit. This atmosphere, in turn, supports social, economic and cultural growth in First Nation and Inuit communities and increases their self-reliance. Co-operative Relationships are the basis for mutually reached resolution of claims and other rights issues. Through Co-operative Relationships, land claims and self-government agreements are negotiated and implemented, treaty relations between the Crown and First Nations are clarified and supported, certainty is obtained over the ownership, use, and management of land and resources, and Inuit are effectively represented in federal policy decisions.
Expected results:
Forecast Spending 2009-10 |
Planned Spending 2010-11 |
Planned Spending 2011-12 |
Planned Spending 2012-13 |
|
---|---|---|---|---|
Total grants | — | — | — | — |
Total contributions | 95.2 | 83.0 | 82.8 | 81.7 |
Total Transfer payments | 95.2 | 83.0 | 82.8 | 81.7 |
Summary of the 3 Year Plan: INAC's Departmental Plan for Transfer Payment Programs
Strategic Outcome: The Government
Program Activity: Claims Settlements
Name of Transfer Payment Program: Transfer payments for Claims Settlements
Start date: N/A
End date: ongoing
Description: This program activity consists in providing approved payments to First Nations for the settlement of special, specific and comprehensive claims which were successfully concluded through a negotiation process.
Expected results:
Forecast Spending 2009-10 |
Planned Spending 2010-11 |
Planned Spending 2011-12 |
Planned Spending 2012-13 |
|
---|---|---|---|---|
Total grants | 640.4 | 464.1 | 471.1 | 448.3 |
Total contributions | 12.6 | — | — | — |
Total Transfer payments | 653.0 | 464.1 | 471.1 | 448.3 |
Summary of the 3 Year Plan: INAC's Departmental Plan for Transfer Payment Programs
Strategic Outcome: The People
Program Activity: Education
Name of Transfer Payment Program: Transfer payments for Education
Start date: N/A
End date: ongoing
Description: This program activity provides First Nations and Inuit communities with tools to achieve educational outcomes comparable to those of other Canadians. INAC has primary responsibility under the Indian Act for the elementary and secondary education of status-Indians living on reserve. As a matter of social policy, INAC also supports on-reserve status-Indians and Inuit students in the pursuit of post-secondary education. Support provided through the Education programs includes provisions for instructional services, special education services as well as targeted initiatives which aim to enhance First Nation education management, improve teacher recruitment and retention, and encourage parental and community engagement. New targeted funds have been recently included to improve the provision of elementary and secondary education services through both a partnership and a student success program.
Expected results:
Forecast Spending 2009-10 |
Planned Spending 2010-11 |
Planned Spending 2011-12 |
Planned Spending 2012-13 |
|
---|---|---|---|---|
Total grants | 36.8 | 39.5 | 41.3 | 42.9 |
Total contributions | 1,712.4 | 1,699.3 | 1,739.9 | 1,777.9 |
Total Transfer payments | 1,749.2 | 1,738.8 | 1,781.1 | 1,820.7 |
Summary of the 3 Year Plan: INAC's Departmental Plan for Transfer Payment Programs
Strategic Outcome: The People
Program Activity: Social Development
Name of Transfer Payment Program: Transfer payments for Social Development
Start date: N/A
End date: ongoing
Description: Supports the provision of: income assistance to meet basic needs for food, clothing and shelter to ensure the safety and well-being of individuals and families consistent with provincial programs and standards; First Nations child and family services to improve their well-being and security; assisted living for social support services of a non-medical nature such as in-home care, short term respite care, foster care and institutional care to improve their well-being and security; Family Violence Program to improve safety and security, particularly of women and children at-risk; National Child Benefit Re-investment to support low-income families with children to help prevent or reduce the depth of child poverty; and other social services to build self-reliant, sustainable, healthy and stable First Nation communities.
Expected results:
Forecast Spending 2009-10 |
Planned Spending 2010-11 |
Planned Spending 2011-12 |
Planned Spending 2012-13 |
|
---|---|---|---|---|
Total grants | 4.7 | 10.0 | 10.0 | 10.0 |
Total contributions | 1,582.4 | 1,475.2 | 1,505.9 | 1,538.4 |
Total Transfer payments | 1,587.1 | 1,485.2 | 1,515.9 | 1,548.4 |
Summary of the 3 Year Plan: INAC's Departmental Plan for Transfer Payment Programs
Strategic Outcome: The People
Program Activity: Managing Individual Affairs
Name of Transfer Payment Program: Transfer payments for Managing Individual Affairs
Start date: N/A
End date: ongoing
Description: The Managing Individual Affairs Program Activity ensures responsible Federal stewardship of the provisions of the Indian Act that pertain to Estates, Band moneys, registration and Band membership through direct client-services as well as partnerships with First Nations to deliver select services including the administration of Estates and the Indian Registration Program. The Program Activity is also responsible for administering the portions of the First Nations Oil and Gas and Moneys Management Act (FNOGMMA) that pertain to Indian Moneys as well as the Indian Residential Schools Settlement Agreement, implemented on September 19, 2007, which oversees the federal obligations outlined within the Agreement and other federal initiatives related to the impact of Residential schools on Aboriginal people in Canada.
Expected results:
Forecast Spending 2009-10 |
Planned Spending 2010-11 |
Planned Spending 2011-12 |
Planned Spending 2012-13 |
|
---|---|---|---|---|
Total grants | 1.4 | 1.4 | 1.4 | 1.4 |
Total contributions | 10.5 | 18.3 | 17.6 | 13.0 |
Total Transfer payments | 11.9 | 19.7 | 19.0 | 14.4 |
Summary of the 3 Year Plan: INAC's Departmental Plan for Transfer Payment Programs
Strategic Outcome: The Land
Program Activity: Responsible Federal Stewardship
Name of Transfer Payment Program: Transfer payments for Responsible Federal Stewardship
Start date: N/A
End date: ongoing
Description: This program activity contributes to the objective established by the Priorities and Planning Committee of Cabinet in September 2007 to promote economic development and good governance on reserve. It establishes the conditions for First Nations under the Indian Act to accelerate the pace at which they are able to exercise greater control over the management of their reserve land, resources and environment and effectively implementing and expanding the First Nations Land Management (FNLM) regime to facilitate the movement of more First Nations beyond the Indian Act. It involves a close collaboration with First Nations, Aboriginal associations and organizations, other government departments and private stakeholders such as oil and gas companies.
Expected results:
Forecast Spending 2009-10 |
Planned Spending 2010-11 |
Planned Spending 2011-12 |
Planned Spending 2012-13 |
|
---|---|---|---|---|
Total grants | — | — | — | — |
Total contributions | 104.4 | 81.1 | 32.4 | 32.4 |
Total Transfer payments | 104.4 | 81.1 | 32.4 | 32.4 |
Summary of the 3 Year Plan: INAC's Departmental Plan for Transfer Payment Programs
Strategic Outcome: The Land
Program Activity: First Nations Governance over Land, Resources and the Environment
Name of Transfer Payment Program: Transfer payments for First Nations Governance over Land, Resources and the Environment
Start date: N/A
End date: ongoing
Description: The overall program framework for the assumption of governance responsibility of First Nations is composed of several programs which may act either as an incremental process toward Self government or as individual, discrete, optional programs which First Nations may select and opt into. The Reserve Land and Environmental Management Program (RLEMP) program builds First Nations Capacity through training and participation in land management in conjunction with INAC officers. The Regional Land Administration Programs (RLAPs) involve delegation of some Ministerial authorities that allow First Nations to act on their own behalf. First Nation Land Management (FNLM) offers First Nations the opportunity to assume full control over their land, transferring from the Indian Act to an individual land code.
