Representatives from small agencies formed an Inter-Agency Steering Committee with the goal of developing models of how evaluation and performance measurement activities could be developed and conducted within the small agency context. We would like to thank the following participants:
They provided guidance, reviewed drafts, provided feedback, and persevered in assisting the consulting team to understand the context of small agencies.
We are most grateful to Robert Lahey, Yolande Andrews and Kim Cronkwright of the Centre of Excellence for Evaluation, Treasury Board Secretariat, for their ongoing support as well as to the administrators of the Modern Comptrollership Innovation Fund, through which the production of this report was funded.
Members of the Inter-Agency Steering Committee worked in collaboration with Celine Pinsent, Goss Gilroy Inc.
This report presents a summary of a project that developed different potential models of evaluation and performance measurement functions within federal small agencies. The goal of the project was to explore what types of models would be most appropriate given the various characteristics, needs and resources available within small agencies. The project was not designed to produce a "how-to" implementation tool-kit for small agencies in developing evaluation and performance measurement functions. Rather, the purpose of the project was to develop models that would guide any implementation work that was to follow. Indeed, a tool-kit or implementation assistance may be appropriate next steps based on the models developed for the current project.
The small-agency community in the federal government is extremely diverse in such various dimensions as organizational structure, relationship with larger departments, nature of work, and organization size. Small agencies also have unique challenges and characteristics when compared with medium-sized or large federal departments. These dimensions and characteristics contribute to the type and nature of information that small agencies need for decisionmaking and ensuring accountability.
Most small agencies are subject to the Treasury Board Evaluation Policy. However, many have neither an evaluation function, nor significant capacity to develop and conduct performance measurement activities.1 It is anticipated that an appropriately sized evaluation function and/or performance measurement capability in small agencies will contribute to an environment that will increase accountability through improved reporting of results achieved for various policies, programs or initiatives. As well, quality information on results achieved will assist in the decision-making process among managers within small agencies.
The Modern Comptrollership Office of the Treasury Board Secretariat (TBS) funded the project. The project was overseen by representatives from a group of small agencies that made up the Project Steering Committee. The Centre of Excellence for Evaluation located within TBS also provided assistance throughout the project.
1 This lack of capacity has been noted in other reports, and was generally confirmed by the current project, which was conducted in 2003–04.The current project took into account both the diversity of the federal small-agency community, as well as the differences and unique challenges that small agencies encounter in comparison with medium-sized and large departments. The model development was conducted in two phases with the initial phase including data collection (key informant interviews, case studies, a literature review, and a review of approaches in other jurisdictions). The second phase involved validating the draft models with the small-agency community through a self-assessment and gap analysis exercise.
The main findings from the key informant interviews, case studies, literature review and review of other jurisdictions' approaches were divided into two main areas:
These were the main findings with regard to community characteristics.
These were the main findings with regard to current approaches.
The findings from Phase One contributed to the development of three different models of approaches to evaluation and performance measurement in small agencies. The choice of which model would be most appropriate for a particular agency is based on the answers to two underlying questions that form the rationale for evaluation and performance measurement:
Some types of decision-making may require very complex information, while other decision-making requires relatively straightforward information. The three models are based on the level of complexity of information required from the evaluation and performance measurement activities within an organization (straightforward, blended, and complex). Determination of information needs was based on some common characteristics such as number of business lines, level of risk associated with decisions, number and types of stakeholders, predictability of workload, agency size, nature of legislation associated with agency, proportion of budget allocated to grants and contributions, number of offices, and the balance of emphasis on process and/or impacts of the agency.
Each of the three models has three main components, namely:
The objective of Phase Two was to validate the models within the smallagency community. The majority of those who participated in the validation exercise indicated that they had a blend of both relatively straightforward information needs combined with one or two aspects that may have required more specialized or complex information. As would be expected from the findings in Phase One, most respondents indicated that there were gaps between what their organizations were currently doing and the activities outlined in the appropriate models.
Feedback received from the respondents with regard to the models was positive, with the vast majority of respondents indicating that the models were appropriate for both their specific agency, and the small agency community in general. One comment that was received from a number of agencies was that the models were a reasonable start, but the exercise did not indicate the next steps to ameliorate gaps or to implement the activities described in the models. As previously noted, this was not within the scope of the current project. However, it is a good indication that the next step in this process is to assist small agencies in the implementation process.
This report presents a summary of a project that developed different models of how issues of accountability and performance measurement could be addressed among the different types of federal small agencies. The current project took into account both the diversity of the federal small agency community, as well as the differences and unique challenges that small agencies encounter in comparison with medium-sized and large departments.
