Information identified as archived on the Web is for reference, research or recordkeeping purposes. It has not been altered or updated after the date of archiving. Web pages that are archived on the Web are not subject to the Government of Canada Web Standards. As per the Communications Policy of the Government of Canada, you can request alternate formats on the "Contact Us" page.




2006-2007
Departmental Performance Report



Northern Pipeline Agency






The Honourable Gary Lunn, P.C., M.P.
Minister responsible for the Northern Pipeline Agency




Table of Contents

Section I: Commissioner's Message

Section II: Agency Context

Section III: Performance Discussion

Appendix A:   Financial Tables

Appendix B: Organization

Appendix C: History/Chronology

Appendix D: Auditor’s Report and Financial Statements

Appendix E: Other Information



Section I: Commissioner's Message

It is my pleasure to present the Performance Report for the Northern Pipeline Agency (NPA).

The NPA was created by the Northern Pipeline Act (the Act)in 1978 to oversee the planning and construction by Foothills Pipe Lines Ltd. (Foothills) of the Canadian portion of the Alaska Highway Gas Pipeline Project (pipeline), also referred to as the Alaska Natural Gas Transportation System. The pipeline was certificated in 1978 and is intended to transport Alaskan and possibly northern Canadian natural gas to southern markets in Canada and the United States.

The portion of the pipeline south of Caroline, Alberta (Phase I), was constructed in the early 1980's and presently transports Canadian gas sourced primarily from south of the 60thparallel. Unfavourable economic conditions led to indefinite delays in the completion of the northern portion of the pipeline (Phase II), and consequently, the Agency's activities in the 1990's were limited to overseeing the expansion of the southern portion of the pipeline.

Recently, perception of a growing North American market for natural gas, combined with concerns about limitations on supply from traditional sources, and strong natural gas prices has resulted in renewed interest in the pipeline as an option for bringing northern gas to market. In response, the Agency has taken measures to address the commitments of the Government of Canada that are embodied in the Actand legislative changes that have occurred since the pipeline was certificated.

___________________________

Cassie J. Doyle

Management Representation Statement

I submit for tabling in Parliament, the 2007 Departmental Performance Report (DPR) for Northern Pipeline Agency.

This document has been prepared based on the reporting principles contained in the Treasury Board of Canada Secretariat’s Guide for the preparation of 2006-2007 Departmental Performance Reports:

  • it adheres to the specific reporting requirements;
  • it uses an approved Program Activity Architecture;
  • it presents consistent, comprehensive, balanced and accurate information; 
  • it provides a basis of accountability for the results pursued or achieved with the resources and authorities entrusted to it; and
  • it reports finances based on approved numbers from the Estimates and the Public Accounts of Canada.

________________________________________

Name:              Cassie J. Doyle

Title:                 Commissioner

Date:                September 26, 2007



Section II: Agency Context

2.1 Agency Overview

2.1.1 Mandate and Mission

In 1977, following extensive regulatory hearings in both countries, the governments of Canada and the United States executed an Agreement on Principles Applicable to a Northern Natural Gas Pipeline.This agreement provided a framework for the construction and operation of the Alaska Highway Gas Pipeline Project.

In 1978, Parliament enacted theNorthern Pipeline Actto:

  • give effect to the agreement; and
  • establish the NPA to oversee the planning and construction of the Canadian portion of the project by Foothills.

Implementing legislation was also passed by the United States in the form of the Alaska

Natural Gas Transportation Act.

Prior to the commencement of construction of any particular section of the pipeline, Foothills is required to obtain a series of specific approvals from the Agency pursuant to theActand the terms and conditions specified under the Act.These approvals relate to socio-economic and environmental factors, routing issues, technical design, and other matters such as demonstration of financing. Approval authority rests with the Agency's Commissioner and Designated Officer, the latter being a member of the National Energy Board (NEB). In some cases, approval from the Board is also necessary.

The Agency also monitors the actual construction by Foothills for compliance with its various undertakings and for sound environmental and engineering practices.

2.1.2 Strategic Outcome

The Agency has one strategic outcome as listed below. The Agency will cease to exist one year after the date on which leave to open the last section or part of the pipeline is given by the NEB. The operation of the pipeline is regulated by the Board pursuant to the National Energy Board Act.