Expected results:
Forecast Spending 2009-10 |
Planned Spending 2010-11 |
Planned Spending 2011-12 |
Planned Spending 2012-13 |
|
---|---|---|---|---|
Total grants | — | — | — | — |
Total contributions | 14.4 | 12.3 | 12.3 | 12.3 |
Total Transfer payments | 14.4 | 12.3 | 12.3 | 12.3 |
Summary of the 3 Year Plan: INAC's Departmental Plan for Transfer Payment Programs
Strategic Outcome: The Land
Program Activity: Clarity of Title to Land and Resources
Name of Transfer Payment Program: Transfer payments for Clarity of Title to Land and Resources
Start date: N/A
End date: ongoing
Description: This program activity aims to provide legal certainty on ownership over on-reserve land and resources. It enables financial institutions and other investors to partner with First Nations in economic development opportunities on reserve. This includes adding land to reserve, providing clarity of title to reserve lands and resources through surveys, ensuring that the government's fiduciary obligations are met, implementing land transfers under specific and comprehensive claims, and negotiating restoration of mineral title to INAC for the benefit of First Nation communities.
Expected results:
Forecast Spending 2009-10 |
Planned Spending 2010-11 |
Planned Spending 2011-12 |
Planned Spending 2012-13 |
|
---|---|---|---|---|
Total grants | 1.2 | 5.8 | 2.0 | 2.0 |
Total contributions | 0.8 | — | — | — |
Total Transfer payments | 2.0 | 5.8 | 2.0 | 2.0 |
Summary of the 3 Year Plan: INAC's Departmental Plan for Transfer Payment Programs
Strategic Outcome: The Economy
Program Activity: Individual and Community Business Development
Name of Transfer Payment Program: Transfer payments for Individual and Community Business Development
Start date: N/A
End date: ongoing
Description: Activities under the Aboriginal Business Development Program aim to create a modern business climate for Aboriginal individuals and communities to participate in Canada's economy and further share in its economic prosperity by addressing the limited range of financing provided by commercial lenders. To support sustainable business development, the program enables access to private sector business financing at competitive rates, as well as essential business information/advice. It also facilitates private sector partnerships in major resource and energy business projects and strengthens Aboriginal-owned or controlled financing institutions to provide developmental lending and advisory services to Aboriginal businesses.
Expected results:
Forecast Spending 2009-10 |
Planned Spending 2010-11 |
Planned Spending 2011-12 |
Planned Spending 2012-13 |
|
---|---|---|---|---|
Total grants | — | — | — | — |
Total contributions | 48.8 | 45.7 | 45.0 | 44.8 |
Total Transfer payments | 48.8 | 45.7 | 45.0 | 44.8 |
Summary of the 3 Year Plan: INAC's Departmental Plan for Transfer Payment Programs
Strategic Outcome: The Economy
Program Activity: Community Investment
Name of Transfer Payment Program: Transfer payments for Community Investment
Start date: N/A
End date: ongoing
Description: For most First Nation and Inuit communities, economic development progress has been slow. The Community Investment program activity provides project-based and core funding to support communities and individuals in their efforts to effectively identify, assess, organize and plan economic development pursuits. This program activity is intended to enhance the ability of communities and individuals to participate in the economy and benefit from economic development opportunities. The activity is expected to yield increased employment and income levels, leading to improvements in the overall economic well-being and prosperity of First Nations, Inuit and Métis people.
Expected results:
Forecast Spending 2009-10 |
Planned Spending 2010-11 |
Planned Spending 2011-12 |
Planned Spending 2012-13 |
|
---|---|---|---|---|
Total grants | — | — | — | — |
Total contributions | 88.1 | 114.5 | 115.3 | 115.3 |
Total Transfer payments | 88.1 | 114.5 | 115.3 | 115.3 |
Summary of the 3 Year Plan: INAC's Departmental Plan for Transfer Payment Programs
Strategic Outcome: The Economy
Program Activity: Community Infrastructure
Name of Transfer Payment Program: Transfer payments for Community Infrastructure
Start date: N/A
End date: ongoing
Description: This program activity supports the provision of funding for the acquisition, construction, operation and maintenance of: community facilities such as roads, bridges, water and sewer, and administration offices; education facilities, such as schools and teacherages and on-reserve housing.
Expected results:
Forecast Spending 2009-10 |
Planned Spending 2010-11 |
Planned Spending 2011-12 |
Planned Spending 2012-13 |
|
---|---|---|---|---|
Total grants | 0.1 | 0.1 | 0.1 | 0.1 |
Total contributions | 1,164.5 | 1,268.0 | 1,022.9 | 998.6 |
Total Transfer payments | 1,164.6 | 1,268.1 | 1,023.0 | 998.7 |
Summary of the 3 Year Plan: INAC's Departmental Plan for Transfer Payment Programs
Strategic Outcome: The North
Program Activity: Northern Governance
Name of Transfer Payment Program: Transfer payments for Northern Governance
Start date: N/A
End date: ongoing
Description: This program activity strengthens northern governments by devolving province-like responsibilities for the land and natural resources, adopting effective intergovernmental mechanisms, managing strategic issues, and strengthening domestic and international inter-governmental co-operation on circumpolar issues.
Expected results:
Forecast Spending 2009-10 |
Planned Spending 2010-11 |
Planned Spending 2011-12 |
Planned Spending 2012-13 |
|
---|---|---|---|---|
Total grants | — | — | — | — |
Total contributions | 12.6 | 7.4 | 4.4 | 2.7 |
Total Transfer payments | 12.6 | 7.4 | 4.4 | 2.7 |
Summary of the 3 Year Plan: INAC's Departmental Plan for Transfer Payment Programs
Strategic Outcome: The North
Program Activity: Healthy Northern Communities
Name of Transfer Payment Program: Transfer payments for Healthy Northern Communities
Start date: N/A
End date: ongoing
Description: This program activity benefits all Northerners by reducing the costs of transporting nutritious, perishable foods and other essential items to isolated northern communities and by researching the sources and effects of contaminants on the Arctic food chain. Through grants for hospital and physician services, the program activity also supports improvements to the health and well-being of members of First Nations communities and Inuit who live in the Northwest Territories and Nunavut.
Expected results:
Forecast Spending 2009-10 |
Planned Spending 2010-11 |
Planned Spending 2011-12 |
Planned Spending 2012-13 |
|
---|---|---|---|---|
Total grants | 47.3 | 48.3 | 49.2 | 50.2 |
Total contributions | 12.1 | 4.8 | 4.8 | 4.8 |
Total Transfer payments | 59.4 | 53.1 | 54.0 | 55.0 |
Summary of the 3 Year Plan: INAC's Departmental Plan for Transfer Payment Programs
Strategic Outcome: The North
Program Activity: Northern Land and Resources
Name of Transfer Payment Program: Transfer payments for Northern Land and Resources
Start date: N/A
End date: ongoing
Description: This program activity supports the sustainable development and regulatory oversight of the land and natural resources of the North. Oil and gas development, including offshore projects, as well as the management of mines and mineral activity are facilitated. Improved environmental management and stewardship is promoted through the continued development of the northern regulatory regime. The identification and clean-up of contaminated sites improves environmental conditions, while the development of arctic science and the increase to the knowledge base through, among others, the activities of the International Polar Year, helps in the development of strategies in response to the challenges of climate change and adaptation. The concerns and issues of climate change are addressed in the interests of maintaining sustainable Aboriginal and northern communities.
Expected results:
Forecast Spending 2009-10 |
Planned Spending 2010-11 |
Planned Spending 2011-12 |
Planned Spending 2012-13 |
|
---|---|---|---|---|
Total grants | 1.1 | 1.1 | 1.1 | 1.1 |
Total contributions | 71.2 | 78.5 | 15.9 | 14.5 |
Total Transfer payments | 72.4 | 79.6 | 16.9 | 15.6 |
Summary of the 3 Year Plan: INAC's Departmental Plan for Transfer Payment Programs
Strategic Outcome: The Office of the Federal Interlocutor
Program Activity: Urban Aboriginal Strategy
Name of Transfer Payment Program: Transfer payments for Urban Aboriginal Strategy
Start date: N/A
End date: ongoing
Description: This program activity helps respond to the needs of Aboriginal people living in urban centres. It promotes the self-reliance and economic participation of urban Aboriginal people and expands their life choices. Through the Urban Aboriginal Strategy (UAS), the federal government partners with other governments, community organizations and Aboriginal people to support (financially and through other means) projects that respond to local priorities. The Strategy enhances the federal government's ability to align expenditures directed toward urban Aboriginal people in key centres with provincial and municipal programming in a way that both advances federal objectives and responds effectively to local challenges and opportunities.