The project was designed to address the modern comptrollership area of developing, strengthening and implementing better accountability frameworks among small agencies by strengthening the evaluation and performance measurement functions in small agencies. Most small agencies are subject to the Treasury Board Evaluation Policy, but many do not have an evaluation function or significant capacity to develop and conduct performance measurement activities. It is anticipated that an appropriately sized evaluation function and/or performance measurement capability in small agencies will contribute to an environment that will increase accountability through improved reporting of results achieved for various policies, programs or initiatives. As well, quality information on results achieved will assist in the decision-making process among managers.
The small agency community in the federal government is extremely diverse when it comes to such dimensions as organizational structure, relationship with larger departments, nature of work, and organization size. These dimensions, in addition to others, contribute to the type and nature of information that agencies need for decision-making and ensuring accountability.
Small agencies also have unique challenges and characteristics when compared with medium-sized or large federal departments. One difference is that small agencies often have one or two business lines in comparison with medium-sized and large departments that often have multiple business lines containing many programs. Another difference is that, in comparison with departments, small agencies often have more limited flexibility in financial resources. Given the differences, models of meeting accountability and performance requirements in medium-sized and large departments may not be as applicable to small agencies.
The project was initiated and implemented by a group of small agencies led by the Office of the Commissioner of Official Languages. The group received funding for the project from the Modern Comptrollership Office, Treasury Board Secretariat of Canada (TBS). Goss Gilroy Inc., a management consulting firm, was hired to work in conjunction with the group of small agencies to develop appropriate models.
The report is divided into five main sections. This brief introduction to the project is followed by a description of the overall approach used to develop the models (Section 2.0). Section 3.0 contains the findings from the different methods used to collect information to develop the models. Section 4.0 describes the exercise that was conducted to validate the models with small agencies. Finally, Section 5.0 contains descriptions of the three models and their various components.
The project team used a two-phase approach for the project. The initial phase consisted of key informant interviews, case studies, and a review of approaches used for addressing accountability and performance measurement requirements in other jurisdictions. Using the information collected from these sources, the project team developed draft models of how various types of small agencies could address accountability and performance measurement requirements.
Phase Two consisted of developing and conducting a validation exercise for the models developed in Phase One, and of compiling the information from the two phases in this summary report.
Figure 1 depicts the overall approach employed for the project.
Figure 1
The purpose of the key informant interviews and case studies was to collect information that would assist in the development of the draft models for addressing accountability and performance measurement requirements in small agencies. For details on the participants in key informant interviews and the case studies, data collection instruments, and brief descriptions of the 15 individual case studies, please refer to Appendix A.
The type of information that was collected during these activities was of two main types.
The key informant interviews and case studies produced information on various characteristics of the small-agency community. These are highlighted briefly below.
Agency size
The small-agency community is extremely diverse in terms of size. Depending on the definition of "small," the size of organizations can range from fewer than ten full-time equivalent staff (FTEs) to
up more than 1000 FTEs. It is apparent that the amount and types of information needed to make decisions and report on activities within an agency with seven staff is significantly different than
that needed to manage an agency with more than 800 staff.
Making shifts in agency culture
For some agencies, the turnover and rate of movement of staff is reduced compared to many large or medium-sized departments. For these agencies, there may be a significant challenge in implementing
approaches that are not already part of agency culture. However, many also noted that one advantage to being small is that often a change in culture can be implemented relatively quickly.
Mandated independence
Many agencies are legislated as independent bodies (e.g., quasi-judicial). They are mandated to remain at arms' length from departments or other agencies in conducting the work of the agency. This
makes the potential for partnerships and resource sharing as somewhat limited for many agencies.
Support from the Head of the agency
For small agencies, often the political appointee (the Head of the agency) does not necessarily have experience within the public service. One challenge this may cause in some agencies is that there
is a lack of support or understanding from the Head of the agency with regard to issues of performance reporting and evaluation within a public service context. In organizations where the Head is
knowledgeable and supportive of performance measurement development activities, not surprisingly the agency is relatively advanced in its ability to meet accountability and performance measurement
requirements.
Limitations on resource flexibility
The resource limitations of small agencies are notable. There is very little flexibility in their allocation of resources to develop new internal processes that are not directly part of their
mandated business line. Unlike mediumsized and large departments—where there is often opportunities present to implement pilot projects, contract external expertise, or make changes to
information systems—small agencies often do not have flexibility in allocating resources.
Human resource considerations
During the case studies and key informant interviews, a number of comments were made with regard to human resource issues that must be taken into account when developing models to meet accountability
and performance measurement requirements.
Information was collected from the case studies and key informant interviews about current approaches to addressing accountability and performance measurement requirements and about some of the current gaps that exist within the community.