Strategic Outcome:

Facilitate the planning and construction of the Canadian portion of the Alaska Highway Gas Pipeline Project while maximizing social and economic benefits and minimizing adverse social and environmental effects.

Key Partners:

Agency demands were primarily managed through an arrangement that the Agency has with Natural Resources Canada (NRCan) for financial and administrative services. Agency staff have worked closely with federal departments to develop strategies for environmental and socio economic assessments. The Yukon Territorial Government monitored the easement agreement as discussed in Section 3.2. The Agency also worked closely with other federal departments, primarily NRCan and Justice Canada, on issues relating to Alaska pipeline development.

Key Targets and Overall Results:

The objectives of the Act, establishing the Agency and certifying the pipeline, are to:

  • carry out and give effect to the 1977 agreement between Canada and the United States underpinning the project;
  • carry out, through the Agency, federal responsibilities in relation to the pipeline;
  • facilitate the efficient and expeditious planning and construction of the pipeline;
  • facilitate consultation and co-ordination with the governments of the provinces and territories traversed by the pipeline;
  • maximize the social and economic benefits of the pipeline while minimizing any adverse social and environmental impacts; and
  • advance national economic and energy interests and to maximize related industrial benefits by ensuring the highest possible degree of Canadian participation.

As discussed in Section III, during this reporting period, Agency staff focused on the development of socio-economic assessment strategies, in anticipation of a filing by Foothills in the fall of 2005. Actual implementation of these plans depends upon details of the Foothills filing.

Program, resources and results linkages:

The Agency examined key environmental, socio-economic and First Nations concerns to ensure it would be able to effectively regulate a Foothills project. The Agency had no active programs or initiatives related to the strategic outcome during the reporting period. The Agency engaged a skeletal staff (3 to 5 persons) to ensure preparedness in the event of a decision to continue with the pipeline.

Management Practices:

The Agency relies on the management practices implemented by NRCan, (www.nrcan.gc.ca) as well as administrative arrangements to maximize efficiencies in respect of financial management and reporting requirements.

2.2 Societal Context

2.2.1 External Factors

Perception of a growing North American market for natural gas, combined with concerns about limitations on supply from traditional sources, and strong natural gas prices, has resulted in strong interest in the pipeline as an option for bringing northern gas to market.  Before the construction of the pipeline can begin, the NPA is responsible for ensuring that the regulatory system in Canada is in a state of readiness to respond to any request from Foothills Pipe Lines Ltd. to resuscitate the pipeline project. Before taking any decision to proceed with construction under the NPA, Foothills Pipe Lines Ltd. will need to resolve a number of commercial issues, and will need to conclude an agreement with the State of Alaska with respect to transportation rights in Alaska. As well, the ongoing process under the Alaska Gasline Inducement Act will significantly influence the decision on whether to proceed with a project under the Northern Pipeline Act

2.3 Challenges

During 2006-2007, the primary challenge for the Agency continued to be ensuring a state of readiness in an environment of uncertainty. In the absence of Foothills initiating an action or formal request of the Agency, responses to questions as to how Phase II of the pipeline would be regulated after a 20-year hiatus were largely speculative. The difficulty in addressing these was compounded during the reporting period by the need to utilize the limited resources of the Agency to maintain and increase awareness of obligations under the Act.

The longer-term challenge for the Agency is to be in a position to regulate pipeline construction effectively if industry decides to proceed with Phase II of the pipeline.



Section III: Performance

In light of the low-level of activity in the Agency, there are no specific RPP commitments or parliamentary committee recommendations to be implemented.

On December 12, 2003, responsibility for the Agency was transferred from the Minister for Foreign Affairs and International Trade to the Minister of Natural Resources Canada. The Deputy Minister of Natural Resources Canada was appointed Commissioner.

3.1 Output Performance

In working toward realization of its strategic outcome, the Agency's principal task for

2006-2007 fiscal year was to maintain preparedness to respond to regulatory filings by Foothills and to make sure that the Actis properly administered. With the renewed interest in northern pipelines the Agency was called on to provide information in the event that the balance of the pipeline (Phase II) proceeded, including an examination of the commitments of the Government of Canada that are embodied in the Actand legislative changes that have occurred since the pipeline was certificated.