Expected results:
Forecast Spending 2009-10 |
Planned Spending 2010-11 |
Planned Spending 2011-12 |
Planned Spending 2012-13 |
|
---|---|---|---|---|
Total grants | — | — | — | — |
Total contributions | 12.1 | 9.9 | 9.9 | — |
Total Transfer payments | 12.1 | 9.9 | 9.9 | — |
Summary of the 3 Year Plan: INAC's Departmental Plan for Transfer Payment Programs
Strategic Outcome: The Office of the Federal Interlocutor
Program Activity: Métis and Non-Status Indian Organizational Capacity Development
Name of Transfer Payment Program: Transfer payments for Métis and Non-Status Indian Organizational Capacity Development
Start date: N/A
End date: ongoing
Description: This program activity is carried out by the Office of the Federal Interlocutor, the Government of Canada's principal point of contact for Métis and Non-Status Indian organizations, and an advocate within government on their key issues. The main mandate of the Office is to support (financially and through other means) the work of these organizations, and help find practical ways to reduce dependency and improve the self-reliance, and social and economic conditions of Métis, Non-Status Indians (MNSI) and off-reserve Aboriginal people. The Office fulfills this mandate by helping Métis and Non-Status Indian organizations develop their organizational and professional capacity, so that they can build effective partnerships with federal and provincial governments, and the private sector.
Expected results:
Forecast Spending 2009-10 |
Planned Spending 2010-11 |
Planned Spending 2011-12 |
Planned Spending 2012-13 |
|
---|---|---|---|---|
Total grants | — | — | — | — |
Total contributions | 12.1 | 12.1 | 12.1 | 12.1 |
Total Transfer payments | 12.1 | 12.1 | 12.1 | 12.1 |
Summary of the 3 Year Plan: INAC's Departmental Plan for Transfer Payment Programs
Strategic Outcome: The Office of the Federal Interlocutor
Program Activity: Métis Rights Management
Name of Transfer Payment Program: Transfer payments for Métis Rights Management
Start date: N/A
End date: ongoing
Description: This program activity is the federal response to the 2003 Supreme Court of Canada's Powley decision, which affirmed that Métis hold section 35 Aboriginal rights under the Canadian Constitution. The program works with (through financial support and other means) nonprofit, representative Aboriginal organizations that have substantial Métis memberships to develop objectively verifiable membership systems for Métis members and harvesters in accordance with the Supreme Court's direction.
Expected results:
Forecast Spending 2009-10 |
Planned Spending 2010-11 |
Planned Spending 2011-12 |
Planned Spending 2012-13 |
|
---|---|---|---|---|
Total grants | — | — | — | — |
Total contributions | 8.0 | — | — | — |
Total Transfer payments | 8.0 | — | — | — |
Summary of the 3 Year Plan: INAC's Departmental Plan for Transfer Payment Programs
Part A: Green Procurement Capacity Building
Activity | 2008-09 Level as % |
2010-11 Level as % |
Description/Comments |
---|---|---|---|
Training for Procurement and Materiel Management Staff | Data Unavailable | 100% | INAC plans to have all procurement services positions trained in green procurement by March 2011. The percentage of procurement stakeholders with training in green procurement is identified as a performance measure in the logic model for INAC's Sustainable Development Strategy target to implement green procurement. |
Training for Acquisition Cardholders | Data Unavailable | 100% | INAC plans to deliver green procurement training to existing acquisition cardholders and introduce mandatory green procurement training for new acquisition cardholders by March 2011. |
Performance Evaluations | 15% |
100% | At present, green procurement is incorporated only in the performance evaluations of three managers and one functional head at Headquarters since it is still in the process of being implemented. By March 2011, INAC plans to evaluate green procurement performance for all regional directors of Corporate Services and managers of administration. |
Procurement Processes and Controls | Data Unavailable | 100% | All INAC requests for proposals include a general clause that requires the minimization of negative environmental impacts. INAC plans to implement green procurement management controls and processes in all relevant departmental procurement instruments by February 2010. |
Part B: Use of Green Consolidated Procurement Instruments
Good/Service | 2008-09 Level |
2010-11 Target as % |
Description/Comments | |
---|---|---|---|---|
$ | % | |||
Passenger motor vehicles (16 vehicles) | $353,000 |
100% | 100% | INAC's on-road/light-duty vehicle acquisition process requires consideration of environmental impacts. |
Office furniture | $637,000 | Data not available | 100% | The exact percentage of office furniture purchases that incorporated environmental considerations is currently unknown because some purchases with a total value of less than $5,000 were done with acquisition cards. All other purchases for office furniture utilized green consolidated procurement instruments as designated by PWGSC. |
Part C: Reduction Initiatives for Specific Goods (Where Applicable)
Consumable/Asset | 2008-09 Level as Ratio # Per FTE |
2010-11 Target |
Description/Comments |
---|---|---|---|
N/A | No departmental reduction initiatives for specific goods were in place during 2008–2009. INAC plans to establish at least three reasonable, achievable and meaningful departmental green procurement targets by June 2010. |
Name of horizontal initiative: International Polar Year
Name of lead department(s): Indian and Northern Affairs Canada (INAC) — Northern Affairs Program
Lead department program activity: Healthy Northern Communities
Start date of the horizontal initiative: April 1, 2006
End date of the horizontal initiative: March 31, 2012
Total federal funding allocation (start to end date): $150 million over six years
Description of the horizontal initiative (including funding agreement): To support Canada's participation in International Polar Year (IPY), the Government of Canada has invested $150 million over six years. This funding is being used to carry out an innovative and multidisciplinary Arctic science program. The Government of Canada IPY program is led by INAC and involving 12 federal departments and agencies, including Environment Canada, Fisheries and Oceans Canada, Health Canada, Natural Sciences and Engineering Research Council (on behalf of Industry Canada), Natural Resources Canada, Canadian Institutes of Health Research, and the Canadian Food Inspection Agency.
Canada's significant involvement and investment in IPY contributes to the government's stewardship of Canada's Northern Region. The Government of Canada IPY program is working with Canadian scientists and northern communities in developing and conducting activities such as research, training and capacity building.
Key areas of the Government of Canada IPY program include:
The funds are distributed among federal departments and agencies according to their involvement in the various aspects of the program. The Northern IPY Co-ordinators maintain a regional network to support all aspects of Canada's IPY program in four Inuit regions across the North. The federal departments and agencies participating in IPY are undertaking research projects, delivering support for logistics and emergency preparedness, and contributing to projects for training, communications and outreach.
Shared outcome(s): The IPY program works toward the achievement of two outcomes:
Governance structure(s):
The Government of Canada IPY program links with the International Joint Committee and other international scientific organizations to assist in the program development of the IPY From Knowledge to Action Conference that Canada will host in April 2012. As of June 2009, the ADM Committee on IPY merged with the ADM Committee on HARS to ensure a smooth transition from IPY activities and work conducted under HARS.
Planning Highlights: IPY will focus its efforts on synthesizing the results of IPY scientific research, managing data and information, communicating these results to northern communities, and articulating this new knowledge to facilitate and generate discussions about policy and program development that address short- and long-term issues.