Diversity within the community
There is a large amount of variation within the small agency community with regard to how advanced agencies are in the areas of performance measurement and evaluation. Some agencies are just starting
to approach the concepts of performance measurement and see how they apply to their agency. Within these agencies, performance measurement and evaluation are not familiar concepts for managers. These
agencies recognize the need to begin the process of understanding their information needs and the ways they can meet accountability and performance measurement requirements. At the other end of this
developmental continuum, there are agencies that are well advanced in applying the concepts of performance measurement and evaluation within their agencies. There are accountability frameworks
developed and implemented, ongoing monitoring using established performance indicators, and periodic evaluations occurring.
Mandated external review process
For some agencies, there is an external review process that is mandated within the legislation that governs their agency. It was recognized that any model used to meet accountability and performance
measurement should take this process into account. This could mean ensuring that quality performance data is available to external reviewers or that there is a reduced need for internal periodic
evaluations.
Need for a "champion"
In the case studies, the project team found that those agencies that had developed the greatest capacity for performance measurement and evaluation often had an identifiable person in the agency who
understood and worked consistently at explaining the benefits of performance measurement and evaluation to other members of the organization. With an identified "champion," agencies appear to be able
to not only increase the acceptance of these concepts, but also to develop significant levels of internal capacity through working groups, planning sessions, etc. In some cases this "champion" was at
a director/manager level; in other instances the champion was the Head of the agency.
Support from senior management
While the Head of the agency does not necessarily need to be identified as the "champion" in the agency, most agencies participating in the case studies indicated that there needs to be support from
senior management in order to integrate performance measurement and evaluation activities with overall agency activities. The senior management support was often cited as being necessary to produce
the overall cultural shifts required in an organization as it integrates the concepts and processes of performance measurement and evaluation within the day-to-day activities of the organization.
Emphasis on process
For many of the agencies that participated in the case studies, there was a large emphasis placed on the need to understand, assess, and report on various processes within the agencies. The project
team attributed this to the nature of the work of many of these agencies, which is often judicial, quasi-judicial, or investigative. This may be different from many large and medium-sized
departments, where the emphasis is on delivering programs or interventions. The types of performance measurement and evaluation that are most appropriate for these special types of work may differ
significantly from the types of information that is required to manage "programs."
Difficulty in evaluating "rationale"
The concept of evaluating "rationale" is difficult for many agencies. For many agencies, they have one business line that is mandated by a specific piece of legislation. Their rationale is defined by
the legislation. This is in contrast to evaluating rationale for a specific program or policy within a large or medium-sized department, where there is the possibility of re-focusing the program,
cutting it, expanding it, and so on. These options are not available to many of the small agencies that have one business line mandated by legislation. As a result, these agencies tend to place more
emphasis on evaluating and reporting on process (see the point above).
Performance measurement as a first step
Many of the agencies reported that, in addressing the overall requirements for accountability, they are focussing initially on developing performance measurement within their agencies. This includes
the development of a framework that links activities to expected outcomes, performance indicators and data collection strategies. Once a solid performance measurement system is in place, they plan to
then address the need for periodic evaluations for different aspects of their organization.
Approaches to addressing capacity building
Participants in the interviews and case studies suggested different approaches to addressing capacity issues within their agencies. Many indicated that capacity building around areas of performance
measurement and evaluation must be done within the overall modern management agenda. Being separated from an overall management approach makes it difficult for individuals to understand the rationale
for the processes and makes them more likely to dismiss performance measurement and evaluation as "the flavour of the month." Successful approaches to building capacity cited by participants included
the following.
Access to expertise
During the case studies and interviews, many participants indicated that one of the main challenges they have in attempting to develop approaches to performance measurement and evaluation in their
organizations is easy accessibility to expertise in these areas. This expertise also needs to understand and adapt to the context of small agencies.
One main component of Phase Two of the project was the development and implementation of a model validation exercise. Once information was collected from the research on approaches used in other jurisdictions, key informant interviews, and case studies, the project team worked with the Steering Committee to develop three draft models of approaches to performance measurement and evaluation within the small agency community. Phase Two required that a validation exercise for the draft models be developed and implemented.
The validation exercise consisted of four main components. The initial component consisted of a brief description of the project and the draft models. The second component briefly assessed their organization's information needs to determine which model was most appropriate. Once an appropriate model was chosen, the participant moved to the third component, which consisted of a brief gap analysis to determine which aspects of the model currently existed within the agency, which were planned, and which were not applicable. Finally, the fourth component encouraged the participant to provide feedback to the project team on the appropriateness of models, the assessment of information needs, and the identification of gaps.
The Chair of the Steering Committee sent an initial letter to notify small agencies that did not participate in the case studies of the validation exercise. Approximately three days later, these agencies were sent a validation package (see Appendix B for copy of validation package). Each small agency that received a validation package was then contacted by phone to ascertain that they had received the package and to offer assistance in completing the package if required.