The agreements that are currently in place with NRCan and other government departments continued to facilitate efficiencies in the administration of the Act. An easement agreement exists among the Yukon Territory Government and the Agency to facilitate the collection of an easement fee related to land access rights on Indian Reserves and Crown land granted to Foothills for the pipeline. The Agency collected the annual fee of $30,400 on behalf of Indian and Northern Affairs Committee (INAC) and redistributed an appropriate share to the Yukon Territory Government. These transactions are excluded from the calculations of recoverable costs mentioned in Section 3.2 Financial Performance.

3.2 Financial Performance

3.2.1 Overview

In 2006-2007, the Agency had spending authority of $946,000. The spending authority was established in anticipation of a significant increase in the work of the Agency to support a high level of planning activity of the pipeline. All costs incurred are fully recovered from Foothills through a cost recovery mechanism. The company is in the process of resolving its commercial issues and has requested that the NPA clarify regulatory framework so that it may proceed quickly once commercial issues have been clarified. Foothills Pipe Lines Ltd. has not yet formally indicated its intention to act on its existing certificates, and the Agency’s expenditures fell far short of expectations.

Resources Used – Table 1


Northern Pipeline Agency

Planned Spending                                        $946,000

Total Authorities                                          $941,254

2006-2007 Actual                                        $390,864


Each year, the Agency's operating budget includes contingencies to mitigate any requirement to return to Parliament for increased funding in the event activity occurs related to either the existing portion of the pipeline, or construction of the balance of the pipeline. Agency operating expenditures are kept to a minimum unless Foothills initiates some action or formal request of the Agency, in which case operating expenditures may increase proportionately. As reported in the 2006-2007 RPP, an allotment was obtained for the second half of 2006-2007 to retain additional staff in response to an anticipated increase in activity by Foothills. This increase in activity did not occur and as a result these funds were not required and were not fully released.

3.2.2 Fixed and Variable Costs

The Agency's operating budget is comprised of fixed and variable cost elements.

Fixed costs relate to salaries for the NPA staff, the administration of the Leasehold Agreement by INAC and the office accommodations and area for information archives managed by Public Works and Government Services Canada.

As a consequence of the changes in the fixed cost portion, the variable costs of the Agency which relate to costs of service provided by NRCan increased slightly. NRCan’s cost of technical advice and administrative services can vary substantially depending upon the timing and magnitude of Foothills' activities.

3.2.3 Cost Recovery

Agency expenditures related to the administration of the Actare fully recoverable, including those costs related to services provided by other government departments and NRCan.

In accordance with Section 29(1) of the Act, the Agency recovers 100% of its costs based on the NEB's Cost Recovery Regulations. Cost recovery is based on an estimate and adjusted in future years upon completion of an audit of the actual costs. Foothills is responsible for full cost recovery based on quarterly billings from NRCan on behalf of the Agency. Details of cost recovery and the respective adjustments can be found in Table 2.

Cost Recovery - Table 2
Historical Comparison of NPA Cost Recovery

($ thousands)


                                                                    2004        2005         2006         2007         2008

Estimated recoverable costs(1)            707       1,357      1,048           436          266

 

  Actual recoverable costs(2)               (415)      (596)      (445)           -           - 

                                                                     ______________________________________           

 

  Adjustment in future year              292       761         603           -          -

  Estimated recoverable costs               707       1,357      1,048       436        266

  Adjustment for prior year                 (59)       (382)      (291)      (760)     (603)

                                                                     ______________________________________ 

                                                                           

  Total cost recovery(3)                         648        975         757       (324)     (337)


(1) a. Cost recovery – Table 2 is calculated on a calendar year basis.

b. Estimated recoverable costs are determined in accordance with section 6 of the National Energy Board Cost Recovery Regulations.

(2) Based on information available as of 10 August 2007. TheNorthern Pipeline Act stipulates that an audit be performed annually by the Auditor General of Canada. Information is not available until the completion of the audits for the corresponding calendar year.