Federal
Partner Program Activity (PA) |
Names of Programs for Federal Partners | Total Allocation (from Start to End Date) | Planned
Spending for 2010–2011 |
Expected
Results for 2010–2011 |
---|---|---|---|---|
Healthy Northern Communities | Government of Canada IPY program |
$59,694,657 |
$13,591,756 |
Dissemination to northern communities of the results and knowledge acquired through IPY science projects Increased participation of Northerners and Aboriginal people in Arctic science activities |
Total | $59,694,657 |
$13,591,756 |
Federal Partner Program Activity (PA) | Names of Programs for Federal Partners | Total Allocation (from Start to End Date) | Planned
Spending for 2010–2011 |
Expected
Results for 2010–2011 |
---|---|---|---|---|
Sustainable Environmental Health | Environmental Health Surveillance (Dietary Choice and Health) |
$158,234 |
$575 |
Increased understanding of the gender-specific determinants of food choices Identification of culturally acceptable strategies to promote healthy dietary choices |
Total | $158,234 |
$575 |
Federal Partner Program Activity (PA) | Names of Programs for Federal Partners | Total Allocation (from Start to End Date) | Planned
Spending for 2010–2011 |
Expected
Results for 2010–2011 |
---|---|---|---|---|
Biodiversity — Wildlife and Habitat Water Resources Weather and Environmental Services for Canadians |
Government of Canada IPY program |
$11,169,875 |
$568,740 |
Continued research on climate change impacts and adaptation and the health and well-being of northern communities; the focus for 2010–2011 will be to complete field work and data analysis, undertake data management, begin to publish results, and conduct outreach |
Total | $11,169,875 |
$568,740 |
Federal Partner Program Activity (PA) | Names of Programs for Federal Partners | Total Allocation (from Start to End Date) | Planned
Spending for 2010–2011 |
Expected
Results for 2010–2011 |
---|---|---|---|---|
Oceanography and Climate Aquatic Ecosystem Science |
Government of Canada IPY program |
$31,542,477 |
$314,530 |
Research conducted on the impacts of climate variability and change on Arctic marine ecosystems under the IPY program; in 2010–2011 the focus will be on publishing scientific results, data management, and continuing sample and data analysis |
Total | $31,542,477 |
$314,530 |
Federal Partner Program Activity (PA) | Names of Programs for Federal Partners | Total Allocation (from Start to End Date) | Planned
Spending for 2010–2011 |
Expected
Results for 2010–2011 |
---|---|---|---|---|
Adapting to a Changing Climate and Hazard Risk Management
|
Climate Change Geoscience, Public Safety Geoscience |
$3,063,000 |
$147,500 |
Canada adapts to a changing climate and has the knowledge and tools to manage risks associated with natural hazards and hazards arising from human activities |
Ecosystem Risk Management | Environmental Geoscience Program | Canada understands and mitigates risks to natural resource ecosystems and human health | ||
Total | $3,063,000 |
$147,500 |
Federal Partner Program Activity (PA) | Names of Programs for Federal Partners | Total Allocation (from Start to End Date) | Planned
Spending for 2010–2011 |
Expected
Results for 2010–2011 |
---|---|---|---|---|
Science for Climate Change Impacts and Adaptation Health and Well-being of Northern Communities |
Government of Canada IPY program |
$31,290,669 |
$2,169,680 |
Funds provided to 37 university-based researchers working on 19 IPY projects in the areas of climate change impacts and adaptation and the health and well-being of northern communities |
Total | $31,290,669 |
$2,169,680 |
Federal Partner Program Activity (PA) | Names of Programs for Federal Partners | Total Allocation (from Start to End Date) | Planned
Spending for 2010–2011 |
Expected
Results for 2010–2011 |
---|---|---|---|---|
Strategic Priority Research |
Government of Canada IPY program |
$9,747,988 |
$723,136 |
Sustainable, healthy and resilient northern communities built Ecosystem and community vulnerability, resilience and adaptive capacity assessed |
Total | $9,747,988 |
$723,136 |
Federal Partner Program Activity (PA) | Names of Programs for Federal Partners | Total Allocation (from Start to End Date) | Planned
Spending for 2010–2011 |
Expected
Results for 2010–2011 |
---|---|---|---|---|
Food Safety and Nutrition Risks |
Parasitology |
$414,500 |
$11,250 |
Trichinellosis: Testing of samples and analysis of prevalence data based on recovery of Trichinella larvae from muscle tissue Toxoplasmosis (serology): Indirect enzyme-linked immunosorbent assay (ELISA) for the detection of anti-Toxoplasma gondii antibodies in serum or hemolyzed blood samples: analysis of validation data; wildlife used for food and disease reservoirs Toxoplasmosis (RT-PCR): Real-time PCR (RT-PCR) for detection of Toxoplasma gondii DNA in tissues and blood (analysis of validation data) and analysis of prevalence data based on detection of Toxoplasma gondii DNA in tissues or blood samples |
Total | $414,500 |
$11,250 |
Federal Partner Program Activity (PA) | Names of Programs for Federal Partners | Total Allocation (from Start to End Date) | Planned
Spending for 2010–2011 |
Expected
Results for 2010–2011 |
---|---|---|---|---|
Conserve Heritage Resources |
IPY Climate Change Impacts on the Canadian Arctic Tundra |
$825,000 |
$115,000 |
Standard methods developed and applied for conducting terrestrial ecological inventories and ecological integrity monitoring in Ukkusiksalik National Park |
IPY Freshwater Systems | $525,000 |
$45,000 |
Reconnaissance inventories conducted and ecological integrity monitoring methods developed for Arctic national parks |
|
Total | $1,350,000 |
$160,000 |
Federal Partner Program Activity (PA) | Names of Programs for Federal Partners | Total Allocation (from Start to End Date) | Planned
Spending for 2010–2011 |
Expected
Results for 2010–2011 |
---|---|---|---|---|
Public Health Agency of Canada |
Government of Canada IPY program |
$617,000 |
$0 |
No activities planned and, hence, no expected results for 2010–2011 |
Total | $617,000 |
$0 |
Federal Partner Program Activity (PA) | Names of Programs for Federal Partners | Total Allocation (from Start to End Date) | Planned
Spending for 2010–2011 |
Expected
Results for 2010–2011 |
---|---|---|---|---|
Agriculture and Agri-food |
Government of Canada IPY program |
$156,400 |
$0 |
A scientific paper to be presented at the 19th World Congress of Soil Science in 2010; work on data analysis and compilation will continue, however, no IPY-related budget allocations were made for 2009–2010 and 2010–2011 |
Total | $156,400 |
$0 |
Federal Partner Program Activity (PA) | Names of Programs for Federal Partners | Total Allocation (from Start to End Date) | Planned
Spending for 2010–2011 |
Expected
Results for 2010–2011 |
---|---|---|---|---|
Canadian Museum of Civilization |
Government of Canada IPY program |
$795,200 |
$32,000 |
Inuit History: Climatic Change and Historical Connections in Arctic Canada, 1000–1500 A.D. Helluland Archaeology Project and Beaufort Sea Archaeological Project components:
|
Total | $795,200 |
$32,000 |
Total Allocation For All Federal Partners (from Start to End Date) | Total Planned Spending for All Federal Partners for 2010–2011 |
---|---|
$150,000,000 |
$17,719,167 |
Contact information:
Kathleen
Fischer
Executive
Director
International
Polar Year Federal Program Office
Indian
and Northern Affairs Canada
10
Wellington Street, Room 745
Gatineau,
Quebec K1A 0H4
Tel:
819-934-6085
Fax:
819-934-0584
fischerk@ainc-inac.gc.ca
Name of horizontal initiative: First Nations Water and Wastewater Action Plan
Name of lead department(s): Indian and Northern Affairs Canada (INAC)
Lead department program activity: Community Infrastructure
Start date of the horizontal initiative: April 1, 2008
End date of the horizontal initiative: March 31, 2010
This program was seeking renewal at time of publication.
Total federal funding allocation (start to end date): $735,639,806 for the two years. Of this amount $202,500,000 in each of 2008–2009 and 2009–2010 are funded from existing reference levels. New funds of $165,318,143 in 2008–2009 and $165,321,663 in 2009–2010 including employee benefit plans and Public Works and Government Services Canada accommodation requirements were sourced from the Fiscal Framework, as confirmed in Budget 2008.