As of the end of July 2003, the project team received completed validation exercises from 22 small agencies. This resulted in a response rate of approximately 50 percent.
In this section, an overview of the findings from the validation exercise is presented. For specific detailed data tables, please refer to Appendix C.
Those who completed the validation exercise varied in many ways. Agencies ranged from fewer than 50 FTEs to more than 150 FTEs. Self-assessed level of knowledge of performance measurement and evaluation ranged from "novice" to "advanced." There was a mixed response with regard to the emphasis on process vs. impact of organization activities.
The majority of those who participated in the exercise indicated that they had a blend of both relatively straightforward information needs combined with one or two aspects that may have required more specialized or complex information (Model B). Most respondents indicated that there were gaps between what their organization was currently doing and the activities outlined in the appropriate models. Where gaps did exist, in most cases, plans were made with regard to implementing the specific activity within three years.
Feedback received from the respondents with regard to the models was positive, with the vast majority of respondents indicating that the models were appropriate for both their specific agency and the small agency community in general. With regard to the usefulness of the information needs assessment and the gap analysis, those who had relatively well established performance measurement and evaluation activities found the exercise less useful, but did tend to comment that it was a good confirmation of their own analysis. Those who had less developed performance measurement and evaluation activities tended to provide feedback that the exercise was useful.
One comment that was received from a number of agencies was that the models were a reasonable start, however, the exercise did not indicate the next steps to ameliorate gaps or to implement the activities described in the models. While it should be noted that the implementation portion was not within the purview of the current project, it is likely the essential next step as small agencies continue to develop these activities within the models provided by the project.
Why would an agency invest in evaluation and performance measurement activities? What is the rationale or raison d'être for their presence within an agency? The quick answer is that if these activities are designed and delivered appropriately, they provide management with information needed to make decisions.
As a result, the two underlying questions that were consistently asked during the development of the models of evaluation and performance measurement were:
Useful evaluation and performance measurement activities are those that can address the information needs of managers in a results-based environment. In order to understand the type of information that is required from these activities, an agency needs to clearly delineate the types of decision-making that managers must perform. Some types of decision-making may require very complex information, while other decision-making requires relatively straightforward information. The models are based on the level of complexity of information required from the evaluation and performance measurement activities within an organization.
Through the initial phase of the project, the project team found the main characteristics of agencies that were related to the complexity of information that they required for decision-making. These included:
By systematically assessing each of these characteristics, an agency should be able to determine to what extent they have overall complex information needs, straightforward information needs, or information needs that are positioned somewhere in between. Depending on their information needs, they will need to design and deliver their evaluation and performance measurement activities accordingly.
Component 2:Once an organization has determined the type of information that it requires (e.g., complex, straightforward), it can then be determined how the evaluation and performance activities could be designed and delivered within the organization. Some areas of consideration include:
How each of these areas is addressed should be linked directly to the actual type of information required from these activities. For example, indicator development could range from multiple level indicators with various levels of roll-up for complex information needs, to the systematic collection of data on three or four good indicators for relatively straightforward information needs.
Component 3:The final component of each of the models is the actual outcomes from the evaluation and performance measurement activities. These should relate directly to the original rationale for the activities (Component 1) and the assessment of management's information needs for decision-making. The main areas to be considered in this component are:
The following diagrams contain the detailed descriptions of each of the models, including the three components for each model.
Assessment of Information Needs
The information needs for management decision-making are relatively simple overall. The types of evaluation and performance measurement activities undertaken by these types of agencies should match
this need in being relatively straightforward, not complicated, and very clear with respect to outcomes produced by these activities.
Integration of activities with other management activities: basic understanding of how ongoing performance measurement and periodic evaluation information can be integrated into other management activities
Assessment of Gaps in Design and Delivery of Evaluation and Performance Measurement Activities
Gaps in the extent to which an agency currently has a sufficient system of evaluation and performance measurement can be assessed against the requirements stated above. Emphasis on each of the
requirements will vary from agency to agency depending on a number of both internal and external considerations.
Assessment of Gaps in Evaluation and Performance Measurement Outcomes
Gaps in the extent to which an agency currently has a sufficient system of evaluation and performance measurement can be assessed against the key outcomes stated above. Emphasis on each of the
outcomes will vary from agency to agency depending on a number of both internal and external considerations.
Assessment of Information Needs
The information needs for management decision-making range between straightforward and complex. The types of evaluation and performance measurement activities undertaken by these types of agencies
should match this need in being ready to respond to the types of information that managers will require, working in an environment that can be at times straightforward and/or complex.