(3) Figures for 2007 and 2008 represent amounts that will not be recovered from Foothills Pipe Lines Ltd.  Future expenses will be credited against these amounts before future invoices are made.



Appendix A: Financial Tables

The following list and financial tables represent an overview of the Northern Pipeline Agency's 2006-2007 financial performance.

  • Table 1 - Summary of Voted Appropriations
  • Table 2 - Comparison of Total Planned Spending to Actual Spending
  • Table 3 - Historical Comparison of Total Planned Spending to Actual Spending
  • Table 4 - Non-respendable Revenues
  • Table 5 - External Charging

Table 1 - Summary of Voted Appropriations


Financial Requirements by Authority

($ thousands)

                                                                      2006 – 2007

                                                                ________________________________________

                                                                   Main          Planned       Total             Actual

Vote     Northern Pipeline Agency       Estimates    Spending    Authorities   Spending

35         Operating Expenditures                   870               870             932                382

S           Contribution to Employee

              Benefit Plans                                     76                76                 9                    9

              Total NPA                                      946              946              941               391


Table 2 - Comparison of Total Planned Spending to Actual Spending


Agency Planned versus Actual Spending
($ thousands)                                                         

                                                 2006 – 2007

                                                         ________________________________________

                                                           Main          Planned         Total             Actual

Northern Pipeline Agency          Estimates      Spending      Authorities   Spending

 

FTEs                                               4.0               4.0               4.0                2.0

                                                    ________________________________________

 

Operating                                       946              946                941              391

 

Capital                                             -                   -                    -                   -  

 

Voted Grants and Contributions       -                   -                    -                   -     

                                                    ________________________________________

 

Total Gross Expenditures               946              946                941               391

 

Less: Respendable Revenues       __  -__________-__________  -__________ -___

 

Total Net Expenditures                  946              946                 941              391

 

Other Revenues & Expenditures       -                   -                    -                   - 

 

     Non Respendable Revenues(1) (946)           (970)              (965)           (595)

 

     Cost of Services Received

            Without Charge                     -                  24                  24               53

                                                    ________________________________________                           

                      

Net Cost of Program                      -                    -                    -                151

 


(1) Of the $595K actual non respendable revenue, $27K does not represent revenue to the NPA.  It is an amount collected from Foothills Pipelines Ltd. and remitted directly to the Government of Canada by the Agency. 

Table 3 - Historical Comparison of Total Planned Spending to Actual Spending


Agency Planned Spending versus Actual Spending

($ thousands)

                                                                                                          2006-2007

____________________________________                                                                              

                                        Actual           Actual            Main             Planned                 Total

                                      2004-2005      2005-2006       Estimates       Spending            Authorities        Actual

Northern Pipeline               496                627                  946                   946                       941                 391

Agency

Total                                    496               627                   946                   946                       941                 391


Table 4 - Non-Respendable Revenues


Non-Respendable Revenues

($ thousands)

                                                                                                             2006-2007

                                                                                          _________________________________

                                          Actual             Actual               Planned           Total

                                       2004-2005        2005-2006         Revenues         Authorities         Actual

Northern Pipeline                 598                  951                    970                    965                 595

Agency

Unplanned                              -                        -                       -                         -                        -

Total Non-Respendable        

Revenues                             598                   951                    970                    965                  595

Total Revenues(1)                 598                  951                     970                    965                  595


(1) Refer to Note 1 on page 10.

Table 5 - DPR 2007 - External Charging Information for NPA


Regulation of construction of the Alaska Highway Gas Pipeline

The NPA regulates the planning and construction of the Canadian portion of the Alaska Highway Gas Pipeline.

 

Fee Type

Regulatory

 

Fee Setting Authority (e.g. Legislative, Regulatory)

The NPA external charging is in accordance with section 29 of the Northern Pipeline Act and section 24.1 of the National Energy Board Act and the National Energy Board Cost Recovery Regulations.

 

Date Last ModifiedB

See section B below for fees amended in fiscal year 2003-04.