Description of the horizontal initiative (including funding agreement): The prime objective of the First Nations Water and Wastewater Action Plan (FNWWAP) is to support First Nation communities on reserves in bringing their drinking water and wastewater services to a level and quality of service comparable to those enjoyed by Canadians living in communities of similar size and location. There are five key activity areas in the FNWWAP: infrastructure investments; operations and maintenance; training; monitoring and awareness; and standards.
To meet the objectives of the FNWWAP, several program enhancements have been introduced, including a national engineering assessment of existing water and wastewater facilities; consultations on a new federal legislative framework for safe drinking water; increased training through the Circuit Rider training program; modification of existing policies related to small water and septic systems and agreements for water and wastewater services; investment in a National Wastewater Program; and development of waterborne illness procedures.
The FNWWAP was implemented as part of government commitments, announced in Budget 2008 and the 2007 Speech from the Throne, to support First Nations' access to safe drinking water.
The FNWWAP supports INAC's strategic outcome, The Economy: Economic well-being and prosperity of First Nations, Inuit and Métis people. The FNWWAP also supports the Health Canada (HC) strategic outcome of the department's First Nations and Inuit Health Programming and Services: Better health outcomes and reduction of health inequalities between First Nations and Inuit and other Canadians.
More information at these websites:
Backgrounder — First Nations Water and Wastewater Action Plan
Budget 2008, Responsible Leadership — Chapter 4 — Leadership at Home and Abroad
RPP 2007_2008 Health Canada — Health Canada's Regional Operations — An Overview
Shared outcome(s): The FNWWAP works toward the achievement of four outcomes:
Governance structure(s): The FNWWAP is a successor to the joint First Nations Water Management Strategy (2003–2008) and the INAC Plan of Action for Drinking Water (2006–2008). A memorandum of understanding has been in place between INAC and HC since 2005 regarding data sharing related to drinking water. INAC shares information on the proposed water and wastewater infrastructure investments; the annual inspections of water and wastewater treatment plants; and action related to drinking water advisories. Conversely, HC shares information such as drinking water sample results that do not meet the Guidelines for Canadian Drinking Water Quality and reasons for recommending drinking water advisories. At the working level, the Strategic Water Management on Reserve Committee, which includes representatives from HC, INAC, Environment Canada and the Assembly of First Nations, provides a forum for discussion to share information and co-ordinate joint action, although this is not a formal decision-making body. It also provides integrated and co-ordinated leadership to ensure safe drinking water for First Nation communities and to implement FNWWAP.
Directors general and assistant deputy ministers from HC and INAC meet when needed to exchange and co-ordinate action on all relevant issues related to the FNWWAP.
Federal partner: INAC
Federal Partner Program Activity (PA) | Names of Programs for Federal Partners | Total Allocation (from Start to End Date) | Planned
Spending for 2010-2011 |
Expected
Results for 2010-2011 |
---|---|---|---|---|
Community Infrastructure | Capital Facilities and Maintenance Program | 671.0 | To be determined (TBD) | TBD |
Total | 671.0 | TBD | TBD |
Expected Results: TBD
Federal partner: HC
Federal Partner Program Activity (PA) | Names of Programs for Federal Partners | Total Allocation (from Start to End Date) | Planned
Spending for 2010-2011 |
Expected
Results for 2010-2011 |
---|---|---|---|---|
First Nations and Inuit Health | Drinking Water Safety Program – FNWWAP funding | 54.6 | TBD | TBD |
Drinking Water Safety Program – A-base funding | 10.0 | TBD | TBD |
|
Total | 64.6 | TBD |
Expected results: TBD
Total Allocation dor All Federal Partners (from Start to End Date) | Total Planned Spending for All Federal Partner for 2010–2011 |
---|---|
($ millions) | |
735.6 | TBD |
Contact information:
Sébastien Labelle
Director, Policy
Indian and Northern Affairs
Policy Directorate, Community Infrastructure Branch
Telephone:819-994-6466
sebastien.labelle@ainc-inac.gc.ca
Name of Horizontal Initiative: Indian Residential Schools Settlement Agreement — Health Supports component
Name of lead department(s): Indian and Northern Affairs Canada (INAC)
Lead department program activity: Managing Individual Affairs
Start date of the Horizontal Initiative: September 2003
End date of the Horizontal Initiative: March 31, 2013
Total federal funding allocation (start to end date): $112,353,000
Description of the Horizontal Initiative (including funding agreement): The Health Supports component of the Indian Residential Schools Settlement Agreement (IRSSA) ensures that former students of Indian residential schools can safely address a broad spectrum of mental wellness issues related to the disclosure of childhood abuse through all phases of the IRSSA. The Health Supports component of the IRSSA is composed of the Indian residential schools Resolution Health Support Program (formerly Mental Health Support Program) and a 24-hour crisis line.
Health Canada delivers the Resolution Health Support Program, which ensures that eligible former Indian residential school students, and their families, have access to an appropriate level of health support services, through all phases of the IRSSA, so that they may safely address a broad spectrum of mental wellness issues related to the disclosure of childhood abuses. Program components include: emotional support services provided by Resolution Health Support Workers (RHSWs); cultural support services provided by Elders; professional counselling; and assistance with the cost of transportation to access counseling, Elder, and/or Traditional Healer services.
INAC — Resolution and Individual Affairs Sector, provides a national 24-hour toll-free Indian residential school crisis line is also provided to support individuals in crisis and is operated by trained Aboriginal crisis counsellors. INAC is also responsible for co-ordinating the verification of program eligibility, and ensuring that Health Canada is aware of dates for independent assessment process/alternative dispute resolution hearings, litigation, and Truth and Reconciliation and Commemoration events as they arise, so that health supports can be provided in a seamless fashion.
Shared outcome(s): The IRSSA Health Supports component works toward the achievement of two outcomes
Governance structure(s): INAC is responsible for the overall IRSSA model and is working in partnership with Health Canada to co-ordinate and provide services for former Indian residential school students throughout all phases of the IRSSA.
Planning Highlights: The Health Supports component will:
Federal Partner Program Activity (PA) | Names of Programs for Federal Partners | Total Allocation (from Start to End Date) | Planned
Spending for 2010-2011 |
Expected
Results for 2010-2011 |
---|---|---|---|---|
($ millions) | ||||
First Nations and Inuit Health Programming and Services | Indian Residential Schools Resolution Health Support Program | 112.4 | 14.8 | Demand-driven health supports are provided to former Indian residential school students and their families through all phases of the IRSSA. |
Total | 112.4 | 14.8 |
Total Allocation For All Federal Partners (from Start to End Date) | Total Planned Spending for All Federal Partners for 2010–2011 |
---|---|
112.4 | 14.8 |
Contact
information:
Health
Canada
Andrea
Challis
Manager,
Indian Residential School Resolution
Health Support Program
Mental
Health and Addictions Division
Community
Programs Directorate
First
Nations and Inuit Health Branch,
Health Canada
Phone:
(613) 952-1377
andrea.challis@hc-sc.gc.ca
Indian
and Northern Affairs Canada:
Patricia
Power
A/Director
Policy
and Strategic Planning
Indian
and Northern Affairs Canada
Tel:
613-947-4146
ppower@ainc-inac.gc.ca
Name of horizontal initiative: Urban Aboriginal Strategy
Name of lead department(s): Indian and Northern Affairs Canada (INAC), Office of the Federal Interlocutor for Métis and Non-Status Indians (OFI)
Lead department program activity: Urban Aboriginal Strategy
Start date of the horizontal initiative: April 1, 2007
End date of the horizontal initiative: March 31, 2012
Total federal funding allocation (start to end date): $68.5 million
Description of the horizontal initiative (including funding agreement): The Urban Aboriginal Strategy (UAS) was developed in 1997 to help respond to the needs of Aboriginal people living in key urban centres. Through the UAS, the Government of Canada seeks to partner with other governments, community organizations, Aboriginal people and the private sector to support projects that address local priorities.