Indicator development: three to four levels of indicators according to different levels of need for information (e.g. program managers, directors, management committee, executive committee)
Development of performance measurement system:Integration of activities with other management activities: identified, planned process for periodic integration of performance measurement and evaluation information with other management activities
Assessment of Gaps in Design and Delivery of Evaluation and Performance Measurement Activities
Gaps in the extent to which an agency currently has a sufficient system of evaluation and performance measurement can be assessed against the requirements stated above. Emphasis on each of the
requirements will vary from agency to agency depending on a number of both internal and external considerations.
Integration of PM/evaluation activities and external reporting: evidence of solid PM and evaluation information being used in external reporting requirements (DPRs, RPPs, Annual Reports)
Use of PM and evaluation information to support internal decision-making:Assessment of Gaps in Evaluation and Performance Measurement Outcomes
Gaps in the extent to which an agency currently has a sufficient system of evaluation and performance measurement can be assessed against the key outcomes stated above. Emphasis on each of the
outcomes will vary from agency to agency depending on a number of both internal and external considerations.
Assessment of Information Needs
The information needs for management decision-making are relatively complex. The types of evaluation and performance measurement activities undertaken by these types of agencies should match this
need in being ready to respond to the types of information that managers will require working in a complex environment.
Indicator development: multiple levels of indicators according to different levels of need for information (e.g. program managers, directors, management committee, executive committee)
Development of performance measurement system:Integration of activities with other management activities: identified formal process for ongoing integration of performance measurement and evaluation with other management activities
Assessment of Gaps in Design and Delivery of Evaluation and Performance Measurement Activities
Gaps in the extent to which an agency currently has a sufficient system of evaluation and performance measurement can be assessed against the requirements stated above. Emphasis on each of the
requirements will vary from agency to agency depending on a number of both internal and external considerations.
Assessment of Gaps in Evaluation and Performance Measurement Outcomes
Gaps in the extent to which an agency currently has a sufficient system of evaluation and performance measurement can be assessed against the key outcomes stated above. Emphasis on each of the
outcomes will vary from agency to agency depending on a number of both internal and external considerations.
Correctional Services of Canada (CSC) – With a staff of approximately 283 FTEs, the agency serves a quasi-judicial function. The Board has an established evaluation function and coordinates program delivery with CSC and RCMP. The agency submits annual performance monitoring reports to Parliament and provides such reports for the public on the NPB Web site.
National Round Table on the Environment and the Economy – The National Round Table on the Environment and the Economy (NRTEE) is an independent advisory body that provides decision makers, opinion leaders and the Canadian public with advice and recommendations for promoting sustainable development. The NRTEE, legislated by Parliament in 1994, explains and promotes sustainable development. Working with stakeholders across Canada, the NRTEE identifies key issues with both environmental and economic implications, examines these implications and suggests how to balance economic prosperity with environmental preservation. The agency employs 28 FTEs, working in the field of policy development.
Office of the Commissioner of Official Languages – The Commissioner of Official Languages is the spokesperson for the Office of the Commissioner. As an Officer of Parliament, she plays several key roles in promoting and achieving the objectives of the Official Languages Act. These include ensuring that federal institutions comply with the Act, upholding the language rights of Canadians and promoting linguistic duality and bilingualism. The Office operates with approximately 162 FTEs.
Office of the Correctional Investigator of Canada – The Correctional Investigator is mandated by Part III of the Corrections and Conditional Release Act as an ombudsman for federal offenders. The primary function of the Office is to investigate and bring resolution to individual offender complaints. The Office also reviews and makes recommendations on the Correctional Services' policies and procedures associated with the areas of individual complaints to ensure that systemic areas of concern are identified and appropriately addressed. The Office works with approximately 27 FTEs.
Office of the Tax Court of Canada – The Tax Court of Canada is a court of law. The Court was established in 1983 pursuant to the Tax Court of Canada Act (Section 3) with a view to dispensing justice in tax matters. The Court is independent of the Canada Customs and Revenue Agency and all other departments of the Government of Canada. The Tax Court of Canada is a superior court to which individuals and companies may appeal to settle disagreements with the Government of Canada on matters arising under legislation over which the Court has exclusive original jurisdiction. Most of the appeals made to the Court relate to income tax, the goods and services tax or employment insurance. There are approximately 124 FTEs employed by the Office of the Tax Court of Canada.
Patented Medicine Prices Review Board – PMPRB is an independent quasi-judicial body, created in 1987 under the Patent Act to protect consumer interests in light of increased patent protection for pharmaceuticals. With a staff of approximately 35 FTEs, PMPRB contributes to canadian health care by ensuring that prices of patented medicines are not excessive.
Social Sciences and Humanities Research Council – The Social Sciences and Humanities Research Council of Canada (SSHRC) is an arms' length federal agency that promotes and supports university-based research and training in the social sciences and humanities. Created by an Act of Parliament in 1977, SSHRC is governed by a 22-member council that reports to Parliament through the Minister of Industry. The Council has approximately 160 FTEs.