 November 6, 2002

2006-2007

Forecast Revenue

($000)

Regulatory

970.0

Actual Revenue (1)

($000)

Regulatory

  595.0

Estimated Full Cost

($000)

Regulatory

   a) NPA costs to provide service =  $ 391.0

   b) Services received without charge    =    $ 53.0

  444.0

Service Standard

The construction of Phase II of the Alaska Highway Gas Pipeline has been put on hold due to adverse market conditions. The NPA has shrunk to a skeleton organization but in a state of readiness in the event Phase II of the pipeline project is reactivated. There are no formally developed measurable service standards at this time.

 

Performance Results

Please refer to notes regarding service standards.

 

(1) Refer to Note 1 on page 10.


Planning Years

Fiscal Year

2007-08
2008-09
2009-10

 

Forecast Revenue

($000)

Sub-Total (2007-08)
Sub-Total (2008-09)
Sub-Total (2009-10)
Total                   

72.5

290.0

290.0

652.5

Estimated Full Cost

($000)

Sub-Total (2007-08)
Sub-Total (2008-09)
Sub-Total (2009-10)
Total                   

72.5

290.0

290.0

652.5


B: Date Last Modified

The NPA cost recovery is determined in accordance with section 24.1 of the National Energy Board Act. Although amendments were made to the NEB Cost Recovery Regulations on November 6, 2002, they do not affect the calculation of the NPA cost recovery charges.

C: Other Information:

1) Cost Recovery and Revenue Accrual:

In accordance with Section 29 of the Northern Pipeline Act and with the National Energy Board Cost Recovery Regulations, the Agency is required to recover all its annual operating costs from the companies holding certificates of public convenience and necessity issued by the Agency.  Currently, Foothills Pipe Lines Ltd. is the sole holder of such certificates. The NPA corresponds with Foothills regularly on the level of and expected activities of the Agency including its operating costs.

Program appropriation for each planning year is presented on a fiscal year basis while cost recovery charges, according to the regulations, are calculated on a calendar year basis and billed quarterly. In addition, forecast revenue figures are presented on an accrual basis. As a result, the program appropriation and the forecast revenue amounts do not reconcile although the NPA recovers 100% of its operating costs.

2) Dispute Management:

Due to the current level of activities, a dispute management policy, a pre-requisite for the implementation of the External Charging Policy, has not been developed. However, frequent consultation with Foothills on changes to activities and the associated costs precludes disputes affecting cost recovery. A dispute management policy will be developed to support increased operational requirements.

Appendix B: Organization

The NPA has been designated as a department for the purposes of the Financial Administration Act. The Agency reports to Parliament through the Minister of NRCan who is responsible for the management and direction of the Agency. The Agency has two senior officers, namely a Commissioner and an Assistant Commissioner and Comptroller.  The  Commissioner of the Agency, currently the Deputy Minister for NRCan, is appointed by the Governor in Council.

Given the continued low level of Agency activity, arrangements are in place whereby the Agency relies largely on NRCan for administrative and technical assistance. This assistance is provided on a cost-recoverable basis. In addition, NRCan also provides policy advice to the Agency.

To further assist the Minister responsible for the Agency in carrying out the Agency's mandate, there is provision for two federally appointed advisory councils. The Councils consist of Aboriginal, business and other interested parties representing communities in northern British Columbia and the Yukon Territory. Membership in these Councils has lapsed over the years in view of the dormant state of Phase II of this project.

As a separate employer, the Agency conforms closely with the principles of personnel administration that apply in the Public Service of Canada and has developed various systems to implement policy appropriate to the Agency's operating requirements.

Figure 3 provides a schematic of the reporting relationships of the key officers of the Agency.

Figure 3: Organization Chart
Organization Chart

Appendix C: History/Chronology

The Agency's activities are dictated by the timing and pace of the construction of the pipeline. The following provides a brief description and chronology of the pipeline.

The project is the largest proposed pipeline in North America, encompassing approximately 7 700 kilometres (4,800 miles) of large-diameter mainline pipe, about 42 percent of which would be located in Canada. The route for the project in Canada and the United Sates is depicted in Figure 1. Once in full operation, the pipeline would be capable of initially transporting 68 million cubic meters (2.4 billion cubic feet) per day of Alaskan gas, and the system could be expanded to transport additional volumes subject to regulatory approval. The system, as designed, could also accommodate the receipt and onward delivery of 34 million cubic meters (1.2 billion cubic feet) per day of northern Canadian gas via a connecting pipeline from the Mackenzie Delta/Beaufort Sea region.