In 2007, Canada decided to set national priorities that focus on greater economic participation and made a long-term commitment by investing $68.5 million over five years to help respond effectively to the needs of Aboriginal people living in key urban centres.
Shared outcome(s): The primary goal of the UAS is to better address issues facing Aboriginal people living in cities across Canada, working toward the achievement of the following outcomes:
To accomplish these outcomes, UAS projects will focus investments in three priority areas: improving life skills; promoting job training, skills and entrepreneurship; and supporting Aboriginal women, children and families.
Governance structure(s): Steering committees are the catalysts for planning, making funding decisions, and co-ordinating work through the UAS — along with other community activities — to respond to urban Aboriginal issues. Each UAS steering committee is composed of a cross-section of the Aboriginal community, to ensure the steering committee's decisions reflect broad community concerns and priorities. While the steering committee structure is meant to be reflective of local circumstances, each steering committee includes representation from the local Aboriginal community, the federal government, other levels of government and the private sector. The inclusive nature of the steering committees is indicative of the principle of partnership that underlies the UAS, particularly in keeping with the objective to establish strong and active partnerships between government and community.
In some of the designated cities under the UAS, federal funding is administered through an incorporated community organization that has been delegated authority for delivering UAS projects on behalf of the various partners. Regardless of whether funding is delivered by a community organization, by federal officials or by a combination of the two, funding through the UAS is designed to promote co-operation with other key partners (including other federal departments) and stakeholders in support of community interests.
Planning Highlights: The UAS works in partnership with other federal departments, provincial and municipal governments, Aboriginal communities and the private sector to make strategic investments designed to enhance the economic participation of Aboriginal people in Canada's urban centres. Community projects funded through the UAS focus on three priority areas: improving life skills; promoting job training, skills and entrepreneurship; and supporting Aboriginal women, children and families. The UAS also invests in building capacity within the urban Aboriginal community through investments that support the formation of effective partnerships and the development and implementation of strategic plans that address the unique needs of each community.
The UAS will continue to work toward achieving greater horizontality across federal departments to maximize investments. It will explore and implement new and innovative approaches to increase horizontality, including through a proactive Horizontal Action Plan. To this end, INAC is undertaking an analysis of horizontal projects (funded under the UAS Horizontal Terms and Conditions) to better understand the mechanics of horizontality and to identify and overcome barriers to increased federal collaboration. In tandem, the UAS is implementing performance measurement tools that can be used to identify successes and mitigate risks.
The UAS will also work toward making progress on its core objectives, including closing the unacceptable socio-economic gaps between urban Aboriginal people and other residents of cities, by leveraging funding from other levels of government and the private sector and by better aligning federal initiatives with provincial-municipal initiatives and other activities.
Federal Partner Program Activity (PA) | Names of Programs for Federal Partners | Total Allocation (from Start to End Date) | Planned
Spending for 2010-2011 |
Expected
Results for 2010-2011 |
---|---|---|---|---|
Urban Aboriginal Strategy |
Urban Aboriginal Strategy |
68.5 | 13.5 | UAS projects will focus investments in three priority areas: improving life skills; promoting job training, skills and entrepreneurship; and supporting Aboriginal women, children and families. |
Total | 68.5 | 13.5 |
Federal Partner Program Activity (PA) | Names of Programs for Federal Partners | Total Allocation (from Start to End Date) | Planned
Spending for 2010-2011 |
Expected
Results for 2010-2011 |
---|---|---|---|---|
Various program activities |
Various programs |
unknown
at this time |
unknown (Funding is dependent on availability of funds at the departmental level and the types of priorities identified at the local level.) |
|
Total |
Total Allocation For All Federal Partners (from Start to End Date) | Total Planned Spending for All Federal Partners for 2010–11 |
---|---|
68.5 | To be determined |
Results to be achieved by non-federal partners (if applicable): The UAS has been redesigned to better address issues facing urban Aboriginal people. The refocused UAS improves program co-ordination within the Government of Canada to maximize its investments and aims for equal cost sharing with provincial and municipal governments.
Through sustainable partnership policy development, program co-ordination at the federal level and with provincial and municipal governments, Aboriginal, and private sector partners, the UAS addresses local priorities and engages partners in the process of reducing the disparities that urban Aboriginal people face.
The UAS strives to make significant progress along the road of horizontal management as well as shared accountability with all its partners. It represents a practical step that illustrates how Canada's government is moving in the right direction to ensure that Aboriginal people living in cities across Canada have greater access to the skills and experiences they need to gain access to and succeed in urban centres.
Contact information:
Allan
MacDonald
Director
General
Office of the Federal
Interlocutor for Métis
and Non-Status Indians
66
Slater Street Ottawa, Ontario
K1A 0H4
Telephone:
613-992-8186
allan.macdonald@ainc-inac.gc.ca
Name of Internal Audit | Internal Audit Type | Status | Expected Completion Date |
---|---|---|---|
Review of PeopleSoft | Review | Completed | April 22, 2009 |
System Under Development Review of CIS-IRS - Remainder of Last Year | Assurance | Completed | April 22, 2009 |
Management Practices Review - Northern Affairs & North Regions | Review | Completed | April 30, 2009 |
MPR - Lands & Economic Dev. Sector, Preliminary Survey for the Audit of Economic Dev. (Non-Proposal Driven) & Follow-up Audit of Aboriginal Business Canada | Review | Completed | May 2009 |
Audit of Capacity Development - Preliminary Survey (Planning, Conduct and Reporting Phases) | Assurance | Completed | June 3, 2009 |
Audit of Elementary & Secondary Schools and Other Education | Assurance | Completed | June 3, 2009 |
Audit of Band Support Funding | Assurance | Completed | September 25, 2009 |
Audit of Expenditure Management Monitoring | Assurance | Completed | September 25, 2009 |
Audit of Liabilities | Assurance | Completed | September 25, 2009 |
Audit of Occupational Health and Safety | Assurance | Completed | September 25, 2009 |
MPR - PSD and Audit of Strategic Policy and Planning | Review | Completed | September 2009 |
MPR - Education, Social Dev. P & P (ESDPP) and Regional Operations | Review | Completed | October 2009 |
MPR - Resolution Individual Affairs | Review | Completed | October 2009 |