The purpose of this initial set of interviews is to gain additional information for the background to the study, clarify the expectations for the study, and potentially provide information on key criteria to be considered in selection of case studies and identification of best practices.
The purpose of these interviews is to provide the study team with information about your agency that will then be used to develop individual case studies (4-5 pages in length). The findings from the individual case studies will then be summarized in an overall document that will be used to develop appropriate models of how evaluation and performance measurement functions could be developed in various types of small agencies.
The interviews will be combined with a document review for each agency. If answers to some of the questions can be easily found in your agency's documents that you will be providing for the document review, please make note and we will skip through those during the interview process. Not all questions will be appropriate for all interviewees, or for all agencies.
Recently, a group of small agencies proposed to the Modern Comptrollership Office of TBS that they receive funds for a project focused on developing models of how evaluation and performance measurement activities could be developed and conducted within the small agency context. It was assumed that while some of the agencies may be able to easily adapt approaches used in the medium/large departments, many agencies, given their special contexts, may find this adaptation approach less appropriate. The current project attempted to develop more appropriate models by:
The study team and Steering Committee felt that one of the most appropriate ways to validate the draft models was to ask the community to review them and actually assess their individual agencies using the models.
This practical application of the models quickly brings them out of the realm of ideas to one of useful tools. The study team will integrate the feedback received through the validation exercise into the final version of the models.
Why would an agency invest in evaluation and performance measurement activities? What is the rationale or raison d'être for their presence within an agency? The quick answer is that if these activities are designed and delivered appropriately, they provide management with information needed to make decisions.
As a result, the two underlying questions that were consistently asked during the development of the models of evaluation and performance measurement were:Useful evaluation and performance measurement activities are those that can address the information needs of managers in a results-based environment. In order to understand the type of information that is required from these activities, an agency needs to clearly delineate the types of decision-making that managers must perform. Some types of decision-making may require very complex information, while other decision-making requires relatively straightforward information. The draft models are based on the level of complexity of information required from the evaluation and performance measurement activities within an organization.
Through the case studies during the initial phase of the project, the study team found ten main characteristics of agencies that were related to the complexity of information that they required for decision-making. These included:By systematically assessing each of these characteristics, an agency should be able to determine to what extent it has, overall, complex information needs, straightforward information needs, or information needs that are positioned somewhere in between. Depending on their information needs, the agency will need to design and deliver its evaluation and performance measurement activities accordingly.
Component 2:Once an organization has determined the type of information that it requires (e.g., complex, straightforward), it can then be determined how the evaluation and performance activities could be designed and delivered within the organization. Some areas of consideration include:
How each of these areas is addressed should be linked directly to the actual type of information required from these activities. For example, indicator development could range from multiple level indicators with various levels of roll-up for complex information needs, to the systematic collection of data on three or four good indicators for relatively straightforward information needs.
Component 3:The final component of the models is the actual outcomes from the evaluation and performance measurement activities. These should relate directly to the original rationale for the activities (Component 1), and the assessment of management's information needs for decision-making. The main areas to be considered in this component are:
Frequency of evaluation studies;The validation exercise for the three models of performance measurement and evaluation activities in small agencies has been broken down into four main steps. We anticipate that it will take you approximately 30 to 45 minutes to walk through the exercise and record your responses directly on the document. Once completed, please return to the study team in the envelope provided.
| No knowledge | Novice | Intermediate | Advanced |
Each of the questions below is based on the dimensions that the study team found were related to the complexity of information needed by management to make decisions. Please check the most appropriate response for your specific agency. If none of the responses are appropriate, please write your response next to the other response categories.
Number of business lines or programsThe assessment of complexity of information needs will assist in determining the model of activities that will likely be most useful to your organization. Using the table below, count the number of times in Step One you indicated each response (A, B or C). Choose the model for the category where most of your responses occur. Then move on to the model indicated for Step Three.
| Response Type | # indicated | Description | For Step Three go to |
| "A" Responses | It is likely that your organization has relatively straightforward information needs for decision-making | Model A Straighforward Information Needs |
|
| "B" Responses | It is likely that some of your information needs are relatively straightforward, while their are some charactersitics of your organization that require more complex types of information. | Model B Blend of Straightforward and Complex Information Needs |
|
| "C" Responses | It is likely that your organization has charactersitics that make the information needs relatively complex. | Model C Complex Information Needs |
|
| Total | 12 |
If your scores tended to fall relatively evenly across the three categories, or were evenly split between two categories, it will be important to review all the models in Step Three to determine which is the most likely fit for your agency.