As far back as 1977, the concept of prebuilding the southern portions of the pipeline was identified as a benefit of the project, providing Canadian natural gas producers with additional export opportunities and supplying U.S. consumers with much-needed gas. This prebuild, which constituted Phase I of the pipeline, included a western leg to transport Canadian gas to markets in California and the Pacific northwest and an eastern leg to serve primarily the U.S. midwest market. At the same time it was contemplated that Phase II of the pipeline, consisting of the northern portions and the remaining sections to be constructed in southern Canada and the lower 48 regions, would follow in the near term.

The construction of the prebuild went ahead as planned and Canadian gas started flowing through the system for export in the 1981-1982 time frame. The Agency's activity level reached its peak during the construction of the prebuild, with a corresponding staff complement of over 100 employees.

In 1982, at about the same time the prebuild was completed, adverse market conditions led the sponsors of the pipeline to put a hold on Phase II. The adverse market conditions were a result of:

  • a decline in demand for natural gas due to economic recession and energy conservation measures;
  • an increase in U.S. supply in response to higher wellhead prices; and
  • escalating forecast costs of construction due to inflation and rising interest rates.

It was originally anticipated that the completion of the project would be delayed by only about two years, however, Phase II of the pipeline remains on hold to this day. In response, the Agency shrank to a skeleton organization in the mid-1980's. Arrangements

are in place whereby the Agency relies largely on NRCan for administrative, technical assistance and policy advice.

There have been five expansions completed since 1988, all of which were designed to either increase system capacity or enhance system reliability. The most significant of these expansion projects involved (i) the addition of two new compressor stations on the eastern leg in Alberta and of an additional compressor station and a further compressor unit in Saskatchewan, (ii) the completion of the western leg mainline in southeastern British Columbia, and (iii) a further expansion of the eastern leg in 1998.

The flow capacity of the prebuild continues to approach the 102 million cubic meters (3.6 billion cubic feet) per day rate provided for in the underlying agreement between Canada and the U.S. The fifth and latest expansion of the prebuild, which came into service in 1998, raised its capacity to about 94 million cubic meters (3.3 billion cubic feet) per day.

On behalf of the Government of Canada, the Agency coordinates implementation of the agreement reached with the United States in 1980 respecting the procurement of certain designated items such as compressors and large-diameter line pipe, valves, and fittings for the construction of the pipeline. This agreement provides that both Canadian and American suppliers be afforded the opportunity to bid on a generally competitive basis. Canada suspended implementation of the agreement for the latest Foothills expansion due to the lack of U.S. reciprocity.

Appendix E: Other Information

A. Contacts for Further Information

Northern Pipeline Agency

580 Booth Street,

Ottawa, Ontario K1A 0E9

Telephone:        (613) 992-9612

Fax:                 (613) 9951913

B. Legislation and Associated Regulations Administered Acts

Northern Pipeline Act                                                    RSC 1977-78, c. 20,s.1

National Energy Board Cost Recovery Regulations SOR/91-7

C. Socio-Economic and Environmental Terms and Conditions (1980-1981)

Northern Pipeline Socio-Economic and Environmental Terms and Conditions for the Province of Alberta(Order NP-MO-1-80 dated 12 June 1980)

Northern Pipeline Socio-Economic and Environmental Terms and Conditions for Southern British Columbia(Order NP-MO-2-80 dated 12 June 1980)

Northern Pipeline Socio-Economic and Environmental Terms and Conditions for the Swift River Portion of the Pipeline in the Province of British Columbia (Order NP-MO-11-80 dated 29 August 1980)

Northern Pipeline Socio-Economic and Environmental Terms and Conditions for Northern British Columbia(Order NP-MO-12-80 dated 29 August 1980)

Northern Pipeline Socio-Economic and Environmental Terms and Conditions for the Province of Saskatchewan(Order NP-MO-13-80 dated 29 August 1980)

Listing of Statutory and Departmental Reports

2007 Annual Report