MPR - CFO | Review | Completed | November 4, 2009 |
Preliminary Survey for the Audit of the Reporting Burden | Preliminary Survey | Completed | December 8, 2009 |
Planning Phase - Horizontal Audit of Grants and Contributions | Assurance | In Progress | January 31, 2010 |
Audit of Grants and Contributions | Assurance | Planned | March 31, 2010 |
Audit of the Delegation of Authorities, Organizational Design and Classification | Assurance | Planned | March 31, 2010 |
Audit of Housing | Assurance | In Progress | March 31, 2010 |
Due Diligence Review of Infrastructure Initiatives | Review | Planned | March 31, 2010 |
Audit of Aboriginal Business Canada and Non-Proposal Driven Programming | Assurance | In Progress | March 31, 2010 |
Audit of Implementation of the Urban Aboriginal Strategy | Assurance | In Progress | March 31, 2010 |
Review of SCIS - System (1,2,3,4) | Review | In Progress | March 31, 2010 |
Audit of Trust Accounts | Assurance | In Progress | March 31, 2010 |
Audit of Payroll | Assurance | In Progress | March 31, 2010 |
MPR - Adjudication Secretariat | Review | In Progress | March 31, 2010 |
Case Study & Analysis of MPRs Conducted Between 2006 - 2009 | Special Study | Planned | March 31, 2010 |
Audit of Information Management - CIDM | Assurance | In Progress | March 31, 2010 |
Administrative Review - Aboriginal Conference | Review | Planned | March 31, 2010 |
Review of Wrongdoing | Review | In Progress | March 31, 2010 |
Audit of Security Program | Assurance | In Progress | March 31, 2010 |
Financial Review | Review | In Progress | March 31, 2010 |
Audit of PeopleSoft | Assurance | In Progress | June 1, 2010 |
System Under Development Audit of CIS-IRS, continued | Assurance | In Progress | July 31, 2010 |
Audit of Regional IT Expenditures | Assurance | In Progress | November 30, 2010 |
Post-Implementation Audit of First Nations and Inuit Transfer Payment System | Assurance | In Progress | November 30, 2010 |
Audit of Family Violence | Assurance | Planned | 2009-2010 |
Preliminary Survey of Assets and Property Management | Preliminary Survey | Planned | 2009-2010 |
Audit of Revenue Management | Assurance | Planned | 2009-2010 |
Preliminary Survey for Audit of Internal and External Communications | Preliminary Survey | Planned | 2009-2010 |
Preliminary Survey of Litigation Management | Preliminary Survey | Planned | 2009-2010 |
Audit of Income Assistance | Assurance | Deferred | 2010-2011 |
Audit of Funding for Implementation and Negotiations | Assurance | Planned | 2010-2011 |
Audit of Specific Claims | Assurance | Planned | 2010-2011 |
Audit of Band Classification | Assurance | Planned | 2010-2011 |
Audit of Indian Government Support | Assurance | Planned | 2010-2011 |
Audit of Infrastructure Initiatives | Assurance | Planned | 2010-2011 |
Audit of Natural Resources and Environmental Management (Scope TBD) | Assurance | Planned | 2010-2011 |
Audit of Child and Family Services (Enhanced Prevention Focus and Follow-up) | Assurance & Follow-Up | Planned | 2010-2011 |
Audit of Special Education | Assurance | Planned | 2010-2011 |
Follow-up of Previous Audits of Residential Schools | Follow-Up | Planned | 2010-2011 |
Audit related to External Reporting (Scope TBD) | Assurance | Planned | 2010-2011 |
Follow-Up Audit of Travel, Taxis, Hospitality, Conferences and Acquisition Cards | Follow-Up | Planned | 2010-2011 |
Audit of Assets and Property Management (Scope TBD) | Assurance | Planned | 2010-2011 |
Audit of Loans and Accounts Receivable | Assurance | Planned | 2010-2011 |
Audit of Aboriginal Resourcing | Assurance | Planned | 2010-2011 |
Audit of Training and Development | Assurance | Planned | 2010-2011 |
Follow-Up Audit of IT Security | Follow-Up | Planned | 2010-2011 |
Audit of IM/IT Security | Assurance | Planned | 2010-2011 |
Audit of Systems Under Development or Application in Place - Enterprise Data Warehouse, Specific Claims Data Base | Assurance | Planned | 2010-2011 |
Preliminary Survey of OASIS | Preliminary Survey | Planned | 2010-2011 |
Preliminary Survey of GroupWise | Preliminary Survey | Planned | 2010-2011 |
Audit of Strategic Policy or Planning | Assurance | Planned | 2010-2011 |
Audit of Governance Structure | Assurance | Planned | 2010-2011 |
Post Implementation Audit of Forensic Audit Policy and Revised Complaints and Allegation Policy | Assurance | Planned | 2010-2011 |
Audit of Internal or External Communications (Scope TBD) | Assurance | Planned | 2010-2011 |
Audit of Lands Management | Assurance | Planned | 2011-2012 |
Follow-up Audit of Capital Facilities and Maintenance | Follow-up | Planned | 2011-2012 |
Follow-up Audit of Economic Development | Follow-up | Planned | 2011-2012 |
Audit of Emergency | Assurance | Planned | 2011-2012 |
Audit of Other Education | Assurance | Planned | 2011-2012 |
Follow-Up Audit of Post Secondary Education | Follow-up | Planned | 2011-2012 |
Audit of Registration and Membership | Assurance | Planned | 2011-2012 |
Audit of Financial Planning and Budgeting | Assurance | Planned | 2011-2012 |
Audit of Forecasting | Assurance | Planned | 2011-2012 |
Audit of Human Resource Planning and Leadership Development | Assurance | Planned | 2011-2012 |
Audit of Advertised Appointments | Assurance | Planned | 2011-2012 |
Follow-up Audit of Occupational Health and Safety | Follow-up | Planned | 2011-2012 |
Audit of Personnel and Physical Security | Assurance | Planned | 2011-2012 |
Follow-up Audit of Information Management (CIDM focus) | Follow-up | Planned | 2011-2012 |
Audit of OASIS | Assurance | Planned | 2011-2012 |
Audit of GroupWise | Assurance | Planned | 2011-2012 |
Audit of Official Languages | Assurance | Planned | 2011-2012 |
Audit of Risk Management | Assurance | Planned | 2011-2012 |
Audit of Continuity of Operations | Assurance | Planned | 2011-2012 |
Grants and Contributions - Horizontal Departmental Audit - (Scope TBD) | Assurance | Ongoing | 2009-2010, 2010-2011, 2011-2012 |
Review of Management Practices (Regions TBD) | Review | Ongoing | 2009-2010, 2010-2011, 2011-2012 |
Review of Management Practices (Sectors TBD) | Review | Ongoing | 2009-2010, 2010-2011, 2011-2012 |
Fraud Risk and Control Strategies (All Audits) | Assurance | Ongoing | 2009-2010, 2010-2011, 2011-2012 |
Electronic Link to Internal Audit and Evaluation Plan:
Risk-Based Audit Plan 2009-2010 to 2011-2012
INAC Audit and Evaluation Reports
Name of Evaluation | Program Type | Status | Expected Completion Date |
---|---|---|---|
Impact Evaluation of Healthy Food to Northern Communities | Operating expenditure/Internal management | Completed | April 2009 |
Summative Evaluation of Community Economic Development and Aboriginal Business Development Programs | Transfer Payment | Completed | April 2009 |
Evaluation Framework for the Indian Residential Schools Settlement Agreement | Transfer Payment | Completed | June 2009 |
Formative Evaluation of Reserve Land and Environment Program | Transfer Payment | Completed | June 2009 |
Impact Evaluation of the National Aboriginal Achievement Foundation | Transfer Payment | Completed | September 2009 |
Impact Evaluation of Indian Government Support | Transfer Payment | Completed | September 2009 |
Impact Evaluation of Treaty Related Measures (BC) | Transfer Payment | Completed | September 2009 |
Formative Evaluation to Assist Northerners in Assessing Key Vulnerabilities and Opportunities for 2009-2010 | Transfer Payment | Completed | December 2009 |
Impact Evaluation of the Aboriginal Healing Foundation | Transfer Payment | Completed | December 2009 |
Impact Evaluation of the Labrador-Innu Comprehensive Healing Strategy | Transfer Payment | Completed | December 2009 |