For each area, indicate whether your organization is currently at the level described, whether the area is currently under consideration, or whether there are no current plans to include that area in the organization's evaluation and performance measurement (PM) activities.
| Under Consideration With Plans for Full Development Within... | ||||||
| Current Situation | 12 Months | 24 Months | 36 Months | Not Under Consideration | Comments | |
| Design and Delivery | ||||||
| Evaluation planning that links into strategic planning for the agency (may be done on a cycle or annually) | ||||||
| Planned periodic evaluation studies that focus on both impacts and processes | ||||||
| Some limited ability to respond to small ad hoc evaluation requests as required | ||||||
| Linking of activities, outputs, outcomes on an overall agency perspective (results chain, logic model) | ||||||
| Linking of activities outputs outcomes for each individual program/business line that can be rolled up into the agency perspective (results chain, logic model) | ||||||
| Clearly defined roles and responsibilities for different aspects of information collection and compilation across a small group of people, a few units/branches and a few partner organizations | ||||||
| Three to four levels of indicators according to different levels of need for information (e.g., program managers, directors, management committee, etc.) | ||||||
| Solid, planned information system that feeds a roll-up of information on a periodic basis according to various levels of indicators | ||||||
| Internal capacity to design, plan and manage evaluation studies focused on either impacts or processes | ||||||
| Internal capacity to develop and monitor activities associated with the performance measurement strategy | ||||||
| Periodic external resources required to implement and conduct evaluation studies | ||||||
| Periodic external resources required to provide expertise in development and adjustment of frameworks and measurement strategies | ||||||
| Identified, planned process for periodic integration of performance measurement and evaluation information with other management activities | ||||||
| Outcomes | ||||||
| Cycle or multi-year plan for evaluation activities | ||||||
| Some limited ability to respond to small ad hoc evaluation requests | ||||||
| Evaluation reports are timely and relevant in meeting the information needs of management | ||||||
| Evaluation plan is linked to strategic planning for organization | ||||||
| Performance measurement information is fed on a periodic basis (at least quarterly) into the management activities on various levels | ||||||
| Evidence of solid performance measurement and evaluation information being used in external reporting requirements (DPRs, RPPs, Annual Reports) | ||||||
| Evidence of solid PM and evaluation information being used in internal decision-making processes | ||||||
| Clear identification, tracking and reporting of immediate outcomes on a periodic basis for the organization | ||||||
For each area, indicate whether your organization is currently at the level described, whether the area is currently under consideration, or whether there are no current plans to include that area in the organization's evaluation and performance measurement (PM) activities.
| Under Consideration With Plans for Full Development Within... | ||||||
| Current Situation | 12 Months | 24 Months | 36 Months | Not Under Consideration | Comments | |
| Design and Delivery | ||||||
| Evaluation planning that links into strategic planning for the agency (may be done on a cycle or annually) | ||||||
| Planned periodic evaluation studies that focus on both impacts and processes | ||||||
| Some limited ability to respond to small ad hoc evaluation requests as required | ||||||
| Linking of activities, outputs, outcomes on an overall agency perspective (results chain, logic model) | ||||||
| Linking of activities outputs outcomes for each individual program/business line that can be rolled up into the agency perspective (results chain, logic model) | ||||||
| Clearly defined roles and responsibilities for different aspects of information collection and compilation across a small group of people, a few units/branches and a few partner organizations | ||||||
| Three to four levels of indicators according to different levels of need for information (e.g., program managers, directors, management committee, etc.) | ||||||
| Solid, planned information system that feeds a roll-up of information on a periodic basis according to various levels of indicators | ||||||
| Internal capacity to design, plan and manage evaluation studies focused on either impacts or processes | ||||||
| Internal capacity to develop and monitor activities associated with the performance measurement strategy | ||||||
| Periodic external resources required to implement and conduct evaluation studies | ||||||
| Periodic external resources required to provide expertise in development and adjustment of frameworks and measurement strategies | ||||||
| Identified, planned process for periodic integration of performance measurement and evaluation information with other management activities | ||||||
| Outcomes | ||||||
| Cycle or multi-year plan for evaluation activities | ||||||
| Some limited ability to respond to small ad hoc evaluation requests | ||||||
| Evaluation reports are timely and relevant in meeting the information needs of management | ||||||
| Evaluation plan is linked to strategic planning for organization | ||||||
| Performance measurement information is fed on a periodic basis (at least quarterly) into the management activities on various levels | ||||||
| Evidence of solid performance measurement and evaluation information being used in external reporting requirements (DPRs, RPPs, Annual Reports) | ||||||
| Evidence of solid PM and evaluation information being used in internal decision-making processes | ||||||
| Clear identification, tracking and reporting of immediate outcomes on a periodic basis for the organization | ||||||
For each area, indicate whether your organization is currently at the level described, whether the area is currently under consideration, or whether there are no current plans to include that area in the organization's evaluation and performance measurement (PM) activities.