Impact Evaluation of Treaty Commissions (MB, SK) | Transfer Payment | In progress | March 2010 |
Impact Evaluation of Registration Administration | Transfer Payment | In progress | March 2010 |
Summative Evaluation of Capital Facilities and Maintenance | Transfer Payment | In progress | March 2010 |
Formative Evaluation of First Nations Infrastructure Fund | Transfer Payment | In progress | March 2010 |
Impact Evaluation of Emergency Management Assistance | Transfer Payment | In progress | March 2010 |
Formative Evaluation of Elementary and Secondary Education | Transfer Payment | In progress | March 2010 |
Formative Evaluation of Post-Secondary Education | Transfer Payment | In progress | March 2010 |
Impact Evaluation of On-Reserve Housing (including Shelter Allowance and Ministerial Loan Guarantees) | Transfer Payment | In progress | March 2010 |
Formative Evaluation of the Alberta Child and Family Services Model | Transfer Payment | In progress | April 2010 |
Summative Evaluation of First Nations Oil and Gas Moneys Management Act Implementation | Transfer Payment | In progress | April 2010 |
Summative Evaluation of Inuit Counseling in the South | Transfer Payment | In progress | April 2010 |
Summative Evaluation of Indian Bands for Land and Estates Management | Transfer Payment | In progress | June 2010 |
Impact Evaluation of the Intervention Policy | Policy | In progress | June 2010 |
Impact Evaluation of Self-Government Agreements | Transfer Payment | In progress | September 2010 |
Summative Evaluation of Inuit Relations Secretariat | Internal management | In progress | September 2010 |
Impact Evaluation of the Sustainable Development Strategy | Transfer Payment | Planned | March 2011 |
Summative Evaluation of the Inuit Art Foundation | Transfer Payment | Planned | March 2011 |
Formative Evaluation of Specific Claims Tribunal Action Plan | Transfer Payment | Planned | March 2011 |
Summative Evaluation of Post-Secondary Education | Transfer Payment | Planned | March 2011 |
Summative Evaluation of Elementary and Secondary Education | Transfer Payment | Planned | March 2011 |
Impact Evaluation of Family Violence Prevention | Transfer Payment | Planned | March 2011 |
Impact Evaluation of Child and Family Services | Transfer Payment | Planned | March 2011 |
Impact Evaluation of INAC's Proposal-Driven Economic Development Programs | Transfer Payment | Planned | March 2011 |
Impact Evaluation of EcoENERGY for Aboriginal and Northern Communities | Transfer Payment | Planned | March 2011 |
Impact Evaluation to Assist Northerners in Assessing Key Vulnerabilities and Opportunities for 2009-2010 | Transfer Payment | Planned | March 2011 |
Impact Evaluation of the Urban Aboriginal Strategy | Transfer Payment | Planned | March 2011 |
Summative Evaluation of Negotiation and Implementation | Transfer Payment | Planned | March 2012 |
Formative Evaluation of Northern Regulatory Improvement Initiative | Transfer Payment | Planned | March 2012 |
Summative Evaluation of International Polar Year Component | Transfer Payment | Planned | March 2012 |
Impact Evaluation of First Nations Fiscal and Statistical Management | Transfer Payment | Planned | March 2012 |
Impact Evaluation of the Federal Interlocutor's Contribution Program and Powley; Management of Metis Aboriginal Rights | Transfer Payment | Planned | March 2012 |
Impact Evaluation of Comprehensive Land Claims Agreements | Transfer Payment | Planned | March 2013 |
Impact Evaluation of Income Assistance, National Child Benefit Reinvestment, Assisted Living Program | Transfer Payment | Planned | March 2013 |
Impact Evaluation of First Nations Water Management | Transfer Payment | Planned | March 2013 |
Evaluation of Community Economic Development Program and Aboriginal Business Development Program | Transfer Payment | Planned | March 2013 |
Assessment of Procurement Strategy for Aboriginal Business Evaluation | Transfer Payment | Planned | March 2013 |
Impact Evaluation of First Nations Land Management | Transfer Payment | Planned | March 2013 |
Impact Evaluation of Healthy Foods to Northern Communities | Operating expenditure/Internal management | Planned | March 2013 |
Impact Evaluation of INAC's Gender-Based Analysis Policy | Operating expenditure/Internal management | Planned | March 2013 |
Electronic link to evaluation plan:
Evaluation and Performance Measurement Plan 2009-2010 to 2013-2014
Indian and Northern Affairs Canada | Forecast Revenue 2009–2010 |
Planned Revenue 2010–2011 |
Planned Revenue 2011–2012 |
Planned Revenue 2012–2013 |
---|---|---|---|---|
Governance and Institutions of Government | ||||
Refunds of previous years' expenditures | 1.9 | 1.9 | 1.9 | 1.9 |
Subtotal | 1.9 | 1.9 | 1.9 | 1.9 |
Co-operative Relationships | ||||
Refunds of previous years' expenditures | 0.6 | 0.6 | 0.6 | 0.6 |
Return on investments | 6.3 | 6.3 | 6.3 | 6.3 |
Subtotal | 6.9 | 6.9 | 6.9 | 6.9 |
Claims Settlements | ||||
Refunds of previous years' expenditures | 1.3 | 1.3 | 1.3 | 1.3 |
Return on investments | 2.7 | 2.7 | 2.7 | 2.7 |
Subtotal | 4.0 | 4.0 | 4.0 | 4.0 |
Education | ||||
Refunds of previous years' expenditures | 3.7 | 3.7 | 3.7 | 3.7 |
Subtotal | 3.7 | 3.7 | 3.7 | 3.7 |
Social Development | ||||
Refunds of previous years' expenditures | 8.4 | 8.4 | 8.4 | 8.4 |
Subtotal | 8.4 | 8.4 | 8.4 | 8.4 |
Clarity of Title to Land and Resources | ||||
Refunds of previous years' expenditures | 0.1 | 0.1 | 0.1 | 0.1 |
Subtotal | 0.1 | 0.1 | 0.1 | 0.1 |
Responsible Federal Stewardship | ||||
Refunds of previous years' expenditures | 0.3 | 0.3 | 0.3 | 0.3 |
Subtotal | 0.3 | 0.3 | 0.3 | 0.3 |
First Nations Governance over Land, Resources and the Environment | ||||
Refunds of previous years' expenditures | 0.3 | 0.3 | 0.3 | 0.3 |
Subtotal | 0.3 | 0.3 | 0.3 | 0.3 |
Northern Land and Resources | ||||
Refunds of previous years: – Norman Wells Project profits |
113.5 | 107.8 | 102.4 | 97.3 |
Refunds of previous years' expenditures | 1.9 | 1.4 | 1.4 | 1.4 |
Adjustments of Prior Year's Payables at Year End | 0.7 | 0.7 | 0.7 | 0.7 |
Rights and Privileges | 5.0 | 5.2 | 5.2 | 5.2 |
Mining Royalties | 90.4 | 34.6 | 74.5 | 91.0 |
Quarrying royalties | 0.1 | 0.1 | 0.1 | 0.1 |
Oil and gas royalties | 13.4 | 16.9 | 16.8 | 16.4 |
Other non-tax revenues | 1.9 | 1.7 | 1.7 | 1.7 |
Subtotal | 226.8 | 168.3 | 202.7 | 213.6 |
Community Investment | ||||
Refunds of previous years' expenditures | 1.4 | 1.4 | 1.4 | 1.4 |
Return on investments | 0.3 | 0.3 | 0.3 | 0.3 |
Subtotal | 1.7 | 1.7 | 1.7 | 1.7 |
Community Infrastructure | ||||
Refunds of previous years' expenditures | 11.7 | 11.7 | 11.7 | 11.7 |
Return on investments | 1.7 | 1.7 | 1.7 | 1.7 |
Subtotal | 13.5 | 13.5 | 13.5 | 13.5 |
Métis and Non-Status Indian Organizational Capacity Development | ||||
Refunds of previous years' expenditures | 0.2 | 0.2 | 0.2 | 0.2 |
Subtotal | 0.2 | 0.2 | 0.2 | 0.2 |
Internal Services | ||||
Refunds of previous years' expenditures | 23.2 | 23.2 | 23.2 | 23.2 |
Miscellaneous revenues | 1.3 | 1.3 | 1.3 | 1.3 |
Subtotal | 24.6 | 24.6 | 24.6 | 24.6 |
Total | 292.4 | 233.9 | 268.4 | 279.3 |
Due to rounding, figures may not add to totals shown.
Indian and Northern Affairs Canada | Forecast Spending 2009–2010 |
Planned Spending 2010–2011 |
Planned Spending 2011–2012 |
Planned Spending 2012–2013 |
---|---|---|---|---|
Co-operative Relationships | 0.4 | 1.0 | 1.0 | 1.0 |
Managing Individual Affairs | — | 4.8 | 0.6 | 0.6 |
Clarity of Title to Land and Resources | — | 0.6 | — | — |
Community Infrastructure | 0.8 | — | — | — |
Total | 1.2 | 6.4 | 1.6 | 1.6 |
Due to rounding, figures may not add to totals shown.