| Under Consideration With Plans for Full Development Within... | ||||||
| Current Situation | 12 Months | 24 Months | 36 Months | Not Under Consideration | Comments | |
| Design and Delivery | ||||||
| Annual evaluation planning that links into strategic planning for the organization | ||||||
| Planned periodic evaluation studies that focus on both impacts and processes | ||||||
| Ability to respond to most ad hoc evaluation requests as required | ||||||
| Linking of activities, outputs, outcomes on an overall agency perspective (results chain, logic model) | ||||||
| Linking of activities outputs outcomes for each individual program/business line that can be rolled up into the agency perspective (results chain, logic model) | ||||||
| Clearly defined roles and responsibilities for different aspects of information collection and compilation across numerous people, units/branches and a various partner organizations | ||||||
| Multiple levels of indicators according to different levels of need for information (e.g., program managers, directors, management committee, etc.) | ||||||
| Relatively complex information system that feeds a roll-up of information on an ongoing basis according to various levels of indicators | ||||||
| Internal capacity to design, plan and manage evaluation studies focused on either impacts or processes | ||||||
| Internal capacity to develop and monitor activities associated with the performance measurement strategy | ||||||
| Internal capacity to develop and monitor activities associated with the performance measurement strategy | ||||||
| Periodic external resources required to implement and conduct evaluation studies | ||||||
| Periodic external resources required to provide expertise in development and adjustment of frameworks and measurement strategies | ||||||
| Identified, planned process for periodic integration of performance measurement and evaluation information with other management activities | ||||||
| Outcomes | ||||||
| Annual plan for evaluation activities | ||||||
| Readily able to respond to small ad hoc evaluation requests | ||||||
| Evaluation reports are timely and relevant in meeting the information needs of management | ||||||
| Annual evaluation plan is linked to strategic planning for organization | ||||||
| Performance measurement information is fed on a periodic basis (at least quarterly) into the management activities on various levels | ||||||
| Evidence of solid performance measurement and evaluation information being used in external reporting requirements (DPRs, RPPs, Annual Reports) | ||||||
| Evidence of solid PM and evaluation information being used and integrated into internal decisionmaking processes | ||||||
| Clear identification, tracking and ongoing reporting of immediate outcomes for the organization | ||||||
| Evidence of use of PM/evaluation information for decisions about resource allocation | ||||||
1. To what extent did the exercise assist you in any of the following:
2. Taking into account the wide diversity within the small agency community, do the models proposed accurately reflect the activities in evaluation and performance measurement that could be carried out in different types of small agencies?
3. What are your suggestions for changes to either the exercise or the models themselves to make them more useful for the small agency community?
4. How could TBS best assist you within the upcoming 12-18 months in meeting the evaluation/performance measurement needs of your organization?
Please check off from the list below the three capacity building options that you feel would most benefit your organization at this time.
Thank you very much for your participation.
Please place the completed validation exercise in the envelope provided and call the consultant group at 230-5577 for pick-up service.
| Level | #(%) |
| No knowledge | 0(0%) |
| Novice | 4(18%) |
| Intermediate | 13(59%) |
| Advanced | 5(23%) |
| #of lines | #(%) |
| One | 13(59%) |
| Two or Three | 6(27%) |
| Four or more | 3(14%) |
| Risk Level | #(%) |
| Low | 12(55%) |
| Medium | 9(40%) |
| High | 1(5%) |
| Predictability | #(%) |
| Very | 2(9%) |
| Somewhat | 13(59%) |
| Not at all | 7(32%) |
| Number of FTEs | #(%) |
| Less than 50 | 9(40%) |
| 50 to 150 | 7(32%) |
| More than 150 | 6(27%) |
| Percentage Gs&Cs | #(%) |
| Less than 15% | 19(86%) |
| 15% to 30% | 1(5%) |
| More than 30% | 2(9%) |
| Emphasis | #(%) |
| More emphasis on process | 2(9%) |
| Equal emphasis on process and impacts | 16(73%) |
| More emphasis on impacts | 4(18%) |
| Model | #(%) |
| Model A: Straightforward Information Needs | 8(36%) |
| Model B: Blend of Straightforward and Complex Information Needs | 13(59%) |
| Model C: Complex Information Needs | 1(5%) |
| Gaps | #(%) |
| Few or no gaps (85%-100% current situation for elements) | 3(14%) |
| Some gaps (50%-84% current situation for elements) | 5(23%) |
| Many gaps (less than 50% current situation for elements | 14(64%) |
| Capacity Building Options | #(%) |
| General tools and toolkit | 9(41%) |
| Demonstration projects | 5(23%) |
| Individual agency projects | 8(36%) |
| TBS assistance: prep of RFPs, contracts, etc | 10(45%) |
| Assistance from medium/large departments | 2(14%) |
| Shared service solution | 7(32%) |